Changing Scenario in up Officials and Experts Discuss Developmental Reforms and Challenges Ahead

Total Page:16

File Type:pdf, Size:1020Kb

Changing Scenario in up Officials and Experts Discuss Developmental Reforms and Challenges Ahead Alok Ranjan, chief advisor to chief minister, Uttar Pradesh, addressing the UP Reforms in Governance Summit 2016 Changing scenario in UP Officials and experts discuss developmental reforms and challenges ahead Vishwas Dass wheat production and the third largest like commencement of metro train in economy in India after Maharashtra Lucknow and Agra-Lucknow express- and Tamil Nadu. The government has way would be completed within the brought revolution in the work culture stipulated time-frame. sserting that Uttar which has resulted in timely comple- Terming the laptop distribution Pradesh is emerging as tion of projects,” Ranjan said. scheme as one of the biggest schemes one of the fastest devel- According to him, things have dra- in the world, Ranjan said over 15 lakh oping states, chief advisor matically changed in Uttar Pradesh. laptops were distributed to meritori- to the UP chief minister, For instance, UP has become the coun- ous students in the first phase. Luc- Alok Ranjan, said that the try’s first state to have implemented di- know metro, Agra-Lucknow express- Astate government is leaving no stone rect benefit transfer (DBT) in supply of way, international cricket stadium and unturned to ensure seamless develop- seeds and registered 50 lakh farmers Kamdhenu Dairy Scheme for strength- ment. Ranjan was speaking at the UP online, he remarked. ening the dairy sector were some of the Reforms in Governance Summit, 2016, “Sixty-seven percent population of key projects of the UP government he organised by Governance Now in Au- the state is working in the agricultural highlighted. gust in Lucknow. sector which contributes 25 percent of Commissioner, commercial tax, “UP has become a state which can’t the state’s GDP. The government has en- Mukesh Kumar Meshram, highlighted be ignored by anyone now. Look at the sured that farmers get fertilisers in time that UP is embracing IT at a rapid pace size of the massive consumer market and more youngsters get jobs under to strengthen citizen services. “As far which is difficult to find anywhere else the agriculture junction scheme rolled as commercial tax department is con- in the country. The state is the first in out by the Akhilesh government,” Ran- cerned, we have made a lot of changes milk production, sugar production, jan said, adding that flagship projects in collaboration with NIC in the last 62 GovernanceNow | September 16-30, 2016 people politics policy performance Conference Report “We are going “Right from the “There is a lot through very registration of demand to interesting stage, dealers create suitable times. need not visit manpower for Technology is the trade tax the country. In impacting the sustainability offices as they can submit a society, the of every other aspect. all key documents online role of higher education We should make efforts and get their TIN online institutions is very to position India as a important” within 24 hours” superpower by 2050.” Mukesh Kumar Meshram, Commissioner, Sandhya Chintala, VP, NASSCOM Commercial Tax, UP SB Nimse, VC, Lucknow University few years. Right from the registration indirectly employed because of this that a police vehicle reaches to the com- stage, dealers need not visit the trade industry, which today stands about plainant within 20 minutes of lodging tax offices as they can submit all key 150 billion USD and poised to grow to the complaint. The idea is to provide documents online and get their trad- 350 billion USD and UP’s role in creat- integrated emergency response system er identification number (TIN) online ing this, is critical. In one of the things which is like 911 to get three important within 24 hours,” Meshram said. that we as an industry chamber un- services – police, medical and fire res- Dr Sandhya Chintala, vice president, derstood is that without the human re- cue. It is aimed at rendering all the said NASSCOM and executive director, IT- source, this growth can’t be sustained. services across the state,” he said. ITeS Sector Skills Council, applauded So therefore, NASSCOM has also ide- Jai Agarwal, vice chairman, CII, UP the UP government for opting IT to im- ated and indentified the IT sector State state council and director, CP Milks and prove and increase an array of citizen Council under the National Skills De- Foods Private Limited, said, “UP is the services. “We are at the cusp of change velopment Corporation (NSDC) and largest producer of food grain and it and going through very interesting Ministry of Skill Development and En- accounted for almost 19 percent share times. Technology is impacting the sus- trepreneurship plays a critical part,” in the country’s total food grain output tainability of every other aspect. We she added. in 2014-15. It has become a hub for the should make