Appendix A-Major Flood Control Projects Table 1: Major Drainage Projects in Northern NT (As at 30.6.2004)

Total Page:16

File Type:pdf, Size:1020Kb

Appendix A-Major Flood Control Projects Table 1: Major Drainage Projects in Northern NT (As at 30.6.2004) Appendix A-Major Flood Control Projects Table 1: Major Drainage Projects in Northern NT (as at 30.6.2004) PWP Title Est. Cost Length Start Compl. Brief Description Location of Significant Date Date Improvements and Benefits Completed Projects (Total cost = $ 2,359.7 million) 4024CD/A Shenzhen River Regulation Project, 149.4 3.4 05/1995 04/1997 Regulation of Shenzhen Tak Yuet Lau, Liu Pok, Ta Sha stage I - improvement to river bends River from river bends at Lok, Ha Wan Tsuen, Lok Ma Chau at Lok Ma Chau and Liu Pok Liu Pok to Lok Ma Chau 4031CD/A Regulation of Shenzhen River stage II 336 7 05/1997 06/2000 Regulation of Shenzhen Hoo Hok Wai, Sam Po Shue, phase II - improvement to river River from Liu Pok to Ha Wan Tsuen, Lok Ma Chau sections between Liu Pok and Lok Ma Lok Ma Chau and Lok Chau and from Lok Ma Chau to Ma Chau to estuary estuary 4044CD/A Regulation of Shenzhen River, stage 123.9 - 11/1996 11/1998 reprovisioning of border II, phase I - reprovisioning of border road between Lok Ma road between Lok Ma Chau and Tam Chau and Tam Kon Chau Kon Chau 4091CD/A Rural Drainage Rehabilitation Scheme, 181.4 4.2 11/1998 12/2001 Construction of drainage San Wai Barracks, Kwan Tei, stage 1, phase 1A - rehabilitation channels and box culvert Wang Leng, Hung Leng, Leng works at Ng Tung River (about 170 m) Tsai, Wang Shan Keuk San Tsuen, Tai Tong Wu, Shan Tong, San Tong Po 4093CD/A Rural drainage rehabilitation scheme, 155.3 4.9 04/1999 12/2001 Construction of drainage Hang Tau Tai Po, Hang Tau, stage 1, phase 1B - rehabilitation channel Cheung Lek, Lin Tong Mei, works at Sheung Yue River Tsiu Keng Lo Wai, Tsiu Keng Pang Uk, Tsiu Keng San Wai, Chan Uk Po 7053CD/A River training works for the Upper 756.3 4.6 08/1999 03/2003 Training of drainage Fu Tei Au, Sheung Shui Wa River Indus channel Shan, Tin Ping Shan Tsuen, Shek Wu San Tsuen, Wu Nga Lok Yeung, Ma Shi Po, Siu Hang San Tsuen, Siu Hang Tsuen, Kan Lung Tsuen, San Wai, San Uk Tsuen 7072CD/A Village flood protection for Tsung Pak 99 - 02/1996 10/1998 Construction of polder Tsung Pak Long and Long and Tai Tau Leng Tai Tau Leng 7087CL/A Shek Wu Hui Development Package 4, 265 1.7 09/1998 02/2002 River training in Area 30 Tsung Yuen, Ho Sheung engineering works Heung, Ying Kong 7094CD/A River training works for the Lower 253.4 2.6 03/1999 03/2001 Construction of drainage Lo Wu, Tak Yuet Lau, Shek River Indus and River Beas channel Ma, Ngam Pin, Pai Tau Lo, Ho Sheung Heung, Tong Kok, Shek Tsai Leng, Kwu Tung, Ying Kong 7651CL/A Formation and servicing of Area 36, 40 0.35 03/1999 07/2001 Construction of drainage Ng Uk Tsuen, Kai Leng, Fanling, phase 1 channel Chong Tsin Leng Appendix A-Major Flood Control Projects Table 1: Major Drainage Projects in Northern NT (as at 30.6.2004) PWP Title Est. Cost Length Start Compl. Brief Description Location of Significant Date Date Improvements and Benefits Projects under construction (Total cost = $636.2 million) 