Special Economic Zone «Seaport Aktau »

Total Page:16

File Type:pdf, Size:1020Kb

Special Economic Zone «Seaport Aktau » SPECIAL ECONOMIC ZONE «SEAPORT AKTAU » THE AREA OF YOUR SUCCESS SEZ Advantageous geographical location SEAPORT AKTAU RUSSIAN FEDERATION Type of government Presidental Republic BELARUS Head of State KAZAKHSTANI MONGOLIA President Nazarbayev N.A. Population TURKEY China 18.376 million people IRAN Total area PAKISTAN 2,724,900 sq km. INDIA Capital: Astana Official languages kazakh, russian Why Kazakhstan? A business Bridge between Europe and Asia Availability of rich natural resources and minerals Single customs area with Russian Federation, the Republic of Belarus, the Republic of Armenia and the Kyrgyz Republic The protection of investors' rights are ensured by political, economic and social stability in the country. Mangystau region SEZ SEAPORT AKTAU Located in the south-western part of Kazakhstan, on the east cost of Caspian sea. One of the leading regions of Kazakhstan, that makes a significant contribution to the socio-economic development and modernization of the country. ATYRAU REGION Opornyy Karazhanbas Kalamkas AKTOBE REGION Turush Bautino. Tushikudyk Kyzan Beyneu FORT-SHEVCHENKO Akzhigit Tigen Taushyq Shetpe Sai-Utes Mangystau (Mangyshlak) AKTAU (Shevchenko) Ushtagan Omirzak Zhetybay Munaishy Kyzylsai (Uzen) Zhanaozen REPUBLIC UZBEKISTAN Kuryk (Eraliev) Tenge Senek 1 Beineu district 2 Tupkaragan district Mangystau district Caspian Aksu 3 4 Karakiya district sea 4 Regional center 4 District center 4 City, village REPUBLIC 4 Railway TURKMENISTAN 5 Highway 4 Villages TRANSPORT AND LOGISTICS POTENTIAL SEZ OF THE REGION SEAPORT Seaport Aktau AKTAU is designed for transshipment of dry cargo, crude oil and petroleum products; оmain types of cargo: oil, metal, grain, ferry and other cargoes; the availability of 79,700 square meters of open areas and covered transit warehouses - 2,000 square meters; 4 specialized oil loading berths with a planned capacity of 10.4 million tons with actual capacity of up to 12 million tons; 3 universal dry cargo berths for general cargo handling, containers, as well as for transportation of oversized cargo and handling of RO-RO vessels»; railway ferry complex (with a planned capacity of 1 million tons, the actual capacity is 2 million tons); grain terminal with a capacity of 600 thousand tons per year with a specialized berth; able to receive vessels with a length of not longer than 150 meters and a width of up to 20 meters 24 hours a day. _ _ _ Airways _____International transport corridor “TRACECA” _____International transport corridor “North- South” _____ International transport corridor “West Europe-West China” Cities with population of over 1 mln. people RAILWAYS SEA WAYS .AVIATION HIGHWAY 1. Mangystau – Bereket (Turkmenistan) 1. Aktau seaport – Baku 1. Aktau – Russia 1. Mangystau – Atyrau – - Gorgan (Iran) (Azerbaizhan) - Batumi (Georgia) 2. Aktau – Istanbul (Turkey) Aktobe - Astana 2. Mangystau – Atyrau – Aktobe – Black Sea 3. Aktau – Baku 2. Mangystau – Atyrau - Saratov (Russia) 2. Aktau seaport – Alat seaport (Azerbaizhan) Astrakhan 3. Mangystau – Nukus (Uzbekistan) (Azerbaizhan) 4. Aktau – Tbilisi (Georgia) 3. Mangystau – Zhezkazgan - 4. Mangystau – Zhezkazgan – Dostyk – 3. Aktau seaport – Nukus (Uzbekistan) 5. Aktau – Yerevan Kyzylorda Shihezi (PRC) (Armenia) 4. Mangystau – Temirbaba 6. Aktau – Kiev (Ukraine) SEZ Managing company JSC "SEZ "Seaport Aktau» SEAPORT AKTAU Mission • Creating a favorable investment climate, providing full administrative and technical support for investment projects planned for implementation in the SEZ • Providing the assistance at all stages of the project implementation, up to the time of commissioning the facility Advantages