Union Government (Railways) No. 14 of 2017

Total Page:16

File Type:pdf, Size:1020Kb

Union Government (Railways) No. 14 of 2017 lR;eso t;rs Report of the Report No. 14 of 2017 - Union Government (Railways) No. 14 of 2017 - Union Government Report Comptroller and Auditor General of India © COMPTROLLER AND AUDITOR GENERAL OF INDIA www.cag.gov.in Union Government (Railways) No. 14 of 2017 Report of the Comptroller and Auditor General of India for the year ended March 2016 Laid in Lok Sabha/Rajya Sabha on __________ Union Government (Railways) No.14 of 2017 PREFACE The Report for the year ended March 2016 has been prepared for submission to the President under Article 151 of the Constitution of India. The Report contains significant result of the compliance audit of the Ministry of Railways of the Union Government. The instances mentioned in this Report are those, which came to notice in the course of test audit for the period 2015-16 as well as those which came to notice in earlier years, but could not be reported in the previous Audit Reports; instances relating to the period subsequent to 2015-16 have also been included, wherever necessary. The audit has been conducted in conformity with the Auditing Standards issued by the Comptroller and Auditor General of India. CONTENTS Particulars Paragraph Page Abbreviations i Overview v Chapter 1 –Introduction Audit Report outline 1.1 1 Chapter outline 1.2 1 Audited Entity 1.3 1 Integrated Finance Advice and Control 1.4 4 Audit Planning 1.5 4 Reporting 1.6 4 Response of the Ministry/Department to Provisional 1.7 5 Paragraphs Audit observations issued, settled and outstanding 1.8 5 Recoveries at the instance of Audit 1.9 5 Remedial Actions 1.10 5 Paragraphs on which Action Taken Note received/pending 1.11 7 Chapter 2 – Traffic Parcel Business in Indian Railways 2.1 9-41 Introduction 2.1.1 9 Growth of parcel business during 2013-14 to 2015-16 2.1.2 11 Infrastructure development as envisaged in Vision 2020 2.1.3 14 document Computerisation of parcel services - Parcel Management 2.1.4 15 System (PMS) Safety and security at Parcel Offices 2.1.5 18 Leased parcel business 2.1.6 20 Weighment arrangements, overloading and punitive 2.1.7 32 charges - Parcels Vans, AGC/SLRs Other issues 2.1.8 37 Conclusion 2.1.9 40 Recommendations 2.1.10 41 Container Train Operations in Indian Railways 2.2 41-56 Introduction 2.2.1 41 Selection of container train operators (CTOs) and 2.2.2 46 execution of agreements Growth of container traffic 2.2.3 46 Receipt of the Railways' dues from the CTOs 2.2.4 47 Review of Mechanism for monitoring of movement of 2.2.5 54 container trains Particulars Paragraph Page Conclusion 2.2.6 55 Recommendations 2.2.7 56 Wasteful expenditure on preservation of injudiciously 2.3 56 selected sections as heritage and subsequent withdrawal of the decision Non preferring for bills for shunting charges 2.4 59 Irregular levy and collection of Superfast Surcharge from 2.5 60 passengers Non-realisation of detention charges for overloaded 2.6 61 wagons warranting load adjustment Delay in implementation of Integrated Security System 2.7 63 Short-recovery of license fee from Banks for 2.8 66 additional/excess space provided/occupied by them for ATMS Short earning of revenue due to improper utilisation of 2.9 67 Higher Capacity Wagons Non-revision of interest and maintenance charges of 2.10 69 private sidings Loss due to allowing excess free time for 2.11 70 combination of manual and mechanised loading in cement sidings Loss on account of non-weighment of rakes 2.12 72 Chapter 3 – Traction Indigenization of suppliers for locomotive components 3.1 76-87 and vendor development consequent to Transfer of Technology from foreign firm Introduction 3.1.1 77 Continuing imports despite purchase of Transfer of 3.1.2 77 Technology for indigenization Non-utilization of facility created for in-house production 3.1.3 78 consequent to Transfer of Technology Wasteful expenditure in production of 5500 HP locos: ` 3.1.4 82 54.51 crore Non-development of new vendors 3.1.5 83 Conclusion 3.1.6 86 Extra expenditure of ` 59.28 crore in import of crankcases 3.2 87 Energy Conservation measures in Indian Railway 3.3 90-99 Introduction 3.3.1 90 Energy Conservation- Electrical Energy 3.3.2 90 Energy Conservation - Diesel Energy 3.3.3 93 Energy Audit 3.3.4 96 Conclusion 3.3.5 98 Particulars Paragraph Page Extra expenditure due to change of traction from electric 3.4 99 to diesel locomotive and