Modernising the Great Western Railway
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Gloucester Railway Carriage & Wagon Co. 1St
Gloucester Railway Carriage & Wagon Co. 1st Generation DMU’s for British Railways A Review Rodger P. Bradley Gloucester RC&W Co.’s Diesel Multiple Units Rodger P Bradley As we know the history of the design and operation of diesel – or is it oil-engine powered? – multiple unit trains can be traced back well beyond nationalisation in 1948, although their use was not widespread in Britain until the mid 1950s. Today, we can see their most recent developments in the fixed formation sets operated over long distance routes on today’s networks, such as those of the Virgin Voyager design. It can be argued that the real ancestry can be seen in such as the experimental Michelin railcar and the Beardmore 3-car unit for the LMS in the 1930s, and the various streamlined GWR railcars of the same period. Whilst the idea of a self-propelled passenger vehicle, in the shape of numerous steam rail motors, was adopted by a number of the pre- grouping companies from around the turn of the 19th/20th century. (The earliest steam motor coach can be traced to 1847 – at the height of the so-called to modernise the rail network and its stock. ‘Railway Mania’.). However, perhaps in some ways surprisingly, the opportunity was not taken to introduce any new First of the “modern” multiple unit designs were techniques in design or construction methods, and built at Derby Works and introduced in 1954, as the majority of the early types were built on a the ‘lightweight’ series, and until 1956, only BR and traditional 57ft 0ins underframe. -
Midland Main Line Upgrade Programme Economic Case Department for Transport
Midland Main Line Upgrade Programme Economic Case Department for Transport 30 August 2017 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Notice This document and its contents have been prepared and are intended solely for Department for Transport’s information and use in relation to Midland Main Line Upgrade Programme Business Case. Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 108 pages including the cover. Document history Job number: 5159267 Document ref: v4.0 Revision Purpose description Originated Checked Reviewed Authorised Date Interim draft for client Rev 1.0 - 18/08/2017 comment Revised draft for client Rev 2.0 18/08/2017 comment Revised draft addressing Rev 3.0 - 22/08/2017 client comment Rev 4.0 Final 30/08/2017 Client signoff Client Department for Transport Project Midland Main Line Upgrade Programme Document title Midland Main Line Upgrade Programme: KO1 Final Business Case Job no. 5159267 Copy no. Document reference Atkins Midland Main Line Upgrade Programme | Version 4.0 | 30 August 2017 | 5159267 2 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Table of contents Chapter Pages Executive Summary 7 1. Introduction 12 1.1. Background 12 1.2. Report Structure 13 2. Scope of the Appraisal 14 2.1. Introduction 14 2.2. Scenario Development 14 3. Timetable Development 18 3.1. Overview 18 4. Demand & Revenue Forecasting 26 4.1. Introduction 26 4.2. Forecasting methodology 26 4.3. Appraisal of Benefits 29 4.4. -
High Speed Two: Full Speed Ahead?
High Speed Two: Full Speed Ahead? The UK government has given the “green light” to the High Speed Two (HS2) rail project in its entirety, following the outcome of the Oakervee Review, ending months of speculation over the future of the scheme. Phase 2b of the project, linking Crewe to Manchester and Birmingham to Leeds via Sheffield, is subject to further review. It now forms part of an ambitious “High Speed North” integrated masterplan, including Northern Powerhouse Rail and other local rail improvements. What will this mean for landowners, occupiers and others who are directly affected by the HS2 scheme? Time will tell. However, the announcement is likely to be welcomed, as it provides certainty that the project will now proceed, although concerns over the long-term plans for delivery of Phase 2b will persist. HS2 Limited’s remit will be to “…focus solely on getting On all fronts, the government’s announcement gives phases 1 and 2A built on something approaching on time grounds for optimism. The government has pledged to learn and on budget” and, in respect of Phase 2b, new “delivery lessons from Phase 1 and improve how the project is being arrangements” will be put in place, but not before “…an delivered, highlighting the need for better communication and integrated plan for rail in the north” has been introduced. engagement with local communities impacted by the scheme. Grand plans no doubt, but close attention will be paid to the detail, including the enabling legislation required to deliver Major concerns will also remain over the delivery of the Phase 2a of the project and future plans for the design and scheme, including timescales for completion of each phase, delivery arrangements for Phase 2b. -
Hampton Court to Berrylands / Oct 2015
