National Mission for Clean Ganga Format for submission of Monthly Progress Report in the NGT Matter OA No. 673 of 2018 (in compliance to NGT order dated 24.09.2020)

For the State of Overall status of the State: I. Total Population: Urban Population & Rural Population separately:

Rural: 6,15,45,441, Urban: 5,08,27,531

II. Estimated Sewage Generation (MLD): 9758

III. Details of Sewage Treatment Plant:  Existing no. of STPs and Treatment Capacity (in MLD): 142 STPs with treatment capacity of 7747 MLD (3532.95 MLD Existing and 4214.29 ongoing)  Capacity Utilization of existing STPs: 4207 MLD  MLD of sewage being treated through Alternate technology: Faecal Sludge Treatment Plant- 15 FSTPs have been installed along polluted river stretches, with total capacity of 290 KLD.  Gap in Treatment Capacity in MLD: 2011  No. of Operational STPs:135  No. of Complying STPs: 100  No. of Non-complying STPs: 34

53 Rivers in Priority I - 9, II - 6, III - 14, IV - 10, V - 14. • MPR received for January, February, March, April, May, June, July, August, September, October, November, December 2020, January and February 2021. • Total sewage generation in PRS – 2728.65 MLD • No. of STPs-73 • Sewage treatment existing in PRS – 1961.40 MLD • Gap in Treatment Capacity-767.25 • Capacity Utilization - 1637.57 MLD • STPs proposed/ ongoing – 1297.96 MLD (Details provided in the MPR) (Pls refer Annexure-I for river wise progress of STP work)

1

Details of each existing STP in the State

Sewage Treatment Status Compliance Plant (Operational / Present Status Name of the Location of the Sr. (STP) Non- capacity/ (Comply / Town with no. of Sewage Treatment No. Installed Operational / utilization Non-Comply / STP Plant (STP) Capacity Under (MLD) Partially (MLD) Construction) Comply) STP wise Colaba WWTF Nr Municipal Afgan Church 1. Corporation of 37 Operational 22.51 Comply Colaba Mumbai -05 Greater Mumbai Tel No.22150723 LGP WWTF-IPS Municipal 89,Dr.A.B. Road 2. Corporation of 757 Operational 374.78 Non-Comply Worli Mumbai 18. Greater Mumbai Tel No.24933697 Malad STP Municipal Marve Road, Mith 3. Corporation of Chawky, Malad 280 Operational 216.06 Non-Comply Greater Mumbai (W), Mumbai-95 Tel : 28820860 Charkop STP Municipal MHADA, Sector 8 & 4. Corporation of 9, Kandivali(W), 6 Operational 4.28 Comply Greater Mumbai Mumbai- 400067 Tel : 28681357 Bhandup WWTF Off eastern Express Municipal Highway Near Airoli 5. Corporation of 280 Operational 141.48 Comply Bridge Traffic Signal Greater Mumbai Bhandup East Tel No. 8286226994 Ghatkopar WWTF Off eastern Express Municipal Highway 6. Corporation of Near Pant Nagar 380 Operational 151.7 Comply Greater Mumbai Traffic Signal Ghatkopar East. Tel No. 9082820120 Versova STP J.P. Road Jn.,Link Road, Municipal Near Apnana Bazar, 7. Corporation of 180 Operational 108 Comply Andheri (W), Greater Mumbai Mumbai-53 Tel : 26366881 Influent Pumping Station Bandra, Opp Swami Vivekanand Municipal Garden, Mahim 8. Corporation of 797 Operational 531 Comply Causway, Mahim Greater Mumbai (West), Mumbai 400016.Tel. No. 24464750 Thane Municipal TMC STP Kopri, 9. 120 Operational 70 Comply Corporation Thane Thane Municipal TMC STP Mumbra, 10. 32 Operational 12 Comply Corporation Thane Thane Municipal TMC STP Vartak 11. 0.9 Operational 0.25 Comply Corporation Nagar Thane Municipal 12. Vitava 8.4 Operational 2.5 Comply Corporation

2

Non- Thane Municipal Operational 13. Kharegoan 46.76 NA NA Corporation (Commissioning under progress) Thane Municipal Everest World, 14. 23.06 Operational 5 Comply Corporation Kolshet Thane Municipal 15. Lodha 22.02 Operational 5 Comply Corporation Non- Thane Municipal Operational 16. Nagla Bunder 7 NA NA Corporation (Commissioning under progress) Non- Thane Municipal Operational 17. Hiranandani 59 NA NA Corporation (Commissioning under progress) Mira- Bhaindar Bhayander (W) near 18. Municipal 8 Operational 8 Comply Garden Court Tower Corporation Mira- Bhaindar Golden Nest Road, 19. Municipal Bhayander (E) 12 Operational 12 Comply Corporation Goddev Mira- Bhaindar Kanakia, Mira Road 20. Municipal 17 Operational 17 Comply (E) Corporation Mira- Bhaindar Shanti Park - Mira 21. Municipal 13 Operational 13 Comply road - Sanghavinagar Corporation Mhada- shanti Mira- Bhaindar garden- Mira 22. Municipal 7 Operational 7 Comply Penkarpadagavthan Corporation (Mhada Colony) Mira- Bhaindar Shanti nagar Mira 23. Municipal road station, Near 11 Operational 11 Comply Corporation ayappamandir, Ghodbunder- Mira- Bhaindar Kashigaon, 24. Municipal Mashachhapada 14 Operational 14 Comply Corporation Bhayander, Survey No. 233 Mira- Bhaindar 25. Municipal Jesal park 2 Operational 2 Comply Corporation Mira- Bhaindar Shrushti complex, 26. Municipal 1.5 Operational 1.5 Comply Mira Road Corporation Vasai-Virar Bolinge Village STP 27. Municipal 30 Operational 19 Comply - 2, Corporation Kalyan Dombivali 28. Municipal Adharwadi 25 Operational 21 Comply Corporation Kalyan Dombivali 29. Municipal Barave 15 Operational 11 Comply Corporation Kalyan Dombivali 30. Municipal Motagaon 40 Operational 4 -- Corporation Kalyan Dombivali 31. Municipal Chinchpada 40 Operational 15 Comply Corporation

3

Kalyan Dombivali Manda Titwala 2.0 32. Municipal 2 Operational 1 Comply MLD.(E) Corporation Kalyan Dombivali Manda Titwala 1.0 33. Municipal 1 Operational 0.5 Comply MLD (W) Corporation Bhiwandi Nizampur 34. Katai-1 13 Operational 13 Comply Municipal Corporation Bhiwandi Nizampur Non- 35. Katai-2 17 - NA Municipal Operational Corporation Ambernath 36. Municipal Vadalgaon STP 45 operational 22 Comply Council Ambernath 37. Municipal Chikloli STP 9 Operational 6 Comply Council Kulgaon Badalapur 38. Badlapur STP 22 Operational 20 Comply Municipal Council Ulhasnagar 39. Municipal Vadholgaon 20.7 Operational 20.7 Comply Corporation Navi Mumbai 40. Municipal Sec-12 C.B.D. 19.00 Operational 12.00 Comply Corporation Navi Mumbai 41. Municipal Sec-50, Nerul 100.00 Operational 40.00 Comply Corporation Navi Mumbai 42. Municipal Sec-18, Vashi 100.00 Operational 40.00 Comply Corporation Navi Mumbai 43. Municipal Sec-20, Sanpada 37.50 Operational 18.00 Comply Corporation Navi Mumbai 44. Municipal Sec-15, Ghansoli 30.00 Operational 10.00 Comply Corporation Navi Mumbai Sec-14, 45. Municipal 87.50 Operational 45.00 Comply Koparkhairane Corporation Navi Mumbai 46. Municipal Sec-18, Airoli 80.00 Operational 35.00 Comply Corporation Panvel Municipal Bandar Road, 47. 14 Operational 12 Comply Corporation Panvel, Dist. Raigad. Sector-16, Kharghar, Panvel Municipal 48. Tal. Panvel, Dist. 25 Operational 23 Comply Corporation Raigad. Sector-16, Kharghar, Panvel Municipal 49. Tal. Panvel, Dist. 70 Operational 63 Comply Corporation Raigad. Sector-32, , Panvel Municipal 50. Kamothe, Tal. 85 Operational 79 Non-Comply Corporation Panvel, Dist. Raigad.

4

Sector-12,Kalamboli, Panvel Municipal 51. Tal. Panvel, Dist. 50 Operational 47 Comply Corporation Raigad. Panvel Municipal Sector-06, Ulwe, Tal. 52. 32 Operational 26 Comply Corporation Panvel, Dist. Raigad. Kalundre, Kalundre Panvel Municipal 53. Gaon, Panvel, Navi 2 Operational 1.7 Comply Corporation Mumbai Panvel Municipal 54. CIDCO Karanjade 28 Operational 15 Comply Corporation Municipal 55. Chehedi STP 22 Operational 22 Non-Comply Corporation Nashik Municipal 56. Chehedi STP 21 Operational 21 Non-Comply Corporation Nashik Municipal 57. Panchak 7.5 Operational 7.5 Non-Comply Corporation Nashik Municipal 58. Panchak 21 Operational 21 Non-Comply Corporation Nashik Municipal 59. Panchak 32 Operational 32 Non-Comply Corporation Nashik Municipal 60. Tapvan 78 Operational 78 Non-Comply Corporation Nashik Municipal 61. Tapvan 52 Operational 52 Non-Comply Corporation Nashik Municipal 62. Agar Takali 70 Operational 70 Non-Comply Corporation Nashik Municipal 63. Agar Takali 40 Operational 40 Non-Comply Corporation Nashik Municipal Municipal STP 64. 18 Operational 15 Non-Comply Corporation Gangapur Tryambakeshwar Municipal Council 65. Municipal 1 Operational 1 Comply Tryambak Council Municipal Council - Shirpur Municipal 66. Shirpur, Tq Shirpur 12.5 Operational 8.64 Comply Council Dist Dhule Nandurbar Municipal Council - 67. Municipal Nandurbar, Tq and 17.5 Operational 9.3 Comply Council Dist Nandurbar Shirdi Shirdi, Tal-- Rahata, 68. 16 Operational 9 Comply Nagarpanchyat Dist- Ahmednagar

Erandwane STP, Municipal 69. S.No.3&4 50 Operational 50 Non-Comply corporation Bopodi STP, Pune Municipal 70. S.No.2A, 2B, 2C, 2D 18 Operational 15 Non-Comply corporation &6 (P) Bopodi Pune Municipal Tanajiwadi S.No.24, 71. 17 Operational 13 Non-Comply corporation Shivajinagar Bhairoba STP, Final Pune Municipal plot No.330 72. 130 Operational 80 Non-Comply corporation S.No.33A, 33B Mundhawa STP, Pune Municipal 73. S.No.2,3A,4 45 Operational 42 Non-Comply corporation Mundhawa Pune Municipal Vithalwadi STP, 74. 32 Operational 25 Non-Comply corporation S.No.20(P) Hingane Pune Municipal Old Naidu STP, Non- 75. 90 NA NA corporation S.No.439 To 444 Operational 5