Consulting and informational Organization of contacts with local Assistance in obtaining the act of support of investors on legal, authorities and enterprises, commissioning, in the review of organizational, financial and assistance in solving of the the project economic aspects administrative issues Organization of exhibitions, fairs, Selection of the best Assistance in the legalizing of the forums, conferences and other accommodation options , taking land holdings, the organization of public events aimed at raising into account the wishes of the engineering and geological awareness and strengthening the applicant, provision of a surveys and land work reputation of projects temporary legal address until the opening of a permanent office Assistance in obtaining technical Investor support at all stages of conditions for water supply, water investment activity Assistance in the selection of disposal, gas supply and the contractors electricity Special economic zone "Seaport Aktau» SEZ (2003-2028, 25 years) SEAPORT AKTAU Location The mission of the SEZ The Republic of Kazakhstan, providing favorable conditions for Mangystau region, Aktau, the investors to create high-tech territory of the seaport and industries industrial zone. Total area Shareholders 2,000 hectares, consists of 6 sub- 100% the Akimat of Mangystau zones and coastal zones region The purposes of the SEZ creation of favorable investment climate and attraction of domestic and foreign investments for implementation of investment projects with export orientation accelerated development of modern production and innovation technologies in the regional economy for import substitution creating new job opportunities and improving the skills of local staff SEZ The territory of SEZ "Seaport Aktau» SEAPORT AKTAU 2000 hectare The sub-zones No. 1 and No. 3 – SEAPORT infrastructure is ready AKTAU for 100% SEZ Infrastructure SEAPORT AKTAU on the territory of SEZ "Seaport Aktau» SEZ SEAPORT AKTAU Priority activities on the territory of SEZ "Seaport Aktau» Manufacture of household electrical Production of machines and Production of electric motors, devices equipment generators, transformers, electric Manufacture of leather goods Production distribution Production of products of petrochemical products, and control equipment chemical industry as well as products Production of wiring and electro- Manufacture of rubber and of concomitant, conductive devices plastic products related industries and Construction and commissioning of Manufacture of other technologies facilities designed directly for the non-metallic mineral products Warehousing and implementation of activities in Metallurgical auxiliary transport accordance with the design and industry activity estimate documentation Production of finished Production of basic metal product pharmaceutical products and preparations Benefits and advantages of participating in the SEZ "Seaport Aktau» SEZ Corporate Land tax - 0 Property tax Land plot SEAPORT TAX income tax AKTAU CONCESSION % - 0 % rent - 0 % -0 % VAT on Import CUSTOMS imported customs - 0 PRIVILEGES goods-0 % % Availability of infrastructure in the SEZ: Free land until the end of the term of • Construction of infrastructure at the expense of the SEZ: public funds Market access: Period of realization of SEZ "Seaport • Provision of all necessary resources (electricity, Aktau" 2003-2028 • Advantageous geographical location gas, water, sewerage, telecommunications, at the intersection of TRACECA transport infrastructure) transport corridors, North-South • Full completion of construction of infrastructure of • Presence of a port in the Caspian Sea SEZ "Seaport Aktau" is planned in 2023 Free land until the end of the term of the SEZ Support of the investment project