Comprehensive Study Report

Total Page:16

File Type:pdf, Size:1020Kb

Comprehensive Study Report Route 389 Improvement Project Between Fire Lake and Fermont Comprehensive Study Report September 2018 © Her Majesty the Queen in Right of Canada, represented by the Minister of the Environment, (September, 4th, 2018). Catalogue No: En106-211/2018F-PDF ISBN : 978-0-660-27155-2 This publication may be reproduced in whole or in part for non-commercial purposes, and in any format, without charge or further permission. Unless otherwise specified, you may not reproduce materials, in whole or in part, for the purpose of commercial redistribution without prior written permission from the Canadian Environmental Assessment Agency, Ottawa, Ontario K1A 0H3 or [email protected] This document has been issued in French under the title: Projet d’amélioration de la route 389 entre Fire Lake et Fermont - Rapport d’étude approfondie préliminaire Executive Summary The Quebec Ministère des Transports, de la Mobilité durable et de l’Électrification des transports (the proponent) is proposing a road improvement project (the project) on Route 389 between Fire Lake and Fermont to improve traffic flow and safety, enhance the link with Newfoundland and Labrador, and facilitate access to natural resources. The work includes 55.8 km of alignment on new rights-of-way and the upgrading of the existing road, for a total length of 68.9 km. Under the Canadian Environmental Assessment Act (S.C. 1992, c. 37) (the former Act), a federal environmental assessment is required since Fisheries and Oceans Canada will likely need to issue an authorization as part of the project, in accordance with the Fisheries Act, to allow for activities that result in serious harm to fish. Infrastructure Canada could also provide funding to the proponent for this project. The project is subject to a comprehensive study–type environmental assessment because it involves an activity described in section 29(b)1 of the Schedule of the Comprehensive Study List Regulations. The Canadian Environmental Assessment, 2012 (the Act), came into force on July 6, 2012, replacing the former Act. In accordance with the transition provisions of the Act, the comprehensive study for the project was completed under the former Act. The Canadian Environmental Assessment Agency (the Agency) prepared the comprehensive study in collaboration with the Federal Environmental Assessment Committee composed of representatives of Fisheries and Oceans Canada, Infrastructure Canada, Environment and Climate Change Canada, and Health Canada. In this comprehensive study report, the Agency describes the project’s effects on the following valued components: the atmospheric environment, wetlands and plant species with special status, fish and fish habitat, birds and bird habitat, terrestrial wildlife and wildlife habitat, and the current use of lands and resources for traditional purposes. The Agency assessed the significance of the effects of the project based on information provided by the proponent in its environmental impact statement and supplementary documents, opinions provided by federal and provincial experts, and comments received from the public and First Nations. The First Nations raised concerns about maintaining traditional activities, access to their traditional territory and its availability to non-Indigenous people, the preservation of the Innu archaeological and cultural heritage, the effects on the sacred Moisie River, the economic opportunities related to the project, and the effects on wildlife, particularly boreal caribou. The summary of concerns raised by First Nations can be found in Appendix G. The proponent committed to implementing mitigation measures deemed necessary by the Federal Environmental Assessment Committee and that are expected to reduce the potential environmental effects of the project. The measures include a dust management plan, work restrictions during sensitive periods for wildlife and fish habitat compensation measures. The proponent also committed to implementing a follow-up program for a number of valued components and an emergency response plan for accidents and malfunctions. 1 29(b) The proposed construction of an all-season public highway that will be more than 50 km in length and either will be located on a new right-of-way or will lead to a community that lacks all-season public highway access. ii Comprehensive Study Report – Route 389 Improvement Project Between Fire Lake and Fermont A follow-up program is required to verify the accuracy of the environmental assessment and to determine the effectiveness of the proposed mitigation measures. Fisheries and Oceans Canada and Infrastructure Canada, as responsible authorities for the project, will be responsible for ensuring the development and implementation of the federal follow-up program. Taking into account the implementation of the proposed mitigation measures and follow-up program, the Agency finds that the project is not likely to cause significant adverse environmental effects. The Minister of Environment and Climate Change will consider this report and the comments from the public and First Nations before issuing an environmental assessment decision statement. The minister will then send the project to Fisheries and Oceans Canada and Infrastructure Canada as the responsible authorities to render their decision, in accordance with section 37 of the former Act. iii Comprehensive Study Report – Route 389 Improvement Project Between Fire Lake and Fermont Table of Contents Executive Summary ........................................................................................................................................ii Table of Contents .......................................................................................................................................... iv List of Tables ............................................................................................................................................... viii List of Figures ................................................................................................................................................ ix List of Abbreviations and Acronyms ................................................................................................................ x 1 Introduction .......................................................................................................................................... 1 1.1 Project Introduction .............................................................................................................................. 1 1.2 Purpose of the Comprehensive Study Report ...................................................................................... 