Pune final Plot No. (STP of 98 Knndy Road capacity of 127 MLD is proposed at this STP) Pune Municipal STP, S.No.221 76. 30 Operational 30 Non-Comply corporation To 227 Baner Pune Municipal STP, 77. 40 Operational 40 Non-Comply corporation S.No.74, 75 Kharadi New Naidu STP, Pune Municipal S.No.439 To 444 78. 115 Operational 115 Non-Comply corporation Pune final Plot No. 98 Knndy Road Baramati Gunawadi Road, 79. Munucipal 11.5 Operational 11.5 Non-Comply Baramati council Non- Operational Daund Municipal Daund Municipal 80. 4.2 (Maintenance 0 NA Council Council STP work under progress) Saswad Municipal Saswad Municipal 81. 2 Operational 2 Non-Comply Council council STP Non- Operational (existing STP is Lonavala Capacity Dongar Gaon, dismantled for 82. Municipal 3.6 NA enhancement Lonavala capacity Council under progress enhancement to the tune of 6 MLD) Shirur Municipal Sr. No. 269, Sonar 83. 6 Operational 2.5 Comply Council Ali, Shirur Pune Cantonment 900 Boottee Street, 84. 20 Operational 9 Comply Board Pune-! Khadaki Gaddi Adda, Ward 85. Cantonment No. Tamela Chawl, 8 Operational 6 Non-Comply Board Khadaki. Khadaki East Khadali, Near 86. Cantonment Lokmanya Tilak 1.2 Operational 1.2 Non-Comply Board Highschool 87. Chikhali Phase I 16 Operational 26.33 Comply Municipal Corporation Pimpri Chinchwad 88. Chikhali Phase II 16 Operational Comply Municipal Corporation Pimpri Chinchwad Chinchwad Phase I 89. 30 Operational 28.9 Comply Municipal (Bhatnagar) Corporation Pimpri Chinchwad 90. Chinchwad Phase II 30 Operational 28.08 Comply Municipal Corporation Pimpri Chinchwad 91. Sangvi Phase I 10 Operational 6.031 Comply Municipal Corporation

6

Pimpri Chinchwad 92. Kasarwadi I 40 Operational 85.312 Comply Municipal Corporation Pimpri Chinchwad 93. Kasarwadi II 40 Operational Comply Municipal Corporation Pimpri Chinchwad 94. Kasarwadi III 40 Operational Comply Municipal Corporation Pimpri Chinchwad 95. Pimple Nilekh 20 Operational 18.741 Comply Municipal Corporation Pimpri Chinchwad 96. Ravet 20 Operational 12.547 Comply Municipal Corporation Pimpri Chinchwad 97. Akurdi 30 Operational 26.514 Comply Municipal Corporation Pimpri Chinchwad Sangvi Phase II 98. 20 Operational 13.774 Comply Municipal () Corporation Pimpri Chinchwad 99. Chahroli Phase I 21 Operational 20.362 Comply Municipal Corporation Pimpri Chinchwad 100. Chahroli Phase II 20 Operational 14.30 Non-Comply Municipal Corporation Solapur Municipal 101. Degaon STP 75.00 Operational 52.12 Comply Corporation Solapur Municipal 102. Kumathe STP 12.50 Operational 5.39 Comply Corporation Solapur Municipal 103. Pratap Nagar STP 15.00 Operational 5.22 Comply Corporation Compartment no. 79(City Survey Mahabaleshwar no.257/1) behind 104. Municipal Karmachari Vasahat, 4 Operational 2 Comply Council At-Mahabaleshwar, Tal-Mahabaleshwar, Dist-Satara at Survey No.626, Mahabaleshwar near Dhobi Ghat,At- 105. Municipal Mahabaleshwar, Tal- 1 Operational 0.5 Comply Council Mahabaleshwar, Dist-Satara Survey No. 83/2 near Panchagani Siddharthnagar,At- 106. Municipal 0.65 Operational 0.65 Comply Panchgani, Tal- Council Mahabaleshwar, Dist-Satara

7

Plot no. 497/4 & 5 Panchagani near Shivajinagar,At- 107. Municipal Panchgani, Tal- 0.35 Operational 0.35 Comply Council Mahabaleshwar, Dist-Satara Hindu Panchagani Crematorium,At- 108. Municipal Panchgani, Tal- 1.5 Operational 1.5 Comply Council Mahabaleshwar, Dist-Satara Bara Dabari, Karad, Karad Municipal 109. Tal-Karad, Dist- 12.5 Operational 9.5 Comply Council Satara Malkapur A/p-Malkapur Tal 110. Municipal 5 Operational 5 Comply Karad Dist-Satara Council Malkapur ,A/p-Malkapur Tal 111. Municipal 3 Operational 3 Comply Karad Dist-Satara Council Pandharpur STP 112. Municipal 15.5 Operational 12 Comply Gopalpur,Pandharpur Council Pandharpur STP, 65 113. Municipal 2.5 Operational 0.5 Comply Acre,Pandharpur Council Kolhapur Kolhapur Municipal Municipal Corporation STP ( 76 114. 76 Operational 55 Comply Corporation, MLD )Kasaba Kolhapur Bavada, Kolhapur Kolhapur Kolhapur Municipal Municipal Corporation STP ( 17 115. 17 Operational 17 Comply Corporation, MLD )Dudhali, Kolhapur Kolhapur Dhulgaon STP 27 Sangli Municipal 116. MLD (Oxidation 27 Operational 27 Comply Corporation pond) STP at Miraj-9.2 Sangli Municipal 117. MLD (Oxidation 9.2 Operational 9.2 Comply Corporation pond) Hamumannagar STP Sangli Municipal 100 Footy road( 118. 23.5 Operational 13 Non-Comply Corporation Commising date- 23/7/2018) Ichalkaranji Ichalkaranji Municipal Council ( 119. Municipal STP 18 MLD ) Old 20 Operational 14 Comply Council Sangli Naka, Ichalkaranji Aurangabad Kanchanwadi, 120. Municipal 161 Operational 60 Comply Aurangabad Corporation Aurangabad 121. Municipal Padegaon 10 Operational 5 Comply Corporation Aurangabad 122. Municipal Salim Ali Lake 5 Operational 4 Comply Corporation Aurangabad 123. Municipal At Zalta, 35 Operational 15 Comply Corporation

8

Nanded Waghala 124. Municipal Elichpur 30 Operational 12 Non-Comply Corporation Nanded Waghala 125. Municipal Bondar 87 Operational 35 Non-Comply Corporation Nanded Waghala 126. Municipal Sangvi 15 Operational 10 Non-Comply Corporation Municipal 127. Bhandewadi 200 Operational 200 Comply corporation Nagpur Municipal 128. Bhandewadi 130 Operational 130 Comply corporation Nagpur Municipal 129. Mankapur 5 Operational 5 Comply corporation Nagpur Municipal 130. Mokshadham 5 Operational 5 Comply corporation Nagpur Municipal 131. Kachimet (NIT) 1 Operational 1 Comply corporation Nagpur Municipal 132. Sonegaon (NIT) 0.3 Operational 0.3 Comply corporation Nagpur Municipal 133. Hazari Pahad (NIT) 4 Operational 4 Comply corporation Somalwada- Nagpur Municipal 134. 1(Ongoing work by 20 Operational NA Comply corporation NIT) Nagpur Municipal 135. Dabha(NIT) 5 Operational NA Comply corporation Amravati 136. Municipal STP-1 –Lalkhadi, 44.0 Operational 44 Comply Corporation Amravati 137. Municipal STP-2-Lalkhadi 30.5 Operational 30.5 Comply Corporation Shegaon S.No. 752/1, 138. Municipal Charmori, Shegaon, 7 Operational 3.5 Non-Comply Council Dist.-Buldana Opposite to Municipal Chamunda Devi 139. 8 Operational 4 Comply Council Washim Mandir, Nimazaga Washim Chandrapur 140. Municipal Pathanpura 45 Operational 24 Comply Corporation Chandrapur 141. Municipal Rehmat Nagar 25 Operational 22 Non-Comply Corporation Chandrapur 142. Municipal Azad Garden 0.5 Operational 0.5 Non-Comply Corporation

Details of under construction STPs along the Polluted River Stretches

Capacity Status of I&D or Sr. Name of the of the Physical Progress House sewer Completion No. City/Town Location plant in in % connections Timeline MLD 1550 km sewer Nashik Municipal STP network completed March-21 1. Municipal Pimpalgaon, 32 40% work completed 210km sewer network Corporation Baswant work under progress is 40% completed and 9

expected to complet March 2022 as informed by representative NMC Municipal Corporation of WSP Compound 8 70% work completed Dec-21 2. Greater Mumbai The underground drainage scheme is designed for the population left bak at old akola city 2.27km Shiloda 30 and nalla intercept (15No.), Right bak of The civil construction morna river length Akola work of both these 10.93 km and nalla 3. April-21 Municipal STPs is completed up intercept 18 no., Bapu Corporation to 95% nagar to Kharap length 1.91km nalla interception 2 nos.,

Construction of PDKV 7 4. pumping station with Wetwell at Old city River Bak (Wet well at old city river bank) Work was stopped and Pimpri structure demolished by 5. Chinchwad Proposed STP 12 NGT Order, but work is April-22 Municipal started on alternative Corporation land parcel. Sangli Miraj Total 164.9 KM sewer SMKC Bedag road 100% work is line is proposed out of 6. Kupwad 22.5 May-21 Municipal Miraj completed that 116.5 KM wok Corporation completed Pili Mazid 7. Bhimnagar Ward, 10 Hinganghat 100% Civil work Hinganghat. May-21 Municipal completed. Hinganghat Council 3 8. Municipal Council

Excavation work is Jalgaon Gat No.413,390 48 completed. Civil work August-21 9. Municipal Jalgaon Shiwar Corporation is not yet started. Drainage network work Pachora Pachora Municipal 9 80% work completed is under progress. Oct-21 10. Municipal Council STP Council Kolhapur Municipal Corporation STP ( 6 10% work completed Kolhapur 6 11. MLD ) Bawda, (foundation Municipal Kolhapur Corporation, March-21 Kolhapur Kolhapur Municipal Corporation STP ( 4 4 55% work completed 12. MLD ) Dudhali, Kolhapur The work had begun. Ichalkaranji Funds of Rs. 82.60 Municipal Council ( Ichalkaranji crore have been STP 18 MLD 18 Mar-21 13. Municipal sanctioned from Council )Ichalkaranji STP Takawade UIDSSMT scheme. But at present the work is 10

stopped due to legal issues.

Ulhasnagar 95%work completed 14. Municipal Shanti Nagar-1 15 Corporation

Ulhasnagar 90 % Khemani STP 15. Municipal Shanti Nagar-2 31.26 Aug-21 Corporation

Work order given to Ulhasnagar 16. Municipal Khadegovili STP 8 contractor Corporation Work awarded and Kundalika River Funds are available Right Bank at Survy Roha No. 128/3A at Vill. however contractor has 1 Mar-22 Municipal Ashtami, about 120 not yet started the Council construction work due 17. mtrs. away from Kundalika River. to GST issue. Excavation for Foundation of Sewage Nanded Pumping station Well is 18. Waghala Chunal Nalla 10 75% completed and the Dec-21 Municipal levelling of ground and Corporation other miscellaneous works are in progress.

As said area is having less population, underground network is Work order is awarded not proposed. Sewage Kalyan to agency and Dombivali collection is proposed 19. Vadavali STP 21 construction work is May-21 Municipal by nalla intersection at under progress Corporation Sewage pumping station followed by treatment at STP

40% work of main Work order for STP is drainage line has been just awarded to Gadchiroli Bormala Road, completed. The work of 20. Municipal 11.5 contractor. Foundation Oct-21 Gadchiroli internal drainage is yet Council work is just started. to start.

Work completed up to Khalapur Khalapur Nagar 21. 3 Mar-22 Nagar Panchayat STP PCC level. Panchayat Total Sewage network Amalner Amalner Municipal length is 80km, till date 22. 12.6 8% work completed Jul-21 Municipal Council STP work completed is Council 21km.

Dhule Dhule Municipal 23. 17 Municipal Corporation STP Corporation 10% STP construction 20% Underground completed drainage, completed Mar-21 Dhule Dhule Municipal 24. 40p Municipal Corporation STP Corporation

11

Drainage pipeline of Near Solid Waste Ballarpur 54.09 kms is proposed 25. Municipal Management Plant, 7.5 Survey No. 22 Work Order for STP in the zone-I of Council awarded and Ballarpur City. Zone-II excavation work in of Ballarpur City is Oct-21 Ballarpur Visapur Road, under progress having old drainage 26. 8.5 Municipal Survey No. 86/2 network & same will be Council utilized.

