Project Developed and Implemented
Total Page:16
File Type:pdf, Size:1020Kb
2015-2021 PROJECT DEVELOPED AND IMPLEMENTED List of main activities of “Automated systems and complexes” company for the period of 2015 - 2021. A complete list of activities you will find at our company site WWW.ASC-URAL.RU METALLURGY FERROUS METALLURGY Modernization of electric drives and control systems PJSC “Seversky pipe works”, 2021 the wheel machine. Polevskoy, Sverdlovsk region. Modernization of electric drives and control system of the sizing PJSC “Seversky pipe works”, 2021 mill. Polevskoy, Sverdlovsk region. Modification of the control controller software within the PJSC “Seversky pipe works”, 2020 framework of work on the replacement of frequency converters Polevskoy, Sverdlovsk region. of an electric bridge casting crane with a capacity of 225 / 80t CCM. Modernization of the control system of the continuous pickling OJSC “Novolipetsk steel mill”, 2021 unit. Lipetsk. System of address accounting of products "3D warehouse". OJSC Severstal - Metiz, 2021 Cherepovets. Process parameters control system (dispatching system). OJSC Severstal - Metiz, 2021 Cherepovets. Reconstruction of the technological process control system PJSC Severstal, 2020 catfish radial 2-stream UNRS No. 5. Cherepovets Modernization of the control system of the finishing group of NLMK-Ural JSC, 2020 stands Nizhnie Sergi town, Sverdlovsk region. SIMAC. Commissioning of electric drives and process control systems Busan, 2020 for a section rolling mill at the Daehan Sinpyeong plant. South Korea Commissioning works on electric drives and automated process El Marakby Steel, Giza, 2020 control system of the section mill. Egypt Commissioning works on electric drives and process control Metallurgical plant of the Posco company, 2020 system of the section mill of the POSCO steel company. Pohang, South Korea. Commissioning works on electric drives and APCS of the section Moon Iron & Steel Company (Misco), 2020 mill of the casting and rolling complex. Sohar, Oman. Modernization of electric drives of the reduction mill. PJSC "Sinarsky Pipe Plant", Kamensk-Uralsky, 2020 Sverdlovsk Region. Modernization of the coupling-cutting line. PJSC "Sinarsky Pipe Plant", 2020 Kamensk-Uralsky, Sverdlovsk region. Modernization of the control system of the hydrogen station. PJSC "Novolipetsk Metallurgical Plant", 2020 Lipetsk. Pipe heat treatment complex. PJSC "Seversky Pipe Plant", 2020 Polevskoy, Sverdlovsk region Modernization of DC converters of the main drives of the pre- EVRAZ NTMK JSC, 2020 finishing group of stands GUK2 and VK2 of the universal beam Nizhny Tagil, Sverdlovsk Region. mill of the wide-flange beams rolling shop. www.asc-ural.ru 3 Modernization of the APR-6 control system in the cold rolling LLC "VIZ-Steel", 2020 shop. Yekaterinburg city. Light and sound signaling of the UGM-RBC highway crossing. JSC "EVRAZ NTMK", 2020 Nizhny Tagil, Sverdlovsk region Design, supply and commissioning of equipment for a new SMS Group GmbH, 2019 high-pressure system for roll cleaning for PJSC Seversteel, Germany. 2019 Cherepovets. Light and sound signaling of the UGM-RBC highway crossing. EVRAZ NTMK JSC, 2019 Nizhny Tagil, Sverdlovsk region The software has been developed and a large diameter pipe LSAW Al Gharbia Pipe Company (AGPC), 2019 handling system has been put into operation. Abu Dhabi, United Arab Emirates. Modernization of the production line for the production of PJSC "Sinarsky Pipe Plant", 2019 EMAG couplings. Kamensk-Uralsky, Sverdlovsk region. Software for automation of large diameter welded pipe Corinth Pipe Works (CPW), 2019 handling system. city Thisvi, Greece. Commissioning of electric drives at the reconstructed section of Daehan Sinpyeong rolling mill, 2019 the light section hot rolling mill. Busan, South Korea. Design, supply and commissioning of electrical equipment for PJSC "Ashinskiy Metallurgical Plant", 2019 the drive of the push device for mill "1500" LPC-2. Asha town, Chelyabinsk region. Replacement and commissioning of the billet transport control JSC "Oskol Electrometallurgical combine ", 2019 controller and auxiliary systems at the DUO stand section of mill Stary Oskol, Belgorod region. 