1 1.3 Scope of Environmental Assessment .................................................................................................... 2 1.3.1 Requirements of environmental assessment .......................................................................................... 2 1.3.2 Factors considered in the assessment .................................................................................................... 3 1.3.3 Selection of valued components ............................................................................................................. 3 1.4 Methodology and Approach ................................................................................................................. 5 1.4.1 Spatial boundaries .................................................................................................................................. 5 1.4.2 Temporal boundaries .............................................................................................................................. 5 1.4.3 Impact assessment ................................................................................................................................. 5 2 Project Overview ................................................................................................................................... 7 2.1 Project Location .................................................................................................................................... 7 2.2 Project Components ............................................................................................................................. 9 2.3 Project Activities ................................................................................................................................. 10 3 Purpose of and Need for the Project, Project Alternatives, and Alternative Means Analysis .................. 11 3.1 Purpose of and Need for the Project .................................................................................................. 11 3.2 Project Alternatives ............................................................................................................................. 12 3.2.1 Option 1: Status quo ............................................................................................................................. 15 3.2.2 Option 2: Upgrade of the existing Route 389 ....................................................................................... 15 3.2.3 Option 3: New highway ........................................................................................................................ 16 3.2.4 Choosing an option ............................................................................................................................... 17 3.3 Alternative Means Assessment ..........................................................................................................
Recommended publications
  • 1 General Information and Contacts
    1 General Information and Contacts 1.1 Nature of Project Champion Iron Mines Ltd. is a Canadian-based mining exploration and development company. Champion is one of the largest landholders of highly prospective iron ore claims, with holdings located southwest of Fermont and northeast of Schefferville, Quebec. Champion Iron Mines Ltd. intends to develop the deposit located on its Fire Lake North property near Fermont, Quebec. The project includes the construction of an access road linking the site to Route 389, along with the construction of a railway line and an ore storage area in Pointe-Noire. 1.2 Proponent Contact Information Project Title: Fire Lake North Iron Ore Project Proponent Name: Champion Iron Mines Ltd. Address: 630 René-Lévesque West, 18th Floor – 1850 Montreal QC H3B 1S6 Senior Manager: Tom Larsen President and Chief Executive Officer Phone: 514-316-4858 Fax: 514-393-9069 Project Manager: Jean-Luc Chouinard, Eng. M.Sc. Vice-President, Project Development [email protected] Phone: 514-973-4858 514-316-4858 Fax: 514-393-9069 1.3 Consultations Consultations have been held with local and regional stakeholders to gather as much information as possible on the local and regional biophysical environment as well as the social environment. Solid relationships and partnerships have been forged as a result of these discussions with the City of Fermont. Relations with the Innu Uashat mak Mani-Utenam (ITUM1) First Nation are progressing well, although it has not yet been possible to gather information that would be directly useful for the environmental assessment of the project. Consultations with ITUM have been held on a regular basis since 2009, consisting first of information sessions and discussions on various potential joint business opportunities.
    [Show full text]
  • APPENDIX O Summary of Stakeholder Consultation
    APPENDIX O Summary of Stakeholder Consultation Labrador Iron Mines Ltd Stakeholder Consultation Report Parameters: Start Date: 1 Jan 2005 End Date: 15 Dec 2008 Community Visit 30 May 2005 Kawawachikamach Participants: Summary: Introductory visit to Schefferville. Reviewed project proposal. No major Phillip Einish issues raised. Do not want to see any new mining resulting in the visual “eyesore” left Chief – Naskapi Nation behind by IOC. Aboriginals effectively shut out by IOC operations. John Mameamskum Naskapi Team Members: Erick Chavez Gerry Gauthier John Kearney Terence McKillen Meeting 23 Sep 2005 Participants: Summary: Initial MOU discussion and project introduction. No significant issues other Uashat Band Council than jobs and economic benefits. Gilbert Pilot Uashat Team Members: Joseph Lanzon Dan O'Rourke Meeting 21 Oct 2005 Uashat Meeting Participants: Summary: TRT rail capacity discussion. Upgrade on a yearly approach. Richard Bell TSH Team Members: Joseph Lanzon Dan O'Rourke Meeting 18 Nov 2005 Sept-Iles Participants: Summary: Meeting with Band officials in Sept-Iles and City Officials. Presentation of Normand Laprise LIM project. Norma Lebri Team Members: Joseph Lanzon Dan O'Rourke Meeting 1 Dec 2005 Participants: Summary: Meeting with Grand Chief - Innu of Labrador. Discussion on project and Ben Michel benefits for Labrador. Labrador Innu Team Members: Joseph Lanzon Dan O'Rourke Thursday, August 13, 2009 Page 1 of 40 Labrador Iron Mines Ltd Stakeholder Consultation Phone Call 2 Dec 2005 Participants: Summary: Reviewed Anglesey press release and discussed scope of project. Asked to Gilbert Pilot set up a meeting with Development Corporation and Band Council. Uashat Team Members: Terence McKillen Meeting 7 Mar 2006 Participants: Summary: Meeting with aboriginal leaders.