efforts to position India Additional director general of po- semi-conductor industry. UP is ahead of as a superpower by 2050,” she said. lice (traffic) Anil Agarwal outlined the all states in terms of the dairy industry. Chintala further said that the role role of UP police in modernising the Resources, policy incentives, infrastruc- of UP as an IT destination is critical. citizen services. “I have been given the ture and climate are best suited for in- “In every State, human resource is the responsibility of integrated technol- vestments in different sectors,” he said. capital wealth of that particular State. ogy enabled citizen centric services UP has a robust industrial infra- To have them upskilled and upgraded and heading the citizen centric service structure including 15 industrial areas, is the critical factor to have the socio cell. We have established four modern 12 specialised parks, four growth cen- economic growth. In this regard, Na- control rooms. Earlier, police control tres and industrial infrastructure de- tional Association of Software and Ser- rooms used conventional technology velopment centres,” he added. vices Companies (NASSCOM), which in where they had just one telephone line SB Nimse, vice chancellor, Lucknow its 26th year, has been able to establish and an operator who may not attend University, highlighted that the state of India as an IT destination globally. It calls round-the-clock. We have estab- higher education is neither miserable has got 16,000 IT companies of which lished a modern control room where nor good in India. “There is a lot of de- about 2,200 are members of the NASS- every call is recorded, everything is mand to create suitable manpower for COM. But that they own collectively done electronically and we have trail the country. For this, the role of higher 96 percent of the business and about of every record,” Agarwal said. education institutions is very impor- 95 percent representation of the hu- He further highlighted that the UP tant. To support the GDP growth, we man resource who are directly em- police has set up four control rooms at need research of good quality. We have ployed which is about 3.7 million to- Lucknow, Kanpur, Allahabad and Gha- to reform the higher education sector day. And around 10 million odd are ziabad. “In Lucknow, we have ensured on an urgent basis,” Nimse said. www.GovernanceNow.com 63 people politics policy performance Conference Report “UP Police has established a modern control room where every call is recorded, everything is done electronically and we have trail of every voice record.” Anil Agarwal, ADGP- Traffic, UP L-R: Sunita Mishra, dean, BBAU; N K Goyal, president, CMAI; Vivek Banka, director, “Because Maverick Digital; LB Gautam, national head, Accuster Technology of mega infrastructure Selva Kumari J, managing director, has developed a portable laboratory Kanpur Electricity Supply Corpora- in a suitcase that does not require big projects, a tion (KESCO), said Uttar Pradesh needs rooms to operate and can perform 37 lot of smaller more power for its rural and remote bio-chemistry tests that cost less than parts. She outlined that the govern- `100. “The device is a boon for states towns are increasing and ment needs to cover at least 1.73 lakh like UP and Bihar where affordability need more electricity. As habitations under electrification. “Be- matters a lot. All the latest IT features cause of mega infrastructure projects, have been incorporated in this device. many cities are slated a lot of smaller towns are expanding People will get SMS alerts for every to transform into smart and need more electricity. As more check-up done through this machine,” urban clusters are slated to transform Gautam said. cities, they require more into smart cities, they certainly require Sunita Mishra, dean, school of home more electricity in future. Electricity sciences, Babasaheb Bhimrao Ambed- electricity in future.” pilferage is one of the biggest concerns kar University (BBAU), talked about of the KESCO at present,” she added. the newly started community college Selva Kumari J, MD, KESCO Daljit Singh, director (works and in- which offers a three-month course on frastructure), Lucknow Metro Rail Cor- dietetics and nutrition. Many young- poration (LMRC), said smart transpor- sters are opting for such courses, she “Smart tation is the backbone of the smart city added. project and it should be environmen- NK Goyal, president, CMAI Asso- transportation tally safe, seamless and sustainable. ciation of India, chairman emeritus is the backbone “When traffic volume increases beyond TEMA; member Governing Council 50,000 per hour per direction traffic Telecom Equipment and Services Ex- of smart city (PHPDT), problem of traffic through port Promotion Council, government project and it road transport cannot be solved easily. of India, mentioned that full availabil- In such cases, rail-based transport sys- ity of internet connectivity in rural ar- should be environmentally tems are required.
