Spacespace For:For: Air, Landgoing and Places Sea Access

Total Page:16

File Type:pdf, Size:1020Kb

Spacespace For:For: Air, Landgoing and Places Sea Access SpaceSpace for:for: air, landgoing and places sea access PORTAIR INDUSTRIAL ESTATE 1 HALE STREET, BOTANY, NSW OVERVIEW 2 Opportunity PortAir Industrial Estate is a premium estate that offers high quality warehouse and office space in South Sydney. The estate benefits from excellent transport efficiencies, situated close to Port Botany, Sydney Airport and the M5 Motorway. An outstanding opportunity exists to lease 3,811 sqm of premium warehouse and office space, joining high profile customers Swisse, Lovatt Transport, UPS and Star Track at this prime location. VIEW FROM ABOVE 3 Sydney CBD PortAir Industrial Estate Sydney Airport Botany Road Port Botany Freight Line Foreshore Road Port Botany Perry Street Foreshore Road Beauchamp Road Port Botany Port Botany INFRASTRUCTURE UPGRADES 4 Burwood M4 Rozelle Sydney CBD Glebe STAGE 1 Haberfield Paddington M4 widening M4 tunnels M4-M5 Link Complete Ashfield Opening 2023 Leichhardt Bondi Camperdown Future proofing Sydney Redfern Westconnex is the largest transport and urban renewal project in Australia, Newtown bringing major improvements to road infrastructure and public transport to Alexandria keep Sydney moving. The Sydney Gateway will be completed St Peters Rosebery in 2023, and will provide access to the STAGE 2 M8 and M4 Motorways which will provide New M8 St Peters Interchange Coogee Complete efficient transport to Sydney’s West and Mascot South West. Tempe M8 Benefits: SYDNEY GATEWAY Opening 2023 + Easing road congestion Bardwell Park + Bypass 42 sets of traffic lights from Kingsgrove Sydney airport to Parramatta Airport Bexley Arncliff + Double the capacity of the M5 corridor M5 + Better connections along the M4, M5 and M8 Motorways Maroubra + Quicker and more reliable trips between west and south west Sydney. Completed tunnel to/from M4 Matraville Existing M5 Motorway Completed tunnel M8 Motorway Under Construction M4-M5 link Malabar Sydney Gateway Port Botany LOCATION 5 Southern Cross Drive General Holmes Drive Sydney Airport Bunnerong Road Stephen Road Wentworth Avenue Smart move M5 East Freeway PortAir Industrial Estate General Holmes Drive The Estate’s close proximity to Sydney Airport Fitzgerald Avenue and Port Botany provides significant logistical efficiencies for users. Botany Road Sydney’s motorway network is easily accessed via Foreshore Road with connections to the Eastern Distributor and M5 Motorway each within 1.5 kilometres of the estate. Bunnerong Road Foreshore Road Anzac Parade To/from M5 Freeway Bumborah Point Road To/from Southern Cross Drive To/from Sydney International Container Terminal To/from Sydney Airport Military Road Signalised intersection Port Botany CENTR ALLY CONNECTED 2.2KM 8.7KM to M5 East to Sydney CBD 2.2KM Motorway 2.4KM 12KM to Port Botany to Sydney Airport to M8 Motorway KEY AREA STATISTICS – WITHIN 45 MINUTE DRIVE TIME 6 KEY AREA STATISTICS: m Kellyville 3.9 TOTAL POPULATION Dee Why m Blacktown 1.5 TOTAL HOUSEHOLDS $198.0 bn TOTAL PURCHASING POWER Sydney TOTAL SPEND ON: PortAir $ bn Industrial Estate 4.8 Matraville CLOTHING $15.7 bn FOOD + BEVERAGE Cronulla $3.4bn Rosemeadow PERSONAL CARE Source: Esri and Michael Bauer Research All currency in Australian dollars. Source: Esri and Michael Bauer Research FEATURES 7 Flexible workspace + 3,516 sqm clearspan warehouse with internal clearance up to 10.8m + 296 sqm recently refurbished office space over two floors + Access via on-grade roller shutters + ESFR sprinklers + On-site Building Manager + Ample parking. MASTERPLAN 8 NEW WAREHOUSE/ LAYOUT BY OTHERS 6 6A AFTER HOURS 7B 7A TRUCK PARKING 9 9 8B 8B 8A 3B 3A 4A 5 4B NEW ARMCO BARRIER REFURBISHED OFFICE2A 2B 29 ADDITIONAL SPACES OFFICE 12 NEW PALISADE FENCE SHOWN 11 10A DOTTED ORANGE 32 ADDITIONAL SPACES 10B 1A–1C 1D NEW OFFICE HALE STREET 10C OFFICE REFURBISHED EXIT ONLY FOR LEASE FOLKESTONE PARADE UNIT 7B PLAN 9 AREA SCHEDULE SQM Warehouse 3,514.8 Ground floor office 75.9 First floor office 219.9 Total area 3,810.6 50.1 Adjoining Tenancy F M Fire Tunnel 7 . 