High Speed 2: the Draft Environmental Statement 1
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Midland Main Line Upgrade Programme Economic Case Department for Transport
Midland Main Line Upgrade Programme Economic Case Department for Transport 30 August 2017 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Notice This document and its contents have been prepared and are intended solely for Department for Transport’s information and use in relation to Midland Main Line Upgrade Programme Business Case. Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 108 pages including the cover. Document history Job number: 5159267 Document ref: v4.0 Revision Purpose description Originated Checked Reviewed Authorised Date Interim draft for client Rev 1.0 - 18/08/2017 comment Revised draft for client Rev 2.0 18/08/2017 comment Revised draft addressing Rev 3.0 - 22/08/2017 client comment Rev 4.0 Final 30/08/2017 Client signoff Client Department for Transport Project Midland Main Line Upgrade Programme Document title Midland Main Line Upgrade Programme: KO1 Final Business Case Job no. 5159267 Copy no. Document reference Atkins Midland Main Line Upgrade Programme | Version 4.0 | 30 August 2017 | 5159267 2 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Table of contents Chapter Pages Executive Summary 7 1. Introduction 12 1.1. Background 12 1.2. Report Structure 13 2. Scope of the Appraisal 14 2.1. Introduction 14 2.2. Scenario Development 14 3. Timetable Development 18 3.1. Overview 18 4. Demand & Revenue Forecasting 26 4.1. Introduction 26 4.2. Forecasting methodology 26 4.3. Appraisal of Benefits 29 4.4. -
High Speed Two: Full Speed Ahead?
High Speed Two: Full Speed Ahead? The UK government has given the “green light” to the High Speed Two (HS2) rail project in its entirety, following the outcome of the Oakervee Review, ending months of speculation over the future of the scheme. Phase 2b of the project, linking Crewe to Manchester and Birmingham to Leeds via Sheffield, is subject to further review. It now forms part of an ambitious “High Speed North” integrated masterplan, including Northern Powerhouse Rail and other local rail improvements. What will this mean for landowners, occupiers and others who are directly affected by the HS2 scheme? Time will tell. However, the announcement is likely to be welcomed, as it provides certainty that the project will now proceed, although concerns over the long-term plans for delivery of Phase 2b will persist. HS2 Limited’s remit will be to “…focus solely on getting On all fronts, the government’s announcement gives phases 1 and 2A built on something approaching on time grounds for optimism. The government has pledged to learn and on budget” and, in respect of Phase 2b, new “delivery lessons from Phase 1 and improve how the project is being arrangements” will be put in place, but not before “…an delivered, highlighting the need for better communication and integrated plan for rail in the north” has been introduced. engagement with local communities impacted by the scheme. Grand plans no doubt, but close attention will be paid to the detail, including the enabling legislation required to deliver Major concerns will also remain over the delivery of the Phase 2a of the project and future plans for the design and scheme, including timescales for completion of each phase, delivery arrangements for Phase 2b. -
Hampton Court to Berrylands / Oct 2015
Crossrail 2 factsheet: Services between Berrylands and Hampton Court New Crossrail 2 services are proposed to serve all stations between Berrylands and Hampton Court, with 4 trains per hour in each direction operating directly to, and across central London. What is Crossrail 2? Crossrail 2 in this area Crossrail 2 is a proposed new railway serving London and the wider South East that could be open by 2030. It would connect the existing National Rail networks in Surrey and Hertfordshire with trains running through a new tunnel from Wimbledon to Tottenham Hale and New Southgate. Crossrail 2 will connect directly with National Rail, London Underground, London Overground, Crossrail 1, High Speed 1 international and domestic and High Speed 2 services, meaning passengers will be one change away from over 800 destinations nationwide. Why do we need Crossrail 2? The South West Main Line is one of the busiest and most congested routes in the country. It already faces capacity constraints and demand for National Rail services into Waterloo is forecast to increase by at least 40% by 2043. This means the severe crowding on the network will nearly double, and would likely lead to passengers being unable to board trains at some stations. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce congestion, and would enable us to run more local services to central London that bypass the most congested stations. Transport improvements already underway will help offset the pressure in the short term. But we need Crossrail 2 to cope with longer term growth. -
Management Case for High Speed 2