Recommended publications
  • Varanasi Municipal Corporation’S Proposal for the Indian Smart Cities Challenge Phase-II #Smartkashi - Smart City Proposal
    Varanasi Municipal Corporation’s proposal for the Indian Smart Cities Challenge Phase-II #SmartKashi - Smart City Proposal © [year] [legal member firm name], a [jurisdiction] [legal structure] and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative, a Swiss entity. All rights reserved.. 1 Document Classification: KPMG Confidential EXECUTIVE SUMMARY “To rejuvenate the oldest Indian living city of Varanasi as a great place to live Intro: Varanasi’s proposal for Phase 2 of and visit by conserving and the Smart Cities Challenge was drafted showcasing its enriched heritage, by putting our citizens right in the culture, spirituality and traditions middle of all discussions. Varanasi through innovative social and financial Municipal Corporation’s (VMC) inclusion solutions.” outreach to the residents, involved a massive awareness and discussion From the vision, we derived six key campaign which leveraged: pillars of Varanasi’s future.Citizens indulged in animated discussion on — Print-media: 60 articles their preference of ABD area. Our — Radio: 9 lakh secondage citizens identified the following across 3 channels parameters as crucial to selection of — Advertising: 165 hoardings the best fitted ABD area: — Tableau vehicles: 6,000 km — Social Media (reach):2 lakhs i. Citizen priorities ii. Impact assessment Citizen connect: A multi-pronged iii. Ease of execution approach was adopted across 175 iv. Revenue generation potential. workshops, which bucketed diverse groups representative of key Our deliberations resulted in the demographics selection of the iconic Old City area adjoining the Kashi Vishwanath temple — Renowned personalities from and serene riverfront ghats as the Area Arts & Culture Based Development area.
    [Show full text]
  • ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr
    GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:672 ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr. Hari Babu;Mohammed Shri Faizal P.P.;Senguttuvan Shri Balasubramaniam;Somaiya Dr. Kirit;Thomas Prof. Kuruppassery Varkey;Venugopal Dr. Ponnusamy Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the MINISTER OF URBAN DEVELOPMENT be pleased to state: (a) the details of metro rail proposals received by the Government during the last three years and the current year, stretch and State/ UT-wise along with the estimated cost of each stretch; (b) the details of proposals cleared and lying pending stretch and State-wise, the reasons for pendency along with the time by which pending proposals are likely to be cleared; (c) the funds sanctioned, released and utilized during the above period for various projects, stretch and State/UT-wise; (d) the present status of various under construction and sanctioned metro rail stretches, stretch and city-wise and the time by which these are likely to be completed and operationalized; and (e) Whether various metro rail projects are going behind schedule and if so, the details thereof, stretch and city-wise and the details of cost escalated as a result thereof along with the steps taken/being taken to complete these projects within a reasonable period of time? Answer THE MINISTER OF STATE IN THE MINISTRY OF URBAN DEVELOPMENT (RAO INDERJIT SINGH) (a)& (b) : The details of metro rail proposals received/ cleared/pending during the last three years and the current year along with the names of stretch and the estimated cost stretch wise, State/UT-wise are given in Annexure-I & IA.
