Program Overview

Martin Young

Sound Transit Modes

2 Sounder Commuter Rail Corridor

3 Corridor Characteristics

North-line South-line South-line Extens. •Everett- •Tacoma-Seattle • Lakewood-Tac •35 miles (BNSF) •39 miles (BNSF) •8 miles (ST) •3 Stations •1.2 mi. (Tac. Rail) •2 Stations •4 round trips daily •7 Stations •9-13 round trips daily •Peak direction •13 round trips daily •New layover facility only •7 car train sets •1 mi. 2.85% grade •Fully built out •Opened 2000 •Opens late 2012 on •3 car train sets property purchased •Opened 2003 by BNSF

4 Sounder North-line

5 Kent Station

6 Station

7 Event Service

• Mariners Baseball – 20 Week-end games / year • Seahawks Football – 8 Week-end games / year • Sounder FC Soccer – 4 Week-end games/ year

8 Capital vs. Operating Forecast (Budget 1997-2012)

• TOTAL = CAPITAL + OPERATING ($1.4 b = $1.2 b + $0.2 b) • Overall Budget is 85% Capital • Most original capital will be expended by end of 2012 • ST2 (Nov. ’08 vote) adds $250m

9 Railroad Access Costs

North-line South-line South-ST2 Track mi. 35 39 39 Trips 4 (r.t.) 9 (r.t.) 4 (r.t.) Term Permanent 40 Yrs Permanent Cost* $258 m $300 m $180 m Year 2003 2000-08 2008 *Capital paid to BNSF Railway

10 Track Improvements: Turnouts/Sidings

11 BNSF Agreements - Operations

ST coordinates: • Train Schedules and special services (Seahawks, Mariners) • Customer notification • Fare collection • Stations, P&R’s, Transit Centers • Security

BNSF provides: • Security • Train Crews – Locomotive Engineer, Conductors • Centralize Dispatch from Ft Worth, TX

12 Transit Operations Detail

Contingency Rail Admin. G&A 5% 17% Maint. of 9% Stations 3%

RR MOW/ Maint. Of Crew/Fees Equip./Fuel 31% 35%

13 CRT Capacity Equivalency

Sounder Commuter Rail Passengers •Ave Daily Ridership – 10k+, 5k per peak period •5 am to 8 am departure = 3 hours •5,000 / 3 (peak hours) = 1,650 passengers/hr. Interstate Freeway Lane • Ideal peak traffic flow – 45 mph = 1,800 vph •Equivalent to 2 sec. rule and 3600 seconds (60x60) •With congestion, closer to 35 mph and 1,500 vph •Ave occupancy of 1.1 = 1,650 passengers/hr. Benefits

• 2011 – 2.5+ million Annual Boardings • 2009 - Cumulative On-time Performance – 97+% • Special Event Service – Mariners, Seahawks, Other (Concerts, etc.) • More reliable service in inclement weather • Optimizes capacity and demand through train length

15 Challenges • O & M .Freight Volumes .Mudslides .Changing Federal Regulations .South-line Renegotiation after 30 yrs.

• Capital .Tacoma D-M Grade .Funding Partnerships .Station Construction 16 .

Rail Track & Signal Improvements  5.39 miles of third main track  65 crossings reconstructed  7.31 miles of existing track  4 crossings closed converted to third main track  164 power switch machines  19.94 miles of main track installed relocated and reconstructed  27 signal bridges  47.44 route miles of  166 ground signals Centralized Traffic Control  300 miles of signal cable signals  18.1 miles of increased train  38 high-speed crossovers speeds  171 additional turnouts

17 On-Time Performance

18 Average Daily Ridership

Sounder Ridership, 2000-present 11,000

10,000

9,000

8,000

7,000

6,000

5,000

4,000

3,000

Average Weekday Boardings Boardings Weekday Average 2,000

1,000

- Sep 00 Sep 01 Sep 02 Sep 03 Sep 04 Sep 05 Sep 06 Sep 07 Sep 08 Sep 09 Sep 10 Sep 11 Sep Mar 01 Mar 02 Mar 03 Mar 04 Mar 05 Mar 06 Mar 07 Mar 08 Mar 09 Mar 10 Mar 11 Mar South Line North Line Sounder Total 19

THE END