    [Show full text]
  • Bibliothèque Et Archives Canada
    Library and Archives Bibliotheque et Canada Archives Canada Published Heritage Direction du Branch Patrimoine de I'edition 395 Wellington Street 395, rue Wellington Ottawa ON K1A0N4 Ottawa ON K1A 0N4 Canada Canada Your file Votre reference ISBN: 978-0-494-88023-4 Our file Notre reference ISBN: 978-0-494-88023-4 NOTICE: AVIS: The author has granted a non­ L'auteur a accorde une licence non exclusive exclusive license allowing Library and permettant a la Bibliotheque et Archives Archives Canada to reproduce, Canada de reproduire, publier, archiver, publish, archive, preserve, conserve, sauvegarder, conserver, transmettre au public communicate to the public by par telecommunication ou par I'lnternet, preter, telecommunication or on the Internet, distribuer et vendre des theses partout dans le loan, distrbute and sell theses monde, a des fins commerciales ou autres, sur worldwide, for commercial or non­ support microforme, papier, electronique et/ou commercial purposes, in microform, autres formats. paper, electronic and/or any other formats. The author retains copyright L'auteur conserve la propriete du droit d'auteur ownership and moral rights in this et des droits moraux qui protege cette these. Ni thesis. Neither the thesis nor la these ni des extraits substantiels de celle-ci substantial extracts from it may be ne doivent etre imprimes ou autrement printed or otherwise reproduced reproduits sans son autorisation. without the author's permission. In compliance with the Canadian Conformement a la loi canadienne sur la Privacy Act some supporting forms protection de la vie privee, quelques may have been removed from this formulaires secondaires ont ete enleves de thesis.
    [Show full text]
  • Continuation of the Negotiations with the Innu
    QUEBECERS and the INNU CONTINUATION OF THE NEGOTIATIONS WITH THE INNU AGREEMENT-IN-PRINCIPLE WORKING TOGETHER TO ACHIEVE A TREATY Québec Secrétariat aux affaires autochtones Québec HOW TO PARTICIPATE IN THE NEGOTIATIONS The Government of Québec has put in place a participation mechanism that allows the populations of the Saguenay–Lac-Saint-Jean and Côte-Nord regions to make known their opinion at the negotiating table. Québec’s negotiations team includes a representative of the regions who attends all of the negotiation sessions. He is the regions’ spokesperson at the negotiating table. The representative of the regions can count on the assistance of one delegate in each of the regions in question. W HAT IS THE RO L E OF THE REP RES ENTATIV E O F THE REGIO NS AND THE DELEGATES? 1 To keep you informed of the progress made in the work of the negotiating table. 2 To consult you and obtain your comments. 3 To convey your proposals and concerns to the Minister for Aboriginal Affairs and to the special negotiator for the Government of Québec. WHAT IS THE AGREEM ENT-IN-P RINCIPLE? The agreement-in-principle reached by the Government of Québec, the Government of Canada and the First Nations of Betsiamites, Essipit, Mashteuiatsh and Nutashkuan will serve as a basis for negotiating a final agreement that will compromise a treaty and complementary agreements. In other words, it is a framework that will orient the pursuit of negotiations towards a treaty over the next two years. WHY NEGOTIATE? Quebecers and the Innu have lived together on the same territory for 400 years without ever deciding on the aboriginal rights of the Innu.