vice versa for placement/release of rakes in the electrified siding notified for charging on ‘through distance basis’ and loss of earning capacity due to detention of wagons Chapter 4 – Rolling Stock Management of Linen in Indian Railways 4.1 102- 130 Introduction 4.1.1 102 Assessment of requirement and procurement of linen 4.1.2 106 Storage and handling of linen 4.1.3 109 Setting up and working of Mechanised Laundries for 4.1.4 115 washing linen Feedback and complaint redressal mechanism 4.1.5 126 Non adherence to statutory requirements by Railways as 4.1.6 128 Principal Employer Conclusion 4.1.7 129 Recommendations 4.1.8 130 Working of Coach Rehabilitation Workshop, Bhopal 4.2 130- 144 Introduction 4.2.1 130 Planning, Financing and Execution of MLR activity 4.2.2 133 Assets Management (Infrastructure and its up-gradation) 4.2.3 139 Manpower 4.2.4 142 Non-revision of MLR cost under Rolling Stock Programme 4.2.5 143 (RSP) Conclusion 4.2.6 143 Recommendations 4.2.7 144 Detention of POHed wagons at Jhansi Workshop by using 4.3 144 them for storage of scrap instead of carrying freight Injudicious procurement of material for manufacturing 4.4 146 coaches for Kolkata Metro Deficient planning in procurement and non- 4.5 148 installation of machines simultaneously in the same complex, led to non-achievement of objective of a self- sufficient Wheel Shop in the Wagon Shop at Kharagpur Workshop Premature rejection of ERRUs 4.6 150 Loss due to non-revision of agreement clause for repair 4.7 152 and maintenance charges for Rail Milk Tankers (RMT) Chapter 5 – Engineering Injudicious expenditure of ` 93.89 crore on the Bagnan- 5.1 155 Particulars Paragraph Page Amta and Deshpran-Nandigram New Railway line projects Avoidable expenditure due to delay in payment of 5.2 157 spectrum charges to Department of Telecommunication Failure to settle the land acquisition matter on time led to 5.3 159 avoidable expenditure liability of ` 50.68 crore Non-recovery of lease charges from NHAI 5.4 162 Delay in re-building of bridge resulted in 5.5 163 compromising safety of passengers by running of train on this bridge Opening of an additional leg of a Road Over Bridge for 5.6 165 traffic without adequate safety measures Non-utilization of pit line facilities 5.7 167 Unfruitful expenditure due to award of contract without 5.8 168 availability of clear site and drawings for execution of work Uneconomic operation of Reinforced Cement Concrete 5.9 170 Depot Chapter 6 – Staff Matters and Public Sector Undertakings (PSUs) of IR Non recovery of subscription towards New Pension 6.1 170 System amounting to ` 77.07 lakh and equal amount of matching contribution Award of the work of ‘Maintenance of 6.2 175 Accounts of RVNL’ to a firm on nomination basis in contravention of CVC guidelines Continuing payment of rent on office accommodation due 6.3 176 to delay in construction of own office building Annexure 179 Abbreviations Abbreviation Full form ACASH Association of Corporations and Apex Societies of Handlooms AGC Assistant Guard’s Cabin AIEHC All India Engine Hour Cost ATM Automated Teller Machine ATN Action Taken Note BEE Bureau of Energy Efficiency BOOT Build Own Operate Transfer C&W Carriage and Wagons CCM Chief Commercial Manager CCTV Closed-circuit Television CDE Chief Designing Engineer CEDE Chief Electrical and Distribution Engineer CEE Chief Electrical Engineer CEGE Chief Electrical General Engineer CLW Chittaranjan Locomotive Works CME Chief Mechanical Engineer COFMOW Centre for Modernisation of Workshops COM Chief Operations Manager CONCOR Container Corporation of India Limited COS Controller of Stores CPO Chief Personnel Officer CR Central Railway CRB Chairman Railway Board CRIS Centre for Railway Information Systems CRS Commissioner of Railway Safety CRT Container Train Terminal CRWS Coach Rehabilitation Workshop CTO Container Train Operators CVC Central Vigilance Commission CWE Chief Workshop Engineer D&G Direction and General DLW Diesel Locomotive Works DoT Department of Telecommunication DPR Detailed Project Report DRM Divisional Railway Manager EAC Estimated Annual Consumption i Abbreviation Full form ECOR East Coast Railway ECR East Central Railway EMU Electric Multiple Unit EOL Engine On Load EPF Employees Provident Fund ER Eastern Railway ESI Employees State Insurance FA&CAO Financial Advisor and Chief Accounts Officer FOB Foot Overbridge FOIS Freight Operations Information System FSLA Freight Service and Ledger Account