1.Hendrepada nalla- 2.5km Kulgaon Kulgaon Badalapur 2. Joveli nalla- 1km 27. Badalapur Municipal Council 12 Municipal Proposed STP 3. Eramjad nalla- Council Preliminary works in 550mtr. progress - Cleaning, survey, design, trial 4. Badlapur gaon nalla- Dec-21 bore etc 1.5km Kulgaon Kulgaon Badalapur 5. Sonivali Nalla- 28. Badalapur Municipal Council 10 700mtr. Municipal Proposed STP Council 6. Near WTP barrage road nalla-2km

Details of Proposed STPs in the State

Status of Project (at Capacity of Likely DPR Stage/ Under Name of the Town with no. the STP Date of Sr. Tendering/ of STP Location proposed in Completio No. Work to be Awarded) MLD n

Municipal Corporation of Worli STP, 1. 500 Proposed Mar-26 Greater Mumbai MCGm, Mumbai

Municipal Corporation of Bandra STP, 2. 360 Proposed Mar-26 Greater Mumbai MCGM, Mumbai

Municipal Corporation of Dharavi STP, 3. 418 Proposed Mar-26 Greater Mumbai MCGM, Mumbai Municipal Corporation of Ghatkopar STP, 4. 337 Proposed Mar-25 Greater Mumbai MCGM, Mumbai Municipal Corporation of 5. Versova 180 Proposed Mar-25 Greater Mumbai Municipal Corporation of 6. Bhandup 215 Proposed Mar-25 Greater Mumbai Municipal Corporation of Malad STP, 7. 454 Proposed Mar-27 Greater Mumbai MCGM, Mumbai

Mira- Bhaindar Municipal 8. Bhayander West 8 Proposed Corporation

Mira- Bhaindar Municipal 9. Kharigaon 13 Proposed Corporation Vasai-Virar Municipal 10. Chikhal dongri 13 Proposed Corporation 12

Vasai-Virar Municipal Nalla sopara 11. 30.5 Proposed Corporation (East) Vasai-Virar Municipal Nalla sopara 12. 49 Proposed Corporation (West) Vasai-Virar Municipal Navghar 13. 7.1 Proposed Corporation Manikpur Vasai-Virar Municipal Navghar 14. 33.85 Proposed Corporation Manikpur Vasai-Virar Municipal 15. Vasai 11.57 Proposed Corporation Bhiwandi Nizampur Municipal 16. Bhadwad 9 Proposed Corporation Bhiwandi Nizampur Municipal 17. Stepping Garden 31 Proposed Mar-22 Corporation Kulgaon Badalapur Kulgaon Badalapur Municipal 18. Municipal 10 Proposed Council Council Proposed STP CIDCO Taloja 19. Panvel Municipal Corporation 32 Proposed Phase-I CIDCO Pushpak 20. Panvel Municipal Corporation 45 Proposed Nagar Kundalika River Left Bank, at Survy No. 21. Roha Municipal Council 4 Proposed Mar-22 211/1/2/3/4/8/9/1 0/11(0.43A) at Roha. Ahmednagar, Tal Ahmednagar Muncipal 22. & Dist- 57 Proposed Corporation Ahmednagar Pune Municipal Corporation, 23. Pune Municipal corporation 10 Proposed 2023 Botanical Garden, Pune Pune Municipal 24. Pune Municipal corporation Corporation, 25 Proposed 2023 Baner, Pune Municipal 25. Pune Municipal corporation Corporation, 28 Proposed 2023 , Pune Pune Municipal 26. Pune Municipal corporation Corporation, 26 Proposed 2023 Vadgaon, Pune Pune Municipal 27. Pune Municipal corporation Corporation, 15 Proposed 2023 Tanaji Wadi, Pune Municipal 28. Pune Municipal corporation Corporation,Naid 127 Proposed 2023 u, Pune Municipal 29. Pune Municipal corporation Corporation, 33 Proposed 2023 Dhanori, Pune Pune Municipal 30. Pune Municipal corporation Corporation, 75 Proposed 2023 Bhairoba, Pune Pune Municipal 31. Pune Municipal corporation Corporation, 20 Proposed 2023 Mundhva, Pune Pune Municipal 32. Pune Municipal corporation Corporation, 30 Proposed 2023 Kharadi, Pune

13

Pune Municipal Corporation, 33. Pune Municipal corporation 7 Proposed 2023 Matsyabij Kendra, Pune Pimpri Chinchwad Municipal 34. Bbhatnagar 15 Proposed Apr-22 Corporation Alandi Municipal 35. Alandi Municipal Council 4 Proposed Mar-21 Council STP 36. Satara Municipal Council 17.5 Proposed

Wai Municipal 37. Wai Municipal Council 6 Proposed Council STP Ashta Municipal 38. Ashta Municipal Council 5.5 Proposed Council STP Islampur 39. Islampur Municipal Council Municipal 7 Proposed Jun-21 Council STP Islampur 40. Islampur Municipal Council Municipal 5 Proposed Jun-21 Council STP 41. Malvan Municipal Council Malvan Council 4 Proposed Aurangabad Municipal 42. Banewadi 10 Proposed Corporation Paithan Municipal 43. Paithan Municipal Council 8.8 Proposed Council STP Beed Municipal 44. Beed Municipal Council 35 Proposed Council, STP Latur Municipal 45. Latur Municipal Corporation Corporation 40 Proposed Proposed STP Latur Municipal 46. Latur Municipal Corporation Corporation 32 Proposed Proposed STP Kamptee 47. Kamptee Municipal Council Municipal 12.5 Proposed Council STP Bhandara 48. Bhandara Municipal Council Municipal 15 Proposed Mar-22 Council STP Pauni Municipal 49. Pauni Municipal Council 7 Proposed Mar-22 Council STP Amravati Amravati Municipal Municipal 50. 16 Proposed Corporation Corporation Proposed STP Amravati Amravati Municipal Municipal 51. 12 Proposed Corporation Corporation Proposed STP Bramhapuri 52. Bramhapuri Municipal Council Municipal 7 Proposed Council STP Rajura Municipal Council Rajura Municipal 53. Municipal Corporation of 5.5 Proposed Council STP Greater Mumbai

14

Information of FSTPs-along polluted river stretches in Maharashtra State Sr. Capacity of FSTP River Stretch Name of city Technology used No. (KLD) 1 Kanhan Mouda 20 Sludge Drying Bed 2 Krishna Wai 70 MBBR 3 Bori Amalner 20 Sludge Drying Bed 4 Girna Jalgaon 20 Sludge Drying Bed 5 Krishna Islampur 15 Sludge Drying Bed 6 Darna Igatpuri 10 Sludge Drying Bed 7 Panzara Dhule 20 Sludge Drying Bed 8 Patalganga Khopoli 15 Sludge Drying Bed 9 Kundalika Roha 5 Sludge Drying Bed 10 Savitri Mahad -- -- 11 Wardha Ballarpur 45 Sludge Drying Bed, MBR 12 Bindusar Beed 20 Sludge Drying Bed 13 Godavari Gangakhed 10 Sludge Drying Bed 14 Gomai Shahada 10 Sludge Drying Bed 15 Rangavali Navapur 10 Sludge Drying Bed

IV. Details of Industrial Pollution:  No. of industries in the State:92081  No. of water polluting industries in the State: 16597  Quantity of effluent generated from the industries in MLD:2100 MLD  Quantity of Hazardous Sludge generated from the Industries in TPD: 2738.53  Number of industrial units having ETPs: 16597  Number of industrial units connected to CETP: 7856  Number and total capacity of ETPs (details of existing/ under construction / proposed) No.of ETPs- 16597 with capacity of 2100 MLD  Compliance status of the ETPs: 16406 complied and 191 non-complied  Number and total capacity of CETPs (details of existing/ under construction / proposed)- 26 Nos of CETPs with capacity of 244.85 MLD  Status of compliance and operation of the CETPs: 25 CETPs are complied, 1 non- complied.

15

Industrial Status of CETPs (existing, Sr. Town No. of Discharge under construction & No. industries (MLD) proposed) Additional Ambernath CETP, Dist. 1. Existing Thane 53 7.5 Butibori CETP Pvt. Ltd., Dist. 2. Existing Nagpur 450 5 SMS Waluj CETP Pvt Ltd, Dist. 3. Existing Aurangabad 224 10 Greenfield CET Plant P. Ltd, Dist. 4. Existing Solapur 27 1.5 Ichalkaranji Textile Development 5. Existing Cluster Ltd. (1 MLD), Dist. Kolhapur 11 1 Ichalkaranji Textile Development 6. Cluster Ltd. (12 MLD), Dist. 191 12 Existing Kolhapur Kagal-Hatkanangale C.E.T.P.,, 7. Existing Dist. Kolhapur 5 10 L.K. Akiwate Industrial Co Op, 8. Existing Estate Ltd, Dist. Kolhapur 15 0.8 Hydro Air Tectonics (PCD), Dist. 9. Existing Pune 1 4 Kurkumbh Environment Protection Co 10. Existing op Society, Dist. Pune 65 1 11. Ranjangaon CETP, Dist. Pune 117 3 Existing Lote Parshuram Environment 12. Protection Co-op Societ, Dist. 190 10 Existing Ratnagiri MMA-CETP Co Operative Society 13. Existing Ltd., Dist. Raigad 73 7.5 RIA CETP Co-op. Society Ltd., 14. Existing Dist. Raigad 41 22.5

15. PRIA CETP (I) Ltd., Dist. Raigad 18 15 Existing Taloja CETP Co Operative Society, 16. Existing Dist. Thane 941 22.5 Thane-Belapur Association, Dist. 17. Existing Thane 3309 27 Badlapur CETP Association, Dist. 18. Existing Thane 263 8 Chikhloli-Morivali Effluent 19. Existing Treatment, Dist. Thane 130 0.8 ACMA - CETP-Co-operative 20. Existing Society Ltd, Dist. Thane 61 0.25 Dombivli CETP (Chemical) (Phase- 21. Existing II), Dist. Thane 120 1.5 Dombivli Better Environment 22. Existing System Association, Dist. Thane 148 16 Tarapur Environment Protection 23. Existing Society CETP, Dist. Thane 1176 25

24. Akkalkot Cetp, Dist. 222 3 Existing Additional Amravati Industrial 25. Existing Area, Dist. Amravati 5 5

16

Tarapur Environmental Protection 26. Existing Society, Tarapur, Palghar - Phase II 25

27. Satpur in District Nashik 1 Proposed Krishna Valley Envirotech (P) Ltd. Plot No J-MIDC kupwada Block 28. Under Construction Sangali-Miraj Industrial Area Dist- 0.64 Sangali

29. Ichalkaranji in Kolhapur District 1.2 Proposed Butibori CETP Pvt. Ltd., Dist. 30. Under Construction Nagpur 5

V. Solid Waste Management:  Total number of Urban Local Bodies and their Population- No. of ULBs-392, Population- 5,08,27,531.  Current Municipal Solid Waste Generation-22945 (MT/D).  Current Municipal Solid Waste Treatment-16037 (MT/D)  Number, installed capacity and utilization of existing MSW processing facilities in TPD: ULBs installed 337 composting plants as a waste processing facility. Also 82 vermin-composing facilities are installed, 62 bio-methanization plants are installed, 01 waste to Energy plant and 26 RDF plant installed. The 320 landfill sites are identified and 18 sites under construction phase.  No. and capacity of C&D waste processing plants in TPD (existing, proposed and under construction)- In Operation 1 with capacity 300 TPD Proposed 4 Nos with Capacity of 1750 TPD Sr. Plant capacity Name of Municipal Corporation Present Status No. (TPD) 1 Thane Municipal Corporation 300 In operation. Pimpri-Chinchwad Municipal Work order issued. 2 200 Corporation Proposed plant. 3 Navi Mumbai Municipal Corporation 150 Proposed plant. Municipal Corporation of Greater E-Tendered. Proposed 4 1200 Mumbai Plant. 5 Pune Municipal Corporation 200 Proposed Plant.