    [Show full text]
  • Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______
    LOK SABHA ___ SYNOPSIS OF DEBATES* (Proceedings other than Questions & Answers) ______ Thursday, July 11, 2019 / Ashadha 20, 1941 (Saka) ______ SUBMISSION BY MEMBERS Re: Farmers facing severe distress in Kerala. THE MINISTER OF DEFENCE (SHRI RAJ NATH SINGH) responding to the issue raised by several hon. Members, said: It is not that the farmers have been pushed to the pitiable condition over the past four to five years alone. The miserable condition of the farmers is largely attributed to those who have been in power for long. I, however, want to place on record that our Government has been making every effort to double the farmers' income. We have enhanced the Minimum Support Price and did take a decision to provide an amount of Rs.6000/- to each and every farmer under Kisan Maan Dhan Yojana irrespective of the parcel of land under his possession and have brought it into force. This * Hon. Members may kindly let us know immediately the choice of language (Hindi or English) for obtaining Synopsis of Lok Sabha Debates. initiative has led to increase in farmers' income by 20 to 25 per cent. The incidence of farmers' suicide has come down during the last five years. _____ *MATTERS UNDER RULE 377 1. SHRI JUGAL KISHORE SHARMA laid a statement regarding need to establish Kendriya Vidyalayas in Jammu parliamentary constituency, J&K. 2. DR. SANJAY JAISWAL laid a statement regarding need to set up extension centre of Mahatma Gandhi Central University, Motihari (Bihar) at Bettiah in West Champaran district of the State. 3. SHRI JAGDAMBIKA PAL laid a statement regarding need to include Bhojpuri language in Eighth Schedule to the Constitution.
    [Show full text]
  • Global Report Global Metro Projects 2020.Qxp
    Table of Contents 1.1 Global Metrorail industry 2.2.2 Brazil 2.3.4.2 Changchun Urban Rail Transit 1.1.1 Overview 2.2.2.1 Belo Horizonte Metro 2.3.4.3 Chengdu Metro 1.1.2 Network and Station 2.2.2.2 Brasília Metro 2.3.4.4 Guangzhou Metro Development 2.2.2.3 Cariri Metro 2.3.4.5 Hefei Metro 1.1.3 Ridership 2.2.2.4 Fortaleza Rapid Transit Project 2.3.4.6 Hong Kong Mass Railway Transit 1.1.3 Rolling stock 2.2.2.5 Porto Alegre Metro 2.3.4.7 Jinan Metro 1.1.4 Signalling 2.2.2.6 Recife Metro 2.3.4.8 Nanchang Metro 1.1.5 Power and Tracks 2.2.2.7 Rio de Janeiro Metro 2.3.4.9 Nanjing Metro 1.1.6 Fare systems 2.2.2.8 Salvador Metro 2.3.4.10 Ningbo Rail Transit 1.1.7 Funding and financing 2.2.2.9 São Paulo Metro 2.3.4.11 Shanghai Metro 1.1.8 Project delivery models 2.3.4.12 Shenzhen Metro 1.1.9 Key trends and developments 2.2.3 Chile 2.3.4.13 Suzhou Metro 2.2.3.1 Santiago Metro 2.3.4.14 Ürümqi Metro 1.2 Opportunities and Outlook 2.2.3.2 Valparaiso Metro 2.3.4.15 Wuhan Metro 1.2.1 Growth drivers 1.2.2 Network expansion by 2025 2.2.4 Colombia 2.3.5 India 1.2.3 Network expansion by 2030 2.2.4.1 Barranquilla Metro 2.3.5.1 Agra Metro 1.2.4 Network expansion beyond 2.2.4.2 Bogotá Metro 2.3.5.2 Ahmedabad-Gandhinagar Metro 2030 2.2.4.3 Medellín Metro 2.3.5.3 Bengaluru Metro 1.2.5 Rolling stock procurement and 2.3.5.4 Bhopal Metro refurbishment 2.2.5 Dominican Republic 2.3.5.5 Chennai Metro 1.2.6 Fare system upgrades and 2.2.5.1 Santo Domingo Metro 2.3.5.6 Hyderabad Metro Rail innovation 2.3.5.7 Jaipur Metro Rail 1.2.7 Signalling technology 2.2.6 Ecuador
    [Show full text]
  • 1. Introduction