    [Show full text]
  • Spring Survey of Caribou in the Vicinity of Schefferville May 2009
    SPRING SURVEY OF CARIBOU IN THE VICINITY OF SCHEFFERVILLE MAY 2009 Prepared for: NEW MILLENNIUM CAPITAL CORP. AND LABRADOR IRON MINES LIMITED FINAL REPORT – WITHOUT PREJUDICE Natalie D’Astous, Groupe Hémisphères Perry Trimper, Jacques Whitford Stantec Limited November 2009 EXECUTIVE SUMMARY During May 2009, Labrador Iron Mines Limited and New Millennium Capital Corp. partnered to complete an aerial survey for caribou in consultation with the Newfoundland and Labrador Wildlife Division. Both companies are undergoing environmental reviews for mining projects located in the vicinity of Schefferville, Quebec. Working under the regulatory direction of the Provincial Wildlife Division in Newfoundland and Labrador and the ministère des Ressources naturelles et de la Faune du Quebec, consultants for these proponents (i.e., Jacques Whitford Stantec Limited (JWSL) and Groupe Hémisphères (GH), respectively) worked together to assess the presence/absence of sedentary caribou in the area surrounding these proposed iron ore developments. The survey was a requirement of the Newfoundland and Labrador environmental assessment process. Prior to field investigations, a literature search was conducted to identify a Study Area of 50 km in radius centred on each proposed development. Letters explaining the objectives and other aspects of the survey were sent to the leaders of the local First Nations concerned, namely the Innu Nation, Innu Takuaikan Uashat mak Mani-Utenam, the Naskapi Nation of Kawawachikamach and the Nation Innu Matimekush-Lac John. Given the presence of staging waterfowl, a portion of Attikamagen and Petitsikapau Lakes was avoided to reduce potential effects on the goose hunting activities being conducted at the time, at the request of these leaders.
    [Show full text]
  • Pékans and Moisie Rivers (Québec, Canada)
    Pékans and Moisie Rivers (Québec, Canada) Useful contacts Credits and Distribution • Quebec search & rescue: +1.819.310.4141 Original Map most likely not accessible through satellite phone Lester Kovac, 2006 • Air Canada (Wabush): +1.888.247.2262 Adaptation • Provincial Airlines (Wabush): +1.708.282.3177 Charles Leduc, 2006. not of much help Base Maps • Provincial Airlines (Sept-Îles): +1.418.962.1222 Copyright © Her Majesty the Queen in Right of Canada, • Air Inuit: +1.418 961.2522 Department of Natural Resources. All rights reserved. • Helicopteres Canadiens, Sept Îles: +1.418 968.8677 Distribution • Centre hospitalier régional de Sept-Îles Authorized, provided the content remains unchanged and the Tel: +1.418.962.9761 distribution free of charge. Fax: +1.418.962.2701 Available from www.cartespleinair.org. 45, rue du Pere-Divet Sept-Îles, Quebec Disclaimer G4R 3N7 This document has been produced on a volunteer basis by • QNS&L Sept Îles Train Yard: +1.418.968.7603 paddlers who do not claim to have infallible judgment. The Locked on weekend & off hours – call ahead to have vehicles put authors assume no responsibility for any accident, damage or outside in regular parking lot at train station for us other prejudice that may result from the use of this document. • QNS&L Sept-Îles Schedule: +1.418.968.5253 Omissions or errors are always possible, and we would be grateful • QNS&L Sept-Îles should you bring them to our attention. Reservations +1.866.962.0988 • QNS&L Labrador-City Info (automated system) +1.709.944 8400 • QNS&L Labrador-City Info (Shipping - Wayne Bursey) +1.709.944.2490 • Sept-Îles Radio Carillon Taxi : +1.418.962.9444 • Transport Québec: +1.877.393.2363 • Ministère des Transports du Labrador: +1.709.896.2108 • CAA towing in Fermont: +1.418.287.5555 • Québec weather: +1.