Crossrail 2 factsheet: Services between Berrylands and Hampton Court New Crossrail 2 services are proposed to serve all stations between Berrylands and Hampton Court, with 4 trains per hour in each direction operating directly to, and across central London. What is Crossrail 2? Crossrail 2 in this area Crossrail 2 is a proposed new railway serving London and the wider South East that could be open by 2030. It would connect the existing National Rail networks in Surrey and Hertfordshire with trains running through a new tunnel from Wimbledon to Tottenham Hale and New Southgate. Crossrail 2 will connect directly with National Rail, London Underground, London Overground, Crossrail 1, High Speed 1 international and domestic and High Speed 2 services, meaning passengers will be one change away from over 800 destinations nationwide. Why do we need Crossrail 2? The South West Main Line is one of the busiest and most congested routes in the country. It already faces capacity constraints and demand for National Rail services into Waterloo is forecast to increase by at least 40% by 2043. This means the severe crowding on the network will nearly double, and would likely lead to passengers being unable to board trains at some stations. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce congestion, and would enable us to run more local services to central London that bypass the most congested stations. Transport improvements already underway will help offset the pressure in the short term. But we need Crossrail 2 to cope with longer term growth. -
Management Case for High Speed 2
Management Case for High Speed 2 1 Contents Introduction 4 Timetable to an operational railway 5 Governance 7 Planning 16 Risk Management 17 Issue Management 18 Change Control 19 Assurance 24 Benefit Realisation and Evaluation 25 Communication and Stakeholder Management 26 Building Capability and Capacity 28 Document Control 30 Annex A – Governance Framework for High Speed 2 31 Annex B – Remit letter 32 Annex C – DfT High Speed Rail Organogram 36 Annex D – HS2 Ltd Organogram 37 Annex E – Risk and Issue Management Strategy 38 Annex F - Integrated Assurance and Approvals Plan 53 Annex G – Benefit Realisation and Evaluation Strategy 73 Annex H - Communications Plan 84 Annex I – Resource Management Plan 111 2 Purpose 1. The purpose of the Management Case is to provide confidence that credible and robust arrangements are in place to deliver the High Speed 2 (HS2) programme to time, cost and quality. It includes: . an outline of the HS2 programme and how it will be delivered; . governance arrangements for the programme, including the role of the High Speed Rail Programme Board, the separate Project Boards and HS2 Ltd’s own governance; . details on the programme of work planned and how key milestones are tracked; . evidence on how risks and issues are managed and escalated; . detail on how change is and will be managed within the programme; . arrangements for programme and project assurance; . our communication plan for the programme, including how we engage with stakeholders; . how we plan to manage and record the benefits from the programme; . contingency and resource planning arrangements; and . document control arrangements. 2. -
High Speed Two Limited
High Speed Two Limited High Speed 2 Infrastructure Maintenance Depot (IMD) High Speed Two Limited H igh Speed 2 Infrastructure Maintenance Depot (IMD) March 2011 This r eport t akes i nto a ccount t he particular instructions and requirements of our client. It i s not i ntended f or a nd s hould n ot be relied u pon b y any third p arty a nd no responsibility i s u ndertaken to any t hird Ove Arup & Partners Ltd party The Arup Campus, Blythe Gate, Blythe Valley Park, Solihull, West Midlands. B90 8AE Tel +44 (0)121 213 3000 Fax +44 (0)121 213 3001 www.arup.com Job number High Speed Two (HS2) High Speed 2 Infrastructure Maintenance Depot Contents Page 1 Introduction 1 1.1 The December 2009 Report 1 1.2 Layout of this Report 1 2 Scope of Work, Methodology and Deliverables 2 2.1 Scope of Work 2 2.2 Meeting 1 2 2.3 Intermediate instructions 3 2.4 Meeting 2 3 3 Current Rail Operations and Future Developments 4 3.1 Context 4 3.2 Oxford - Bletchley 4 3.3 Aylesbury – Claydon Line 4 3.4 High Speed 2 5 3.5 Evergreen 3 5 3.6 East West Project 5 4 Functional Requirements 6 5 Site Location Options 7 5.1 Introduction 7 5.2 Quadrant 1 9 5.3 Quadrant 2 11 5.4 Quadrant 3 15 5.5 Quadrant 4 17 5.6 Sites on HS2 (north) 18 6 Cost Estimates 20 6.1 Matrix table for all Site options 20 7 Conclusion 21 8 Selected Option Development 23 8.1 General layout 23 8.2 Specific site details 27 8.3 Site operation 28 8.4 West end connections 29 9 Calvert Waste Plant 30 9.1 Rail Access 30 9.2 Heat and power generation 32 10 Use of site as a potential construction depot 33 -
Brunel's Dream