    Detailed Project Report for Rail Based Mass Transit System in Varanasi Final Report CHAPTER 1: INTRODUCTION 11.. IINNTTRROODDUUCCTTIIOONN 1.1 BACKGROUND Varanasi is the fifth most populous city in the state of Uttar Pradesh and it is often referred to as "the holy city of India" or “the religious capital of India". Varanasi is well connected by road, rail and air with other parts of the country. The city is surrounded by Jaunpur and Azamgarh in north, Bhadoi and Allahabad in west, Mirzapur and Robertsganj in south & Mughal Sarai and Ghazipur in east. Varanasi is a tourist centre with ghats, temples, educational and archaeological sites as main attractions. Varanasi is a UNESCO declared heritage city attracting sizable population of tourist from across the world each year. The city also has a strong cantonment base along with Diesel Locomotive Works (DLW) and Bharat Heavy Electrical Ltd. (BHEL) as major industrial units. As per the National Urban Transport Policy (NUTP), Comprehensive Mobility Plan (CMP) for Varanasi was prepared in 2009 which lays out a set of measured steps that are designed to improve transportation scenario in the city in a sustainable manner. The CMP proposes a total of 57.5 km length of rail based mass rapid transit system (MRTS) network in Varanasi. 25.9 km of the proposed network was to be completed in Phase II (2015 – 2019) and the remaining network to be completed in Phase III (2020 – 2029) of implementation programme. The State Government has now decided to introduce an efficient, safe and high capacity rail based transport system in Varanasi.
    [Show full text]
  • FINAL DISTRIBUTION.Xlsx
    Annexure-1B 1)Taxpayers with turnover above Rs 1.5 Crores b) Taxpayers falling under the jurisdiction of the State Taxpayer's Name SL NO GSTIN Registration Name TRADE_NAME 1 NATIONAL INSURANCE COMPANY LIMITED NATIONAL INSURANCE COMPANY LTD 19AAACN9967E1Z0 2 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD 19AAACW6953H1ZX 3 INDIAN OIL CORPORATION LTD.(ASSAM OIL DIVN.) INDIAN OIL CORPORATION LTD.(ASSAM OIL DIVN.) 19AAACI1681G1ZM 4 THE W.B.P.D.C.L. THE W.B.P.D.C.L. 19AABCT3027C1ZQ 5 ITC LIMITED ITC LIMITED 19AAACI5950L1Z7 6 TATA STEEL LIMITED TATA STEEL LIMITED 19AAACT2803M1Z8 7 LARSEN & TOUBRO LIMITED LARSEN & TOUBRO LIMITED 19AAACL0140P1ZG 8 SAMSUNG INDIA ELECTRONICS PVT. LTD. 19AAACS5123K1ZA 9 EMAMI AGROTECH LIMITED EMAMI AGROTECH LIMITED 19AABCN7953M1ZS 10 KOLKATA PORT TRUST 19AAAJK0361L1Z3 11 TATA MOTORS LTD 19AAACT2727Q1ZT 12 ASHUTOSH BOSE BENGAL CRACKER COMPLEX LIMITED 19AAGCB2001F1Z9 13 HINDUSTAN PETROLEUM CORPORATION LIMITED. 19AAACH1118B1Z9 14 SIMPLEX INFRASTRUCTURES LIMITED. SIMPLEX INFRASTRUCTURES LIMITED. 19AAECS0765R1ZM 15 J.J. HOUSE PVT. LTD J.J. HOUSE PVT. LTD 19AABCJ5928J2Z6 16 PARIMAL KUMAR RAY ITD CEMENTATION INDIA LIMITED 19AAACT1426A1ZW 17 NATIONAL STEEL AND AGRO INDUSTRIES LTD 19AAACN1500B1Z9 18 BHARATIYA RESERVE BANK NOTE MUDRAN LTD. BHARATIYA RESERVE BANK NOTE MUDRAN LTD. 19AAACB8111E1Z2 19 BHANDARI AUTOMOBILES PVT LTD 19AABCB5407E1Z0 20 MCNALLY BHARAT ENGGINEERING COMPANY LIMITED MCNALLY BHARAT ENGGINEERING COMPANY LIMITED 19AABCM9443R1ZM 21 BHARAT PETROLEUM CORPORATION LIMITED 19AAACB2902M1ZQ 22 ALLAHABAD BANK ALLAHABAD BANK KOLKATA MAIN BRANCH 19AACCA8464F1ZJ 23 ADITYA BIRLA NUVO LTD. 19AAACI1747H1ZL 24 LAFARGE INDIA PVT. LTD. 19AAACL4159L1Z5 25 EXIDE INDUSTRIES LIMITED EXIDE INDUSTRIES LIMITED 19AAACE6641E1ZS 26 SHREE RENUKA SUGAR LTD. 19AADCS1728B1ZN 27 ADANI WILMAR LIMITED ADANI WILMAR LIMITED 19AABCA8056G1ZM 28 AJAY KUMAR GARG OM COMMODITY TRADING CO.