GC Gauge Conversion GM General Manager GPS Global Positioning System GSD General Store Depot GSM-R Global System for Mobile Communication-Railway GTKM Gross Tonnage per Kilometre HSD High Speed Diesel ICD International Container Depot ICF Integral Coach Factory IOH Intermediate Overhaul IR Indian Railways IRCA Indian Railway Conference Association IRCON Indian Railway Construction Organisation IRCTC Indian Railway Catering and Tourism Corporation IRPSM Indian Railways Projects Sanctions & Management IRR Internal Rate of Return IRSOD Indian Railway Schedule of Dimensions ISS Integrated Security System KVIC Khadi and Village Industries Commission LC Level Crossing MIS Management Information System MLR Midlife Rehabilitation MoR Ministry of Railways MoU Memorandum
Recommended publications
  • GMT Urban Rail in India 2019.Qxp
    URBAN RAIL IN INDIA 2019 Market Analysis, New Technologies and Systems, Upcoming Projects and Opportunities India has emerged as a fast growing market for urban rail systems. Currently, 10 cities have an operational urban rail network spanning 536 km. The network has grown significantly over the past 12-13 years, up from about 90 km in 2006. With the Metro Rail Policy 2017 in place, several cities are ready to roll out work to develop their respective urban transit systems. In the last five years, 13 new metro projects with a total length of about 248 km have been approved for implementation. Further, about 750 km of metro rail network and 373 km of rapid rail transit network is under planning in various cities. While metro will continue to be the dominant mode, new modes such as trams, rapid rail, light rail are also gaining traction. State-of-the-art rolling stock and advanced signalling and telecommunication systems are expected to be deployed as part of these projects. Innovations and developments in the fare payments industry are resulting in the adoption and use of a variety of payment methods, especially interoperable electronic payment methods such as smartcards, bank cards, mobile wallets and near-field communication (NFC)-enabled devices. The current level of activity in the urban rail sector spells significant opportunity for consultants, developers, contractors, operators, rolling stock manufacturers, signalling and communications technology providers, fare system providers, equipment manufacturers, construction material suppliers, software solution providers, etc. Global Mass Transit Research has released the Urban Rail in India 2019 report - the most comprehensive and up-to-date study on the Indian urban rail market.
    [Show full text]
  • Fd W`C Vrc]J C"! !!! Tc Z Gvde^V Ed Z ;Yrc\YR U
    6 ! <! & . *= > # ( = > # > 5- / $$ 5 ( 3 . ## * /+,012 +345. "*+,-. !"#$ "%&' ( )# *" )33 -3&3 7-3 ) &9! !4 7)8 3!4 !; 3- )-!3& 26 )#%)*'!(*+ +*'#$ 78 !8 14! !! +*$%+ #*' $,*+# 94 N!'3&3 9'! &3& !4&)3& !#+* %' #- !+*)* .$/*-(* * !"#$#%#&"'$ 13 1 ! " " # he Government of TJharkhand signed Memorandums of Understanding worth nearly 10,000 crore with leading industrial houses of the coun- try on the concluding day of the two-day Investor’s Meet organized by the Department of Industries, Government of Jharkhand on Saturday. The industrial giants including, TATA Steel, Dalmia Group, SAIL, Adhunik Power and Prem Rubber Works will make investments in the State, which is likely to generate employment opportunities for over 1.7 lakh people through direct and indirect means in Jharkhand. ! " During the launch of the $ % Jharkhand Industrial and Investment Promotion Policy ing to turn Jharkhand into an 2021, Chief Minister Hemant Electronics Manufacturing Hub. Soren said, “The State A Question and Answer Government wants to move session was also organized dur- forward with the cooperation !! # $% ing the event, where prospective of the investors. We are trying investors put up their queries & to leverage the infinite & & '&( ! suggestions in front of the CM. "$ ) ! % * !$% + & '# ( ) # # % * resources, which nature has # # , ( # The Chief Minister, the Chief gifted to Jharkhand and walk % % Secretary & Secretary Industries the path of development.” - . /% answered the queries of investors “In this quest, we expect Renewable Energy, I would like work out some solutions. Our provide land to medical equip- healthy and very law-abiding. ( ) . %0 and invited everyone to come to your cooperation. The to inform you all that very soon internal resources came to the ment manufacturers also.