4090CD/A Regulation of Shenzhen River, 467.8 4 12/2001 03/2006 Training of Shenzhen Lo Wu, Yuen Leng Chai, Nam stage III River upstream of Lo Wu Hang, Man Kam To, Muk Wu, to Lo Shue Leng Muk Wu Nga Yiu, Lo Shue Ling, Ta Kwu Ling 4131CD/A Rural drainage rehabilitation scheme 168.4 1.7 05/2003 10/2005 Drainage rehabilitation Chow Tin Tsuen, Ta Kwn Ling Village, (part) - Drainage rehabilitation works at works at RiverGanges Kan Tau Wai, Fung Wong Wu, Ping Yuen River and Mo Fan Heung Lei Uk, Tong Fong, Shui Hau Stream Projects under Design/Planning (Total estimated cost = $1,100.4 million) 4112CD/B Drainage improvement in Northern 224 4.9 04/2005 07/2008 Construction of drainage Ping Kong, Tai Lung, Tong (part) New Territories - package A (NNT channels in Ping Kong, Hang, Kau Lung Hang Lo Wai, portion) Kau Lung Hang, Nam Kiu Tau, Kau Lung Hang San Wah Po and for the Wai, Yuen Leng, Tai Wo, Nam upstream part of Ma Wat Wa Po, Tai Hang, Shek Wu River Hui, Luen Wo Hui, Sam Po Shue 152 8.8 04/2006 06/2009 Upgrading and Sheung Shui and Fanling Town rehabilitation of urban drains in Sheung Shui and Fanling Town 4118CD/B Drainage Improvements in Northern 328 7.6 10/2005 10/2009 Construction of 7.6 km Ma Tso Lung, Tse Koo Hang, (part) New Territories - Package B (including drainage channels in Shun Yee San Tsuen, Ma Tso the cost of Kwu Tung, Ma Tsao Lung San Tsuen, Lo Wu Camp, works in Lung and Fu Tei Au Tsung Yuen, Hang Tau Tai Po, NWNT) Tong Kung Leng, Lin Tong Mei Tsoi Yuen, Ying Pun, Tsiu Keng Lo Wai, Tsiu Keng Pang Uk, Tsiu Keng San Wai, Luk Mei Tsuen, Pang Loon Tei 4119CD/B Drainage Improvements in Northern 329 8 6/2007 6/2011 Construction of 8 km Lin Ma Hang, Ping Che, Tai Po New Territories - Package C drainage channels in Tin, Sheung Shan Kai Wat, Lung Yeuk Tau, Man Uk Man Uk Pin, Loi Tung, Ng Uk Pin, Ta Kwu Ling, Ping Tsuen, Tan Chuk Hang Lo Wai, Che and Lin Ma Hang Tan Chuk Hang, San Tong Po, Tai Wo 4125CD/B Drainage improvement from Tung 67.4 1 8/2005 8/2007 Construction of drainage Tung Kok Wai, San Wai Kok Wai to San Wai, Fanling channels from Tung Kok Wai to San Wai, Fanling Appendix A-Major Flood Control Projects Table 2: Major Drainage Projects in Northwestern NT (as at 30.6.2004) PWP Title Est. Cost Length Start Compl. Brief Description Location of Significant Date Date Improvements and Benefits Completed Projects (Total cost = $ 2,546.6 million) 4101CD/A Rural drainage rehabilitation scheme, 16.4 0.35 07/2000 11/2002 Construction of drainage Nam Hang Tsuen stage 2, phase 1-Nam Hang drainage channels in Nam Hang improvement 7029CD/A Main drainage channels for Ngau Tam 105.7 1.7 03/2000 12/2002 Construction of drainage Yau Tam Mei Tsuen, Yau Tam Mei, phase 2-Ngau Tam Mei to Yau channel from Ngau Tam Mei San Tsuen, Wai Tsai Mei San Tsuen section Mei to Yau Mei San Tsue 7035CD/A Village flood protection for the San 232 - 11/1996 12/1999 Construction of floodwater San Tin (Tung Chan Wai, Yan Tin villages and Chau Tau Tsuen, pumping stations in San Tin Shau Wai, On Lung Tsuen, Wing North West New Territories and Chau Tau Ping Tsuen, Fan Tin Tsuen, San Lung Tsuen, Tsing Lung Tsuen) and Chau Tau 7043CD/A North West New Territories 349 