    [Show full text]
  • Provincial Archaeology Office 2006 Archaeology Review
    Government of Newfoundland and Labrador Department of Tourism, Culture & Recreation February 2007 Volume 5 Provincial Archaeology Office 2006 Archaeology Review TABLE OF CONTENTS 1. NUNATSIAVUT ARCHAEOLOGY Lena Onalik.............................................................................................................................................................................3 2. REPORT OF ACTIVITIES 2006 - GERALD PENNEY ASSOCIATES LIMITED Gerald Penney & Robert Cuff............................................................................................................................................3 3. RECENT INVESTIGATIONS OF MARITIME ARCHAIC STRUCTURES AT WHITE POINT, NORTHERN LABRADOR Christopher B. Wolff.............................................................................................................................................................7 4. ARCHAEOLOGICAL ASSESSMENTS IN NORTHERN LABRADOR Jenneth Curtis.......................................................................................................................................................................13 5. 2006 FLEUR DE LYS ARCHAEOLOGICAL PROJECT FIELDWORK SUMMARY John Erwin and Amanda Crompton ..............................................................................................................................16 6. CONCHE ARCHAEOLOGY PROJECT: SALMON NET (EFAX-25) SUMMARY OF 2006 FIELDWORK Mary Melnik..............................................................................18 7. ARCHAEOLOGY OF THE PETIT NORD Peter
    [Show full text]
  • Rapport Rectoverso
    HOWSE MINERALS LIMITED HOWSE PROJECT ENVIRONMENTAL IMPACT STATEMENT – (APRIL 2016) - SUBMITTED TO THE CEAA 7.5 SOCIOECONOMIC ENVIRONMENT This document presents the results of the biophysical effects assessment in compliance with the federal and provincial guidelines. All results apply to both jurisdictions simultaneously, with the exception of the Air Quality component. For this, unless otherwise noted, the results presented/discussed refer to the federal guidelines. A unique subsection (7.3.2.2.2) is provided which presents the Air Quality results in compliance with the EPR guidelines. 7.5.1 Regional and Historical Context The nearest populations to the Project site are found in the Schefferville and Kawawachikamach areas. The Town of Schefferville and Matimekush-Lac John, an Innu community, are located approximately 25 km from the Howse Property, and 2 km from the Labrador border. The Naskapi community of Kawawachikamach is located about 15 km northeast of Schefferville, by road. In Labrador, the closest cities, Labrador City and Wabush, are located approximately 260 kilometres from the Schefferville area (Figure 7-37). The RSA for all socioeconomic components includes: . Labrador West (Labrador City and Wabush); and . the City of Sept-Îles, and Uashat and Mani-Utenam. As discussed in Chapter 4, however, Uashat and Mani-Utenam are considered within the LSA for land-use and harvesting activities (Section 7.5.2.1). The IN and NCC are also considered to be within the RSA, in particular due to their population and their Aboriginal rights and land-claims, of which an overview is presented. The section below describes in broad terms the socioeconomic and historic context of the region in which the Howse Project will be inserted.
    [Show full text]
  • Bilan Des Connaissances De La Dynamique De L'érosion Des Côtes
    Document generated on 09/27/2021 4:26 a.m. Géographie physique et Quaternaire --> See the erratum for this article Bilan des connaissances de la dynamique de l’érosion des côtes du Québec maritime laurentien A Review of Coastal Erosion Dynamics on Laurentian Maritime Québec Coasts Pascal Bernatchez and Jean-Marie M. Dubois Volume 58, Number 1, 2004 Article abstract A review of coastal erosion dynamics in the St. Lawrence maritime Estuary and URI: https://id.erudit.org/iderudit/013110ar Gulf demonstrates that shoreline retreat in unconsolidated formations varies DOI: https://doi.org/10.7202/013110ar between 0.5 and 2.0 m/yr. The data indicate a recent acceleration of coastal erosion that corresponds with the anticipated global trend resulting from See table of contents climatic change. Saltmarshes are the most sensitive to coastal erosion, with some upper marshes having already disappeared in the last decade. In cold regions saltmarshes are affected by numerous processes such as undercutting Publisher(s) by waves and tidal currents, ice foot scouring, freeze-thaw processes, wetting and drying processes, biologic processes and anthropogenic activities. Wave Les Presses de l'Université de Montréal action during spring tides or storm surges is an important factor causing shoreline retreat in sandy cliffs, whereas cryogenic and hydrogeological ISSN processes are mainly responsible for reactivation and erosion of silt and clay-based cliffs in deltaic environments. In maritime Québec, quantitative 0705-7199 (print) seasonal studies are needed to develop a better understanding of 1492-143X (digital) spatio-temporal process distribution and to better assess the causes that regulate coastal erosion in mid-latitude cold regions.