2 r 1 e h Office tt hu .7m S 6 r e x ll o w R 22.2 .6m 7 y c n Sprinkler Room a First floor Unit 7B n e r 9 T e h . tt g Warehouse 2 n 7m 5 hu . i S 6 n r x Maximum Height: 10.8m i e o l j l w o d R Minimum Height: 7.3m A .6m 7 M Fire Exit Ground floor FOR LEASE SERVICE 10 Manage Dedicated Building Managers provide on-site support for day-to-day operations, while Property and Asset Managers are available to discuss any lease queries, invoicing issues or modifications to tenancies. We give our customers the space they need to succeed by providing unparalleled service To ensureService our customers receive the best possible service, all of our estates have in-house property services teams that attend to customers’ operational needs and ensure maintenance and presentation standards are exceptional. Contact Jason Min Asset Manager T 02 9230 7195 M 0425 223 929 [email protected] Goodman The Hayesbery 1–11 Hayes Road Rosebery NSW 2018 T 02 9230 7400 View this property online goodman.com/au This document has been prepared by Goodman Property Services (Aust) Pty Ltd ABN 40 088 981 793 for general information purposes only. Whilst every care has been taken in relation to its accuracy, no warranty of accuracy is given or implied. You should obtain your own independent advice before making any decisions about the property referred to in this document. Images contained in this document have been used to enable the customer to visualise the development concepts only, and are not intended to definitively represent the final product. August 2021.
Recommended publications
  • New South Wales Class 1 Load Carrying Vehicle Operator’S Guide
    New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Important: This Operator’s Guide is for three Notices separated by Part A, Part B and Part C. Please read sections carefully as separate conditions may apply. For enquiries about roads and restrictions listed in this document please contact Transport for NSW Road Access unit: [email protected] 27 October 2020 New South Wales Class 1 Load Carrying Vehicle Operator’s Guide Contents Purpose ................................................................................................................................................................... 4 Definitions ............................................................................................................................................................... 4 NSW Travel Zones .................................................................................................................................................... 5 Part A – NSW Class 1 Load Carrying Vehicles Notice ................................................................................................ 9 About the Notice ..................................................................................................................................................... 9 1: Travel Conditions ................................................................................................................................................. 9 1.1 Pilot and Escort Requirements ..........................................................................................................................