2.3 10/1995 12/1998 Training of Kam Tin River Cheung Chun San Tsuen, Ha Ko development-main drainage channels Po Tsuen, Ko Po Tsuen, Pak Wai for Yuen Long and Kam Tin-stage 1 Tsuen, Shui Mei, Shui Tau, Kam phase 2 Hing Wai, Kam Tin Shi 7060/CD/A North West New Territories 557 6 10/1993 03/1999 Training of Shan Pui Lut Chau, Tai Sang Wai, Nam development-main drainage channels River and Kam Tin River Sang Wai, Tung Tau Wai San for Yuen Long and Kam Tin, stage 1 Tsuen, Shan Pui Chung Hau phase 1 Tsuen, Lam Uk Tsuen, Tai Hong Wai, Kam Tin San Tsuen 7071CD/A Village flood protection for Sha Po 75 - 09/1996 06/1999 Construction of Sha Po Tsuen Tsuen, Kam Tin, New Territories floodwater pumping station in Sha Po Tsuen 7081CD/A Main drainage channels for Yuen 259.9 3.4 05/2001 07/2003 Construction of drainage Tsz Tong Tsuen, Ng Ka Tsuen, Long and Kam Tin, stage 2-remainder channels near Ng Ka Kam Tsin Wai, Nam Hing Lei, Tsuen and Shek Tau Wai Chung Sum Tsuen, Pak Pin Tsuen, Uk Tau Tsuen, To Uk Tsuen, Shek Tau Wai, Tsz Tong Tsuen 7095CD/A Main drainage channels for Yuen 313.6 3.1 08/1999 03/2004 Construction of drainage Kam Tin San Tsuen, Wing Lung Long and Kam Tin stage 2-Kam Tin channel from Kam Tin Wai, Kiu Tau Tsuen, Pang Ka San Tsuen to Wang Toi Shan section San Tsuen to Wang Toi Tsuen, Shek Kong San Tsuen, Shan Wang Toi Shan 7097CD/A Main drainage channels for Yuen 229 3.5 07/1999 03/2002 Construction of drainage Kat Hing Wai, Tai Hong Tsuen, Long and Kam Tin stage 2-Kam Tin channel from Kam Tin Shek Wu Tong, Tin Sam Tsuen, Road to Tai Kek section Road to Tai Kek Tai Kek 7098CD/A Phase 1 village flood protection for 77.6 0.24 10/1999 04/2002 Construction of Pok Wai, Wang Chau Pok Wai and Wang Chau, North West floodwater pumping New Territories station in Pok Wai 7107CD/A Village flood protection for Chuk 122.2 - 11/2000 03/2003 Construction of Chuk Yuen Tsuen and Ha San Wai Yuen Tsuen and Ha San Wai, North floodwater pumping West New Territories station in Chuk Yuen Tsuen and Ha San Wai 7113CD/A Main drainage channels for Yuen 93.2 2.4 03/2001 05/2003 Construction of drainage Sham Chung Tsuen, Muk Kiu Long and Kam Tin-Sham Chung channel in Sham Chung Tau Tsuen, Shui Tsiu San Tsuen, Channel Tai Tong Tsuen 7117CD/A Village flood protection for Mai Po Lo 70 - 12/2001 3/2004 Construction of Ma Tin Tsuen and Shui Pin Wai (part) Wai, Mai Po San Tsuen, Ma Tin Tsuen floodwater pumping and Shui Pin Wai, North West New stations in, Ma Tin Tsuen Territories and Shui Pin Wai 7473CL/A Tin Shui Wai development-village 46 - 04/1997 08/1998 Construction of Ha Mei San Tsuen flood protection works for Ha Mei San floodwater pumping Tsuen station in Ha Mei San Tsuen Projects under construction (Total cost = $ 1,871.5 million) 4114CD/A Yuen Long, Kam Tin, Ngau Tam Mei 192.1 7.5 12/2001 05/2005 Upgrading of urban Yuen Long town, Ping Shan, and Tin Shui Wai drainage drainage in Yuen Long Hung Shui Kiu and Tin Shui Wai improvements, stage 1, phase 1-Yuen town, Ping Shan and Long and Tin Shui Wai Hung Shui Kiu and bank raising in Tin Shui Wai Appendix A-Major Flood Control Projects Table 2: Major Drainage Projects in Northwestern NT (as at 30.6.2004) PWP Title Est.