in the Availability of infrastructure in the SEZ: Market access • Consulting and informational support SEZ of investors on legal, organizational, Simplified procedure for attracting foreign financial and economic aspects labour for SEZ participants: • Organization of contacts with local During construction and 1 year after authorities and enterprises, assistance commissioning, foreign labour is attracted in solving administrative issues Simplified without quotas and without permission. After • Assistance in the collection of Investment project the expiration of this period, Foreign labour is documents (registration of land, support procedure for attracted by the generally established obtaining technical conditions) attracting procedure. • Organization of exhibitions, fairs, foreign labour forums, conferences and other public The use of state events aimed at increasing awareness support instruments and strengthening the reputation of projects The use of state support instruments: • The program "Productivity 2020" • The program "Exporter 2020" • The program "Investor 2020" • The program "Business road map - 2020" • Concessional financing through financial institutions SEZ PERFORMANCE SEAPORT AKTAU 2003-2019 27 98.1 290 Registered participant The amount of investment The volume of production (billion tenge) (billion tenge) (operating companies — 17; at the implementation stage — 10) PLANNED IMPLEMENTATION OF PROJECTS: in the years 2019- 2021 - 10 projects 7.8 1000 25 The amount of funds Jobs The volume of payments allocated from the budget to the budget (billion (billion tenge) tenge) JOIN US! SEZ FOREIGN RESIDENT BE A PART OF SEZ "SEAPORT SEAPORT AKTAU"! AKTAU Italy LLP "Kazakhstan Pipe Traders" British Virgin islands JSC "ArcelorMittal Tubular Products Aktau" Iran LLP "PAK oil" Turkey Azerbaijan China LLP "Satex Chemie" LLP "Center of Production and Logistics Azersun" LLP "KazTrub-Industries" LLP "Aktau Energomash" www.sez.kz SEZ SEAPORT Cooperation with DP World AKTAU On March 24, 2018, as part of the official visit of the Head of State to the UAE, the Akimat of the Mangystau region signed a framework agreement on attracting DP World as a strategic partner. This agreement provides: - Attraction of foreign and national investments for development of highly profitable production in Mangystau region; - Creation of transport and logistics centre in the region; - Development of knowledge-intensive industries; - An attraction of advanced technologies in the industrial industry of the region; - Teaching and training of qualified local personnel through the involvement of employees of DP World. Thank you for your attention! Contacts for cooperation: Kazakhstan, Aktau city, an industrial zone Phone: + 7 7292 302777 Investment managing department: +7 7292 302776 www.sez.kz [email protected] .
Recommended publications
  • PIMS 4855 TE REPORT.Pdf
    Terminal Evaluation Report UNDP-GEF Project: Improving sustainability of the PA system in desert ecosystems through promotion of biodiversity-compatible livelihoods in and around PAs GEF Project ID: 4584 UNDP Project ID: 4855 Country: Kazakhstan Region: Europe and Central Asia Focal Areas (GEF-5): Biodiversity Land Degradation GEF Agency: United Nations Development Programme (UNDP) Executing Agencies: Forestry and Wildlife Committee of the Ministry of Agriculture Date Version 31 July 2018 01 First draft 30 September 02 Final Terminal Evaluation Report 2018 Improving sustainability of the PA system in desert ecosystems through promotion of biodiversity-compatible livelihoods in and around PAs UNDP PIMS ID: 4855; GEF Project ID: 4584 Opening Page PROJECT DETAILS: Project Name: Improving sustainability of the PA system in desert ecosystems through promotion of biodiversity- compatible