For Sale 11,318 Sq

Total Page:16

File Type:pdf, Size:1020Kb

For Sale 11,318 Sq 1016-1018 FOR SALE 11,318 SQ. FT. LAND S. ALMADEN AVENUE OFFICE / RETAIL / MIXED-USE SAN JOSE, CA Ideal Development Opportunity Willow Street South Almaden Avenue PROPERTY SUMMARY FEATURES LOCATION: 1016 - 1018 South Almaden Aveune • Signalized corner lot San Jose, CA 95110 • Less than 2 miles from: Negotiable ASKING PRICE: -Downtown San Jose LAND SIZE: Approximately 11,318 sq. ft. (buyer to verify) -Diridon and Tamien Caltrain stations APN: 434-07-087 Zoning: CP (More Info link) 434-07-0 88 Zoning: R-M (M ore Info link) • Close proximity to all major freeways GENERAL PLAN: M.U.C - Mixed-use commercial (More Info link) • Wide range of development uses • Ideal residential or retail development opportunity For further information or to schedule a tour, please contact: Lloyd H. Bakan Wendy Leung, CCIM Principal Vice President 650.425.6418 650.425.6416 [email protected] [email protected] CA License # 00914232 CA License # 01407609 The above statement was made based upon information furnished to us by the owner or from sources we believe are reliable. While we do not doubt its accuracy, we have not verified it and we do not make any guarantee, warranty or representation about it. The property offered is subject to prior sale, lease, change of price or withdrawal from the market without notice. 1016-1018 S. ALMADEN AVE SAN JOSE, CA Vehicles Street Per Day Frontage Land Size Zoning 10,175 VPD 129’ on 1016 S. Almaden 11,318 sq. ft. CP (APN: 434-07-087) 40’ on 1018 S. Almaden (0.26 acres) R-M (APN:434-07-088) General Plan SJ 2040: Zoning M.U.C For further information or to schedule a tour, please contact: Lloyd H. Bakan Wendy Leung, CCIM Principal Vice President 650.425.6418 650.425.6416 [email protected] [email protected] CA License #00914232 CA License # 01407609 1016-1018 S. ALMADEN AVE SAN JOSE, CA Downtown San Jose Diridon Station 1016-1018 S Almaden 10 Min. Drive Time 5 Min. Drive Time Tamien Station Demographics 1-Mile 3-Miles 5-Miles 2016 Estimated Population 41,297 272,942 715,864 2016 Census Population 37,435 249,209 662,606 2016 Estimated Households 13,542 90,565 228,850 2016 Census Households 12,153 82,513 212,562 Median Household Income $50,233 $65,020 $75,256 Per Capita Income $28,861 $33,671 $34,654 Average Household Income $82,986 $99,470 $107,191 For further information or to schedule a tour, please contact: Lloyd H. Bakan Wendy Leung, CCIM Principal Vice President 650.425.6418 650.425.6416 [email protected] [email protected] CA License #00914232 CA License # 01407609 1016-1018 S. ALMADEN AVE SAN JOSE, CA # San Jose’s Top Employers Employees 1 County of Santa Clara 17,476 San Jose Airport 2 Cisco Systems 15,470 Santa Clara Station 3 eBay 6,130 College Park Station 4 City of San Jose 5,928 Downtown 5 San Jose State University 4,480 Diridon Station San Jose 6 U.S. Postal Service 3,900 7 Western Digital 2,660 8 IBM 2,360 Tamien Park Station 1016-1018 S Almaden 9 San Jose USD 2,320 10 Kaiser Permanente 2,290 Capitol Station 11 Good Samaritan Hospital 2,110 12 Adobe Systems, Inc. 2,010 CLOSE PROXIMITY TO: San Jose Airport Major Freeways Schools Public Downtown Transportaion San Jose For further information or to schedule a tour, please contact: Lloyd H. Bakan Wendy Leung, CCIM Principal Vice President 650.425.6418 650.425.6416 [email protected] [email protected] CA License #00914232 CA License # 01407609 1016-1018 S. ALMADEN AVE SAN JOSE, CA San Jose Market Overview San Jose is a global city, notable as a center of innovation, for its affluence and high cost of living. San Jose’s location within the booming high tech industry, as a cultural, political, and economic center has earned the city the nickname “Capital of Silicon Valley”. San Jose is one of the wealthiest major cities in the United States and the world, and has the third highest GDP per capita in the world (after Zurich, Switzerland and Oslo, Norway), according to the Brookings Institution. With a median home price of $1,085,000, San Jose has the most expensive housing market in the country and the fifth most expensive housing market in the world, according to the 2017 Demographia International Housing Affordability Survey. Major global tech companies including Cisco Systems, eBay, Cadence Design Systems, Adobe Systems, PayPal, Brocade, Samsung, Acer, and Western Digital maintain their headquarters in San Jose, in the center of Silicon Valley. A large concentration of major employers, like Adobe, Morgan Stanley and Pricewaterhouse Cooper (PwC) are located in Downtown San Jose, which is less than 1 1 2 mile from the subject property in what is referred to, in combination with the Downtown area, Central San Jose . The Downtown boasts an impressive network of public transportation consisting of an abundance of bus stops, light rail stations and also Caltrain, where future residents of this site will be able to take advantage of convenient commutes throughout the immediate area and up the Peninsula to San Francisco. San Jose State University, located about 1 1 2 mile from the subject property, also a major employer and respected institution of higher learning in the region, and has become a destination for many local and international students looking to get an education in the technology capital of the world. For further information or to schedule a tour, please contact: Lloyd H. Bakan Wendy Leung, CCIM Principal Vice President 650.425.6418 650.425.6416 [email protected] [email protected] CA License #00914232 CA License # 01407609.