Management Case for High Speed 2 1 Contents Introduction 4 Timetable to an operational railway 5 Governance 7 Planning 16 Risk Management 17 Issue Management 18 Change Control 19 Assurance 24 Benefit Realisation and Evaluation 25 Communication and Stakeholder Management 26 Building Capability and Capacity 28 Document Control 30 Annex A – Governance Framework for High Speed 2 31 Annex B – Remit letter 32 Annex C – DfT High Speed Rail Organogram 36 Annex D – HS2 Ltd Organogram 37 Annex E – Risk and Issue Management Strategy 38 Annex F - Integrated Assurance and Approvals Plan 53 Annex G – Benefit Realisation and Evaluation Strategy 73 Annex H - Communications Plan 84 Annex I – Resource Management Plan 111 2 Purpose 1. The purpose of the Management Case is to provide confidence that credible and robust arrangements are in place to deliver the High Speed 2 (HS2) programme to time, cost and quality. It includes: . an outline of the HS2 programme and how it will be delivered; . governance arrangements for the programme, including the role of the High Speed Rail Programme Board, the separate Project Boards and HS2 Ltd’s own governance; . details on the programme of work planned and how key milestones are tracked; . evidence on how risks and issues are managed and escalated; . detail on how change is and will be managed within the programme; . arrangements for programme and project assurance; . our communication plan for the programme, including how we engage with stakeholders; . how we plan to manage and record the benefits from the programme; . contingency and resource planning arrangements; and . document control arrangements. 2. -
High Speed Two Limited
High Speed Two Limited High Speed 2 Infrastructure Maintenance Depot (IMD) High Speed Two Limited H igh Speed 2 Infrastructure Maintenance Depot (IMD) March 2011 This r eport t akes i nto a ccount t he particular instructions and requirements of our client. It i s not i ntended f or a nd s hould n ot be relied u pon b y any third p arty a nd no responsibility i s u ndertaken to any t hird Ove Arup & Partners Ltd party The Arup Campus, Blythe Gate, Blythe Valley Park, Solihull, West Midlands. B90 8AE Tel +44 (0)121 213 3000 Fax +44 (0)121 213 3001 www.arup.com Job number High Speed Two (HS2) High Speed 2 Infrastructure Maintenance Depot Contents Page 1 Introduction 1 1.1 The December 2009 Report 1 1.2 Layout of this Report 1 2 Scope of Work, Methodology and Deliverables 2 2.1 Scope of Work 2 2.2 Meeting 1 2 2.3 Intermediate instructions 3 2.4 Meeting 2 3 3 Current Rail Operations and Future Developments 4 3.1 Context 4 3.2 Oxford - Bletchley 4 3.3 Aylesbury – Claydon Line 4 3.4 High Speed 2 5 3.5 Evergreen 3 5 3.6 East West Project 5 4 Functional Requirements 6 5 Site Location Options 7 5.1 Introduction 7 5.2 Quadrant 1 9 5.3 Quadrant 2 11 5.4 Quadrant 3 15 5.5 Quadrant 4 17 5.6 Sites on HS2 (north) 18 6 Cost Estimates 20 6.1 Matrix table for all Site options 20 7 Conclusion 21 8 Selected Option Development 23 8.1 General layout 23 8.2 Specific site details 27 8.3 Site operation 28 8.4 West end connections 29 9 Calvert Waste Plant 30 9.1 Rail Access 30 9.2 Heat and power generation 32 10 Use of site as a potential construction depot 33 -
Delivering High Speed 2 Major Project Report
DELIVERING HIGH SPEED 2 MAJOR PROJECT REPORT New rail reality Developing a £33bn rail network to transform Uk’s north-soUth 03|2012 CONNECTIONS Special report | High Speed 2 03 | 2012 Foreword 04 infrastructure specialists who supply the rail Introduction industry. Many of them are already helping HS2 Ltd chief executive Alison Munro us deliver Crossrail, Thameslink, electrifica- updates on the project’s progress tion, and upgrades to major stations like Reading and Birmingham. But even the 08 largest of these schemes will be dwarfed in Technical challenge size by HS2. So the challenge is for British Why the current London to West firms to develop the expertise to compete Midlands route is the best for key high speed contracts, and help deliver Britain’s Victorian engineering HS2 on time and on budget. 12 pioneers built a railway that was the The government’s National Infrastructure Euston envy of the world. Such was their Plan makes clear the importance of a predict- vision and singular focus that able and transparent pipeline of infrastruc- Expanding the station presents a ❝ following the opening of the first intercity line regeneration opportunity ture projects that will help the private sector between Manchester and Liverpool in 1830, it invest and plan for the future. HS2 will form 14 took just a little over two decades to construct a a key element of that long-term pipeline, Euston masterplan national rail network which linked all our major providing certainty about future contracting cities, and transformed our economy. Designs for Euston station opportunities following the Yet the modern reality is that since the terminus are vital to the project completion of Crossrail in 2017. -
Hsuk London Terminal Strategy