Recommended publications
  • Yuen Long District(Open in New Window)
    District : Yuen Long Recommended District Council Constituency Areas +/- % of Population Estimated Quota Code Recommended Name Boundary Description Major Estates/Areas Population (17,194) M01 Fung Nin 17,927 +4.26% N Castle Peak Road - Yuen Long 1. CRYSTAL PARK 2. HO SHUN TAI BUILDING NE Castle Peak Road - Yuen Long 3. MANHATTAN PLAZA E Tai Tong Road 4. TSE KING HOUSE STAGE 1 SE Tai Tong Road, Ma Tong Road 5. YEE FUNG GARDEN S Ma Tin Road, Ma Tong Road SW Ma Tin Road, Yuen Long Tai Yuk Road W Yuen Long Tai Yuk Road NW Castle Peak Road - Yuen Long Yuen Long Tai Yuk Road M02 Shui Pin 20,833 +21.16% N Ma Wang Road 1. COVENT GARDEN 2. GREENERY PLACE NE Ma Wang Road 3. PARK ROYALE E Castle Peak Road - Yuen Long 4. PARKSIDE VILLA Yuen Long Tai Yuk Road 5. SCENIC GARDENS 6. SHUI PIN WAI ESTATE SE Ma Tin Road, Yuen Long Tai Yuk Road 7. SPRINGDALE VILLAS S Ma Tin Road 8. TSE KING HOUSE STAGE 2 9. VILLA ART DECO SW Shan Ha Road W Shan Ha Road NW Castle Peak Road – Yuen Long Shui Pin Wai Road, Town Park Road North M1 District : Yuen Long Recommended District Council Constituency Areas +/- % of Population Estimated Quota Code Recommended Name Boundary Description Major Estates/Areas Population (17,194) M03 Nam Ping 15,967 -7.14% N 1. LONG PING ESTATE (PART) : Cheuk Ping House NE Fung Ping House E Nullah Hay Ping House SE Ma Wang Road Hor Ping House Wah Ping House S Ma Wang Road Yuet Ping House SW Fung Chi Road W Fung Chi Road, Long Ping Road NW Long Ping Road M04 Pek Long 15,052 -12.46% N Fuk Hi Street, Long Ping Road 1.
    [Show full text]
  • 332 Controlling Officer's Reply
    Examination of Estimates of Expenditure 2019-20 Reply Serial No. FHB(FE)332 CONTROLLING OFFICER’S REPLY (Question Serial No. 5578) Head: (49) Food and Environmental Hygiene Department Subhead (No. & title): (-) Not specified Programme: (2) Environmental Hygiene and Related Services Controlling Officer: Director of Food and Environmental Hygiene (Miss Vivian LAU) Director of Bureau: Secretary for Food and Health Question: How many unisex toilets are there in the territory? Please provide their addresses with a breakdown by the 18 districts. Does the Food and Environmental Hygiene Department have any plan to continuously increase the number of unisex toilets? If yes, please provide the details. Asked by: Hon CHAN Chi-chuen (LegCo internal reference no.: 409) Reply: The Food and Environmental Hygiene Department (the Department) has 379 public toilets with accessible unisex toilets (AUTs) provision. A list of these toilets is provided at Annex. If circumstances permit, the Department will, based on “The Design Manual on Barrier Free Access 2008”, provide AUTs at new public toilets or during reprovisioning or refurbishment of existing ones. Access to AUTs does not necessitate traversing an area reserved for one sex only. - End - Session 13 FHB(FE) - Page 901 Annex (Page 1 of 20) List of Public Toilets with Accessible Unisex Toilets Serial District Name of Public Toilet Address No. 1 Central/Western Belcher's Street Public Behind No.2-12 Belcher's Street, Sai Toilet Wan 2 Central/Western Centre Street Public Toilet Near Centre Street Market,
    [Show full text]
  • Report on the 2007 Village Representative Election
    53 Appendix V(A) (Page 1/11) 2007 Village Representative Election List of Duly Elected Candidates in Uncontested RR Elections (Pursuant to Gazette Notices (Extraordinary) No. 185-211 of 20 December 2006, Gazette Notice No. 485 of 19 January 2007 and Gazette Notice No. 661 of 26 January 2007) District/ Name of Village Name of Candidate Rural Committee ISLANDS Ko Long LAU CHI YUEN Lo Tik Wan NG CHONG YIP Pak Kok Kau Tsuen CHAN KWOK KIN Pak Kok San Tsuen CHOW CHEUNG YAU Sha Po MA CHING WAH Lamma Island Tai Peng Tsuen WONG KING CHEE (North) Tai Wan Kau Tsuen CHAN KAM PANG Tai Wan San Tsuen CHAN WAI LUN ALAN Tai Yuen CHOW WING CHUNG ALAN Wang Long CHOW KWOK KWONG Yung Shue Long WONG KING CHUEN Lamma Island Mo Tat CHAN KAM WAH (South) Pak Mong KWOK SHU YUNG