Recommended publications
  • Caltrain TIRCP Application Jan
    PENINSULA CORRIDOR JOINT POWERS AUTHORITY APPLICATION FOR 2018 TRANSIT AND INTERCITY RAIL CAPITAL PROGRAM FUNDS PROJECT NARRATIVE A. Project Title Page Project Title: Peninsula Corridor Electrification Expansion Project The Peninsula Corridor Electrification Expansion Project (EEP) includes a series of incremental investments in the 51-mile Caltrain Corridor between the 4th and King Station (San Francisco) and the Tamien Station (San Jose). These investments are focused on expanding and fully converting Caltrain’s mainline diesel fleet to electric trains. This investment builds on and leverages the existing Peninsula Corridor Electrification Project (PCEP) and supports the goals of the Transit and Intercity Rail Capital Program (TIRCP), providing increased capacity and service flexibility, supporting state and interregional connectivity, and reducing greenhouse gas emissions through elimination of diesel service from the mainline Peninsula Corridor. In addition to providing immediate, direct benefits, the EEP also represents an incremental step within a larger program of development that will evolve the Peninsula Corridor in a way that supports the ridership, service levels, and connectivity goals contemplated in the draft 2018 State Rail Plan. The central component of Caltrain’s 2018 TIRCP application is the purchase of 96 additional Electric Multiple Units (EMU). This procurement will fully exercise all available options under Caltrain’s current contract with Stadler and will provide sufficient EMUs to fully electrify Caltrain’s mainline fleet, while also sustaining and expanding capacity to accommodate growing demand. In addition to requesting funds for the purchase of EMUs, Caltrain is also requesting a smaller amount funding for a series of associated projects that will equip the corridor to receive and operate a fully electrified fleet in a way that allows the railroad to reap the maximum benefit from its investments.
    [Show full text]
  • 2004 Draft EIS/EIR Chapter 4.2: Transportation and Transit
    Silicon Valley Rapid Transit Corridor Draft EIS/EIR 4.2 TRANSPORTATION AND TRANSIT 4.2.1 INTRODUCTION This section discusses existing and future transportation conditions in the SVRTC and quantifies the expected long-term transportation impacts of the No-Action, Baseline, and BART alternatives. Existing and projected future transit services, forecasts of transit patronage, and impacts on travel patterns and the transportation environment are described, as well as existing and projected vehicular traffic, circulation, parking, and non-motorized conditions in the corridor. Traffic operations under each of the project alternatives during the peak hour are evaluated, with emphasis on intersection level of service, and measures are identified for mitigating adverse impacts of the Baseline and BART alternatives on the roadway network. Short-term construction-phase impacts are discussed in Section 4.19, Construction. Future transit patronage and vehicular traffic volumes were developed using an enhanced version of the Metropolitan Transportation Commission (MTC) regional model. Transportation modeling approaches, assumptions, baseline projects, and projections for existing conditions under the Baseline and BART alternatives are described in the Travel Demand Modeling Methodology Report, Travel Demand Forecasts Report, and three traffic impact analysis reports addressing the station areas in the cities of Milpitas, San Jose, and Santa Clara (Hexagon Transportation Consultants, Inc., 2003)1. These reports form the basis for much of the information in this section. 4.2.2 REGULATORY SETTING 4.2.2.1 Alameda County Congestion Management Agency Level of Service Policies The Alameda County Congestion Management Agency (ACCMA) Land Use Analysis Program requires a level of service analysis for roadway segments within a study area if 100 evening peak hour vehicle trips are generated by a proposed project (see Section 4.2.6.2 for definitions of level of service).