    [Show full text]
  • New Delhi/NDLS to Mathura/MTJ - 67 Trains - India Rail Inf
    New Delhi/NDLS to Mathura/MTJ - 67 Trains - India Rail Inf... http://indiarailinfo.com/search/664/0/249 2 PNR Posts Wed Sep 19, 2012 08:44:09 IST Home Trains ΣChains Atlas PNR Forum Gallery News FAQ Trips Members Login Feedback from station via station to station Search train Disclaimer All Departures from New Delhi Search Return Journey All Arrivals at Mathura 67 Trains / 1 ΣChains from New Delhi/NDLS to Mathura Junction/MTJ Filter this Search Date of Travel Quota: General Get Seat Availability 2S SL CC Ex 3A FC 2A 1A 3E Adult (12 and above) Refresh Total Seats All Trains Morning Afternoon Evening Exact Match Switch to Trains at a Glance View Try these Via Stations: Shoranur No. Name Type Zone From Dep ↑↑ To Arr Duration Halts Dep Days Classes Distance Speed 04012 Nizamudin - Sai Naga... Exp NR NZM* 00:20 MTJ 02:30 2h 10m 0 F II SL 3A 2A 1A 134 km 61 km/hr 18238 Chhattisgarh Express Exp SECR NZM 04:40 MTJ 07:05 2h 25m 4 S M T W T F S II SL 3A 2A 1A 134 km 55 km/hr 18238-Slip Chhattisgarh Express... Exp SECR NZM 04:40 MTJ 07:05 2h 25m 4 S M T W T F S II SL 3A 2A 1A 134 km 55 km/hr 12138 Punjab Mail SF CR NDLS 05:15 MTJ 07:50 2h 35m 2 S M T W T F S II SL 3A 2A 1A 141 km 54 km/hr 12782 Nizamuddin-Mysore Sw..
    [Show full text]
  • Title: Shri Pawan Kumar Bansal Presented a Statement of the Estimated Receipt and Expenditure of the Government of India for the Year 2013-14 in Respect of Railways
    > Title: Shri Pawan Kumar Bansal presented a statement of the estimated receipt and expenditure of the Government of India for the year 2013-14 in respect of Railways. THE MINISTER OF RAILWAYS (SHRI PAWAN KUMAR BANSAL): . Madam Speaker, I rise to present before this august House the Revised Estimates for 2012-13 and a statement of estimated receipts and expenditure for 2013-14. ...(Interruptions) अय महोदया : या कर रह े ह, अब आप शोर य मचा रह े ह ...(Interruptions) SHRI PAWAN KUMAR BANSAL: I do so with mixed feelings crossing my mind. While I have a feeling of a colossus today, it is only ephemeral and is instantaneously overtaken by a sense of humility. Democracy gives wings to the wingless, cautioning us all the while, that howsoever high or wide our flight may be, we must remain connected to the ground. For giving me this opportunity, I am grateful to the Hon'ble Prime Minister Dr. Manmohan Singh and the UPA Chairperson, Smt. Sonia Gandhi and pay my homage to the sacred memory of Sh. Rajiv Gandhi who introduced me to the portals of the highest Temple of Indian democracy. Madam Speaker, as I proceed, my thought goes to a particularly severe cold spell during the recent winter, when it was snowing heavily in Kashmir valley, and suspension of road and air services had brought life to a grinding halt. Photographs appearing in Newspapers showing a train covered with snow emerging from a similar white background, carrying passengers travelling over the recently commissioned Qazigund - Baramulla section instilled in me a sense of immense pride.