livelihoods in and around PAs Project ID: GEF Project ID: 4584 UNDP PIMS ID: 4855 Country: Kazakhstan Region: Europe and Central Asia Focal Area: Biodiversity Funding Source: GEF Trust Fund Strategic Programs: GEF-5 Biodiversity Strategy, Objective 1: Improve Sustainability of Protected Area Systems GEF-5 Land Degradation Strategy, Objective 3: Integrated Landscapes: Reduce Pressures on natural resources from competing land uses in wider landscape GEF Agency: United Nations Development Programme Implementation Modality: National Implementation Modality (NIM) Executing Agency: Forestry and Wildlife Committee of the Ministry of Agriculture Responsible Partners:
    [Show full text]
  • 43439-033: CAREC Corridor 2 (Mangystau Oblast Sections
    Social Monitoring Report Project Number: 43439-033 July 2020 KAZ: CAREC Corridor 2 (Mangystau Oblast Section) Investment Program – Tranche 2 Prepared by the "SNS-2017" LLP for the Ministry of Industry and Infrastructure Development, Republic of Kazakhstan and the Asian Development Bank. This bi-annual social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status or any territory or area. 5th BIANNUAL REPORT ON SOCIAL SAFEGUARD MEASURES Internal Monitoring Loan: 2967-KAZ Project of reconstruction of the highway "Zhetybay–Zhanaozen– Kenderli–Turkmenistan Border" (to Turkmenbashy) section km 0–73 Report on Social Safeguard Measures. Internal Monitoring. Project of Reconstruction of the highway "Zhetybay–Zhanaozen–Kenderli–Turkmenistan Border" (to Turkmenbashy) section km 0–73. 5th Bi-annual Report. Prepared by: Consultant for Supervision Construction "SNS-2017" LLP (Kazakhstan) For: - Committee for Roads, Ministry of Industry and Infrastructure Development of RK - Asian Development Bank; - Project Management Consultant: “Renardet S.A.” Report period: January-June 2020 1 Report on Social Safeguard Measures. Internal Monitoring. Project of Reconstruction of the highway "Zhetybay–Zhanaozen–Kenderli–Turkmenistan Border" (to Turkmenbashy) section km 0–73.
    [Show full text]
  • Kazakhstan Regulatory and Procedural Barriers to Trade in Kazakhstan
    UNECE UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE Regulatory and procedural barriers to trade in Kazakhstan Regulatory and procedural barriers to trade in Kazakhstan - Needs Needs Assessment Assessment Information Service United Nations Economic Commission for Europe Palais des Nations UNITED NA CH - 1211 Geneva 10, Switzerland Telephone: +41(0)22 917 44 44 Fax: +41(0)22 917 05 05 E-mail: [email protected] Website: http://www.unece.org TIONS Printed at United Nations, Geneva GE.14-22004–May 2014–150 UNITED NATIONS ECE/TRADE/407 UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE Regulatory and procedural barriers to trade in Kazakhstan Needs Assessment United Nations New York and Geneva, 2014 2 Regulatory and procedural barriers to trade in Kazakhstan Needs Assessment Note The designation employed and the presentation of the material in this publication do not imply the ex- pression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area, or of its authorities, or concerning the delimitation of its frontiers of boundaries. This study is issued in English and Russian. ECE/TRADE/407 Copyright © 2014 United Nations and International Trade Centre All rights reserved Foreword 3 Foreword The International Trade Center (ITC) and the United Nations Economic Commission for Europe (UNECE) are pleased to present the needs assessment study of regulatory and procedural barriers to trade in the Republic of Kazakhstan. We would also like to express our appreciation to Kazakhstan’s Centre for Trade Policy Development under the Ministry of Economic Development, which cooperated with both ITC and UNECE in preparing the study.