    [Show full text]
  • EIS/Pdmdp Chapter 8 Construction
    Roads and Maritime Services/Sydney Airport Corporation Limited Sydney Gateway Road Project Environmental Impact Statement/ Preliminary Draft Major Development Plan Chapter 8 Construction November 2019 Environmental Impact Statement / Preliminary Draft Major Development Plan Contents 8. Construction ........................................................................................................................................ 8.1 8.1 Overview .................................................................................................................................... 8.1 8.2 Indicative construction methodology ......................................................................................... 8.2 8.3 Construction program and timing ............................................................................................ 8.20 8.4 Construction ancillary facilities ................................................................................................ 8.25 8.5 Construction workforce and resources .................................................................................... 8.33 8.6 Transport and access .............................................................................................................. 8.34 8.7 Utility works .............................................................................................................................. 8.40 Tables Table 8.1 Indicative list of buildings and structures proposed for removal ........................................... 8.9 Table 8.2
    [Show full text]
  • Sydney Water in 1788 Was the Little Stream That Wound Its Way from Near a Day Tour of the Water Supply Hyde Park Through the Centre of the Town Into Sydney Cove
    In the beginning Sydney’s first water supply from the time of its settlement Sydney Water in 1788 was the little stream that wound its way from near A day tour of the water supply Hyde Park through the centre of the town into Sydney Cove. It became known as the Tank Stream. By 1811 it dams south of Sydney was hardly fit for drinking. Water was then drawn from wells or carted from a creek running into Rushcutter’s Bay. The Tank Stream was still the main water supply until 1826. In this whole-day tour by car you will see the major dams, canals and pipelines that provide water to Sydney. Some of these works still in use were built around 1880. The round trip tour from Sydney is around 350 km., all on good roads and motorway. The tour is through attractive countryside south Engines at Botany Pumping Station (demolished) of Sydney, and there are good picnic areas and playgrounds at the dam sites. source of supply. In 1854 work started on the Botany Swamps Scheme, which began to deliver water in 1858. The Scheme included a series of dams feeding a pumping station near the present Sydney Airport. A few fragments of the pumping station building remain and can be seen Tank stream in 1840, from a water-colour by beside General Holmes Drive. Water was pumped to two J. Skinner Prout reservoirs, at Crown Street (still in use) and Paddington (not in use though its remains still exist). The ponds known as Lachlan Swamp (now Centennial Park) only 3 km.
    [Show full text]
  • Business Impact Assessment
    Roads and Maritime Services/Sydney Airport Corporation Limited Sydney Gateway Road Project Environmental Impact Statement/ Preliminary Draft Major Development Plan Technical Working Paper 12 Business Impact Assessment November 2019 Sydney Gateway road project – Road Technical Advisory and Environmental Advisory Services SYDNEY GATEWAY ROAD PROJECT: Technical Working Paper 12 – Business Impact Assessment Prepared for Roads and Maritime Services November 2019 Sydney Gateway road project – Road Technical Advisory and Environmental Advisory Services Sydney Gateway Road Project: Technical Working Paper 12 – Business Impact Assessment Document prepared by: HillPDA Pty Ltd ABN 5200 3963 755 Level 3, 234 George Street Sydney NSW 2000 GPO Box 2748 Sydney NSW 2001 T: +61 2 9252 8777 F: +61 2 9465 5598 E: [email protected] W: www.hillpda.com Report contact Elle Clouston Associate BRTP Hons 1A, Cert IV Human Resources MPIA, IAP2 [email protected] The information in this document is confidential to HillPDA Pty Ltd and should not be disclosed, used, or duplicated in whole or in part for any purpose other than the evaluation and exhibition by the Roads and Maritime Services of NSW for the purposes of this proposal. P18027 November 2019 Sydney Gateway road project – Road Technical Advisory and Environmental Advisory Services Sydney Gateway Road Project: Technical Working Paper 12 – Business Impact Assessment Contents 1.0 Introduction ................................................................................................ 1 1.1 Overview
    [Show full text]
  • Sydney Gateway