    [Show full text]
  • LOK SABHA ___ SYNOPSIS of DEBATES (Proceedings Other Than
    LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Wednesday, March 15, 2017/ Phalguna 24, 1938 (Saka) ______ OBITUARY REFERENCE HON'BLE SPEAKER: Hon'ble Members, I have to inform the House of the sad demise of Shri B.V.N. Reddy who was a member of the 11th to 13th Lok Sabhas representing the Nandyal Parliamentary Constituency of Andhra Pradesh. He was a member of the Committee on Finance; Committee on External Affairs; Committee on Transport and Tourism; Committee on Energy and the Committee on Provision of Computers to members of Parliament. At the time of his demise, Shri Reddy was a sitting member of the Andhra Pradesh legislative Assembly. He was earlier also a member of the Andhra Pradesh Legislative Assembly during 1992 to 1996. Shri B.V.N. Reddy passed away on 12 March, 2017 in Nandyal, Andhra Pradesh at the age of 53. We deeply mourn the loss of Shri B.V.N. Reddy and I am sure the House would join me in conveying our condolences to the bereaved family. The Members then stood in silence for a short while. STATEMENT BY MINISTER Re: Recent incidents of Attack on Members of Indian Diaspora in the United States. THE MINISTER OF EXTERNAL AFFAIRS (SHRIMATI SUSHMA SWARAJ): I rise to make a statement to brief this august House on the recent incidents of attack on Indian and members of Indian Diaspora in the United States. In last three weeks, three incidents of physical attack in the United States on Indian nationals and Persons of Indian Origin have come to the notice of the Government.
    [Show full text]
  • Master Plan Jammu 2032
    Jammu Master Plan-2032 CONTENTS 1. INTRODUCTION ..................................................................................................................... 1 1.1 Review of Earlier Master Plans ................................................................................................................ 2 1.1.1 Master Plan Jammu (1974-94) .........................................................................................................2 1.1.2 Second Master Plan -2001-2021 ......................................................................................................2 1.2 Objectives of the Jammu Master Plan-2032 ........................................................................................... 5 1.3 Proposed Local Planning Area under Revised JMP-2032 ........................................................................ 6 2. JAMMU CITY- A PROFILE ................................................................................................... 9 2.1 Historical Development of Jammu City .................................................................................................. 9 2.1.1 Ramayana’s period ...........................................................................................................................9 2.1.2 Bahulochana’s and Jambulochan’s period. .....................................................................................9 2.1.3 9th Century A.D to 18th Century A.D .............................................................................................. 10
    [Show full text]
  • Jharkhand Central Railway Limited: [ICRA]BBB+ (Stable) Assigned
    December 03, 2020 Jharkhand Central Railway Limited: [ICRA]BBB+ (Stable) assigned Summary of rating action Current Rated Amount Instrument* Rating Action (Rs. crore) Proposed Term Loans 1,259.75 [ICRA]BBB+ (Stable); Assigned Total 1,259.75 *Instrument details are provided in Annexure-1 Rationale The rating assignment factors in Jharkhand Central Railway Limited’s (JCRL’s) long-term concession agreement with the Ministry of Railways (MoR), which provides earnings visibility to its upcoming railway project, and the approval to charge an inflated mileage from users, which would make the project’s return indicators attractive. ICRA notes that Central Coalfields Limited (CCL, JCRL’s parent, owning 64%1 of the shareholding) plans to significantly ramp-up coal production in the North Karanpura coalfield over the medium term, which, along with shorter lead distances, faster rake turn-around times, and lower trip costs following the commissioning of JCRL’s railway line, partly mitigates the traffic fluctuation risk. Moreover, given the strategic importance of the rail corridor to CCL's expansion plans, the operational synergies between CCL and JCRL remains high, which supports JCRL’s business risk profile. In addition, JCRL’s credit profile benefits from the strong financial profile of its parent CCL, as well as IRCON International Limited (IRCON), which has a target shareholding of 26% in JCRL. JCRL’s rating also factors in the fixed revenue share clause with MoR for providing reserve services, which partly mitigates risks associated with inadequate increase in freight rates to cover for rising operation and maintenance (O&M) costs. The rating, however, is tempered by JCRL’s exposure to high project implementation risks, leading to risks of time and cost over-runs, and the company’s sizeable dependence on external borrowings, which is likely to lead to modest debt coverage metrics during the initial years post commissioning.