    [Show full text]
  • BLUE LINE Light Rail Time Schedule & Line Route
    BLUE LINE light rail time schedule & line map Baypointe View In Website Mode The BLUE LINE light rail line (Baypointe) has 2 routes. For regular weekdays, their operation hours are: (1) Baypointe: 12:29 AM - 11:46 PM (2) Virginia: 12:16 AM - 11:33 PM Use the Moovit App to ƒnd the closest BLUE LINE light rail station near you and ƒnd out when is the next BLUE LINE light rail arriving. Direction: Baypointe BLUE LINE light rail Time Schedule 17 stops Baypointe Route Timetable: VIEW LINE SCHEDULE Sunday 12:30 AM - 10:20 PM Monday Not Operational Virginia Station West Virginia Street, San Jose Tuesday Not Operational Children's Discovery Museum Station Wednesday 12:29 AM - 11:46 PM Convention Center Station Thursday 12:29 AM - 11:46 PM 300 Almaden Bl, San Jose Friday 12:29 AM - 11:46 PM San Antonio Station Saturday 12:29 AM - 11:47 PM 200 S 1st St, San Jose Santa Clara Station Fountain Alley, San Jose BLUE LINE light rail Info Saint James Station Direction: Baypointe Stops: 17 Japantown/Ayer Station Trip Duration: 33 min 15 Hawthorne Way, San Jose Line Summary: Virginia Station, Children's Discovery Museum Station, Convention Center Station, San Civic Center Station Antonio Station, Santa Clara Station, Saint James 800 North 1st Street, San Jose Station, Japantown/Ayer Station, Civic Center Station, Gish Station, Metro/Airport Station, Karina Gish Station Court Station, Component Station, Bonaventura North 1st Street, San Jose Station, Orchard Station, River Oaks Station, Tasman Station, Baypointe Station Metro/Airport Station 1740 North First
    [Show full text]
  • Route(S) Description 26 the Increased Frequency on the 26 Makes the Entire Southwestern Portion of the Network Vastly More Useful
    Route(s) Description 26 The increased frequency on the 26 makes the entire southwestern portion of the network vastly more useful. Please keep it. The 57, 60, and 61 came south to the area but having frequent service in two directions makes it much better, and riders from these routes can connect to the 26 and have much more areas open to them. Thank you. Green Line The increased weekend service on the Green line to every twenty minutes is a good addition of service for Campbell which is seeing markedly better service under this plan. Please keep the increased service. Multiple Please assuage public concerns about the 65 and 83 by quantifying the impact the removal of these routes would have, and possible cheaper ways to reduce this impact. The fact is that at least for the 65, the vast majority of the route is duplicative, and within walking distances of other routes. Only south of Hillsdale are there more meaningful gaps. Mapping the people who would be left more than a half mile (walkable distance) away from service as a result of the cancellation would help the public see what could be done to address the service gap, and quantifying the amount of people affected may show that service simply cannot be justified. One idea for a route would be service from winchester transit center to Princeton plaza mall along camden and blossom hill. This could be done with a single bus at a cheaper cost than the current 65. And nobody would be cut off. As far as the 83 is concerned, I am surprised the current plan does not route the 64 along Mcabee, where it would be eq..