Pak Ngan Heung WONG WAI KIT Mui Wo Tai Ho HO TIN SHUNG Tai Tei Tong WONG CHAU FUK Peng Chau Nim Shu Wan WONG SIU NGOK Cheung Sha Lower Village YAU WAI SUN Ham Tin CHEUNG YUK WAH LION (LION) Pui O Lo Uk Tsuen LAW YUK TONG Pui O Lo Wai CHEUNG SHU FONG South Lantao Pui O San Wai HO WAI YIP Shap Long CHOW KWAI TANG Shui Hau CHEN YIP LING Tong Fuk TANG KOON SANG Kat Hing Back Street WONG CHI CHUEN Kat Hing Street KWOK KAM YING Keung Shan, Lower CHEN TAI KAM Nam Tong Sun Tsuen POON KAM CHUEN Ngong Ping SIK CHI WAI San Tau TSE KIN KWOK Sha Lo Wan MAN WAI CHEONG Tai O Sham Shek WONG CHO KWONG Shek Tsai Po (East) CHANG SUI SING Tai O Market Street KUNG WAI HING Tai O Tai Ping Street (I) SO MING Tai O Tai Ping Street (II) WONG CHI YIN Tai O Wing On Street (I) CHEUNG FOR YAU Tai O Wing On Street (II)
    [Show full text]
  • In Central & Western District
    October 2018 Service Boundary of Integrated Home Care Services Teams (Ordinary Cases) in Central & Western District No. Agency Service Unit Address Phone / Fax Service Boundary 1 St. James’ Central & Western 11/F., Sheung Wan 2805 1256, Admiralty, Central, Sheung Wan, Mid-levels,Sai Ying Pun Settlement Integrated Home Care Municipal Bldg., 345 2805 1257 / (Connaught Road West all numbers, Des Voeux Road West from Services Team Queen’s Road West, 2851 6557 number 1 to 408 ),Centre Street (all odd numbers, even numbers Hong Kong. from 2 to 40),Queen’s Road West (odd numbers from 1 to 451 even numbers from 2 to 290), Western Street (even numbers from 2 to 22), Water Street (numbers from 1 to 3), First Street (odd numbers from 1 to 55, even numbers from 2 to 60), Second Street (odd numbers from 1 to 55, even numbers from 2 to 32), Third Street (odd numbers from 1 to 61, even numbers from 2 to 54), High Street (odd numbers from 1 to 51, even numbers from 2 to 44), Mid-levels (Boham Road odd numbers from 1 to 31, all even numbers), Caine Road (all numbers) 1 October 2018 No. Agency Service Unit Address Phone / Fax Service Boundary 2 Hong Kong Family Central & Western G/F, Lower Block, Grand 2546 3332 / Sai Ying Pun, Centre Street (even numbers from 42 to 62), Queen Welfare Society Integrated Home Care Millennium Plaza, 181 to 2167 8987 Road West (odd numbers from 453 onwards, even numbers Services Team 183 Queen’s Road from 292 to 504), Hing Hon Road (all numbers) Central, Sheung Wan.
    [Show full text]
  • LC Paper No. CB(1)842/19-20(01)
    。LC Paper No. CB(1)842/19-20(01) 商務及經濟發展局 COMMUNICATIONS AND CREATIVE lNDUSTRIES BRANCH 通訊及創意產業科 COMMERCE AND ECONOMIC 香港添馬添美道二號 DEVELOPMENT BUREAU 政府總部西翼二十一摟 21/F, West Wing Central Government Offices 2 Tim Mei Avenue Tamar, Hong Kong 本函檔號 OUR REF 來函檔號 YOUR REF 電語 TEL. NO. 2810 2708 傅真 FAXLINE· 2511 1458 電子郵件 E - mail Address: [email protected] By Email 3 July 2020 Clerk, Legislative Council Panel on Information Technology and Broadcasting Legislative Council Complex 1 Legislative Council Road Central, Hong Kong (Attn.: Mr Daniel SIN) Dear Mr SIN, Panel on Information Technology and Broadcasting Follow-up to Meeting on 8 June 2020 At the meeting of the Legislative Council Panel on Information Technology and Broadcasting on 8 June 2020, Members requested the Government to provide the following supplementary information on the Subsidy Scheme to Extend Fibre-based Networks to Villages in Remote Areas (Subsidy Scheme): Regarding the rolling out of fibre-based lead-in connections to a total of 235 villages as required under the Subsidy Scheme, selected fixed network operators (FNOs) have made additional service commitments for some of the villages, e.g. providing villagers with broadband services at a speed of 1 000 Mbps or above, installing Wi-Fi hotspots within the common area of villages for provision of free Wi-Fi services and/or providing broadband services to villagers at the prevailing market prices during the first three years upon project completion (see Annex A for details). The two selected FNOs are now undertaking various works /Cont'd .... - 2 - pla画ng and 唧lying for relevant statutory permits and approvals.