    [Show full text]
  • Progress Report on the Implementation of the Grant ECE/GC/2017/11/025 “Improved Understanding of Key Water Management Issues by Mid-Level Government Officials”
    Progress Report on the implementation of the grant ECE/GC/2017/11/025 “Improved understanding of key water management issues by mid-level government officials” . Kazakh-German University 1 January – 31th of July, 2018 1 part (Aktau training) Narrative report prepared by the German-Kazakh University 1. BACKGROUND AND CONTEXT Within the framework of the project 025 “Improved understanding of key water management issues by mid-level government officials”, German-Kazakh University was responsible to implement the following tasks under the grant ECE/GC/2017/11/025: • Organization of training for civil servants on Integrated Water Resources Management in collaboration with the State Academy of Management under the President of the Republic of Kazakhstan (State Academy) Aktau, Kazakhstan – April 9 – 11/2018 • Organization of training for civil servants on Integrated Water Resources Management in collaboration with the State Academy of Management under the President of the Republic of Kazakhstan (State Academy) Almaty, Kazakhstan – May 28 – 30/2018 Below is the description of activities implemented under each of the above tasks. Task I: Organization of IWRM training for civil servants in Aktau Based on the previous grant ECE/GC/2017.07.013 the second training for government officials was organized in Mangystay region (Aktau city) in order to cover water professionals from the Southwest region of the Republic of Kazakhstan. The training was organized by the Kazakh-German University with the support of the UNECE and in partnership with the RK State Academy Mangystay branch. The training was organized for 30 participants including trainers and organizational staff. The target audience of the training was the mid-level government staff.
    [Show full text]
  • Initial Environmental Examination (Draft) Kazakhstan: Urban
    Initial Environmental Examination (Draft) Project Number: 51365-001 June 2020 Kazakhstan: Urban Infrastructure Modernization Program – Wastewater Treatment Project Construction of Wastewater Treatment Plant in Zhezkazgan City Prepared by The Kazakhstan Center for Communal Services Modernization and Reform (KazCenter ZhKH) for the Asian Development Bank. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. WASTEWATER MODERNISATION PROGRAM OF GOVERNMENT OF KAZAKHSTAN KAZ: “CONSTRUCTION OF WASTEWATER TREATMENT PLANT IN ZHEZKAZGAN CITY” INITIAL ENVIRONMENTAL EXAMINATION (IEE) (DRAFT) June 2020 TABLE OF CONTENTS EXECUTIVE SUMMARY .............................................................................................................1 A. INTRODUCTION ......................................................................................................................9 A.1 General ................................................................................................................................9
    [Show full text]
  • Kazakhstan: Trade Facilitation and Logistics Development Strategy Report
    Kazakhstan: Trade Facilitation and Logistics Development Strategy Report The Asian Development Bank has been supporting efforts to reduce poverty and improve livelihoods in the Central Asia Regional Economic Cooperation (CAREC) countries. A major focus of these efforts is improving the transport and trade sectors to spur economic growth and promote social and political cohesion within the region. Improving the efficiency of the CAREC transport corridors will allow these landlocked countries to take full advantage of being transit countries between the surging and dynamic economies of the East and the West. This report, one of a series of nine reports, highlights the substantial challenges that Kazakhstan needs to overcome and recommends measures to make its transport and trade Kazakhstan sectors more efficient and cost-competitive. Trade Facilitation and Logistics Development About the Asian Development Bank Strategy Report ADB’s vision is an Asia and Pacific region free of poverty. Its mission is to help its developing member countries substantially reduce poverty and improve the quality of life of their people. Despite the region’s many successes, it remains home to two-thirds of the world’s poor: 1.8 billion people who live on less than $2 a day, with 903 million struggling on less than $1.25 a day. ADB is committed to reducing poverty through inclusive economic growth, environmentally sustainable growth, and regional integration. Based in Manila, ADB is owned by 67 members, including 48 from the region. Its main instruments for helping its developing member countries are policy dialogue, loans, equity investments, guarantees, grants, and technical assistance. Asian Development Bank 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines www.adb.org ISBN 978-971-561-812-0 Publication Stock No.