    [Show full text]
  • TRANSPORTATION and TRANSIT /  with the Santa Teresa to Alum Rock Line on 1St Street 4.2.2 Transit Between Downtown San Jose and Tasman Drive
    \\\\\\\\ \\\\\\\\ \\\\\\\\ \\\\\\\\ \\\\\\\\ \\\\\\\\ \\\\\\\\ 4.2 \\\\\\\\ \\\\\\\\ \\\\\\\\ \\\\\\\\ TRANSPORTATION \\\\\\\\ AND TRANSIT \\\\\\\\ 4.2.1 IntroductIon traffic impact reports are listed below and form the basis for much of the information in this section. This section discusses existing and future o Milpitas BART Stations Transportation Impact transportation conditions in the study area, and quan- Analysis, Draft, Hexagon Transportation tifies the expected long-term transportation impacts Consultants, Inc., September 20, 2006. of the Without Project and BART Extension Project. o San Jose BART Stations Transportation Impact Existing and projected future transit services, forecasts Analysis, Draft, Hexagon Transportation of transit patronage, and impacts on travel patterns Consultants, Inc., August 30, 2006. and the transportation environment are described, o Santa Clara BART Stations Transportation as well as existing and projected vehicular traffic, Impact Analysis, Draft, Hexagon Transportation circulation, parking, and non-motorized conditions Consultants, Inc., August 24, 2006. in the study area. Traffic operations during the peak hour are evaluated, with emphasis on intersection The analysis for the SEIR underwent a major change in levels of service (LOS), and measures are identified that the forecast year is 2030, rather than 2025 as used in for mitigating significant impacts on the roadway net- the FEIR. As a result of the new forecast year, new base work. Short-term construction-phase impacts are dis- year traffic counts, new modeling, updated demographic cussed in Section 4.18, Construction. data with ABAG projections and other assumptions, this Future transit patronage and vehicular traffic section has been updated since the FEIR. The regulatory volumes were developed using an enhanced version of setting did not change from the FEIR.
    [Show full text]
  • Vta Replacement Parking Study
    Santa Teresa Station PREPARED FOR METROPOLITAN TRANSPORTATION COMMISSION VTA REPLACEMENT PARKING STUDY FINAL REPORT Smart Growth Technical Assistance Task Order 4-11 EISEN| LETUNIC TRANSPORTATION, ENVIRONMENTAL MARCH 2012 AND URBAN PLANNING VTA Replacement Parking Study Metropolitan Transportation Commission Table of Contents Page Executive Summary ............................................................................................................... ES-1 1 Introduction ......................................................................................................................1-1 2 Parking Demand Analysis ...............................................................................................2-1 Observed Parking Demand ................................................................................................................. 2-1 Modeled Parking Demand ................................................................................................................... 2-1 3 Scenario Analysis ............................................................................................................3-1 4 Recommended Replacement Parking Policy ....................................................................4-1 Guiding Principles .................................................................................................................................. 4-1 Station-Specific Replacement Parking Analysis ............................................................................... 4-2 Table of Figures
    [Show full text]
  • Grading California's Rail Transit Sta on Areas Appendix LEGEND