    Sydney Gateway State Significant Infrastructure Scoping Report BLANK PAGE Sydney Gateway road project State Significant Infrastructure Scoping Report Roads and Maritime Services | November 2018 Prepared by the Gateway to Sydney Joint Venture (WSP Australia Pty Limited and GHD Pty Ltd) and Roads and Maritime Services Copyright: The concepts and information contained in this document are the property of NSW Roads and Maritime Services. Use or copying of this document in whole or in part without the written permission of NSW Roads and Maritime Services constitutes an infringement of copyright. Document controls Approval and authorisation Title Sydney Gateway road project State Significant Infrastructure Scoping Report Accepted on behalf of NSW Fraser Leishman, Roads and Maritime Services Project Director, Sydney Gateway by: Signed: Dated: 16-11-18 Executive summary Overview Sydney Gateway is part of a NSW and Australian Government initiative to improve road and freight rail transport through the important economic gateways of Sydney Airport and Port Botany. Sydney Gateway is comprised of two projects: · Sydney Gateway road project (the project) · Port Botany Rail Duplication – to duplicate a three kilometre section of the Port Botany freight rail line. NSW Roads and Maritime Services (Roads and Maritime) and Sydney Airport Corporation Limited propose to build the Sydney Gateway road project, to provide new direct high capacity road connections linking the Sydney motorway network with Sydney Kingsford Smith Airport (Sydney Airport). The location of Sydney Gateway, including the project, is shown on Figure 1.1. Roads and Maritime has formed the view that the project is likely to significantly affect the environment. On this basis, the project is declared to be State significant infrastructure under Division 5.2 of the NSW Environmental Planning & Assessment Act 1979 (EP&A Act), and needs approval from the NSW Minister for Planning.
    [Show full text]
  • Viva Energy REIT Portfolio
    Property Portfolio as at 31 December 2018 ADDRESS SUBURB STATE/ CAP RATE CARRYING MAJOR TENANT TERRITORY VALUE LEASE EXPIRY Cnr Nettleford Street & Lathlain Drive Belconnen ACT 6.18% $10,180,000 2034 Cnr Cohen & Josephson Street Belconnen ACT 6.22% $3,494,183 2027 Cnr Mort Street & Girrahween Street Braddon ACT 5.75% $4,240,000 2028 Lhotsky Street Charnwood ACT 6.69% $7,070,000 2033 17 Strangways Street Curtin ACT 6.74% $3,933,191 2028 25 Hopetoun Circuit Deakin ACT 6.49% $4,657,265 2030 Cnr Ipswich & Wiluna Street Fyshwick ACT 6.51% $2,840,000 2027 20 Springvale Drive Hawker ACT 6.50% $5,360,000 2031 Cnr Canberra Avenue & Flinders Way Manuka ACT 6.18% $8,100,000 2033 172 Melrose Drive Phillip ACT 6.00% $5,010,000 2030 Rylah Crescent Wanniassa ACT 6.49% $3,120,000 2027 252 Princes Highway Albion Park NSW 6.28% $6,041,239 2031 Cnr David Street & Guinea Street Albury NSW 7.08% $5,273,140 2031 562 Botany Road Alexandria NSW 4.79% $12,178,139 2034 124-126 Johnston Street Annandale NSW 4.25% $4,496,752 2027 89-93 Marsh Street Armidale NSW 8.76% $3,386,315 2028 Cnr Avalon Parade & Barrenjoey Road Avalon NSW 4.51% $4,190,223 2027 884-888 Hume Highway (Cnr Strickland Street) Bass Hill NSW 4.99% $4,225,892 2028 198 Beach Road Batehaven NSW 7.08% $5,374,877 2031 298 Stewart Street (Cnr Rocket Street) Bathurst NSW 6.53% $6,010,223 2029 59 Durham Street Bathurst NSW 7.00% $6,810,000 2033 Cnr Windsor Road & Olive Street Baulkham Hills NSW 4.75% $10,020,000 2028 Cnr Pacifi c Highway & Maude Street Belmont NSW 6.19% $3,876,317 2030 797 Pacifi c Highway
    [Show full text]
  • Technical Paper 1 Traffic Report
    Technical Paper 1 Traffic report 1 WestConnex Updated Strategic Business Case Contents List of Tables ..................................................................................................................................................... 3 List of Figures .................................................................................................................................................... 4 Preface .............................................................................................................................................................. 6 Terminology ....................................................................................................................................................... 7 1 Executive summary .................................................................................................................................... 8 1.1 Background to this report ................................................................................................................... 8 1.2 Traffic methodology ........................................................................................................................... 9 1.3 Road network performance without WestConnex ........................................................................... 10 1.4 Traffic effects of WestConnex.......................................................................................................... 12 1.5 Traffic operations and influence on WestConnex design ...............................................................