    [Show full text]
  • Indian Railways from Wikipedia, the Free Encyclopedia This Article Is About the Organisation
    Indian Railways From Wikipedia, the free encyclopedia This article is about the organisation. For general information on railways in India, see Rail transport in India. [hide]This article has multiple issues. Please help improve it or discuss these issues on the talk page. This article may contain an excessive amount of intricate detail that may only interest a specific audience. (August 2015) This article may be written from a fan's point of view, rather than a neutral point of view. (August 2015) This article needs additional citations for verification. (August 2015) Indian Railways "Lifeline to the Nation" Type Public sector undertaking Industry Railways Founded 16 April 1853 (162 years ago)[1] Headquarters New Delhi, India Area served India (also limited service to Nepal,Bangladesh and Pakistan) Key people Suresh Prabhakar Prabhu (Minister of Railways, 2014–) Services Passenger railways Freight services Parcel carrier Catering and Tourism Services Parking lot operations Other related services ₹1634.5 billion (US$25 billion) (2014–15)[2] Revenue ₹157.8 billion (US$2.4 billion) (2013–14)[2] Profit Owner Government of India (100%) Number of employees 1.334 million (2014)[3] Parent Ministry of Railways throughRailway Board (India) Divisions 17 Railway Zones Website www.indianrailways.gov.in Indian Railways Reporting mark IR Locale India Dates of operation 16 April 1853–Present Track gauge 1,676 mm (5 ft 6 in) 3 1,000 mm (3 ft 3 ⁄8 in) 762 mm (2 ft 6 in) 610 mm (2 ft) Headquarters New Delhi, India Website www.indianrailways.gov.in Indian Railways (reporting mark IR) is an Indian state-owned enterprise, owned and operated by the Government of India through the Ministry of Railways.
    [Show full text]
  • Government of India Ministry of Housing and Urban
    GOVERNMENT OF INDIA MINISTRY OF HOUSING AND URBAN AFFAIRS LOK SABHA UNSTARRED QUESTION NO. 587 TO BE ANSWERED ON JULY 19, 2017 METRO RAIL NETWORK No. 587: SHRI DHANANJAY MAHADIK: SHRIMATI P.K. SREEMATHI TEACHER: SHRIMATI SUPRIYA SULE: DR. HEENA VIJAYKUMAR GAVIT: DR. J. JAYAVARDHAN: SHRI MOHITE PATIL VIJAYSINH SHANKARRAO: SHRI ALOK SANJAR: Will the MINISTER OF HOUSING AND URBAN AFFAIRS be pleased to state: (a) the total kilometer of metro rail network in operation in the country, city and State-wise and the criteria for setting up of metro rail network; (b) the details of metro rail proposals received during each of the last three years and the current year, stretch, city and State/ Union Territory-wise along with the estimated cost of each stretch; (c) the details of proposals cleared and lying pending stretch, city and State-wise along with the reasons for pendency and the time by which pending proposals are likely to be cleared; (d) the funds sanctioned, released and utilized by the Government and private partners during the above period for various projects, stretch, city and State/Union Territory-wise; (e) the progress of various under construction and sanctioned metro rail stretches and the time by which these are likely to be completed and operationalized, stretch and city-wise; and (f) whether the metro which is already operational in cities such as Jaipur and Gurgaon is not getting enough passengers to fill coaches and if so, the steps taken by the Government to popularize metro in these cities? ANSWER THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS (RAO INDERJIT SINGH) (a) The details of metro rail network operational in the country are given at Annexure-I.