 Total no. of wards-12420, no. of wards having door to door collection service-12333, no. of wards practicing segregation at source -10229 VI. Bio-medical Waste Management:  Total Bio-medical generation: 62254.62 Kg/Day  No. of Hospitals and Health Care Facilities: 63642  Status of Treatment Facility/ CBMWTF: 30 CTFs are operating in Maharashtra State covering 36 Districts. 29 Incineration Based and 1 Deep burial. 17

VII. Hazardous Waste Management:  Total Hazardous Waste generation: 999565.96 MT  No. of Industries generating Hazardous waste: 7257  Treatment Capacity of all TSDFs: o Capacity of 03 Nos of Incinerator Facilities (MT/Hour) - 9.0 o Capacity of 04 Nos of Secured Landfill (MT/A)- 2,61,600  Avg. Quantity of Hazardous waste reaching the TSDFs and Treated; 360505.3 MT  Details of on-going or proposed TSDF- NA. VIII. Plastic Waste Management:  Total Plastic Waste generation: 4.43 Lacs MT  Treatment/ Measures adopted for reduction or management of plastic waste: o From Oct 2018 to August 2020, Plastic Waste collected- 72600 MT. o Plastic waste recyclers- 88 Nos. o Plastic waste used in Cement Industry-27000 MT o Plastic to Fuel Plants- 05 Nos o 71 Extended Producers Responsibility (EPR) is granted by Urban Development Department for regulation of Plastic Waste. o Issued the GR to use waste plastic in to the construction of the road at the tune of 7%. IX. Details of Alternate Treatment Technology being adopted by the State/UT:

Faecal Sludge Treatment Plant- 15 FSTPs have been installed along polluted river stretches, with total capacity of 290 KLD.

X. Identification of polluting sources including drains contributing to river pollution and action as per NGT order on insitu treatment: Polluting sources including drains have been identified contributing to river pollution. Demonstration project has been started by MPCB for in-situ treatment of wastewater at Kotwali village drain on Vashisthi River to explore the possibilities and viability of the interim measures as resources of the Government are very much limited.

XI. Details of Nodal Officer appointed by Chief Secretary in the State/UT: Member Secretary, Maharashtra Pollution Control Board XII. Details of meetings carried under the Chairmanship Chief of Secretary in the State/UT: Ten meetings were held under the chairmanship of Hon’ble Chief Secretary to take review of the compliance in the matter OA 673/2018. XIII. Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river.

18

Status of polluted river stretches in 2020 (Jan to December 2020)

No. of stretches in 2020 Priority No. of stretches declared in 2018 No. of stretches in 2019 (Jan to Dec)

Priority I 9 1 1 Priority II 6 6 3 Priority III 14 10 12 Priority IV 10 14 13 Priority V 14 21 21 Less Polluted - 1 3 Total 53 53 53

WATER QUALITY STATUS OF POLLUTED RIVER STRETCHES IN MAHARASHTRA (January to December 2020)

Fecal Coliform (MPN/100 BOD (mg/l) Current Sr. No. NAME OF RIVER ml) Priority Min Max Min Max Priority I 1 GODAVARI 3.6 8.8 2 150 IV 2 KALU 20 20 170 170 III 3 KUNDALIKA 4.4 12 21 240 III 4 MITHI 54 54 92000 92000 I 5 MORNA 8.8 8.8 39 39 IV 6 MULA 16 18 1600 1800 III 7 MUTHA 8 26 8 1800 II 8 NIRA 7 12 50 900 III 9 VEL 12 12 40 40 III Priority II 1 BHIMA 8 25 12 1600 II 2 INDRAYANI 10 12 170 550 III 3 MULA-MUTHA 20 20 70 900 III 4 PAWANA 7.5 28 10 1800 II 5 WAINGANGA 4 16 32 39 III 6 WARDHA 5 14 38 40 III Priority III 1 GHOD 10 10 250 250 IV 2 KANHAN 7.8 9 39 39 IV 3 KOLAR (MAH) 8.6 8.6 39 39 IV 4 KRISHNA 1.8 9.5 14 200 IV 5 MOR 3.8 3.8 25 25 V 6 PATALGANGA 4 12 110 540 III 7 PEDHI 5 5 39 39 V 8 PENGANGA 4.8 5 34 39 V 9 PURNA 5.4 6.8 39 39 IV 10 TAPI 3.8 7 17 25 IV

19

11 URMODI 6 6 50 50 V 12 VENNA 4.5 6.4 25 120 IV 13 WAGHUR 4.2 4.2 21 21 V 14 WENA 4 5.8 38 40 V Priority IV 1 BINDUSAR 8.5 8.5 2 2 IV 2 BORI 4.2 4.2 14 14 V 3 CHANDRABHAGA 8.5 11 230 1800 III 4 DARNA 3.8 10 17 40 IV 5 GIRNA 4.2 5 17 17 V 6 HIWARA 4 4 17 17 V 7 KOYNA 10 10 140 140 IV 8 PELHAR 4 4 21 21 V 9 SINA 13 13 50 50 III 10 TITUR 3.8 3.8 17 17 V Priority V 1 AMBA 4 4 110 110 V 2 BHATSA 3.4 4 17 130 V 3 GOMAI 4 4 22 22 V 4 KAN 3.2 3.2 14 14 V 5 MANJARA 7.4 7.4 IV 6 PANCHGANGA 2 2.2 11 21 Less Polluted 7 PANZARA 4 4 12 12 V 8 RANGAVALI 4 4 13 13 V 9 SAVITRI 2 2.8 14 21 Less Polluted 10 SURYA 4 4.2 21 23 V 11 TANSA 4 4 17 17 V 12 ULHAS 4 4.2 40 170 V 13 VAITARNA 4 4 27 27 V 14 VASHISHTHI 1.8 2 12 17 Less Polluted

XIV. Ground water regulation: o In Maharashtra State Ground Water is regulated under Maharashtra Groundwater (Development and Management) Act, 2009. Groundwater Surveys and Development Agency (GSDA). o GSDA concerned with groundwater surveys, exploration, assessment, monitoring, development, management and regulation of groundwater resources for irrigation, drinking and industrial needs. It also undertakes periodic ground water assessment in order to regulate the ground water use and guide ground water developmental activities on scientific basis. o GSDA also works towards ensuring sustainability of ground water resources, on a long-term basis. It acts as a custodian, for the implementation of ground water legislation, within the State of Maharashtra.

20

XV. Good irrigation practices being adopted by the State: o 82% of water is used for irrigation purpose in State. o As per MWRRA notification dated 25 Jun 2015, it is mandatory to supply water through micro-irrigation for selected irrigation projects in State. o Government of Maharashtra has adopted Piped Irrigation Network policy from Jan 2017, in which it is aimed to achieve 20 % increase in irrigation efficiency. Several projects are undertaken by the Government in order to supply water through piped net work. XVI. Rainwater Harvesting: o Maharashtra Govt. is implementing "Shivkalin Pani Sathawan Yojana", the scheme for augmentation the availability of water for Drinking and Domestic use and Strengthening of Drinking Water Sources by utilising Rainwater. o RRC has already requested to Water Resource Dept, GoM water shed management. All concerned local bodies located along the riverbanks are mandated to implement Water shed management, rain water harvesting, XVII. Demarcation of Floodplain and removal of illegal encroachments: Water resource Department and Local Bodies ensure Demarcation of Floodplain and removal of illegal encroachments. XVIII. Maintaining minimum e-flow of river: Rainwater Harvesting: RRC has already requested to Water Resource Dept, GoM for maintaining minimum E-flows the rivers. XIX. Plantation activities along the rivers: RRC has already requested to Water Resource Dept, GoM for plantation on both sides of the river. All concerned local bodies located along the riverbanks are mandated for plantation at both sides of the river and setting up biodiversity parks in their jurisdiction. XX. Development of biodiversity park: RRC has already requested to Water Resource Dept, GoM for setting up of biodiversity parks. All concerned local bodies located along the riverbanks are mandated for setting up biodiversity parks in their jurisdiction. XXI. Reuse of Treated Water: o Water resource department, GoM has prepared integrated State Water Plan, which includes recycling of Treated sewage. o MPCB has submitted Action plan for Utilization of Treated Sewage to CPCB, in which it is mandated to utilize treated sewage for different class of users like Thermal Power Plants, Industrial Units, Construction activities, non-potable municipal uses, Agriculture-Irrigation, etc. depending on its availability. o The Infrastructure Projects are mandated by MPCB to recycle 60% of treated sewage for secondary use by providing duel pipeline. 21

o The Local Bodies will be encouraged to reuse treated sewage for various purposes including construction and gardening. XXII. Model River being adopted by the State & Action Proposed for achieving the bathing quality standards: GOM, has announced Namami Chandrabhaga Abhiyan on 18/03/2016 to revive and rejuvenate the river Chandrabhaga and to restore its historic glory. The aim of the Namami Chandrabhaga Abhiyan is to make the Chandrabhaga river pollution free and conserve its purity and sanctity up to year 2022 and others are as mentioned below:  To maintain the permanent minimum continuous flow of water in the river bed.  To construct weirs in the river bed for maintaining water level.  To maintain & keep minimum environmental flow of water.  To make available sufficient public bathrooms & toilets as well as mobile bio- toilets to the publics during Pandharpur yatras.  To install STP’s for treatment of domestic wastes and scientific disposal facilities for solid waste generated from the villages & cities located on the bank of Chandrabhaga river.  To carry out the beautification & forestation of river banks.  To make reuse/recycle of treated industrial water generated from the industries and industrial estates located in the catchment area of Chandrabhaga river.  As per the local need to work for public participation and development of pilgrimage area.

“Namami Chandrabhaga Pradhikaran” established under the Chairmanship of Hon’ble Chief Minister, GoM & Co-Chairmanship of Hon’ble Finance Minister, GoM, having Divisional Commissioner, Pune as Member Secretary.

“High Power Committee” established under the Chairmanship of Hon’ble Chief Secretary, GoM of Maharashtra having Divisional Commissioner, Pune as Member Secretary.

The Maharashtra Government intends to cleanse and make the holy river Chandrabhaga pollution free by the year 2022. XXIII. Status of Preparation of Action Plan by the 13 Coastal States: In compliance of the order dated 26/9/2019 passed by the Hon'ble NGT, Principal Bench, New Delhi in the matter of O.A. No. 360/2018 filed by Shree Nath Sharma V/s Union of India, District Environment Plans for coastal Districts in Maharashtra State have been submitted to H’ble NGT and CPCB on 30.12.2019. Action Plan Comprises of Following- a. Waste management Plan b. Water Quality Management Plan c. Air Quality Management Plan, Mining Activity Management Plan d. Noise Action Plan 22

XXIV. Regulation of Mining Activities in the State/UT: All mining activities are regulated by issuing consent to Establish and consent to Operate along with post approval periodic monitoring of mining activities. All Coal mines are regulated by DGMS (Director General Mines and Safety), Dhanbad and other mines are regulated by Indian Bureau of Mines, Nagpur and Goa.

XXV. Action against identified polluters, law violators and officers responsible for failure for vigorous monitoring:

MPC Board issued directions to 15 Municipal Corporations, 29 Municipal Councils and one Cantonment Board to provide adequate sewage treatment plant and to achieve the consented standards prescribed by MoEFCC, GoI and to implement short term and long term measures for treatment of sewage and restrict the discharge of untreated/partially treated sewage to the rivers.

In compliance with the Hon’ble NGT order dtd. 28.08.2019 in the matter of OA No. 593/2017 Paryavaran Suraksha Samiti v Union of India, the MPC Board has issued directions to 01 Mega city, 09 Million plus cities, 254 Class I cities/towns and 122 Nagar Panchayats as to why Environmental Compensation shall not be levied after the stipulated timeline.