    [Show full text]
  • Car Parking and Commercial Facilities International Terminal Precinct
    SYDNEY AIRPORT Car parking and commercial facilities International Terminal Precinct Major Development Plan SYDNEY AIRPORT Car parking and commercial facilities International Terminal Precinct Major Development Plan Approved version APRIL 2005 Prepared by Sydney Airport Corporation Limited Airport Central Level 10, 241 O’Riordan Street MASCOT NSW 2020 CONTENTS SUMMARY ................................................................................................................................. i 1 INTRODUCTION .............................................................................................................. 1 1.1 Background to the proposal ..................................................................................... 1 1.2 Overview of the proposal ......................................................................................... 1 1.3 Proponent details ..................................................................................................... 2 1.4 SACL’s objectives for the proposed development ................................................... 3 1.5 The MDP process and other project approvals........................................................ 3 1.6 Structure of this MDP ............................................................................................... 4 2 BACKGROUND AND NEED FOR THE PROPOSAL ..................................................... 5 2.1 Background to the proposal ..................................................................................... 5 2.2 Need for the
    [Show full text]
  • Sydney Gateway
    Final Business Case Summary Sydney Gateway July 2019 July 2019 About this report Sydney Gateway is designed to increase transport capacity and connections between the Sydney transport network, Sydney Airport and Port Botany. It will do this by delivering new road and rail infrastructure. A motorway from St Peters to Mascot is proposed, together with road upgrades to provide improved access to Terminals 2 and 3 of Sydney Airport. The rail line between Mascot and Port Botany will be duplicated, with some realignment of the line and upgrading of existing rail infrastructure. The Business Case for Sydney Gateway was developed by (Roads and Maritime Services) Transport for NSW and submitted to the NSW Government in October 2018. This Business Case Evaluation Summary has been prepared by Infrastructure NSW, the NSW Government’s independent infrastructure advisory agency. Final Business Case Summary Page 1 Sydney Gateway July 2019 Strategic context Growth in population and the economy The Greater Sydney Commission’s Plan for Sydney1 describes a metropolis of three separate cities where residents of each city have easy access to jobs and services. The three cities are the Eastern Harbour City, Central River City and Western Parkland City. By 2031, the economic output of Sydney is expected to almost double and it will maintain its role as one of the economic capitals of Australia. The transport network currently services a population of 4.8 million making a total of 15.5 million multi-modal trips each day. By 2031, Sydney’s population is forecast to grow by around 1.6 million people and 0.7 million new jobs are forecast.
    [Show full text]
  • NSW Government Submission
    Inquiry into Economic Regulation of Airports NSW Government Submission NSW Transport Planning and Landside Access In March 2018, the NSW Government release ‘NSW Future Transport 2056’, a comprehensive strategy to ensure the way we travel is more personal, integrated, accessible, safe, reliable and sustainable. The associated Regional NSW Services and Infrastructure Plan outlines the NSW Government’s thinking on the big trends, issues, services and infrastructure needs which are now shaping, or will soon shape transport in regional NSW. This includes regional aviation, a key component of Transport for NSW’s future vision for the Hub and Spoke model of transport services in NSW that supports the visitor economy by enabling international and domestic visitation. Central to this is the importance of aviation for international, interstate and intrastate movements. Landside Access to Kingsford Smith Airport (Sydney Airport) The NSW Government is upgrading roads around Sydney Airport to help improve traffic flow around the airport and Port Botany. The upgrades are complementing Sydney Airport’s upgrades to its internal road network. The Sydney Airport precinct employs more than 12,000 people. Around half of these people live within public transport, walking or cycling distance of the Airport. Improvements to public transport, walking and cycling connections will improve access for staff and visitors alike. The NSW Government is currently progressing: • The Sydney Gateway project, including major new road linkages between the motorway network and the domestic and international terminals. • Airport Precinct road upgrade projects, with East Precinct works covering Wentworth Avenue, Botany Road, Mill Pond Road, Joyce Drive and General Holmes Drive, Mascot; West Precinct work, in the vicinity of Marsh Street, Arncliffe; and North Precinct work in the vicinity of O’Riordan Street, Mascot.