    [Show full text]
  • Kd4 – Final Concept, Master Plan and Feasibility Report (Complete)
    PREPARATION OF TECHNICAL FEASIBILITY STUDY AND MASTER PLAN FOR DEVELOPMENT OF BIJWASAN NEW DELHI RAILWAY STATION OF THE INDIAN RAILWAY NETWORK KD4 – FINAL CONCEPT, MASTER PLAN AND FEASIBILITY REPORT (COMPLETE) WWW.SENER.ES SENER Ingeniería y Sistemas S.A. - India 2013 The information contained in this document is confidential and restricted, and is to be used only for the purposes established in the document. No modification, exploitation, reproduction, communication to any third party, dissemination or distribution of the whole or any part of the document is permitted without the prior written consent of SENER Ingeniería y Sistemas, S.A.. Failure to respond to any request for such consent shall in no way be construed as authorization for use. SENER Doc. P210G04-01-KD4-SR-RP-0002 Rev. 3 2017/02/10 Page 2 of 162 KD4- Final Concept, Master Plan and Feasibility Report (Complete) Changes Record Signature Control Rev Date Author Affected section Changes Written Reviewed Approved 0 13/09/2013 Juan Francisco Paz Modified submission Juan Francisco Paz Juan Fernández Aller Juan Francisco Paz 1 15/07/2016 Juan Francisco Paz Modified submission María Ugarte José Manuel Almoguera 2 11/11/2016 Juan Francisco Paz Modified submission Addition of New Chapters and Section José Manuel Almoguera María Ugarte Chapter 11 - Environmental Impact Assessment Chapter 13 - Risk Analysis and Mitigation. Osvaldo Gandini Section 8.8 - Block working of Railways Addition of New Drawings Patricia Díaz Master Plan Zoning (BWSN-MP-KD4-ARC-PLN-103) 3 10/02/2017 Juan Francisco Paz Modified submission Master Plan Phase-1 Station Area (BWSN-MP-KD4-ARC- PLN-104) Ernesto Sánchez Larios Master Plan Phase-1 Rag picking Zone (BWSN-MP-KD4- ARC-PLN-105) Central Data Controller Scheme (BWSN-RS-KD4-COM-SKM- Rohit Kumar 001) Addition of 3D Views for Phase-1 and Phase-2 Development Sandip Kumar Krishna Choudhary K.
    [Show full text]
  • Names of Trains
    NAMES OF TRAINS Agniveena Express 2341/ 2342 Howrah – Asansol (ER Howrah division) In Bangla it means “The Fiery Lute”. This is the name given to the collection of poems by the celebrated Bengali poet, musician, revolutionary and philosopher, Kazi Nazrul Islam. He was born in Burdwan district in 1899 and died in Dhaka in 1976. He is the national poet of Bangladesh, and also honoured in India. Ahilyanagari Express 6325/ 6326 Indore – Thiruvananthapuram Central (SR Thiruvananthapuram division) Rajmata Ahilyadevi Holkar (1725-1795, ruled 1767-1795) also known as the Philosopher Queen was a Holkar dynasty Queen of the Malwa kingdom. She took over reigns of the kingdom after the death of her husband and father-in-law. She moved the capital to Maheshwar south of Indore on the Narmada River. She also built temples and Dharamshalas (free lodging)at sacred sites outside her kingdom, at prominent religious places like Dwarka, Kashi Vishwanath in Varanasi, Ujjain, Nasik, Parli Vaijnath and Somnath. The city of Indore is sometimes called Ahilyanagari in her memory. Ahimsa Express 1095/ 1096 Ahmadabad – Pune (CR Pune division) The name is also sometimes given to 1087/ 1088 Veraval – Pune Express, 1089/ 1090 Jodhpur – Pune Express and 1091/ 1092 Bhuj – Pune Express, as all these trains are “derived” from 1095/ 1096. Ahimsa is a Sanskrit term meaning “to do no harm” (literally, the avoidance of violence or himsa). Ahimsa was one of the main principles which Gandhiji followed in his life. Pune was the place where Gandhiji was imprisoned and where his wife passed away, and Ahmadabad was where he set up his Ashram.