23

Annexure-I River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

Municipal Council is having Tryambakeshwar 1 1) Local Nallas 1.00 1.00 0.00 1.00 0.00 0.00 STP and is in working NA Complied NA No Gap Municipal Council condition

1550 km sewer network 1) Chikhali Nalla 40% work of 32 MLD completed 210km sewer Nashik have 100% treatment 2) Gangapur Nalla STP for future requiremnt network work under progress capacity. Nashik Municipal 2 3) Bardan phata Nalla. 290.00 360.00 -70.00 290.00 0.00 32.00 NA proposed at Pimpalgaon Complied Sep-21 is 40% completed and All Sewage network line connected Corporation 4) Someshwar Nalla. completed and will expected to complet March to STP, Sump is pending the work 5) Chopda Nalla Operational on Sept 21 2022 as informed by will be complied by March 2022. representative NMC

In zone-1 drainage network of Permission for flashing of DWC and RCC pipe of tender is to various dia.of length 19304 m obtained considering is laid. finanace allocation. After In zone-2 ,which is currently in approval to carry further progress 32000 m drainage Paithan Municipal tender process from 3 1) Local Nallas 5.00 0.00 5.00 0.00 5.00 8.80 Mar-23 network of DWC and RCC Budget 46 Cr Sanctioned. Council Paithan Apegaon Vikas pipe are Pradhikaran Committee, laid. About 3 km drainage tender for STP network is balance. Site for Construction and allied wet well no.2 is now finalised works will by by M. C. be done Paithan on 9-6-2020.

Concil has approached to MAHARASHTRA JIVAN 02 STPS proposed with capacity of Gangakhed PRADHIKARN for DPR 3 1) Local Nallas 1.50 0.00 1.50 0.00 1.50 5.00 NA -- 4 MLD at Kaplicha nala and 1 MLD Municipal Council Preparation for 2 nos of at Datta Mandir Nalla. STP's of capacity 1 & 4 MLD Someshwar Godavari Temple to 504 I IV North side Nalla - Rahed 1.Chunal Nalla 2.Bhimghat Nalla East 3.Shani Mandir Nalla. 4.Govardhan Ghat Nalla East 5. Govardhan Ghat Nalla Weast 6. Balgiri Nalla -1 7. Balgiri Nalla - 2 8. Gadipura Nalla Harijan Wasti 9. Gadipura Nalla Badi dargha There is gap of 13 MLD in sewage 10. Gadipura Habib Talkiz Excavation for Foundation treatment. Municipal corporation has 11. Sidhhi Ghat Nalla of Sewage Pumping DPR for renovation of existing already installed 03 STPs of 132 12. Killa Center Nalla station Well is 75% Nalls, construction of newely MLDcapacity. But, to treat 10 MLD 13.Killa East Nalla completed and the developed Nalls as well as sewage coming from chunal Nalla, 14. BurudGalli Nalla levelling of ground & pollution free treatment STP based on MBBR technology Nanded Waghla 15. NawGhat Nalla materail collection for stp stagnant water in 4 km of river 4 70.00 132.00 -62.00 57.00 13.00 10.00 Dec-21 Dec-21 and with capacity of 10 MLD is Municipal Corporation 16. Karbala Nalla work is in progress. STP bank development and under construction on Chunal Nalla 17. Chouphala Nalla based on MBBR plantation etc. of amount 77 coimng from north side of city. 18 Bialal nagar Nalla technology with 10 MLD Cr. Is prepared and process of Balnce 03 MLD sewage coimng 19 Kudbenagar Nalla capacity. Likely Date of submission to Govt. is in from south side wil be diverted to 20.Bhimghat Nalla weast Complition is 31 Dec. progress. extsing STP at Bondar. Pumpimng 21. Laxmi nagar Malli 2021. station is proposed for the diversion. area Nalla - 1 22. Laxmi nagar Malli area Nalla - 2 23. Laxmi nagar Malli area Nalla - 3

South side Nalla - 24 Vasarni Nalla - 1 25. Vasarni Nalla - 2 26. Saibaba Mandiar Nalla 27. Nawin pul Nalla 28. Vakaspur Nalla 29. Vrundawan Nalla River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

Construction of Vadavali STP is sanctioned under AMRUT PH-II project of Central Govt. Work order is awarded to agency and As said area is having less Construction of Vadavali STP is construction work is under 1) Neptune Nalla, population, under ground sanctioned under AMRUT PH-II progress. Amrut project 2) Balkrishna Paper Mill network is not proposed. project of Central Govt. Work order Along Atale funding pattern is Central- 4 Kalu 2.5 I III Kalyan-Dombivali Nalla, 7.60 0.00 7.60 0.00 7.60 21.00 May-21 Sewage collection is proposed is awarded to agency and village 35 %, State-15 %, ULB- 3) Shiv Mandir Nalla, by nalla intersection at construction work is under progress. 50%. Physical progress of 4) Balyani Nalla Sewage pumping station Amrut project funding pattern is STP 30 % . Proposed date followed by treatment at STP Central-35 %, State-15 %, ULB-50% of completion is May 2021. For the said STP, Sequential Batch Reactor technology (SBR) tenchology is proposed.

The Dist. Collector Raigad has approved the possession of land where Roha MC has stipulated the STP plant proposed by condition of provision of Septic tank Roha Municipal Council. & soak pit while granting the building Part of the underground Roha Municipal Drainage network 60% permission. Rest water is discharged 5 Kundalika Salav to Roha 35.5 I III 1) Local nallas 2.80 0.00 2.80 0.00 2.80 5.00 drainage line work Mar-22 Council completed. in to saline water zone of Kundalika. completed but due to

contractor problem further 1MLD and 4 MLD capacity of STP work has been hampered. proposed. The Municipal Council Roha representative apprised that actual

Construction of STP of 8 MLD capacity and WSP compound. 144+134=278MLD will be diverted to existing STPs at Bandra and Ghatkopar by Dec-2023. Out of Total 286 MLD of Dry weather flow, the work of construction of STP of 8 MLD capacity from Filterpada to WSP STP by Dec-2021 Compound is in progress. Dry Powai to Mumbai Municipal Physical Progress – 70%. 6 Mithi 17.8 I I 1) Local Nallas 286.00 0.00 286.00 0.00 286.00 8.00 and Divesrion Weather Flow of 97 MLD (from Dharavi Corporation Financial Progress – 65% work by Dec-2023 WSP Compound to CST Bridge) and 37 MLD (from CST Bridge to Mahim Causeway) will be diverted to Bandra Treatment Zone through existing sewer network by proposing sewer interceptors, whereas, Dry Weather Flow of 144 MLD (from Bapat Nalla & Saphed Pool Nalla) will be diverted at Ghatkoapar WWTF through proposed Tunnel. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement. 1) Nalla at Vidrupa river 2) Hingna Nalla 3) Khadan Nalla 4) Kailash tekdi 5) Nimwadi Nalla 6) Luxury Bus stand Nalla 7) Anicut Nalla 8) Kholeshwar nalla 9) Ganesh Ghat Nalla 10) Shalini Talkies Nalla The civil construction work 11) Savatram Nalla of two STPs of capacity 12) Masum Shah baba 30 MLD and 7 MLD The underground drainage Nalla respectively is completed. scheme is designed for the 13) Mohata Mill The commissioning of population left bak at old akola Smashan Nalla both the STPs was city 2.27km and nalla intercept 14) najuk nagar Nalla expected up to February, (15No.), Right bak of morna 02 STPs of Capacity 37 MLD are 15) Naigaon nalla at 2021. However, the work river length 10.93 km and proposed. At present sewage Akola to Akola Municipal 7 Morna 6 I IV nagina masjid trust 27.60 0.00 27.60 0.00 27.60 37.00 …...... of express feeder for Apr-21 nalla intercept 18 no., Bapu generation is 35 MLD. Takalijalam Corporation 16) River Junction electricity required for the nagar to Kharap length 45 MLD is projected value for next Naigaon Nalla operation of STPs is yet to 1.91km nalla interception 2 ten years. 17. Shanawajpur be completed. The said nos., Construction of pumping Naigaon Nalla work is in progress. station with Wetwell at Old city 18. Najuk Nagar nalla Therefore, commissioning River Bak (Wet well at old city 19. Sidhatha nagar at of both these STPs is river bank) Idgah Nalla expected before 30 April 20. Rahul Nagar Harihar 2021. Peth nalla 21. Akkalkot Nalla 22. Khidki Pura Nalla 23. Takiya nagar nalla 24. Takiya Islampura Nalla 25. Kala maroti Nalla 26. Agar ves kala maroti nalla 27. Kumbhar wada dagadi Pul nalla

03 STPs with capacity 25. 15 & 10 MLD proposed and will be completed by 2023. Sewage generation from DPR prepared,project has Pune city is 744 MLD, destining 2 Bopodi to Pune Municipal 1) Botanical Garden been sanctioned by 8 Mula 2.7 I III 97.00 73.00 24.00 73.00 24.00 50.00 - 2023 STPs having capacity 567 MLD. Aundh Gaon Corporation Nallah in Pune City NRCD,Tendering Is in MC has proposed 11 STPs with process. capacity 396 MLD & Pune Cantonment Board has proposed one STP of capacity 20 MLD.

03 STPs with capacity f 26, 28 & 33 are proposed & will be completed by 1)Warje nalla DPR prepared,project has 2023. Sewage generation from Pune Nagar 2)vadgaon bk nalla been sanctioned by city is 744 MLD, destining 2 STPs to Pune Municipal 3) Hingne nalla NRCD,Tendering Is in 9 Mutha 16 I II 151.00 94.00 57.00 94.00 57.00 87.00 2023 having capacity 567 MLD. MC has Khadakwasla Corporation 4)Erandwana nalla process. Optional proposed 11 STPs with capacity 396 Dam 5)Nagzari nalla technology as per bidders MLD & Pune Cantonment Board 6)Ambil odha nalla choice has proposed one STP of capacity 20 MLD.

05 STPs with capacity of 127, 75, 30, 20, & 7 MLD have been DPR prepared,project has proposed & will be completed by 1) Keshavnagar Nalla been sanctioned by Theur to 2023. Mula-Mutha is formed after Pune Municipal 2) Nalla at Bhapkar Mala NRCD,Tendering Is in 10 Mula-Mutha Mundhwa 15 II III 496.00 400.00 96.00 400.00 96.00 259.00 2023 confluence of rive Mula and Mutha Corporation 3) Rangicha Odha at process. Optional Bridge rivers. Mula-Mutha pollution Bhapkar Mala technology as per bidders abetment (Jica) shall be completed choice by 2023. Gap in the treatment capacity is 267 MLD.

Mula- further meets to 1) Keshavnagar Nalla Bhīma river. 11 STPs with capacity Pune Municipal 2) Nalla at Bhapkar Mala 2023 219 MLD will be completed by of 396 MLD under Mula-Mutha 11 744.00 567.00 177.00 567.00 177.00 NA NA Corporation 3)Rangicha Odha at 2023 pollution abetment (Jica) shall be Bhapkar Mala completed by 2023. Gap in the treatment capacity is 177 MLD. Vithalwadi to Bhīma 200 II II Takli River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement. Takli

DPR proposal for 5 MLD future work under preparation. Pandharpur 1) Gopalpur Nalla- 12 18.50 18.50 0.00 12.50 6.00 Under DPR preparation Nil Complied Dec-21 Municipal Council Pandharpur Namame Chandrabhaga on the line of Namame Ganga announced by Govt. of Maharashtra

NEERI prepared Camus Gap in the Treatment capacity is 1.3 Soil Bio Technology MLD. 8 MLD STPs is proposed in Akluj Gram Treatment base STP . The Timeline not 13 1) local nallas 1.30 0.00 1.30 0.00 1.30 0.00 Nil Phaltan. MPC Board will provide Panchayat Proposal is submitted to provided financial & technical assistance to Jeevan Pradhikaran which Akluj in next three years. is under progress.

Sangavi to Nira 43 I III Shindewadi

Underground drainage 1) Khadakhira nala from network line work is under 8MLD (2 STPS: 2.5 + 5.5) grant Phaltan Municipal Phaltan DPR Preparation under Timeline not progress. Total 76 km sewage from Maharashtra suvarna jayanti 14 7.00 0.00 7.00 0.00 7.00 8.00 NA Council 2) Dagadi khan nalla progress provided line is under development out nagarothan Mahaabhiyan yojana of near dinti naka of that 23 Km of sewage line 72.76 Cr. is completed.