HSUK LONDON TERMINAL STRATEGY In the development of high speed rail systems, the issue of terminal location and onward distribution of passengers assumes almost as much importance as the more obvious question of route. The new lines are designed to carry large volumes of passengers on trains operating at high frequencies, and these factors combine to create major flows arriving at city terminals which must then be efficiently dispersed onto the local public transport networks. This demands full integration of high speed and local systems, with optimised transfer at dedicated and fit-for- purpose terminals. These issues apply at all UK cities where high speed lines are planned, but are most acute in London, where passenger flows are greatest, and congestion in the existing public transport system is most critical. The following diagrams review existing central London connectivity issues, and compare and contrast the London terminal solutions proposed for HS2, and for the alternative High Speed UK proposals. For precise details of the core High Speed UK proposals (as included in the cost estimates), see the ‘200k’ series of plans. LTS1 : LONDON MAIN LINE NETWORK CIRCA 1963 LTS2 : EXISTING CENTRAL LONDON RAIL NETWORK INCLUDING CROSSRAIL SCHEME These diagrams show the rail network of central London, dominated by the classic terminus stations of the Victorian era. These are mostly reliant for onward connectivity upon the Tube network, which tended to form ‘nodes’ around the busier/more important termini. However, the change from main line to Tube is inherently inefficient, with passengers forced to detrain en masse, and with massive congestion occurring especially at rush hours. -
The Midland Main Line and the Influence of HS2 a Short Report for North West Leicestershire District Council
The Midland Main Line and the influence of HS2 A short report for North West Leicestershire District Council 1. Introduction Concerns have been raised recently about the relationship between the Midland Main Line (MML) and HS2, and whether the high-speed line is likely to have adverse effects on the existing network. At first sight, these concerns do not appear unreasonable in the context of recent Network Rail/Department for Transport decisions: There will be no electrification north of Kettering as this work has been halted in this and other locations. This raises a question about the viability of the Classic Connection with HS2 at Toton The new East Midlands contract will be 7+2, reducing the incentive for a new train operator to invest in new rolling stock; HSTs are scheduled to come out of service by 2019; possible replacements will not be able to attain the same speeds and this could adversely affect journey times. These points together make depressing reading, and it is understandable why there is a feeling that the MML is being sacrificed in favour of HS2 to make it a more attractive prospect for this part of England. The relationship between the MML and HS2 is an important one in the District, and currently it is finely balanced. The Council has been broadly supportive of the scheme because of the economic benefits that will follow on from the construction and operation of HS2, but there is a danger that this could change, particularly if continued opposition from residents and businesses alters the view of the elected members. -
High Speed Rail 2 (Phase Two) in Staffordshire Response to The
High Speed Rail 2 (Phase Two) in Staffordshire Response to the Phase Two Route Consultation CONTENTS INTRODUCTION ......................................................................................................................... 1 QUESTION ONE ......................................................................................................................... 2 QUESTION TWO ...................................................................................................................... 17 QUESTION THREE .................................................................................................................. 19 QUESTION FOUR .................................................................................................................... 23 QUESTION FIVE ....................................................................................................................... 24 QUESTION SIX ......................................................................................................................... 25 QUESTION SEVEN .................................................................................................................. 26 QUESTION EIGHT .................................................................................................................... 33 QUESTION NINE ...................................................................................................................... 36 High Speed Rail 2 in Staffordshire Route Consultation Response Phase Two INTRODUCTION This is a joint response -
High Speed 2: Spring 2020 Update
