FORM –1 “Villagio Toscana”
Total Page:16
File Type:pdf, Size:1020Kb
FORM –1 & 1 A “Villagio Toscana” At S.No. 26/4 Kondhwa Khurd, Dist. Pune. State: Maharashtra By M/s IDEB Grand Reality Pvt. Ltd. FORM –1 “Villagio Toscana” At S.No. 26/4 Kondhwa Khurd, Dist. Pune. State: Maharashtra By M/s IDEB Grand Reality Pvt. Ltd. Form 1 – “Villagio Toscana” APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Sr.No. Item Details 1. Name of the project Villagio Toscana 2. S. No. in the schedule 8 a 3. Proposed Total Plot area: 27,255.37 m2 capacity/area/length/tonnage to Deductions: 7695.28 m2 be handled/command Net Plot area:19,560.09 m2 area/lease area/number of FSI : 42,123.99 m2 wells to be drilled Non FSI: 30,329.59 m2 Built up area: 72,453.58 m2 Building Building Number No. Of Ht. m Type Configuration of Flats shops Wing A B+2P+8 30 - 30 FLOOR Wing B B+2P+8 32 - 30 FLOOR Wing C B+2P+8 30 - 30 FLOOR Wing D B+2P+8 24 - 30 FLOOR Wing E 2P+17 102 - 54.15 FLOOR Wing F 2P+17 102 - 54.15 FLOOR Wing G 2P+17 17 - 54.15 FLOOR Club G +1 - - House Total 337 4. New/Expansion/Modernization Expansion/ Amendment project 5. Existing Capacity/ Area etc. Work has been initiated as per EC received No. 21- 1122/2007-IA-III dated 19th November 2009 Wing A, B,C, D (B+2P+8 floor) have been completed FSI: 20702.90 SQM. No FSI: 9434.80 SQM. Total BUA: 30137.70 SQM.. 6. Category of project i.e.’ A’ or B2 ‘B’ 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location Kondhwa Khurd Form 1 – “Villagio Toscana” Sr.No. Item Details Plot/Survey/Khasra No. S.No. 26/4 Village - Tehsil Haveli District Pune State Maharashtra 10. Nearest railway station Pune Railway Station - approx. 7.00 km Nearest airport Pune Airport – approx.15 km 11. Nearest Town, city, Pune Municipal Corporation District headquarters Along with distance in kms. 12. Village Panchayats, Zilla Pune Municipal Corporation Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s IDEB Grand Reality Pvt. Ltd. 14. Registered Address 10th Floor, Delta Tower, Sigma Soft-Tech Park, #7, Whitefield Main Road, Opp. Varthur Lake, Banagalore – 560066, India 15. Address for correspondence 2S3, 1st Floor, Indrayu Mall, near Konark Puram, Kondhwa, Pune – 411048 Name Mr. Brajesh Singh Designation Director (Owner/Partner/CEO) Address 2S3, 1st Floor, Indrayu Mall, near Konark Puram, Kondhwa, Pune – 411048 Pin Code 411048 E-mail [email protected] Telephone No. 9552511111 Fax No. 16. Details of Alternative Sites No examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects Not applicable 18. Whether separate application Not applicable of interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and No their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any No Form 1 – “Villagio Toscana” Sr.No. Item Details Government Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. Plot History: The proposed site admeasuring 27,255.37 sq.mt. which is owned by M/s IDEB Grand Reality Pvt. Ltd.for residential complex on the said conveyed land. Work has been initiated as per EC received No. 21-1122/2007-IA-III dated 19th November 2009 for 19560.09 m2 Wing A, B,C, D (B+2P+8 floor) have been completed FSI: 20702.90 SQM. No FSI: 9434.80 SQM. Total BUA: 30137.70 SQM.. Size of the Project : Total Plot Area : 27,255.37 SQM (II). Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities Sr. Information/Checklist Yes /rates, wherever possible) with source of No. confirmation / No information data 1.1 Permanent or temporary change No Project site is in Residential zone as per DP in land use, land cover or remarks. topography including increase in intensity of land use (with DP remarks are attached as Enclosure 1 respect to local land use plan) 1.2 Clearance of existing land, No -- vegetation and building? 