1000. Modernization of electrical equipment and process control LLC "VIZ-Steel", 2019 system of mill 1200-1. Yekaterinburg city. Automatic control system for hydraulic descaling from the strip. PJSC "Magnitogorsk Metallurgical combine ", 2019 Magnitogorsk, Chelyabinsk region. Development and delivery of software for RM1 mill. PJSC "Tulachermet", 2019 Tula. Process control system for internal pipe polishing f. DELMET OOO "TMK-Inoks", 2019 (Italy). Kamensk-Uralsky, Sverdlovsk region. Modernization of the production line for the production of PJSC "Sinarsky Pipe Plant", 2019 EMAG couplings. Kamensk-Uralsky, Sverdlovsk region. Modernization of a 20-roll reversing cold mill rolling Sundwig PJSC "Ashinskiy Metallurgical Plant", 2019 720. Asha town, Chelyabinsk region. Automation systems for the casting and section rolling complex. PJSC "Tulachermet", 2019 Tula. Modernization of mills 240 and 250-2. Development of technical PJSC "Chelyabinsk Metallurgical Plant", 2018 and working projects of electrical equipment, electric drives and Chelyabinsk. automation systems. Development of working documentation, implementation PJSC "Sinarsky Pipe Plant", 2018 of installation and commissioning works for the object of Kamensk-Uralsky, Sverdlovsk region workshop T-4. Basic machine VSC400. Modernization of the control system of the tempering mill # 1. JSC "Novolipetsk Metallurgical Plant", 2018 Lipetsk. Repair of electrical equipment and automated systems control JSC "Beloretsk Metallurgical Plant" 2018 of crank shears. Beloretsk, Bashkortostan. 4 Data as of March 2021 Modernization of automation systems of continuous casting EVRAZ NTMK JSC, 2018 machine # 1 in CV # 1 ONRS. Nizhny Tagil, Sverdlovsk region DC drive control systems for a two-high reversing mill stand JSC “Oskolsky electrometallurgical works”, 2018 roller table in hot rolling mill area of long product rolling plant. Stariy Oskol, Belgorod region. Replacement of control system and management of continuous LLC “VIZ-Stal”, 2018 and accurate tension fixing on coilers of decarburization Ekaterinburg. annealing plant-4B. Start-up of control system for pipe degreasing and washing PJSC “Sinarsky pipe works”, 2018 tanks. Kamensk-Uralskiy, Sverdlovsk region. Start-up of control system for ultrafiltration plant MINERVA C500 PJSC “Sinarsky pipe works”, 2018 with deoiling device. Kamensk-Uralskiy, Sverdlovsk region. Revamping of control system for strand core and roll changers OJSC “Novolipetsk steel mill”, 2018 of mill 1400. Lipetsk. Adjustment of DC drive Sinamics DCM. PJSC “Nadezhdinsky metallurgical works”, 2018 Serov, Sverdlovsk region. Revamping of 20-high reversing cold rolling mill Sundwig 720. PJSC “Asha metallurgical works”, 2018 (The first stage completed). Asha, Chelyabinsk region. Upgrading of 20-high cold reversing mill Sundwig 720. (The first PJSC “Asha metallurgical works”, 2018 stage completed). Asha, Chelyabinsk region. Automated strip thickness gage system. JSC “ELECTROSTAL” Metallurgical works”, 2017 Electrostal, Moscow region. Automated control system for drying and heating stand of JSC “Kama iron and steel works (KMK) 2017 intermediate and steel ladles. “TEMPO”, Naberezhnye Chelny, Tatarstan. Revamping of crane (20/5 tons) of ingot storing bay (melting PJSC “Seversky pipe works”, 2017 shop). Polevskoy, Sverdlovsk region. Revamping of roll cooling system of mill “2000” finishing train. PJSC “MMK”, 2017 Supervised installation, start-up and commissioning. Magnitogorsk, Chelyabinsk region. Supply of thyristor converters for DC drive of sizing mill No.2 JSC “Volzhsky pipe works”, 2017 (pipe rolling plant No.1). Volzhsky, Volgograd region. Revamping of control circuits for two sizing presses LAEIS (pipe PJSC “Seversky pipe works”, 2017 rolling plant No.1). Polevskoy, Sverdlovsk region. Electric arc furnace DSP-1,5. Upgrading of electrode positioning PJSC “Seversky pipe works”, 2017 drives. Polevskoy, Sverdlovsk region. Automated control system for lime furnace. JSC “EVRAZ NTMK”, 2017 Nizhny Tagil, Sverdlovsk region. Electric equipment for universal transversal rolling mill. CJSC “Izhevsk experimental mechanical 2017 plant”, Izhevsk, Udmurtia. Modernization of the main drive of the calibration mill. OJSC “Sinarsky Pipe plant”, 2017 Kamensk-Uralsky, Sverdlovsk region. Technical re-equipment of the control system of the five- ‘‘Nadezhdinsky metallurgical plant” PJSC, 2017 machine mill drive unit 850. Serov, Sverdlovsk region. The system of diagnostic archives of the seamless pipe mill FQM Severskiy tube plant, 2017 TPC 1. Polevskoi, Sverdlovsk region. www.asc-ural.ru 5 Technical re-equipment of hydrogen production with a “VIZ-Stal” LLC, 2017 reformer. Ekaterinburg. Reconstruction of thyristor converters of the main drives of the JSC PNTZ, 2017 TPU30-102 mill. Pervouralsk, Sverdlovsk Region. Technical re-equipment of the nine-cage gauge mill. OJSC “Sinarsky Pipe plant”, 2017 Kamensk-Uralsky, Sverdlovsk region. Software for the automation of the long products mill of SMS- PJSC «Tulachermet», 2017 Group. Tula. The system of address registration of products (3D warehouse). PJSC Severstal, 2017 Cherepovets. Automated control system for furnace installations for the PJSC «Tulachermet», 2017 limestone-calcining site. Tula. Service maintenance of process control systems and electric LLC Irbit Pipe Plant Metallinvest, 2017 drives of the welded pipe production line. Irbit, Sverdlovsk Region. Modernization of the annular