    [Show full text]
  • Case Study on Policy Reforms to Promote Renewable Energy in Kazakhstan E/ESCWA/SDPD/2017/CP.11
    Economic and Social Commission for Western Asia United Nations Development Account project on promoting renewable energy investments for climate change mitigation and sustainable development Case Study on Policy Reforms to Promote Renewable Energy in Kazakhstan E/ESCWA/SDPD/2017/CP.11 Economic and Social Commission for Western Asia United Nations Development Account project on promoting renewable energy investments for climate change mitigation and sustainable development Case Study on Policy Reforms to Promote Renewable Energy in Kazakhstan 2 CASE STUDY ON POLICY REFORMS TO PROMOTE RENEWABLE ENERGY IN KAZAKHSTAN © 2018 United Nations All rights reserved worldwide Photocopies and reproductions of excerpts are allowed with proper credits. All queries on rights and licenses, including subsidiary rights, should be addressed to the United Nations Economic and Social Commission for Western Asia (ESCWA), e-mail: [email protected]. The findings, interpretations and conclusions expressed in this publication are those of the authors and do not necessarily reflect the views of the United Nations or its officials or Member States. The designations employed and the presentation of material in this publication do not imply the expression of any opinion whatsoever on the part of the United Nations concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. Links contained in this publication are provided for the convenience of the reader and are correct at the time of issue. The United Nations takes no responsibility for the continued accuracy of that information or for the content of any external website. References have, wherever possible, been verified.
    [Show full text]
  • Expanding the Opportunities of the Mangystau Region in Achieving
    Expanding the opportunities of the Mangystau region in achieving sustainable development and socio-economic modernization MPTF OFFICE ANNUAL PROGRAMME NARRATIVE PROGRESS REPORT REPORTING PERIOD: 1 JANUARY – 31 DECEMBER 2015 Country, Locality(s), Priority Area(s) / Strategic Programme Title & Project Number Results • Programme Title: “Expanding the opportunities Kazakhstan, Mangystau region of the Mangystau region in achieving sustainable Priority area/ strategic results development and socio-economic • Reduction of inequities and disparities in social modernization” well-being for the vulnerable populations, • Programme Number: increase of employment, improving key health • MPTF Office Project Reference Number: indicators • Enhancement of the capacities of local government to plan for diversified and balanced local economic growth and expansion of income generation opportunities and local self- governance development • Formation and use of sustainable development practices in response to the current problems caused by climate change, natural and man-made aspects of development Participating Organization(s) Implementing Partners UNDP, UNESCO, UNFPA, UNHCR, UNICEF, • The Ministry of National Economy of the UN Women, and WHO Republic of Kazakhstan and the Akimat of Mangystau Region Programme/Project Cost (US$) Programme Duration Total approved budget as per project document: Overall Duration $8,259,333 30 months JP Contribution Agency Contribution: UNDP ($700,000); UNICEF ($306,500); WHO Start Date ($250,000); UNHCR ($90,000); UNFPA ($70,000);
    [Show full text]
  • Republic of Kazakhstan
    Kazakhstan as a Transport Bridge between Europe and Asia Geographically advantageous location of Kazakhstan in the centre of the Eurasian continent between Europe and Asia provides the country with unique opportunity to establish efficient straight transit corridors connecting Asia and the Pacific with Europe. Transforming Kazakhstan into the largest transit country of Eurasia is a main state policy in the field of transport. State of transport infrastructure is an important factor for the economy of Kazakhstan, and it mostly impacts on effective implementation of transit opportunities of the country. In this regard, priorities in developing transport sector of Kazakhstan are to be: Integrating national transport system into Euro-Asian transport network; Harmonizing national transport legislation with international rules and standards; Facilitating investment climate. Currently, there is such a trend as sustainable growth of transport complex role in country’s economy. Substantial public investments are being allocated for its development as functional opportunities of transport infrastructure should be ahead of development pace of economy with establishment of necessary preconditions for high speed growth. 2010 has become a year of summing up the first decade of the new century. This decade was of positive progress for Kazakhstan’s transport and communication complex. So for the last 10 years 1.4 trillion tenge invested into the development of transport and communication complex. In this respect, due to high authority of the President of our country on the international scene, despite the global financial crisis loans from the international financial institutes have been involved into transport sector with total amount of $4.2 billion.