    [Show full text]
  • List of Recognized Villages Under the New Territories Small House Policy
    LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN,
    [Show full text]
  • RNTPC Paper No. A/YL-NTM/391A for Consideration by the Rural and New Town Planning Committee on 18.10.2019
    Annex A of TPB Paper No. 10621 RNTPC Paper No. A/YL-NTM/391A For Consideration by the Rural and New Town Planning Committee on 18.10.2019 APPLICATION FOR PERMISSION UNDER SECTION 16 OF THE TOWN PLANNING ORDINANCE APPLICATION NO. A/YL-NTM/391 Applicant : Nice Trend Development Ltd. Site : Lots 232 (Part), 233 (Part), 234 (Part), 235 (Part) and 236 RP (Part) in D.D. 104, and Adjoining Government Land (GL), Ngau Tam Mei, Yuen Long Site Area : About 3,926 m2 (including GL of about 823 m2) Lease : Block Government Lease (demised for agricultural use) Plan : Approved Ngau Tam Mei Outline Zoning Plan (OZP) No. S/YL-NTM/12 Zoning : “Green Belt” (“GB”) Application : Filling of Land and Filling of Pond for Permitted Agricultural Use 1. The Proposal 1.1 The applicant seeks planning permission for filling of land and filling of pond at the application site (the Site) for permitted agricultural use (fish farming). According to the Notes of the OZP for the “GB” zone, ‘Agriculture Use’ is a Column 1 use which is always permitted. However, any filling of land or pond, including that to effect a change of use to any of those specified in Columns 1 and 2 or uses or developments always permitted under the covering Notes, requires planning permission from the Town Planning Board (the Board). The Site has been filled without obtaining planning permission and currently used for fish farming. The Site is not the subject of any previous application. 1.2 There were two ponds at the Site (see aerial photo of 2015 in Plan-3b ).
    [Show full text]
  • NA36 Yuen Long
    Effective Date:From 00:01 on 20 June 2021 Bus Stop List for Long Win Route No. NA36 To Airport (Passenger Terminal Building/ To Yuen Long (Kam Sheung Road Station) Cathay Pacific City) No. Bus Stop Name (Note 1) Street No. Bus Stop Name (Note 1) Street Yuen Long Airport Unnamed Road 1) Kam Sheung Road Station 1) Cathay Pacific City (South Bound) Airport (Ground Transportation Centre) Bus 2) Ko Po Tsuen 2) Kam Tin Road Terminus 3) Ha Ko Po Tsuen (West Bound) HZMB Hong Kong Port 4) Au Tau 3) HZMB Hong Kong Port 5) Tung Shing Lei Tuen Mun Tuen Mun Chek Lap Kok Tunnel Interchange 6) Yeung Uk Tsuen 4) (T3) (Yuen Long Bound) Tuen Mun Town Plaza Tuen Hi Road 7) YOHO MALL I 5) [near (North Bound) Tuen Mun Central] Tuen Mun Road 8) Yau San Street 6) Hugn Kiu Castle Peak Road (North Bound) 9) Tai Tong Road (West Bound) Yuen Long Wang Tat Road 10) Hong Lok Road 7) Fung Chi Tsuen (East Bound) Yuen Long Police 11) 8) Yuen Long Plaza Station Castle Peak Road 12) Shui Pin Tsuen 9) Tung Lok Street (East Bound) 13) Yuen Long Park 10) Kuk Ting Street Long Yat Road 11) YOHO MALL II Tuen Mun (East Bound) Tuen Mun Road Long Yat Road 14) Hung Kiu 12) YOHO MALL I (South Bound) (South Bound) Waldorf Garden Tuen Fat Road Castle Peak Road 15) [near 13) Tung Shing Lei (South Bound) (East Bound) Tuen Mun Central] Tuen Mun Chek Lap Kok Tunnel Interchange 16) 14) Au Tau (A1) (Airport bound) Kam Tin Road 15) Ha Ko Po Tsuen HZMB Hong Kong Port (East Bound) HZMB Passenger Shun Fai Road 17) 16) Ko Po Tsuen Clearance Building (East Bound) Airport 17) Kam Sheung Road Station Cheong Hong Road 18) Terminal 1 (North Bound) Scenic Road 19) Cathay Pacific City (South Bound) Note 1: Passengers can click on the hyperlink for the above bus stop name to check for the location and the street view of the bus stops.