Shikrapur is Gram panchayat & there is no proposal of STP. MPC Nhavare to Shikrapur Gram Timeline not 15 Vel 10 I III 1) local nallas 2.00 0.00 2.00 0.00 2.00 0.00 NA NA Board will provide financial & Shikarpur Panchayat provided technical assistance to small towns to install STPs

1) Ravet Nalla Near Ravet STP 2) Garware Nalla Near Bhatnagar 3) DPR prepared for Kalasagar Nalla Augmenation of 30 MLD Intercepted Sewer along the PCMC 4) Chinchwad Nalla Near Dapodi to Pimpri-Chinchwad Bahtnagar STP to 45 MLD. Proposed STP – 15 MLD at side bank of river is in progress. 16 Pawana 20 II II SBR 30 MLD STP 205.80 260.00 -54.20 205.80 0.00 15.00 Apr-22 Ravet Municipal Corporation DPR prepared and chinchwad Bhatnagar Augmentation of STPs Work under 5) Gavade Colony Nalla submitted to Technical progress at Pimpri Chinchwad Near Manikbag Committee for sanction. (Chinchwad Staion Nalla Nearby Bombay Selection) 1) Ravet Nala Near Ravet STP 2) Garware Nala Near Bhatnagar 3) Kalasagar Nala Work was stoped and 4) Chinchwad Nala Near Preparation of proposal for structure demolished by Work was stoped and structure Pimpri-Chinchwad 17 SBR 30 MLD STP 88.20 73.00 15.20 73.00 15.20 12.00 STP out side of Blue line is NGT Order but work is Apr-22 demolished by NGT Order but work Municipal Corporation 5) Gavade Colony Nala under prgress started on alternative land is started on alternative land parcle. Near Manikbag parcle. (Chinchwad Staion Nala Near by Bombay Selection) 3 6) Nala Near Sandvik Moshigaon to Indrayani 4.62 II III Alandigaon DPR prepared for STP at Alandi. DPR is prepared for Alandi Funds sanctioned under Municipal council. Pilgrimis Devlopment Proposed STP – 10 Scheme. Work order Alandi Municipal Council interceptor Sewer along the PCMC Alandi Municipal issued, 80 percent work of completed 80% work of side bank of river is in progress. 18 1) local nallas 2.50 0.00 2.50 0.00 2.50 4.00 -- Council underground drainage underground sewage network Commencement of setting up STPs network has been lines. by March 2021. Govt. had already complited. STP plant provided funds to Maharasgtra construction is remaining. Jeevan Pradhikaran under Pilgrim Development Scheme will excuting and monitoring work. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

DPR preparation is also yet not started. Project cost of 50 Cr Desaiganj Municipal Timeline not including the drainage network cost. 19 1) local nallas 3.50 0.00 3.50 0.00 3.50 0.00 STP yet not proposed ------Council provided Proposal submitted by Municipal Council to UDD. But UDD has yet not given any approval.

Received technical sanction from MJP. Tender floated. Work Order of Rs. 12.0 Crores given to STP contractor based at Gujarat. MJP is Foundation work is just 40% work of main drainage the overall Project Consultant for started. Work order for Gadchiroli Municipal line has been completed. The this. Project cost of 96.5 Cr including 20 1) local nallas 5.00 0.00 5.00 0.00 5.00 11.50 STP is just given to Oct-21 -- Council work of internal drainage line the drainage network cost and this is contractor. Cost of the is yet not started. approved UDD. As on today, Rs. 20 Project is Rs. 12.0 Crores. Crore has already been spent. Out of 96.5 Crore, Rs. 12.0 Crore will be utilized for STP & remaining Rs. 84.5 Crore are for drainage work. Tumsar to Wainganga 98 II III Ashti

STP Project cost of approx. 70 Cr including the drainage network cost. DPR is prepared by private agency through tender process. This DPR submitted to MJP for approval. MJP 7.0 MLD STP is proposed. STP Project cost of approx. has yet not given approval. (Note:- Bramhapuri Timeline not 21 1) local nallas 3.50 0.00 3.50 0.00 3.50 7.00 DPR is under consideration 70 Cr including the drainage Distance of Bramhapuri City is Municipal Council provided of MJP. network cost. approx. 10 km from Wainganga River. Part of Untreated sewage reaches upto Wainganga River through Bhuti Nalla. Part of untreated sewage is lifted by farmers for irrigation purpose.)

1) Bhandara town drain Land alloted for STP. DPR coming from Sant Bhandara Municipal approved. Approved DPR DPR has been submitted to MJP for 22 Tukdoji Ward, Town 5.50 0.00 5.50 0.00 5.50 15.00 Mar-22 Council has been sent to MJP for technical approval. Bhandara, Dist- technical sanction. Bhandara.

Land alloted for STP. DPR DPR has been submitted to MJP for Pauni Municipal approved. Approved DPR 23 1) Pauni town drain 1.00 0.00 1.00 0.00 1.00 7.00 Mar-22 technical approval. FSTP of 5 KLD Council has been sent to MJP for is provided technical sanction.

Chandrapur has Sewage Treatment 1) Confluence of Erai & Total sewage network length capacity of 70.5 MLD. But, Wardha River near is 176 km, completed 141km, inadequate drainage network. Hadasti Village balance 35km. Presently 80% sewage Balance could not be 24 Chandrapur 35.00 70.50 -35.50 35.00 0.00 0.00 NA NA Complied generated is treated in STP and 2) Tail end of Amal nalla completed currently by CCMC balnace 20% alongwith the 80% meeting to Wardha River due to no NOC from forest treated sewage is discharged in Erai near Sasti Opencast dept., Archelogical dept. and River, which later meets Wardha Mines other gov. dept.. river.

Ballarpur has proposed 2 STPs of 7.5 and 8.5MLD with total capacity Ghuggus to 1) Discharge of BILT 16 MLD. Total project cost of STP & Wardha 42 II III Rajura Nalla in Ballarpur, behind Drainage pipeline of 54.09 undergruond sewage network is Rs. Ballarpur Opencast E-Tender floated. Work kms is proposed in the zone-I 57.19 Cr. Project cost of 7.5 MLD is Mines. Order for STP awarded on of Ballarpur City. Zone-II of 6.992 Crores & 8.5 MLD is 7.5906 25 Ballarpur 5.00 0.00 5.00 0.00 5.00 16.00 Oct-21 2) Local Nalla near 27/04/2020. Construction Ballarpur City is having old Crores. The agency will complete crematorium meeting to work under progress. drainage network & same will drainage pipeline of 54.09 kms. in Wardha River at be utilized. the zone-I of Ballarpur City. Zone-II Ballarpur of Ballarpur City is having old drainage network & same will be utilized. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

DPR prepared by MJP. Currently 1) Kapangaon Nalla 3.2 MLD sewage generated and all Timeline not 26 Rajura meeting to Wardha River 3.20 0.00 3.20 0.00 3.20 5.50 DPR Prepared NA is discharged directly into Wardha provided at Rajura River. Total project cost of STP plant + drainage system is 38 Cr.

1) Nallah near Kathapur Village There is discharge from villages 2) Nallah near Hindu Shirur Municipal Council is Annapaur, Kathapur & Annapur to temple at Malawadi 27 Ghod 10 III IV Shirur 6.00 6.00 0.00 2.50 3.50 0.00 having STP from 2014 and Complied Phakate.MPC Board will provide Shirur 3) Ramling is in working condition financial & technical assistance to Grampanchayat Nallah villages in next three years. 4) Shirur Town nallahs 5) Shirur Gramin Nallahs Letter issued to Kamptee MC by 1) submitted proposal for RO, Nagpur vide dated 14/08/2020 provision of sewage to submit details of DPR, Time line. Treatment plant of capacity Meeting was conducted under the 1) JN Road Nalla 12.50 MLD to MJP for Chairmanship of the Hon'ble 2) Akshok nagar Nalla Technical approval and land Minister Env regarding pollution of Timeline not Lenth of Nalla is 7.5 km (3 28 Kamptee 3) lohiya layout Nalla. 10.80 0.00 10.80 0.00 10.80 12.50 approval proposal is Nag River on 01/03/2021 and provided mtr. Avg.} 4) Bagdor Nalla pending at Collector Office, directed Collector, Nagpur , to 5) Other 2 local nallas Nagpur. 2) resolve issue of STP of the Kanhan Applied for grant of consent & Kamptte. Chief Officer, M.C , under Water/Air Act and is Kamptte vide letter no.962 dated under consideration. 19/03/2021 has submitted that , District Collector, Nagpur has Letter issued to Kanhan MC by RO, Bhandara to submitted proposal for Nagpur vide dated 14/08/2020 to Kanhan 100 III IV Nagpur provision of sewage submit details of DPR, Time line. Treatment plant of capacity Meeting was conducted under the 8.0 MLD estimating 32.42 Timeline not Chairmanship of the Hon'ble 29 Kanhan Pimpri 1) Local Nallas 8.00 0.00 8.00 0.00 8.00 8.00 Crs to the Govt of provided Minister Env regarding pollution of Maharashtra for further Nag River on 01/03/2021 and approval. Funding by Urban directed Collector, Nagpur , to Development. resolve issue of STP of the Kanhan & Kamptte. Chief Officer, M.C , 2 nos. of STP of capacity 0.5 MLD each is proposed at 2 locations, Tenders for submission of Lenth of Nalla is 7.5 km (3 which will be expected to be 30 Mouda 1) Local Nallas 1.50 0.00 1.50 0.00 1.50 1.00 DPR for proposed STP of Mar-22 mtr). Avg. completed by 2021. FSTP provided capacity 1.5 done and is in operation having capacity 20 KLPD.

ZP CEO vide letter dated 14/08/2020 has submitted Estimate for Provision of combined STP of 2 MLD capacity for Chankapur & Chicholi and requested to MPC Board will provide financial & sanction fund of Rs technical assistance to villages in 3,56,92,459/-. MPCB next three years to comply with Regional Officer, Nagpur waste management. Meeting was 1) Chandkapur village vide letter dated 14/08/2020 Timeline not conducted under the Chairmanship 31 Chandkapur 0.25 0.00 0.25 0.00 0.25 0.00 sub drain has requested to submit provided of the Hon'ble Minister Env detail DPR with Bank regarding pollution of Nag River on Details to submit said 01/03/2021 in this regard letter is proposal at Head office for received from ZP Nagpur regarding further needful. A Detail grant same is attached. proposal has been sent to The Head office, M.P.C.B Kolar Along Koradi 3.4 III IV vide t.o.l No.675 dated 19/10/2020. For further needful.

Meeting was conducted under the Chairmanship of the Hon'ble Minister Env regarding pollution of 1) Chicholi Village Major Timeline not 32 Chicholi 0.25 0.00 0.25 0.00 0.25 0.00 Nag River on 01/03/2021 in this Drain provided regard letter is received from ZP Nagpur regarding grant same is attached.

RO Nagpur, issued letter to 1) Drain coming from Timeline not Mahadula Nagr Panchayat vide 33 Mahadula side pond No. 3 Koradi 1.40 0.00 1.40 0.00 1.40 0.00 provided dated 14/08/2020 to submit details TPS. of DPR, Time line. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

03 STPs having capacity of 59.7 1) Sheri Nalla, Sangli. MLD (27, 9.2 & 23.5) are in 2) Sidharth Nagar Nalla, operation with actual utilization of Total 164.9 KM sewer line is Sangli. STP is under construction. 52.2 MLD ( 23.5 MLD STP at 34 Sangli Miraj Kupwad 68.00 59.70 8.30 49.20 18.80 22.50 May-21 proposed out of that 116.5 KM 3) Haripur Nalla, Sangli. 100% work is completed Hanuman Nagar is operating at 16 wok completed 4) Miraj Nalla, Miraj MLD)One STP of capacity 22.5 5) Other Major drain MLD STP is under construction at Bedag Road,

30% sewer network completed, land acquisition under progress for STP, 23.58 Cr grant from govt and 21.0 8 km distance from city Cr aswell is received. Land acquisition under Pumping station land 35 Islampur 9.00 0.00 9.00 0.00 9.00 12.00 NA Jun-21 NA Shindi to 1) Islampur Municipal progress. acquisition under process. 7MLD+4.5MLD STP by March 2022. Krishna 106 III IV Kurundwad Council Local Nalla. No water is being discharged to river every drop of treated sewage is utised for agricultural use.