    [Show full text]
  • 43439-033: Zhetybai-Zhanaozen Road Section (Km 0-73) Initial
    Initial Environmental Assessment Project Number: 43439-033 Second draft 15 May 2015 Kazakhstan: CAREC Corridor 2 (Mangystau Oblast Sections) Investment Program, Project 2 [Zhetybai- Zhanaozen Road Section (Km 0–73)] Prepared by Committee of Roads under the Ministry of Investments and Development of the Republic of Kazakhstan This initial environmental assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. INITIAL ENVIRONMENTAL ASSESSMENT KAZ: CAREC CORRIDOR 2 (MANGISTAU OBLAST SECTION) ZHETYBAI-ZHANAOZEN 0-73 KM Content ABBREVIATIONS .................................................................................................................................... 7 EXECTUTIVE SUMMARY ...................................................................................................................... 8 INTRODUCTION ....................................................................................................................................17 PROJECT DESCRIPTION .....................................................................................................................17
    [Show full text]
  • Book Water 1A
    ATLAS OF WATER MINING DEVICES IN THE ARID ZONES OF KAZAKHSTAN (HISTORICAL EVOLUTION OF WATER USE IN THE MIDDLE DESERTS) ЛАБОРАТОРИЯ ГЕОАРХЕОЛОГИИ Алматы On the cover, above: Map of the belt-zonal division of the territory of Kazakhstan (Yevstifeev Yu.G., Rachkovskaya E.I., Sadvokasov R.E.) where 6 arid zones explored in this book are highlighted in yellow. Below: left: at a well in the South-Western Balkhash on the border of the Taukum desert (Rumyantsev, 1913) right: beginning of a karez line trapping groundwater between 2 dried aquifers of the Sauran district, Turkestan oasis (aerial photo by R. Sala 2003) AL-FARABI KAZAKH NATIONAL UNIVERSITY FACULTY OF HISTORY, ARCHAEOLOGY AND ETHNOLOGY INTERNATIONAL LABORATORY "GEOARCHEOLOGY" R. SALA , J.-M. DEOM ATLAS OF WATER MINING DEVICES IN THE ARID ZONE OF KAZAKHSTAN (HISTORICAL EVOLUTION OF WATER USE IN THE MIDDLE DESERTS) Almaty Kazakh University 2020 УДК 55:902 C 16 Recommended to the Academic Council of the Faculty of History, Archeology and Ethnology. Minutes No. 2, dated September 25, 2020. Printed according to the project - “Traditional methods of water supply in arid zones of Kazakhstan: ethnological and geoarcheological approaches” Sala R., Deom J.-M. C 16 Atlas of water mining devices in the arid zone of Kazakhstan (Historical evolution of water use in the Middle deserts).Monographs. Almaty: Kazakh University, 2020. ISBN 978-601-04-4813-1 The research will be inclusive of field and cameral works and laboratory analyses: reading all available information about past and present, relict and active water collection devices; documenting their surface or buried structure and all the elements of the material culture associated with their activity; studying the hydrogeological, environmental and archaeological context; gathering ethnological data through local documents and interviews.
    [Show full text]
  • Central Asia Oil and Gas Industry - the External Powers’ Energy Interests in Kazakhstan, Turkmenistan and Uzbekistan
    A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Raimondi, Pier Paolo Working Paper Central Asia Oil and Gas Industry - The External Powers’ Energy Interests in Kazakhstan, Turkmenistan and Uzbekistan Working Paper, No. 006.2019 Provided in Cooperation with: Fondazione Eni Enrico Mattei (FEEM) Suggested Citation: Raimondi, Pier Paolo (2019) : Central Asia Oil and Gas Industry - The External Powers’ Energy Interests in Kazakhstan, Turkmenistan and Uzbekistan, Working Paper, No. 006.2019, Fondazione Eni Enrico Mattei (FEEM), Milano This Version is available at: http://hdl.handle.net/10419/211165 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen
    [Show full text]