    [Show full text]
  • Sediment and Water Quality in the Kam Tin River, Hong Kong
    Erosion and Sediment Yields in the Changing Environment (Proceedings of a symposium held at the 81 Institute of Mountain Hazards and Environment, CAS-Chengdu, China, 11–15 October 2012) (IAHS Publ. 356, 2012). Sediment and water quality in the Kam Tin River, Hong Kong M. R. PEART1, L. FOK2 & J. CHEN3 1 Department of Geography, University of Hong Kong, Hong Kong, China [email protected] 2 Department of Science and Environmental Studies, Hong Kong Institute of Education, Hong Kong, China 3Department of Civil Engineering; University of Hong Kong, Hong Kong, China Abstract River water quality has reflected development pressures in Hong Kong. The Hong Kong Government has adopted a range of measures to improve water quality including the enactment of the Water Pollution Control Ordinance which specifies Water Quality Objectives (WQO) for rivers. One of the key WQO for the Kam Tin River, one of the largest rivers in Hong Kong, is an annual median suspended solids value of <20 mg/L. During the years of 2006 to 2011, regular weekly sampling at the Kam Tin monitoring station revealed dry season median values for suspended solids of 82.1, 84.4, 52.6, 74.3, 82.2 and 60.6 mg/L, respectively, well above the WQO limits. In the summer wet season the annual median values are 52.2, 43.4, 19.1, 21.6, 25.0 and 56.6 mg/L, respectively, which are much lower than those in the dry season and in general exceed the WQO limit. Monitoring at three additional stations indicates spatial variation in sediment concentrations in the basin.
    [Show full text]
  • OFFICIAL RECORD of PROCEEDINGS Wednesday, 16 December 2020 the Council Met at Eleven O'clock
    LEGISLATIVE COUNCIL ― 16 December 2020 2375 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 16 December 2020 The Council met at Eleven o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE ANDREW LEUNG KWAN-YUEN, G.B.M., G.B.S., J.P. THE HONOURABLE ABRAHAM SHEK LAI-HIM, G.B.S., J.P. THE HONOURABLE TOMMY CHEUNG YU-YAN, G.B.S., J.P. THE HONOURABLE JEFFREY LAM KIN-FUNG, G.B.S., J.P. THE HONOURABLE WONG TING-KWONG, G.B.S., J.P. THE HONOURABLE STARRY LEE WAI-KING, S.B.S., J.P. THE HONOURABLE CHAN HAK-KAN, B.B.S., J.P. THE HONOURABLE CHAN KIN-POR, G.B.S., J.P. DR THE HONOURABLE PRISCILLA LEUNG MEI-FUN, S.B.S., J.P. THE HONOURABLE WONG KWOK-KIN, S.B.S., J.P. THE HONOURABLE MRS REGINA IP LAU SUK-YEE, G.B.S., J.P. THE HONOURABLE PAUL TSE WAI-CHUN, J.P. THE HONOURABLE MICHAEL TIEN PUK-SUN, B.B.S., J.P. THE HONOURABLE STEVEN HO CHUN-YIN, B.B.S. 2376 LEGISLATIVE COUNCIL ― 16 December 2020 THE HONOURABLE FRANKIE YICK CHI-MING, S.B.S., J.P. THE HONOURABLE YIU SI-WING, B.B.S. THE HONOURABLE MA FUNG-KWOK, G.B.S., J.P. THE HONOURABLE CHAN HAN-PAN, B.B.S., J.P. THE HONOURABLE LEUNG CHE-CHEUNG, S.B.S., M.H., J.P. THE HONOURABLE ALICE MAK MEI-KUEN, B.B.S., J.P. THE HONOURABLE KWOK WAI-KEUNG, J.P. THE HONOURABLE CHRISTOPHER CHEUNG WAH-FUNG, S.B.S., J.P.