Connected all drains to RCC Krishna River 6 Km constructed Cannel. The Proposal sent for Timeline not 36 Ashta away from city 2.50 0.00 2.50 0.00 2.50 5.50 NA NA cannel were block because of DPR sent for approval Administrative approval provided 1) Local Nallas farmas had diverted that water and the cannel is very narrow.

Land acquisition for STP is in process. Technical sanction of STP & underground networking is in DPR forwarded to MJP 1) Gangapuri nalla progress. Presently no fund Pune for technical Timeline not 37 Wai 2) Siddheshwar Nalla 4.00 0.00 4.00 0.00 4.00 6.00 sanctioned work will be commenced sanctioning, provided 3) Other small nalla under Maharashtra Suvarnjayanti Vojana. FSTP of 70 KLD Capacity has been installed and is in operation.

Timeline not 38 Marul 1) Local Nallas 0.45 0.00 0.45 0.00 0.45 0.00 No No --- Zilla Parishad, Jalgaon, given provided proposal for Financial & Technical Assistance from MPCB for provision of STP at the Marul, Nhavi & Jalgaon to Timeline not 39 Mor 20 III V Nhavi 1) Local Nallas 0.50 0.00 0.50 0.00 0.50 0.00 No No --- Padalse villages. MPCB given work Amoda provided order for Financial assistance to 03 Gram Panchayats for preparation of DPR for Sewage treatment facilities, Timeline not 40 Padalse 1) Local Nallas 0.26 0.00 0.26 0.00 0.26 0.00 No No --- 2 Lakhs each. provided

DPR approval is pending DPR preparation is under progress 41 Khopoli 1) Bazarpeth Nalla 11.00 0.00 11.00 0.00 11.00 0.00 with MJP for technical Mar-22 -- for STP at Khopoli. Rs. 98 Cr grant sanction is sanctioned.

Khadepada to Patalganga 20 III III Kopoli STP is under construction. 1) Lendi Nalla 42 Khalapur 1.60 0.00 1.60 0.00 1.60 3.00 Work completed up to Mar-22 -- 2) Bazarpeth Nalla PCC level. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement. 1) Drain from Village Narayanpur 2) Drain from Village Bhatkuli 3) Amba Nalla from DPR preparation under progress for Amravati City DPR Prepard by MJP 02 STPs (16 + 12 MLD) at Amravati. Narayanpur to Amravati Municipal 4) Frizapura Nalla Amravati and submitted to Timeline not 43 Pedhi 3.2 III V 71.05 55.00 16.05 74.50 -3.45 28.00 Bhatkuli Corporation 5) Prashant Nagar Nalla Higher Authorities of MJP provided 34.5MLD for future expanction. land 6) Minor Nalla for necessary approvals acquisition for STP is in process. 7) rathi nagar 8) Retigaon nalla 9) Nawethe nalla 10) Bhartiya Mahavidya 1.Nalla Drain from Village Asegaon Purna 2. Drain from Village Purna Nagar 3. Drain From Village DPR Prepard by MJP DPR Prepard by MJP Amravati and Asegaon to Amravati Municipal Sawalapur Amravati and submitted to Timeline not 44 Purna 223.2 III IV 0.00 0.00 submitted to Higher Authorities of Dhupeshwar Corporation 4. Drain From Village Higher Authorities of MJP provided MJP for necessary approvals Nerul Ganagamai for necessary approvals 5. Drain From Village Nerul Wathoda Shukleshwar 6. Drain From Village

MC appointed PMC to prepared Mehkar Municipal 1) Mehekar to umarkhed DPR Preparation under 45 3.77 0.00 3.77 0.00 3.77 0.00 Mar-23 DPR for under ground drainage and Council Lendhi nalla progress STPs.

STP Project cost of 33 Cr including the drainage network cost was done by NEERI Nagpur. Then this proposal was submitted to MJP for technical sanction. MJP has not given technical sanction. Hence, administrative approval is not given by UDD. Then Municipal Council has worked out a proposal of Rs. Mehkar to 10.0 Lakhs based on Phyto- Penganga 7.65 III V Umarkhed Full-fledged STP is not Plankton Technology. Now proposed. However, Municipal Council says that, 1) Mehekar to umarkhed Municipal Council has Timeline not Penganga River is 18 km. away from 46 Umarkhed 4.10 0.00 4.10 0.00 4.10 9.60 Lendhi nalla worked out a proposal of provided the city. Lendhi Nalla is just at the Rs. 10.0 Lakhs based on boundary of the city. Presently, 4.1 Phyto-Plankton Technology. MLD Sewage flows through this Lendhi Nalla but not reach upto Penganga River. After some distance Lendhi Nalla is mostly dry. Farmers had constructed small barrages on Lendhi Nalla. Nearby farmers are utilizing this untreated sewage by providing number of pumps & motors & thus the untreated sewage is utilized for irrigation purpose.

Gap in the treatment capacity is 11 Proposal for closed drain MLD. At present no treatment facility system and STP is Timeline not 47 Bhusawal 1) Local Nallas 11.00 0.00 11.00 0.00 11.00 12.50 No --- at Bhusawal, proposal for closed submitted to Government provided drain system and STP is submitted for approval. to Government for approval. Raver to Tapi 58 III IV Shahada

Shirpur Municipal Council is O&M technology of STP is SBR - Total exiating sewage network 48 Shirpur 1) Local Nallas 5.00 12.50 -7.50 5.00 0.00 0.00 having STP and is in --- Complied --- level of teratment aeration and length 74km working condition clorination.

MPC Board will provide financial & technical assistance to villages in This office has issued letter to Timeline not next three years to comply with 49 Valse 1) Valse nalla 0.40 0.00 0.40 0.00 0.40 0.00 NA NA Gram Panchayat for provided waste management. SRO Jalgaon, installation of STP has issued letter to Gram Panchayat for installation of STP. Dhangarwadi Urmodi 18 III V to Nagthane River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement. to Nagthane

MPC Board will provide financial & technical assistance to villages in This office has issued letter to Timeline not next three years to comply with 50 Nagthane 1) Nagthane nalla 0.00 0.00 0.00 0.00 0.00 0.00 NA NA Gram Panchayat for provided waste management. SRO Jalgaon, installation of STP has issued letter to Gram Panchayat for installation of STP.

Underground drainage Mahabaleshwa DPR prepared. Budget DPR approved. Proposal for location 51 Venna 47 III IV Satara 1) Ranmala Nala, Karanje 12.80 0.00 12.80 0.00 12.80 17.50 Mar-22 network line work is under r to Mahuli sanctioned of 50cr. for approval is under progress. progress.

Timeline not 52 Pahur, Dist. Jalgaon 1) Local Nallas 0.45 0.00 0.45 0.00 0.45 0.00 NA NA --- provided Zilla Parishad, Jalgaon, given proposal for Financial & Technical Assistance from MPCB for provision Sunasgaon to Timeline not 53Waghur 98 III V Neri, Dist. Jalgaon 1) Local Nallas 0.00 0.00 0.00 0.00 0.00 0.00 NA NA --- of STP at the Pahur, Neri and Sakegaon provided Sakegaon, Nhavi & Padalse villages. MPCB has approved fund of Rs. 2 Sakegaon, Dist. Timeline not Lakh for each Gram Panchayts. 54 1) Local Nallas 0.00 0.00 0.00 0.00 0.00 0.00 NA NA --- Jalgaon provided

02 STPs are under construction 1) Hingnaghat town drain with capacity of 13.5 (10+3 MLD). 100% Civil work coming to Wena River Budgetary completed. STP of MBBR Kawadghat to near Railway Bridge provision 10 MLD-7.17 Cr & 3.5 55 Wena 1 III V Hinganghat 6.25 0.00 6.25 0.00 6.25 13.00 technology having May-21 Hinganghat 2) Hingnaghat town drain MLD-4.0 Cr. 2. STP will be in capacity 13 MLD civil work coming to Wena River operation by 30.04.2021. One completed from Ghat month delay due to installation of MSEB DP at STP Site

No Treatment Facility. 01 STP is proposed with capacity of 35 MLD. 1) Subhash Road nalla Swarajnagar to Beed Municipal Tender floated for land Work of drainage work is Budget 165 Cr Sanctioned. 50%- 56 Bindusar 0.7 IV IV at Sathe Chowk, Sneha 22.00 0.00 22.00 0.00 22.00 35.00 Jul-21 Snehanagar Council acquisition under progress GOI, 25%-GOM & 25%-MC. WO Nagar, Beed. already relaeased, work under progress.

Sanction work order for 12.6 MLD Total Sewage network length Capacity STP. FSTP of capacity 25 1) Local nalla coming 57 Bori Along Amalner 20 IV V Amalner 10.00 0.00 10.00 0.00 10.00 12.60 11% work completed Jul-21 is 80km, till date work KLPD is provided. from Amalner city completed is 21km.

DPR proposal for 5 MLD future work under preparation. Pandharpur to Drainage network of 85% 1) Gopalpur Nalla 58 Chandrabhaga Shegaon 3.5 IV III Pandharpur 18.50 18.50 0.00 12.50 6.00 5.00 Under DPR preparation Nil Complied Dec-21 completed, Total length in coming from Pandharpur. Namame Chandrabhaga on the line Dhumala current phase 60km of Namame Ganga announced by Govt. of Maharashtra

Timeline not 59 Ghoti Village 1) Ghoti Village Nalla 0.87 0.00 0.87 0.00 0.87 0.00 No No NA provided

MPC Board will provide financial & Igatpuri to technical assistance to small towns Darna 35 IV IV Timeline not 60Sansari Bhagur 1) Bhagur Village Nalla, 0.74 0.00 0.74 0.00 0.74 0.00 No No NA in next three years to comply with provided waste management.

Timeline not 61 Sansari Village 1) Sansari Nalla. 0.42 0.00 0.42 0.00 0.42 0.00 No No NA provided

STP Work has been started at site Construction of 48 CMD of work at Gat No.413,390 Jalgaon 1) Local nalla coming STP is started. Excavation 62 Jalgaon 48.00 0.00 48.00 0.00 48.00 48.00 Aug-21 NA Shiwar having capacity of 48.00 from the Jalgaon city work is completed. Civil MLD. FSTP of capacity 20 KL/Day work is not yet started. Malegaon to is provided. Girnna 110 IV V Jalgaon MPC Board will provide financial & 1) Kolha nalla coming Timeline not technical assistance to villages in 63 Bhadgaon 2.00 0.00 2.00 0.00 2.00 0.00 No No NA from the Bhadgaon City provided next three years to comply with waste management. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

Civil work is completed Civil work is completed and will and Machinery yet not Pachora to 1) Local nalla coming Drainage network work is commission around March 2021. 64 Hiwara 57 IV V Pachora 3.00 0.00 3.00 0.00 3.00 9.00 No installed. Oct-21 Nimbora from Pachora city. under progress.

Malkapur STP completed and rest of Total Network 59 km and nalla will divert to STP by March 65 Malkapur 1) Local nalla 6.14 8.00 -1.86 6.14 0.00 0.00 - - Complied construstion work of Network 2020. 51km done Karad to No gap in Treatment capacity Koyana 29.6 IV IV Paparde

Instructions given to MC for 66 Karad 1) Local nalla 8.50 8.50 0.00 8.50 0.00 0.00 - Complied NA upgradation of existing STP.

06 STPs with capacity 145 MLD have been proposed.

60 MLD STP was granted and sanction. Revised DPR of proposed Length of sewage network - 46km 06 nos of STP having 170 Cr sanction from Govt. MJP for investment of Rs. 1232 Cr 60 MLD STP and Gap will address Pelhar Dam to 1) Sopara Nalla, was send to State Govt and Length of sewage network - 67 Pelhar 9 IV V Vasai Virar 105.00 30.00 75.00 30.00 75.00 145.00 -- Mar-22 15MLD. State Govt. accorded its Golani Naka 2) Tungar Nalla, State Govt. submutted for 46km. approval to JNNURM-UIDSST for 3) Waliv Nalla. further approval to Central Augmentation of Water Supply and Govt. Yet appproval not Under Ground Sewarage System of received. VVCMC and further recommended to Ministery of UDD of Govt. of India.UDD has directed to JNNURM-UIDSST to forward the above proposals to Govt. of India vide letter dtd. 17/02/2014.