Global Foresights | Global Trends and Hitachi’s Involvement Brunel’s Dream Kenji Kato Industrial Policy Division, Achieving Comfortable Mobility Government and External Relations Group, Hitachi, Ltd. The design of Paddington Station’s glass roof was infl u- Renowned Engineer Isambard enced by the Crystal Palace building erected as the venue for Kingdom Brunel London’s fi rst Great Exhibition held in 1851. Brunel was also involved in the planning for Crystal Palace, serving on the The resigned sigh that passed my lips on arriving at Heathrow building committee of the Great Exhibition, and acclaimed Airport was prompted by the long queues at immigration. the resulting structure of glass and iron. Being the gateway to London, a city known as a melting pot Rather than pursuing effi ciency in isolation, Brunel’s of races, the arrivals processing area was jammed with travel- approach to constructing the Great Western Railway was to ers from all corners of the world; from Europe of course, but make the railway lines as fl at as possible so that passengers also from the Middle East, Africa, Asia, and North and South could enjoy a pleasant journey while taking in Britain’s won- America. What is normally a one-hour wait can stretch to derful rural scenery. He employed a variety of techniques to two or more hours if you are unfortunate enough to catch a overcome the constraints of the terrain, constructing bridges, busy time of overlapping fl ight arrivals. While this only adds cuttings, and tunnels to achieve this purpose. to the weariness of a long journey, the prospect of comfort Rain, Steam and Speed – The Great Western Railway, a famous awaits you on the other side. -
Britain's Need for an Electrified Railway
Britain’s need for an electrified railway A paper by Railfuture’s Network Development Team January 2009 www.railfuture.org.uk In 1981, reflecting uncertainty over future energy supplies, a joint British Rail/Department of Transport report established the need for strategic commitment to electrification and called for a rolling programme. In 1982 its findings and recommendations were broadly supported by the Transport Select Committee. However, since 1990, virtually no electrification has taken place. This must change, now! Benefit of Electric Trains Apart from Britain’s first high-speed line, the Heathrow Airport link and now Crossrail, extension of overhead wires has been limited to a diversionary No pollution at point of use; route on the West Coast Mainline, the reopening of a commuter route Quieter, cleaner, less vibration; south of Glasgow and the rebuilding of the Airdrie-Bathgate route. Little Better acceleration; more than 0.1% of the 17,000km network has been electrified since Not locked into source of fuel; privatisation, whilst wires have been erected over thousands of kilometres Regenerative braking; of routes across Europe and, expansion of electrification is continuing. Trains are cheaper and have longer life as fewer moving Lack of progress in the UK rests with successive treasury-dominated parts than diesel trains; governments, which seem resolutely opposed to any capital expenditure Capable of operating for that brings long-term benefits. All these governments have lacked vision. In longer hours as no fuelling the past this has merely affected Britain’s prosperity; now it risks our future. time required; Visible investment (the “Sparks effect”) encourages The need to be ‘green’ increased rail use. -
8. Portishead to Portbury Dock Junction Overview 17 9
Ref: GS2/140569 Version: 1.00 Date: July 2014 Contents 1. Executive Summary 1 2. Introduction 3 3. Business Objective 6 4. Business Case 9 5. Project Scope 11 6. Deliverables 12 7. Options Considered 13 8. Portishead to Portbury Dock Junction Overview 17 9. Engineering Options 19 10. Bathampton Turnback 52 11. Constructability and Access Strategy 53 12. Cost Estimates 56 13. Project Risks and Assumptions 57 14. High level business case appraisal against whole life costings 58 15. Project Schedule 59 16. Capacity/Route Runner Modelling 60 17. Interface with other Projects 61 18. Impact on Existing Customers, Operators and Maintenance Practice 62 19. Consents Strategy 63 20. Environmental Appraisal 64 21. Common Safety Method for Risk Evaluation Assessment (CSM) 65 22. Contracting Strategy 66 23. Concept Design Deliverables 67 24. Conclusion and Recommendations 68 References 70 Formal Acceptance of Selected Option by Client, Funders and Stakeholders 71 GRIP Stage 2 Governance for Railway Investment Projects Ref: GS2/140569 Version: 1.00 Date: July 2014 Appendices A Drawings B Cost Estimate C Qualitative Cost Risk Analysis D Capacity Modelling E Environmental Appraisal F Signalling Appraisal G Photograph Gallery H Track Bed Investigation (Factual, Interpretative and Hazardous Classification) I Visualisations (Galingaleway and Sheepway Gate Farm) J Interdisciplinary Design Certificate K Portishead Station Options Appraisal Report (produced by North Somerset Council) GRIP Stage 2 Governance for Railway Investment Projects Ref: GS2/140569 Version: 1.00 Date: July 2014 Issue Record Issue No Brief History Of Amendment Date of Issue 0.01 First Draft 30 May 2014 0.02 Second Draft updated to include comments 13 June 2014 1.00 Report Issued 18 July 2014 Distribution List Name Organisation Issue No. -
Delivering High Speed 2 Major Project Report