    [Show full text]
  • Wonders of Shimla Itinerary Destination Information
    Palace Tours 12000 Biscayne Blvd. #107 Miami FL 33181 USA 800-724-5120 / 786-408-0610 Call Us 1-800-724-5120 Wonders of Shimla Ascend high into the hills of Himachal as you explore the lovely hill town of Shimla and experience North Indian lifestyle at its best. Begin and end in Delhi, a convenient flight from most any international or domestic location. Then board one of India's most beloved trains as you glide past glorious landscapes of green, blue, and white as you climb higher toward Shimla. Upon arrival in this quiet village, you can hear the prayers at temple or meditate in a beautiful garden. For the adventure- lover, there are plenty of sporting and recreation activities to enjoy, such as trekking, skiing, and horseback riding. There is also ample time to admire Shimla's British-era history and stupendous panoramic views on this 3-night experience. Take a deep breath and marvel at the beauty and Wonders of Shimla. Itinerary This tour can be scheduled to accommodate your chosen departure date. Day 1 - Travel northwards to Shimla Early this morning you are met by a Palace Tours representative either at the Delhi International Airport or at your hotel. Transfer to the railway station to board the Delhi / Kalka Shatabdi Express train to Kalka. Receive assistance at Kalka railway station to connect to the Toy Train to Shimla, where you are met upon arrival and transferred to your hotel for check-in. Spend your evening at leisure and enjoy your overnight stay at the hotel. Day 2 - Explore the sights of Shimla After breakfast at the hotel, embark on your full day sightseeing tour of Shimla.
    [Show full text]
  • Question Bank for LDC Examination General Feature 1. Steep Gradients
    Question bank for LDC examination General Feature 1. Steep gradients which need extra engine for hauling is known as a) Pusher gradient* b) Rulling Gradient c) Reasonable gradient d) Momentum gradient 2. Rising gradient followed by a falling gradient is known as a) Rulling gradient b) Momentum gradient* c) Pusher graient d) Aangular gradient 3. The safety in Railway in India is looked after by a) Ministry of Railways b) Commission of Railway Safety* c) Railway Board d) Headquarter Office 4. Longest platform of the world on BG is a) At Sonepur station* b) At Sasaram station c) At Allahabad station d) At Kharagpur station 5. The ruling gradient is 1 in 200 on a section of the BG track. If the track is laid in that place at a curve of 5 degrees then the allowable ruling gradient on the curve will be a) 1 in 16.7 b) 1 and 400 c) 1 in 240 d) 1 in 333* 6. The number of stations on Indian Railways is a) 6000 approximately b) 7070 approximately* c) 8000 proximately d) 9000 approximately 7. Longest tunnel on Indian Railway is a) Kharbude tunnel on Konkan Railway* b) Near Lonavala between Monkey hill and Khandala station c) Kalka Shimla d) Darjeeling hill Railway 8. Longest Railway Bridge on Indian Railway is 1. Sone Bridge at Dehri on Sone* 2. Yamuna Bridge at Kalpi 3. Ganga Bridge near Patna 4. Pamban Bridge 9. Longest passenger train on Indian Railway is 1. Prayagraj Express* 2. Kalka Mail 3. Himsagar express 4. Lucknow mail 10.
    [Show full text]
  • Presentation to General Manager NC Railway by Suresh Kumar
    26-08-2019 Presentation to General Manager NC Railway By Suresh Kumar Executive Director/RailTel 1 1 26-08-2019 Introduction - Formation of RailTel • In pursuance of National Telecom Policy 1999, and opening of Telecom sector, RailTel was created as Schedule ‘A’ PSU on 26th SEP’2000. • Objectives: To facilitate Railways in expeditiously modernizing train operation and safety systems by providing state of art communication network infrastructure. To develop, operate and maintain a nationwide broadband telecom and multimedia network to supplement national telecom infrastructure in all parts of country specially rural, remote and backward areas. To generate revenue through commercial exploitation of its surplus capacity. 2 2 26-08-2019 Introduction • Revised Agreement with Rlys Signed in Oct 2006 for 30 yrs • Exclusive Right of Way along Railway route & land to RailTel. • RailTel to pay 7% revenue share to Rlys in lieu of RoW. • Authorised capital ₹ 1000 Cr., Paid up capital ₹ 321 Cr. (seed ₹ 15 Cr. & ₹ 306 Cr. by assets). • Provide Bandwidth, data, internet & value added services to Rlys • Dividend paying Company since FY 2008 & Debt Free (Loan of ₹ 400 Cr. taken from IRFC/SBI has been repaid). • Holds National Long Distance (NLD), Internet service provider (ISP), International long distance (ILD) licenses and IP-1 registration from DoT. • Revenue share of 8% payable to DoT. 3 3 26-08-2019 Growth of Revenue of operations 45000 40000 35000 30000 25000 20000 15000 10000 5000 0 (Rs. In Lakh) (Rs. in Lakh ) FY 2012-13 (Rs. In FY 2013-14 (Rs. In FY 2014-15 (Rs. In FY 2015-16 (Rs.