    [Show full text]
  • Socio-Economic Profile
    BAIE-COMEAUVille... BAIE-COMEAU This way to great projects! Baie-Comeau has been reigning over Côte-Nord for 80 years, not only economically, but also because of its incredible recreational potential. Business center, administrative government center, cultural capital... Baie-Comeau is the nerve center of an immense territory full of natural resources. Largest city of the MRC of Manicouagan, it is one of the major commercial axes of eastern Quebec QUÉBEC and the administrative heart of Côte-Nord. The companies that operate here have high-performing infrastructure, worthy INVESTIR AU QUÉBEC of a metropolis, in the heart of a wild and raw nature that supplies minerals, hydroelectricity and pulp and paper, multinationals and processing industries. INVESTIR AU QUÉBEC With its 22,000 inhabitants, Baie-Comeau has infrastructures that can satisfy up to 30,000 citizens. Baie-Comeau is a beautiful industrial city where employment and business opportunities abound in a context of collaboration and partnership. Here we work and have fun; the people of Baie-Comeau are happy, get on well together, help each other and are most welcoming. There is an unusual respect in our municipality where outside workers and newcomers are naturally integrated into the fabric of our society. A major industrial and port city, its deep-water port operates all year round, as does its airport and its unique road network, linking it to Fermont, at the gateway to the Grand Nord. This is where the Plan Nord goes through! More than ever, in this context, Baie-Comeau serves as a regional metropolis in which all services are available before we embark on large-scale projects or the great nature of hunters and fishermen.
    [Show full text]
  • Fermont: the Making of a New Town in the Canadian Sub-Arctic1
    FERMONT: THE MAKING OF A NEW TOWN IN THE CANADIAN SUB-ARCTIC1 Adrian Sheppard, FRAIC Emeritus Professor of Architecture McGill University, Montreal Canada NOTE: This paper is based on a lecture delivered on July 11, 2007 at the Ion Mincu School of Architecture and Urbanism, in Bucharest, Romania The text was revised in march 2012 ABSTRACT A significant number of new towns were built in the Canadian north since the turn of the century, most of them after 1950. The vast majority are one-industry towns created to service mining companies, government agencies, or utility corporations. Without exception, these new settlements were conceived as straightforward and pragmatic solutions to a housing need for workers and their families. Essential planning issues were bypassed in the interest of speed of construction, savings in costs, and matter-of-fact attitudes about company workers. The concern for the actual buildings (architecture) always mattered more than the design of the town (urbanism). Planners as well as their clients neglected to address important climactic, social, and aesthetic realities related to conditions of the North. The author’s former office was commissioned in the early 1970’s by Quebec Cartier Mining Corporation (QCM) to design the new town of Fermont. The town was to house 5,000 to 6,000 people and include all the essential facilities for normal northern living. QCM was a wholly owned subsidiary of US Steel Corporation, which at that time was the world’s largest steel company.2 The vast majority of the residents of the new town were employees of the Corporation.
    [Show full text]
  • Manic 5 at Expo 67: Territorial Megastructure Or the Connection of Three Spaces
    Manic 5 at Expo 67: Territorial Megastructure or the Connection of Three Spaces Marie-France Daigneault Bouchard A Thesis in The Department of Art History Presented in partial Fulfillment of the Requirements for the Degree of Masters of Arts (Art History) at Concordia University Montréal, Québec, Canada January 2013 © Marie-France Daigneault Bouchard, 2013 CONCORDIA UNIVERSITY School of Graduate Studies This is to certify that the thesis prepared By: Marie-France Daigneault Bouchard Entitled: Manic 5 at Expo 67: Territorial Megastructure or the Connection of Three Spaces and submitted in partial fulfillment of the requirements for the degree of Master of Arts complies with the regulations of the University and meets the accepted standards with respect to originality and quality. Signed by the final examining committee: _______________________________________________ Chair _______________________________________________ Examiner Dr Catherine MacKenzie _______________________________________________ Examiner Dr Johanne Sloan _______________________________________________ Supervisor Dr Cynthia Hammond Approved by ________________________________________________ Dr Johanne Sloan, Graduate Program Director ________________________________________________ Catherine Wild, Dean of Faculty of Fine Arts Date ________________________________________________ iiii ABSTRACT Manic 5 at Expo 67: Territorial Megastructure or the Connection of Three Spaces Marie-France Daigneault Bouchard Manic 5 is the largest multiple-arch and buttress dam in the world. It is part of the Manicouagan-Outardes Complex that marked the emergence of a Québécois expertise in hydroelectric production and transportation. Begun in 1959 and completed in 1968, the iconic dam is located on the Manicouagan River in the Côte-Nord region. In the summer of 1967, during the last stages of Manic 5’s construction, three cameras captured the daily activity of construction, from 10am to 10pm.
    [Show full text]