    [Show full text]
  • Yuen Long District(Open in New Window)
    District : Yuen Long Provisional District Council Constituency Areas +/- % of Population Estimated Quota Code Proposed Name Boundary Description Major Estates/Areas Population (16,964) M01 Fung Nin 19,454 +14.68 N Castle Peak Road - Yuen Long 1. CHUN WAH VILLAS PHASE 3 2. CRYSTAL PARK NE Tai Tong Road 3. HO SHUN TAI BUILDING E Tai Tong Road 4. MANHATTAN PLAZA 5. PO SHING BUILDING SE Tai Tong Road, Tai Shu Ha Road East 6. TSE KING HOUSE (STAGE 1) S Nullah 7. TSING YU TERRACE 8. YEE FUNG GARDEN SW Nullah, Ma Tin Road W Yuen Long Tai Yuk Road NW Yuen Long Tai Yuk Road Castle Peak Road - Yuen Long M1 District : Yuen Long Provisional District Council Constituency Areas +/- % of Population Estimated Quota Code Proposed Name Boundary Description Major Estates/Areas Population (16,964) M02 Shui Pin 19,277 +13.63 N Ma Wang Road, Ping Wui Street 1. COVENT GARDEN 2. EMERALD GREEN Yuen Long On Ning Road 3. GREENERY PLACE NE Yuen Long On Ning Road, Nullah 4. PARK ROYALE 5. PARKSIDE VILLA E Castle Peak Road - Yuen Long 6. SCENIC GARDENS Yuen Long Tai Yuk Road 7. SHUI PIN WAI ESTATE SE Yuen Long Tai Yuk Road, Ma Tin Road 8. SPRINGDALE VILLAS 9. VILLA ART DECO S Ma Tin Road, Shap Pat Heung Road SW Shan Ha Road W Castle Peak Road - Ping Shan Shan Ha Road, Shui Pin Wai Road Town Park Road North NW Ma Wang Road, Shui Pin Wai Road M2 District : Yuen Long Provisional District Council Constituency Areas +/- % of Population Estimated Quota Code Proposed Name Boundary Description Major Estates/Areas Population (16,964) M03 Nam Ping 16,800 -0.97 N 1.
    [Show full text]
  • List of Doctors / Clinics Enrolled in COVID-19 Vaccination Programme Under the Vaccination Subsidy Scheme
    List of Doctors / Clinics Enrolled in COVID-19 Vaccination Programme under the Vaccination Subsidy Scheme Yuen Long District Name of Doctor Name of Clinic Address Enquiry Phone No. Podium M14, Shek Ping House, Long Ping Estate, YUEN LONG, NEW CHAK, CHI WAH Dr Chak Chi Wah's Clinic 24758988 TERRITORIES Shop G, 1/F, Phase 2, Kingswood Richly Plaza, Kingswood Villas, TIN SHUI CHAN, CHI WAI NIXON Grace Medical Clinic 31522170 WAI, NEW TERRITORIES CHAN, HUNG WAI Dr Chan Hung Wai Patrick Flat E15, Town Centre, Fairview Park, YUEN LONG, NEW TERRITORIES 24719580 PATRICK Shop NG16, G/F, T Town North, Tin Yuet Estate, 33 and 39 Tin Wah Road, Tin CHAN, KUNG YAT Dr Chan Kung Yat 22530543 Shui Wai, YUEN LONG, NEW TERRITORIES Shop 5, G/F, Chestwood Court, Kingswood Villas, 8 Tin Shui Road, TIN SHUI CHAN, LAM FUNG Heavenly Joy Family Clinic 26169898 WAI, NEW TERRITORIES Shop 7, G/F, Kwong Wah Plaza, 11 Tai Tong Road, YUEN LONG, NEW CHAN, NAI YIN Dr. Chan Nai Yin 24422120 TERRITORIES CHAN, TSE PUI Dr Chan Tse Pui G/F, Fu Shing Building, 8 Sai Ching Street, YUEN LONG, NEW TERRITORIES 24792716 Shop C2C & C3A, 1/F , Kingswood Richly Plaza, Kingswood Villas, TIN SHUI CHAN, TSZ KIN ANTHONY Tsz Kin Medical Centre 26170508 WAI, NEW TERRITORIES CHAN, WAI CHUNG Jockey Club Tin Shui Wai Community Health Unit 103, 1/F, Tin Ching Amenity & Community Building, Tin Ching Estate, Tin 31569000 VIRGINIA Centre Kwai Road, TIN SHUI WAI, NEW TERRITORIES Shop F1, 1/F, Phase 2, Kingswood Richly Plaza, Kingswood Villas, TIN SHUI CHEUNG, HON YUEN Town Health-PHC Medical Centre 21461119 WAI, NEW TERRITORIES 1 List of Doctors / Clinics Enrolled in COVID-19 Vaccination Programme under the Vaccination Subsidy Scheme Yuen Long District Name of Doctor Name of Clinic Address Enquiry Phone No.
    [Show full text]