    [Show full text]
  • Global Report Global Metro Projects 2020.Qxp
    GLOBALGLOBAL METROMETRO RAILRAIL PROJECTSPROJECTS REPORT:REPORT: MARKETMARKET ANDAND INVESTMENTINVESTMENT OUTLOOKOUTLOOK 2020-20302020-2030 Global Mass Transit Research has just launched the fifth edition of the Global Metro Rail Projects Report: Market and Investment Outlook 2020-22030, the most comprehensive and up- to-date study on the metro rail segment. The report will provide information on the top 150 metro rail projects in the world in terms of upcoming investments and plans. It will provide details on the existing network, stations, ridership, rolling stock, technology and fare systems. It will highlight upcoming capital investment needs and opportunities such as construc- tion of new lines and extensions, upgrades of existing lines, procurement and refurbishment of rolling stock, upgrades of power and communication systems, upgrades of fare collec- tion systems, as well as construction and refurbishment of stations. The report will comprise two distinct sections. Part 1 of the report (PPT format converted to PDF) will describe the existing state of, and - Current ridership the expected opportunities in, the global metro rail industry in terms of network and sta- - Current rolling stock (number of rail cars, technology, suppliers, age, etc.) tion construction and development, ridership, rolling stock, signalling, fare system, power, - Existing signalling system (type of system, suppliers, etc.) tracks, consulting, etc. It will examine the recent technical and financing developments; - Power and tracks analyse key growth drivers and challenges; and assess the upcoming opportunities and - Current fare system (type of system, ticketing infrastructure, suppliers, etc.) future outlook for the industry. - Extensions/ Capital projects - upcoming network and stations - Planned investments, cost estimates and funding Part 2 of the report (MS Word converted to PDF) will provide updated information on 150 - Projected ridership projects that present significant capital investment opportunities.
    [Show full text]
  • Sample Project Profile
    Overview Network Size and Growth • At present, metro systems are operational in seven cities in India – Bengaluru, Chennai, Delhi, Gurgaon, Jaipur, Kolkata and Mumbai – with a running network of about xxx km • In addition, about xxx km of monorail network is operational in Mumbai • During the last decade (2006-16), more than xxx km of network length was added to metro rail systems. The maximum network was added to Delhi Metro (xxx km), followed by Bangalore Metro (xxx km) • Besides, in the last four years (2013-16), new metro rail systems, spanning a total length of over xxx km, were operationalised in Gurgaon, Mumbai, Jaipur and Chennai Growth in Operational Rail-based Network in India (km) Overall Metro-wise 2016 308.0 250.00 200.00 2014 256.3 150.00 208.24 2011 221.7 km 100.00 64.94 50.00 30.30 25.10 2006 81.4 16.50 11.40 9.63 10.00 8.26 5.10 - 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 2006 2016 Km Kolkata Metro Delhi Metro Bangalore Metro Mumbai Metro Gurgaon Metro Jaipur Metro Chennai Metro Mumbai Monorail Source: Global Mass Transit Research © Global Mass Transit Research, May 2016 1 Overview New Project Uptake has Picked Up • The urban rail sector has taken big strides in the past two and a half years (2014-2016) – Mumbai, Jaipur and Chennai metro systems have commenced commercial operations. The first monorail system was operationalised in Mumbai. Small stretches on Delhi and Bangalore metro systems were also operationalised • Over xxx km of network length has been added by these projects • The pace of new project uptake has also picked up.
    [Show full text]