1.3 Creation of new land uses? No -- 1.4 Pre-construction investigation Yes Hydrogeological Investigation has been carried e.g. bore houses, soil testing? out 1.5 Construction works? Yes Work has been initiated as per EC received No. 21-1122/2007-IA-III dated 19th November 2009 Wing A, B,C, D (B+2P+8 floor) have been completed FSI: 20702.90 SQM. No FSI: 9434.80 SQM. Total BUA: 30137.70 SQM.. 1.6 Demolition works? Yes Total number of Row houses to be demolished – Form 1 – “Villagio Toscana” Details thereof (with approximate quantities Sr. Information/Checklist Yes /rates, wherever possible) with source of No. confirmation / No information data 11 G +1 structure – 5 G + 2 structures – 6 1.7 Temporary sites used for No -- construction works or housing of construction workers? 1.8 Above ground building, Yes Excavation material & construction waste structures or earthworks material shall be used at site. including linear structures, cut and fill or excavations. Quantity of Waste Construction Units Reuse/Recycle Reused/ Sent to Material (Metric) Generated Application Recycled Suppliers Backfilling & Road Top soil m3 1129.3 564.65 564.65 levelling Backfilling & Road Excavation m3 14,104.12 7052.06 705206 levelling 1.9 Underground works including No. -- mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes During construction phase temporary storage materials? facilities will be created to store the construction raw material. Enclosure 2 1.15 Facilities for treatment or Yes • STP for treatment of sewage disposal of solid waste or liquid • Segregation of solid waste into non- effluents? biodegradable and biodegradable garbage • Treatment of biodegradable waste in Organic Waste Converter • Segregation of Non-biodegradable waste into recyclable & non-recyclable. Recyclable waste: To recyclers Non-Recyclable waste: To PMC authorised vendor • Dried sludge from STP : As manure 1.16 Facilities for long term housing No -- of operational workers? 1.17 New road, rail, or sea traffic No -- during construction or operation? Form 1 – “Villagio Toscana” Details thereof (with approximate quantities Sr. Information/Checklist Yes /rates, wherever possible) with source of No. confirmation / No information data 1.18 New road, rail, air waterborne No -- or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission No -- lines or pipelines? 1.21 Impoundment, damming, No -- culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water No -- from ground or surface waters? 1.24 Changes in water bodies or the Yes By considering the runoff prior to development land surface affecting drainage and runoff after development there is some or run-off? increment in runoff of storm water. Incremental Runoff = 0.04 m3/sec 1.25 Transport of personnel or Yes Transport of construction materials. materials for construction, Precautions taken to reduce the impact of the operation or decommissioning? vehicular movement by trying to avoid the vehicular trips during peak hours. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes There will be influx of people in proposed project, either temporarily or which includes Fixed No: 1965 Nos. permanently? Floating:28 Nos. 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? No -- 2.0 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Form 1 – “Villagio Toscana” Sr. Information/checklist Yes Details thereof (with approximate quantities No. confirmation / No /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes Total Plot Area under development = 27,255.37 m2 agricultural land (ha) 2.2 Water (expected source & Yes During Construction Phase for worker: competing users) unit : KLD From: Potable water tanker 4-5 m3/day During Operation: Total Quantity of water: About 330 m3/day Fresh from PMC Domestic : 194 m3/day Recycled : For Flushing + gardening : 126 m3/day (for non-monsoon season) 2.3 Minerals (MT) No -- 2.4 Construction material – stone, Yes Quantity : As per requirement aggregates, and / soil (expected Stone aggregates demand will be met from the source – MT) clay/soil generated after excavation and from open market Sources: The material required for construction activities shall be procured from company’s authorized / approved vendors only.