    [Show full text]
  • ALAGAPPA UNIVERSITY 32141-Contemporary India Since
    ALAGAPPA UNIVERSITY [ACCREDITED WITH ‘A+’ Grade by NAAC (CGPA:3.64) in the Third Cycle and Graded as Catego-rIy University by MHRD-UGC] (A State University Established by the Government of Tamiln adu) KARAIKUDI – 630 003 DIRECTORATE OF DISTANCE EDUCATION M.A HISTORY IV SEMESTER 32141-Contemporary India Since 1947 A.D Copy Right Reserved For Private use only INTRODUCTION India‘s independence represented for its people the start of an epoch that was imbued with a new vision. In 1947, the country commenced its long march to overcome the colonial legacy of economic underdevelopment, gross poverty, near-total illiteracy, wide prevalence of diseases, and stark social inequality and injustice. Achieving independence was only the first stop, the first break—the end of colonial political control: centuries of backwardness was now to be overcome, the promises of the freedom struggle to be fulfilled, and people‘s hopes to be met. The task of nation-building was taken up by the people and leaders with a certain elan and determination and with confidence in their capacity to succeed. When Nehru assumed office as the first Prime Minister of India, there were a myriad of issues lying in front of him, vying for his attention. Nehru knew that it was highly important that he prioritized things. For him, ―First things must come first and the first thing is the security and stability of India.‖ In the words of eminent political scientist W.H Morris- Jones, the imminent task was to ―hold things together, to ensure survival, to get accustomed to the feel of being in the water, to see to it that the vessels keep afloat‖.
    [Show full text]
  • COACHING (Status As on 01.02.2021)
    COACHING (Status as on 01.02.2021) Chief Rolling Stock Engineer (Coaching) or CRSE(Coaching) heads the overall Coaching activities of Eastern Railway and his domain of responsibilities are overall management of maintenance and operation of Coaching stock in the divisions of Eastern Railway. He is the technical head of all Sr.DME(C&W)s of divisions w.r.t maintenance of Coaching stock. Dy.CME(C&W)/ER assists CRSE (Coaching) in all activities mentioned under his domain. A. Category of Trains maintained in Major Depots of Eastern Railway: Category of Howrah Sealdah Malda Asansol TOTAL Maintenance TKPR SYAE SDAH CP MLDT BGP ASN Primary 22 12 26 26 9 7 9 111 Maintenance Secondary 0 1 0 3 0 3 1 8 Maintenance Platform Returned / 12 7 5 8 9 6 1 48 Round Trip Trains B. Major & Minor Coaching Depots and their depot-wise holdings (Only PCV): Division DEPOT LHB ICF TOTAL TKPR 356 652 1008 SYAE 403 430 833 JSDG 0 165 165 HWH BWN 0 32 32 AZ 0 85 85 TOTAL 759 1364 2123 NCC 309 663 972 SDAH CP 168 376 544 TOTAL 477 1039 1516 MLDT 26 258 284 MLDT BGP 160 80 240 Division DEPOT LHB ICF TOTAL SBG 0 70 70 JMP 0 24 24 TOTAL 186 432 618 ASN 16 150 166 ASN MDP 0 16 16 TOTAL 16 166 182 ER TOTAL 1,438 3,001 4,439 C. Coach Holdings: ICF : 3001 Coaches LHB : 1438 Coaches OCV : 245 Nos. D. Departmental Mechanized Laundries in Eastern Railway: SN Division Location Capacity of Production (Tons Per Day) 1 Howrah TKPR 9 2 SDAH 8 Sealdah 3 CP 5 4 Asansol ASN 1 5 MLDT 2 Malda 6 BGP 2 Total 27 MECHANIZED LAUNDRY PLANT AT TKPR E.
    [Show full text]