House of Commons Committee of Public Accounts High Speed 2: Spring 2020 update Third Report of Session 2019–21 Report, together with formal minutes relating to the report Ordered by the House of Commons to be printed 6 May 2020 HC 84 Published on 17 May 2020 by authority of the House of Commons The Committee of Public Accounts The Committee of Public Accounts is appointed by the House of Commons to examine “the accounts showing the appropriation of the sums granted by Parliament to meet the public expenditure, and of such other accounts laid before Parliament as the committee may think fit” (Standing Order No. 148). Current membership Meg Hillier MP (Labour (Co-op), Hackney South and Shoreditch) (Chair) Mr Gareth Bacon MP (Conservative, Orpington) Kemi Badenoch MP (Conservative, Saffron Walden) Olivia Blake MP (Labour, Sheffield, Hallam) Sir Geoffrey Clifton-Brown MP (Conservative, The Cotswolds) Dame Cheryl Gillan MP (Conservative, Chesham and Amersham) Peter Grant MP (Scottish National Party, Glenrothes) Mr Richard Holden MP (Conservative, North West Durham) Sir Bernard Jenkin MP (Conservative, Harwich and North Essex) Craig Mackinlay MP (Conservative, Thanet) Shabana Mahmood MP (Labour, Birmingham, Ladywood) Gagan Mohindra MP (Conservative, South West Hertfordshire) Sarah Olney MP (Liberal Democrat, Richmond Park) Bridget Phillipson MP (Labour, Houghton and Sunderland South) Nick Smith MP (Labour, Blaenau Gwent) James Wild MP (Conservative, North West Norfolk) Powers Powers of the Committee of Public Accounts are set out in House of Commons Standing Orders, principally in SO No. 148. These are available on the Internet via www.parliament.uk. Publication © Parliamentary Copyright House of Commons 2020. -
Proposed Local Area Plan for the Hs2 Interchange
PROPOSED LOCAL AREA PLAN FOR THE HS2 INTERCHANGE & ADJOINING AREA INITIAL (REGULATION 18) CONSULTATION November 2014 This page is left intentionally blank CONTENTS 1 INTRODUCTION 1 2 DUTY TO COOPERATE 4 3 FOCUS ON THE HS2 INTERCHANGE AND ADJOINING AREA 5 4 VISION 7 5 STRATEGIC PRIORITIES 10 6 EVIDENCE 14 7 DELIVERY 16 8 PROGRAMME FOR THE LOCAL AREA PLAN 17 9 CONSULTATION QUESTIONS 18 This page is left intentionally blank 1. Introduction 1.1 Solihull Local Plan 2013 1.1.1 The Council has a statutory duty to prepare and review a local plan for its area, to address the spatial implications of economic, social and environmental change. A local plan can be reviewed in whole or in part to enable the Council to respond flexibly to changing circumstances. It must be prepared with the objective of contributing to the achievement of sustainable development. 1.1.2 The Solihull Local Plan was adopted in December 2013 and covers the period 2011 to 2028. Since the Local Plan was adopted a legal challenge has been heard and the judgment handed down in May 2014 requiring the parts of the Local Plan relating to the overall housing requirement and the safeguarded land in Tidbury Green to be remitted to the Planning Inspectorate for re-examination. In July 2014, the Council was given leave to appeal this judgment and the appeal is likely to be heard in November 2014. In the interim, the Council has agreed a policy position statement relating to the housing requirement for the Borough. 1.1.3 The remainder of the Local Plan 2013 is unaffected by this legal challenge and appeal and remains the adopted plan for Solihull. -
Matter M76 Further Suggested Changes to Be Made to Policy T3 Transport Capacity, Connectivity and Safeguarding and Policy T9 Fu
Matter M76 Further suggested changes to be made to Policy T3 Transport capacity, connectivity and safeguarding and Policy T9 Funding transport infrastructure through planning • Bold blue – new text • Blue strikethrough – deleted original plan text • Purple strikethrough – deleted minor suggested change text • Bold purple- reinstated original text • Red bold – Minor Suggested change • Red strike through – minor suggested change Change ref no Policy/para Further suggested change /table/map M76.1 Policy T3, table 10.1 Transformation of Oxford Street low 2017- 2022 M76.2 Policy T3, table 10.1 ULEZ in central and inner London medium 2017- 2021 0 ULEZ in inner London low 2020- 2030 ULEZ strengthening London-wide low 2020- for buses, coaches and HGVs 2030 M76.3 Policy T3, table 10.1 Walk and cycle bridge between low 2020- Nine Elms and Pimlico river 2030 crossing: Nine Elms Pimlico Bridge M76.4 Policy T3, table 10.1 Bus network: wheelchair accessible low 2017- bus stops 2020 2041 M76.5 Policy T3, table 10.1 Bus transit pilots in Opportunity low 2020- Areas 2041 M76.6 Policy T3, table 10.1 Coach hub(s) upgrade and/or medium 2020- reprovision 2023 30 30 M76.7 Policy T3, table 10.1 Elizabeth line high 2017- 2021 0 M76.8 Policy T3, table 10.1 Elizabeth line extension / rail medium 2020- enhancements east of Abbey Wood / high 2041 M76.9 Policy T3, table 10.1 Heathrow Airport Southern Rail medium 2020 Access (required for if airport high - expansion proceeds) 2041 Heathrow Airport Western Rail medium 2020 Access (required for if airport high - expansion