DELIVERING HIGH SPEED 2 MAJOR PROJECT REPORT New rail reality Developing a £33bn rail network to transform Uk’s north-soUth 03|2012 CONNECTIONS Special report | High Speed 2 03 | 2012 Foreword 04 infrastructure specialists who supply the rail Introduction industry. Many of them are already helping HS2 Ltd chief executive Alison Munro us deliver Crossrail, Thameslink, electrifica- updates on the project’s progress tion, and upgrades to major stations like Reading and Birmingham. But even the 08 largest of these schemes will be dwarfed in Technical challenge size by HS2. So the challenge is for British Why the current London to West firms to develop the expertise to compete Midlands route is the best for key high speed contracts, and help deliver Britain’s Victorian engineering HS2 on time and on budget. 12 pioneers built a railway that was the The government’s National Infrastructure Euston envy of the world. Such was their Plan makes clear the importance of a predict- vision and singular focus that able and transparent pipeline of infrastruc- Expanding the station presents a ❝ following the opening of the first intercity line regeneration opportunity ture projects that will help the private sector between Manchester and Liverpool in 1830, it invest and plan for the future. HS2 will form 14 took just a little over two decades to construct a a key element of that long-term pipeline, Euston masterplan national rail network which linked all our major providing certainty about future contracting cities, and transformed our economy. Designs for Euston station opportunities following the Yet the modern reality is that since the terminus are vital to the project completion of Crossrail in 2017. -
Trains Galore
Neil Thomas Forrester Hugo Marsh Shuttleworth (Director) (Director) (Director) Trains Galore 15th & 16th December at 10:00 Special Auction Services Plenty Close Off Hambridge Road NEWBURY RG14 5RL Telephone: 01635 580595 Email: [email protected] Bob Leggett Graham Bilbe Dominic Foster www.specialauctionservices.com Toys, Trains & Trains Toys & Trains Figures Due to the nature of the items in this auction, buyers must satisfy themselves concerning their authenticity prior to bidding and returns will not be accepted, subject to our Terms and Conditions. Additional images are available on request. If you are happy with our service, please write a Google review Buyers Premium with SAS & SAS LIVE: 20% plus Value Added Tax making a total of 24% of the Hammer Price the-saleroom.com Premium: 25% plus Value Added Tax making a total of 30% of the Hammer Price 7. Graham Farish and Peco N Gauge 13. Fleischmann N Gauge Prussian Train N Gauge Goods Wagons and Coaches, three cased Sets, two boxed sets 7881 comprising 7377 T16 Graham Farish coaches in Southern Railway steam locomotive with five small coaches and Livery 0633/0623 (2) and a Graham Farish SR 7883 comprising G4 steam locomotive with brake van, together with Peco goods wagons tender and five freight wagons, both of the private owner wagons and SR all cased (24), KPEV, G-E, boxes G (2) Day 1 Tuesday 15th December at 10:00 G-E, Cases F (28) £60-80 Day 1 Tuesday 15th December at 10:00 £60-80 14. Fleischmann N Gauge Prussian Train Sets, two boxed sets 7882 comprising T9 8177 steam locomotive and five coaches and 7884 comprising G8 5353 steam locomotive with tender and six goods wagons, G-E, Boxes F (2) £60-80 1. -
Thames Valley Branch Lines – Notes of Meeting
Thames Valley Branch Lines – Notes of Meeting Date: 05 December 2016 Time: 10.00am Venue: 4 Marlow Road, Maidenhead Attendees: Cllr Phillip Bicknell, Royal Borough of Windsor & Maidenhead Cllr Julian Brookes, Henley‐on‐Thames Council Martin Coker, Cookham Parish Council) Gerard Coll, Wycombe District Council Kevin Miller, Network Rail Philip Meadowcroft, Wargrave Users Group Gordon Oliver, Royal Borough of Windsor & Maidenhead Nigel Philips, Rail Futures / High Wycombe Society Tom Pierpoint, Great Western Railway Michael Porter, Henley Branch User Group Richard Porter, Maidenhead Marlow Passenger Association Cllr MJ Saunders, Cookham Parish Council / Richard Scarff, Cookham Society / Royal Borough of Windsor & Maidenhead Cllr David Sleight, Wokingham Borough Council Cllr Jocelyn Towns, Marlow Town Council David Wilby, Wokingham Borough Council ITEM NOTES ACTION 1.0 WELCOME AND INTRODUCTIONS Cllr Bicknell welcomed everyone to the meeting and invited attendees to introduce themselves. 2.0 NETWORK RAIL PRESENTATION Kevin Miller (KM) gave the presentation in place of Simon Maple who had been called away to an urgent meeting. He summed up progress on electrification to date: The 16 mile section between Didcot and Reading is complete and is being used for fleet testing. A link to Reading Depot has also been completed, so electric trains no longer need to be dragged in and out and can be moved within the depot, which is being used for training purposes. Changes at Old Oak Common will affect maintenance operations and some facilities are moving to Reading (e.g. wheel lathe). Some elements of the electrification programme have been deferred, in order to fund previously unfunded scope (e.g.