    ! Grading California's Rail Transit Sta3on Areas Appendix LEGEND: CONTENTS: Group 1 - Residen<al • BART Final Scores • LA Metro Final Scores Group 2 - Mixed • Sacramento RT Final Scores • San Diego MTS Final Scores • San Francisco MUNI Final Scores Group 3 - Employment • Santa Clara VTA Final Scores A+ 95% A 80% A- 75% B+ 70% B 55% B- 50% C+ 45% C 30% C- 25% D+ 20% D 5% D- 2% F below 2% Appendix | www.next10.org/transit-scorecard Next 10 ! BART FINAL SCORES AVERAGE: C Final City Line Sta3on Raw Score Grade San SFO-MILLBRAE Civic Center/UN Plaza BART 90.60 A Francisco San SFO-MILLBRAE Montgomery St. BART 88.20 A Francisco San SFO-MILLBRAE 24th St. Mission BART 87.30 A Francisco San SFO-MILLBRAE 16th St. Mission BART 84.30 A Francisco San SFO-MILLBRAE Powell St. BART 84.10 A Francisco San SFO-MILLBRAE Embarcadero BART 83.80 A Francisco Oakland FREMONT Lake Merri] BART 77.60 A DUBLIN/PLEASANTON Berkeley Downtown Berkeley BART 74.50 A TO DALY CITY Berkeley RICHMOND Ashby BART 75.30 A- Berkeley RICHMOND North Berkeley BART 74.30 A- San SFO-MILLBRAE Glen Park BART 74.10 A- Francisco Oakland FREMONT Fruitvale BART 73.50 A- Oakland SFO-MILLBRAE 19th St. Oakland BART 72.90 B+ San SFO-MILLBRAE Balboa Park BART 69.80 B+ Francisco 12th St. Oakland City Center Oakland SFO-MILLBRAE 71.70 B BART Contra Pleasant Hill/Contra Costa Costa SFO-MILLBRAE 66.20 B Centre BART Centre Appendix | www.next10.org/transit-scorecard Next 10 ! Oakland PITTSBURG/BAY POINT MacArthur BART 65.70 B Fremont FREMONT Fremont BART 64.20 B El Cerrito RICHMOND El Cerrito Plaza
    [Show full text]
  • EXISTING CONDITIONS the State Route (SR) 87 Corridor Is a Ten-Mile Multimodal Corridor Serving Motorists, Transit Riders, Cyclists, and Pedestrians
    EXISTING CONDITIONS The State Route (SR) 87 corridor is a ten-mile multimodal corridor serving motorists, transit riders, cyclists, and pedestrians. The corridor has the following physical characteristics: • SR 87 begins at SR 85 in the south and large employment center in the north of ends at US 101 in the north, as shown in the corridor between US 101, SR 237, and I- Figure 2-1. The corridor has three system, 880 in San Jose, Santa Clara, Sunnyvale, or freeway-to-freeway, interchanges at SR and Milpitas. 85, I-280, and US 101, and 11 interchanges • Travel and congestion on the corridor providing access to mostly local roadways show a distinct travel pattern with highly in the City of San Jose. The older portion directional flows in the morning (AM) and of the freeway between SR 85 and I-280 evening (PM) peak periods. The Mineta was built in the 1970s, and the new section San Jose International Airport at the north of I-280 was completed in 2004. Skyport Drive interchange, San Jose State • SR 87 has one carpool, or high-occupancy University near downtown San Jose, the vehicle (HOV) lane, two general purpose SAP Center, and the San Jose McEnery (GP) lanes in each direction, and auxiliary Convention Center, near the Santa Clara lanes in some segments, as shown in Street interchange, are other major Figure 2-2. destinations that contribute to congestion on the corridor. • In 1991, the VTA opened an LRT line south of downtown that traverses in the median • Environmental resources within the of SR 87 for about 5.1 miles.
    [Show full text]
  • AGENDA* Amended 12/18/19, Approx
    BOARD OF DIRECTORS 2019 GILLIAN GILLETT, CHAIR DAVE PINE, VICE CHAIR CHERYL BRINKMAN JEANNIE BRUINS CINDY CHAVEZ RON COLLINS DEVORA “DEV” DAVIS CHARLES STONE SHAMANN WALTON JIM HARTNETT EXECUTIVE DIRECTOR AGENDA* Amended 12/18/19, approx. 2:30 pm PENINSULA CORRIDOR JOINT POWERS BOARD Work Program – Legislative – Planning (WPLP) /Committee Meeting San Mateo County Transit District Administrative Building Bacciocco Auditorium, 2nd Floor 1250 San Carlos Avenue, San Carlos CA 94070 TELECONFERENCE LOCATION: 70 West Hedding Street, 10th Floor, Office of Supervisor Cindy Chavez, San Jose, CA 95110 December 19, 2019 – Thursday 9:00 am 1. Call to Order/Pledge of Allegiance 2. Roll Call 3. Public Comment on Items not on the Agenda Comments by each individual speaker shall be limited to three (3) minutes. Items raised that require a response will be deferred for staff reply. 4. Approve Meeting Minutes of November 26, 2019 MOTION 5. Adoption of the 2019 Title VI Program (materials added) MOTION 6. Draft Caltrain Rail Corridor Use Policy (amended) INFORMATIONAL 7. Draft Transit Oriented Development Policy (materials added) INFORMATIONAL 8. Adoption of 2020 Legislative Program MOTION 9. Committee Member Requests 10. Date/Time of Next Regular WPLP Committee Meeting: January 22, 2020 at 3:00 pm 9:00 am, San Mateo County Transit District Administrative Building, 2nd Floor, 1250 San Carlos Avenue, San Carlos, CA 94070 11. Adjourn Committee Members: Charles Stone (Chair), Cheryl Brinkman, Cindy Chavez Page 1 of 2 Work Program-Legislative-Planning (WPLP) Committee December 19, 2019 INFORMATION FOR THE PUBLIC All items appearing on the agenda are subject to action by the Board.