1) 10 % work SBR PCC and compund wall is 2 STPs provided with treatment DPR preparation is under completed at desai nagar Solapur to capacity of 75 MLD and 15 MLD 68 Sina 6 IV III Solapur 1) Degaon Nalla. 90.00 92.00 -2.00 62.73 27.27 12.50 progress 20 MLD STP 2) Jun-21 Bankalagi respectively. 12.5 MLD Proposed for finalization of site location future requirement under process is under process

Along dist. of Jalgaon Two STPs of capacity 13 Proposal submitted to Government Kodgaon Dam, MLD and 6 MLD are 69 Titur 35 IV V Chalisgaon 1) Local nallas 13.63 0.00 13.63 0.00 13.63 19.00 Sep-21 for 02 STPs Tal. proposed. Administrative Land Acquisition is under process. Chalisgaon, approval pending Dist Jalgaon

MPC Board will provide financial & technical assistance to villages in 70 Amba Bense to Roha 11 V V Pali Village 1) Local nallas 1.00 0.00 1.00 0.00 1.00 0.00 DPR not yet prepared Mar-22 NA next three years to comply with waste management.

Shahapur Nagar Panchayat MPC Board will provide financial & has proposed to provide Timeline not technical assistance to villages in 71 Shahapur 1) Local nallas 2.50 0.00 2.50 0.00 2.50 0.00 Not Started STP. However, DPR not provided next three years to comply with Shahapur to yet prepared waste management. Bhatsa 23.4 V V Bhadane MPC Board will provide financial & Timeline not technical assistance to villages in 72 Vashind Village 1) Local nallas 0.00 0.00 0.00 0.00 0.00 0.00 Nil Nil provided next three years to comply with waste management.

1) Inlet water supply for Shahda City is less than 135 LPCD so STP is not proposed for Shahada Municipal Council. FSTP is Lonkheda to 73 Gomai 7 V V Shahada 1) Local nallas 2.00 0.00 2.00 0.00 2.00 0.00 NA FSTP of 10 KLD Installed Complied approved for Shahda Municipal Shahda Council of capacity 10 KLD (0.01 MLD) and now in operation 2)Technology used for FSTP- Sludge Drying Bed River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

Process for purchase of land not yet DPR has been sanctioned. completed. STP project will be Kavathe to 74 Kan 10 V V Sakri 1) Local nallas 1.20 0.00 1.20 0.00 1.20 0.00 But due to unavailablity land NA started after availability of this land Sakari no progress. and after acquiring required funds from the government.

02 Nos of STPs with Capacity (40+32 MLD) 72 MLD have been proposed. The Latur Corporation provided Budget 139 Cr Sanctioned. water once in a 15days at a tune of Latur to Latur Municipal 50%-GOI, 25%-GOM & 75 Manjara 8 V IV 1) Siddheshwar Nalla 30.00 0.00 30.00 0.00 30.00 72.00 Mar-22 30Million litre approximately water Nanded Bridge Corporation 25%-MC. Due to Land supply is 2MLD. Issue Project on hold River Manjra is 7 km away from Latur city, except monsoon water never meet to the river, it is being used by the farmers.

1) Lakshtirth Nall 2) Jayanti Nalla 3) Dudhali Nalla 4) Jamdar Club Nalla 5) Siddharth Nagar Nalla 6) CPR hospital Nalla 7) Rajhans Nalla !) STP- Dudhali- 6 MLD- 8) Ramanmala Nalla 10% work completed 9) Dream World Nalla (foundation) (2) STP- Temprory measures by means of Balance 5 Nalls will be 76 Kolhapur 10) Line Bazar Nalla 96.00 91.00 5.00 73.00 23.00 10.00 Kasaba Bavad- 4 MLD, Mar-21 bleeching powder dosing manually diverted to STPS 11) Kasaba Bavada Nalla 55% work completed and traditional Phytoremidation. 12) Bapat Camp Nalla Project is under Amrut 13) Kala Odha Nalla Yojana, Centrl Govt. 14) Gandhinagar Nalla 15) Valiwade Nalla 16) Tilawani/Rui Nalla Shirol to Panchganga 67 V Less Polluted 17) Hupri Nalla Kolhapur 18) Shirdhon Nalla 19) Shirol Nalla

1) Chandur Nalla STP work stopped due to 5 nallas are connected to river Ichalkaranji MCs have proposed 01 77 Ichalkaranji 2) Kabnur Nalla 38.00 20.00 18.00 14.00 24.00 18.00 Mar-21 litigation without treatment. STP with capacity 20 MLD. (Including Chandur nalla)

Timeline not 78 Other villages 1) Local nallas 23.00 0.00 23.00 0.00 23.00 0.00 provided

Proposed sewerage network of Total sewage network length 147.56 Km, will be completed by from 6 major nalla is 26km May-2021 AMRUT Budget 163Cr. 1. Moti Nalla - 6km 20% Undergroung 1. Moti Nalla 2. Hagara Nalla- 3km Approved fund allocated Funding drainage, 10% STP 2. Hagara Nalla 3. Sushi Nalla- 4km details- construction completed Varkhede to 3. Sushi Nalla 4. Londhi Nalla- 4km GOI-65.76 Cr, 79 Panzara 7 V V Dhule 36.00 0.00 36.00 0.00 36.00 57.00 Mar-21 Dhule 4. Londhi Nalla 5. G.T.B Nalla- 3km GoM 32.88 Cr. & Technology- SBR 5. G.T.B Nalla 6. Hamal Nalla- 5km ULB/MC-32.88 Cr. Funding details- Amrut 6. Hamal Nalla Sewage gen. 30MLD Total 131.62Cr. Mission. Proposed sewerage Network Amrut Mission implimentation of drain 147.56km Agency maharshtra Jeevan pradhikaran Dhule. River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

Inlet water supply for Navapur City is Tintemba to 80 Rangavali 3.2 V V Navapur 1) Local nallas 2.00 0.00 2.00 0.00 2.00 0.00 FSTP of 10 KLD Installed Complied less than 135 LPCD so FSTP of 10 Navapur KLD installed and now in opeartion

Planning to nalla tapping process on existing two major nalla including small minor nala to major nala and mini 1. Local Nallas from STP and ABR planted filter Chambhar khind to fish bed and chlorination process. Mahad Municipal council vide letter market Council resolution are dtd. 10.3.2021 has informed that Dadli to 2. Local Nallas from DPR preparation is under 81 Savitri 3.5 V Less Polluted Mahad 3.20 0.00 3.20 0.00 3.20 3.70 Mar-22 sanction to proposed detail project report is pending with Muthavali Narenagar to prabhat progress. underground drainage system Maharashtra Jiven Pradhikaran, colony crematorium under state Nagarothan Plan Thane 3. Local Nallas from and DPR sanctioning for Koteshwari lend vahal preparation of CDP export consultant panel are inivited via tender publishing on state level news paper.

There are 9 small villages are situated on the bank of surya river. Those villages are located > 1 km away from surya river. The household of Villages are Dhamni Dam Timeline not 82 Surya 49 V V 09 Villages 1) Local nallas 0.00 0.00 0.00 0.00 0.00 0.00 NA NA NA NA provided septic tank followed by to Palghar provided soak pit for domestic sewage.In some places comm on toilet facility provided. No any drain discharge in river Surya & No any industry situated on the bank of river Surya.

No major drain as only The generated sewage is being 1) Met Village Timeline not No Drainage as only small 83 small villages are located 0.23 0.00 0.23 0.00 0.23 0.00 Nil Nil NA soaked in to soakpits provided by provided villages along the river stretch. indivisual residents of village due to

84 2) Uchat Village, 0.00 0.00 NA

85 3) Kondhale Village, 0.00 0.00 NA

86 4) Mhaswal Village, 0.00 0.00 NA Tansa River Along Thane 10 V V 87 5) Bersheti 0.00 0.00 NA

88 6) Jaale 0.00 0.00 NA

89 7) Kuyalu 0.00 0.00 NA

90 8) Nehal Pada 0.00 0.00 NA River wise Gap Analysis in Sewage Generation & Treatment

Sewage Gap in Timeline for Priority Priority Sewage Gap in Capacity of Sr. Name of the River Length in Treatment Treatment Actual Stage of Under completion of Timeline for completion of ULB wise information of CPCB CPCB Jan Cities/Towns Major Drains Generation Treatment Proposed Stage of Proposed STP Remarks No. River Stretchs Km Capacity Capacity Utilization construction STP STPs for current STPs for future need. drainage network Report 2018 to Dec 2020 (MLD) (MLD) STP (MLD) (MLD) (MLD) requirement.

1) Vadol STP Capacity- 20.70 MLD Commission. Gap in treatment capacity is 2) Shantinagar STP 46.3MLD. Ulhasnagar MC has total capacity-31.26 MLD 04 STPS with capacity of 74.96 95%work completed.3) MLD. and date of copletion 91 Ulhasnagar 1) Local nallas 67.00 20.70 46.30 20.70 46.30 54.26 Khemani STP Dec-2020 Aug-21 August 2021 4) SBR sequencing batch 1 STP - 20.7 MLD reactor. 8MLD Khadegovili 2 STP - 15 MLD STP-Work order given to 3 STP- 31.26 MLD agency on dated 4 STP-8 MLD proposed for future 18.5.2020

70% area of the city has been 92 Ambernath 1) Local nallas 28.00 54.00 -26.00 28.00 0.00 0.00 Complied NA covered by underground sewerage network.

Kalyan to Ulhas 22.5 V V Badlapur

likely date of completion : As Per Preliminary works in work Order March 2021 ( Extended progress - upto Dec-2021 ) 1.Hendrepada nalla Cleaning,survey,design,tria 1.Hendrepada nalla- 2.5km technology : SBR. 2. Joveli nalla l bore etc hydraulic design 2. Joveli nalla- 1km Note: As Per 3. Eramjad nalla for Sewerage Treatment 3. Eramjad nalla- 550mtr. Government Order this Sewerage 4. Badlapur gaon nalla Plant is Submitted on 4. Badlapur gaon nalla- 1.5km 93 Kulgaon Badalapur 26.00 22.00 4.00 22.00 4.00 22.00 Dec-21 Project Handover to Maharashtra 5. Sonivali Nalla March 20 & June 20 to 5. Sonivali Nalla- 700mtr. Jeevan Prathikaran (MJP) as an 6. Near WTP barrage Superintendent 6. Near WTP barrage road Implementing Agency.As Per MJP road nalla Engineer,MJP for nalla-2km Officer discussion due to Covid -19 Sanction, After Lockdown no work should be started Sanctioning Design,actual hence date of Completion likely work started on site extended upto be Dec-2021

Timeline not 94 Sarsi Village 1) Local nallas 0.19 0.00 0.19 0.00 0.19 0.00 No STP proposed yet NA provided

95 Gandhre Village 1) Local nallas 0.00 0.00 MPC Board will provide financial & Gandhre to technical assistance to villages in Vaitarana 5-10 V V Sarashi next three years to comply with waste management. 96 Pimproli Village 1) Local nallas 0.00 0.00

97 Koyna Village 1) Local nallas 0.00 0.00

Timeline not 98 Kherdi Village 1) Local nallas 0.19 0.00 0.19 0.19 0.00 NA provided

Timeline not 99 Dalvatne Village 1) Local nallas 0.00 0.00 0.00 NA MPC Board will provide financial & provided technical assistance to villages in next three Kherdi to Vashishthi 3 V Less Polluted years to comply with waste Dalvatne Timeline not management. MPCB 100 Gane Village 1) Local nallas 0.00 0.00 0.00 NA provided had proposed wetland phytorid project at Dalvatne village

Timeline not 101 Khadpoli 1) Local nallas 0.00 0.00 0.00 NA provided