    [Show full text]
  • M5 Fact Sheet
    NOVEMBER 2009 M5 corridor expansion – about the project The M5 transport corridor is the main road freight, commercial and commuter route between Port Botany and Sydney Airport, and south west Sydney. In recent years traffic levels and the number of heavy vehicles on this route means the corridor is operating at or near capacity during peak periods. This impacts on Sydney’s economic productivity and competitiveness. This fact sheet provides a summary of the project and provides details on how to find out more information. What is the M5 corridor? Key features of the proposed M5 corridor expansion The M5 Transport Corridor is the main road freight, are: commercial and commuter route between Port • Widening the existing M5 South West Motorway Botany and Sydney Airport, and south west Sydney. from two to three lanes in each direction. It is part of the National Highway Network • Widening the M5 East Freeway east of King connecting Sydney, Canberra and Melbourne. Georges Road to four lanes in each direction. • Four new lanes in tunnel next to the existing M5 The existing M5 Motorway can be divided into two East tunnel. sections: • A new arterial surface road from the M5 East • Section 1: The M5 South West Motorway – A 22 tunnel to the airport and the industrial areas of kilometre tolled road with two lanes in each inner southern Sydney. direction between Camden Valley Way, Prestons and King Georges Road, Beverly Hills, operated What are the benefits? by Interlink Roads. The proposed M5 corridor expansion would deliver • Section 2: The M5 East Freeway – A ten much needed additional road capacity, providing: kilometre road connecting the M5 South West • Improved access to Port Botany and Sydney Motorway with General Holmes Drive/ Eastern Airport.
    [Show full text]
  • Sydney Gateway Road Project Environmental Impact St Atement / Pr Eliminary Dr A Major De Velopment Plan
    Representing the community’s interests in getting around on bikes in Sydney’s eastern suburbs Sydney Gateway Road Project Environmental Impact Statement / Preliminary Dra Major Development Plan 18 Dec 2019 BIKEast Incorporated www.bikeast.org.au Belinda Sco PO Box 1601 Planner Bondi Juncon NSW 1355 NSW Planning Portal Online [email protected] BIKEast is pleased to make a submission on the S ydney Gateway Road Project - - Environmental Impact Statement/Preliminary Dra Major Development Plan. We believe that providing and maintaining open and accessible space for the community is very important. We also believe safe, connuous, and connected bike routes will encourage more people to ride their bikes more oen – an outcome that is consistent with NSW and Local Government strategies to realise the considerable individual and public benefits of increasing the mode share of acve travel (walking or cycling). As such, BIKEast submits the following comments. ● We are pleased to see that the proposed replacement route provided is the most direct alternave to the connecon being removed. ● We are pleased to see menon for adding acve travel connecvity to Sydney’s network as outlined in NSW and Local Government strategy. However, we object to the Sydney Gateway project and propose that the project should not be approved, unl it is strongly aligned with current NSW Government policies and plans, to meet its stated goal “ making journeys from west and south-west Sydney to Sydney Airport, the M5, Eastern Distributor and Port Botany easier, faster and safer”, for all customers. Summary of issues 1. Missing walking and cycling integraon to surrounding acve travel network, in parcular from surrounding local areas to Sydney Airport, a major desnaon and employment centre for the local community.
    [Show full text]