    [Show full text]
  • VTA FY1819 Budget
    Search Instructions Items in this PDF version of the FY 2018 and FY 2019 Proposed Budget can be found using one of the following methods: 1) Hyperlinks in the Table of Contents. 2) Hyperlinks in the Org Charts on pages 13 and 20. 3) Hyperlinks in the Bookmarks Panel. To show the Bookmarks Panel, click on the Bookmark button in the Navigation Panel on the left of the screen. To show the Navigation Panel, right click and select “Show Navigation Panel Buttons”. 4) Find Function (Ctrl+F). 5) Search function (Shft+Ctrl+F). Please note: in some versions of Adobe Acrobat, it may be necessary to click on the “Arrange Windows” icon in the Search dialogue box for a side-by-side view of the Search dialogue box and the document text. You may also return to the Table of Contents by clicking on the page number at the bottom of any page. Santa Clara Valley Transportation Authority Santa Clara County, California Adopted Biennial Budget Fiscal Years 2018 and 2019 Adopted by the Board of Directors June 1, 2017 ABOUT VTA The Santa Clara Valley Transportation Authority (VTA) is an independent special district responsible for bus and light rail operation, regional commuter and inter-city rail service, Americans with Disabilities Act (ADA) paratransit service, congestion management, specific highway improvement projects, and countywide transportation planning. As such, VTA is both an accessible transit provider and a multi-modal transportation planning and implementation organization involved with transit, roadways, bikeways, and pedestrian facilities. VTA provides services to cities throughout Santa Clara County including Campbell, Cupertino, Gilroy, Los Altos, Los Altos Hills, Los Gatos, Milpitas, Monte Sereno, Morgan Hill, Mountain View, Palo Alto, San Jose, Santa Clara, Saratoga, and Sunnyvale.
    [Show full text]
  • Non-Railroad Use Compatibility
    VERSION 1.1 - AUGUST 2020 PENINSULA CORRIDOR JOINT POWERS BOARD NON-RAILROAD USE COMPATIBILITY APPLICATION This application is intended to help Caltrain staff determine if a proposed non-railroad use of Peninsula Corridor Joint Powers Board (JPB) property - such as utilities, commercial businesses, development proposals, or community facilities - is compatible with the railroad’s current and future needs for its property. Please consult the Caltrain website to determine if your proposed project must undergo the Caltrain Non-railroad Use Compatibility Review in compliance with the Caltrain Rail Corridor Use Policy. Please fill out all fields in the application including the project information on page 2. For additional information, please refer to the Rail Corridor Use Policy website at https://www.caltrain.com/about/doingbusiness/ Property_Access_Agreement_Process/RCUP_Review_Process.html. If you need additional assistance, please contact Caltrain staff at [email protected]. APPLICANT INFORMATION Date (mm/dd/yyyy) Legal Name of Organization or Business Business Address City State Zip Code Contact Name Contact Phone Number Contact Email Type of Organization (select one) Commercial business or developer City or government agency Utility company Other (please specify below) Other PROJECT INFORMATION Project Location (include address, parcel number, and/or describe project extents and attach RCUP map(s) with indication of project location(s)) Please attach RCUP map(s) with indication of location(s) and approximate footprint of the
    [Show full text]
  • Alternatives
    Silicon Valley Rapid Transit Corridor Draft EIS/EIR CHAPTER 3.0: ALTERNATIVES 3.1 INTRODUCTION Three alternatives are evaluated in this Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Silicon Valley Rapid Transit Corridor (SVRTC): (1) the No-Action Alternative; (2) the “New Starts” Baseline Alternative; and (3) the BART Extension Alternative. Two Minimum Operating Segment (MOS) scenarios area also identified as sub-options under the BART Alternative. This chapter describes the physical and operating characteristics of these alternatives. The chapter also includes a discussion of alternatives that were considered and withdrawn from further evaluation. 3.2 NO-ACTION ALTERNATIVE The No-Action Alternative consists of the existing transit and roadway networks and planned and programmed improvements in the SVRTC that are identified in the San Francisco Bay Area Regional Transportation Plan (RTP) through the long-range planning horizon year 2025. 3.2.1 CORRIDOR TRANSIT SYSTEM 3.2.1.1 Existing System The Santa Clara Valley Transportation Authority (VTA) currently operates 56 local bus routes, six limited stop bus routes, 11 express bus routes, and 3 light rail transit (LRT) routes, as well as 2 inter-county bus lines in its approximate 326-square-mile service area (Figure 3.2-1 and Table 3.2-1). Total fleet size to operate these fixed- route transit services is 506 buses and 50 light rail vehicles including spare vehicles. VTA also provides LRT shuttle service for major Silicon Valley employment destinations and paratransit service for seniors and the disabled community. VTA is a member of the Peninsula Corridor Joint Powers Board, which operates Caltrain service between Santa Clara, San Mateo, and San Francisco counties; the ACE rail service between San Joaquin, Alameda, and Santa Clara counties; and the Figure 3.2-1: VTA Light Capitol Corridor Joint Powers Board, which operates Rail Vehicle service from Placer County to Santa Clara County.
    [Show full text]