Tallawarra Stage B - Power Station Project

Total Page:16

File Type:pdf, Size:1020Kb

Tallawarra Stage B - Power Station Project Tallawarra Stage B - Power Station Project PRELIMINARY ENVIRONMENTAL ASSESSMENT FINAL 6 September 2007 Tallawarra Stage B - Power Station Project PRELIMINARY ENVIRONMENTAL ASSESSMENT FINAL 6 September 2007 Sinclair Knight Merz ABN 37 001 024 095 100 Christie Street PO Box 164 St Leonards NSW Australia 1590 Tel: +61 2 9928 2100 Fax: +61 2 9928 2500 Web: www.skmconsulting.com COPYRIGHT: The concepts and information contained in this document are the property of TRUenergy Pty Ltd. Use or copying of this document in whole or in part without the written permission of TRUenergy constitutes an infringement of copyright. LIMITATION: This report has been prepared on behalf of and for the exclusive use of Sinclair Knight Merz Pty Ltd’s Client, and is subject to and issued in connection with the provisions of the agreement between Sinclair Knight Merz and its Client. Sinclair Knight Merz accepts no liability or responsibility whatsoever for or in respect of any use of or reliance upon this report by any third party. The SKM logo is a trade mark of Sinclair Knight Merz Pty Ltd. © Sinclair Knight Merz Pty Ltd, 2006 Preliminary Environmental Assessment Contents Summary 1 1. Introduction 3 1.1 Purpose of the Document 3 1.2 The Proponent 4 1.3 Background 4 1.3.1 Tallawarra Lands 5 2. Description of Proposed Development 6 2.1 Overview 6 2.2 Gas Turbine Power Station 6 2.2.1 Cooling System 8 2.2.2 Fuel 8 2.3 Ancillary Infrastructure 9 2.3.1 Emissions Control 9 2.3.2 Transformers and High Voltage Switchyard 9 2.3.3 Chemicals and Oil storage 9 2.3.4 Emergency Diesel Generators 10 2.3.5 Water 10 2.3.6 Sewage Treatment 10 2.3.7 Site Office and Workshop 10 2.3.8 Site Access and Parking 10 2.4 Workforce and Hours of Operation 10 2.5 Alternatives and Justification 11 2.5.1 Alternatives Considered to Date 11 2.5.2 Justification for Project 12 3. Planning Considerations and Consultation 13 3.1 Planning Considerations 13 3.2 Authority Consultation 15 3.3 Community Consultation and Social Impact Assessment 15 4. Preliminary Environmental Assessment 17 4.1 Environmental and Community Context 17 4.1.1 Land Ownership 17 4.2 Assessment of Key Issues 17 4.2.1 Air Quality & Greenhouse Gas Emissions 17 4.2.2 Noise 19 4.2.3 Water 19 SINCLAIR KNIGHT MERZ I:\ENVR\Projects\EN02239\Deliverables\PEA\CCGT\PEA_combined_final_V2.doc PAGE i Preliminary Environmental Assessment 4.2.4 Hazard Analysis 20 4.3 Other Environmental Issues 21 Figures 1 Locality Plan 2 Site Layout SINCLAIR KNIGHT MERZ PAGE ii I:\ENVR\Projects\EN02239\Deliverables\PEA\CCGT\PEA_combined_final_V2.doc Preliminary Environmental Assessment Summary This report provides a Preliminary Environmental Assessment to support TRUenergy’s Project Application for the Tallawarra Stage B Gas Power Station Project. The report identifies key environmental issues associated with the project and ultimately supports an application to the Minister for Planning under Section 75J(1) for project approval. TRUenergy is currently constructing a 400MW Combined Cycle Gas Turbine (CCGT) Power Station at Yallah, on the shores of Lake Illawarra some 13km South of Wollongong in the Illawarra district of NSW. The Power Station is sited on part of the area previously occupied by the Tallawarra coal fired power station. TRUenergy wishes to proceed with Stage B of the project which involves the siting of either a CCGT power station, to provide intermediate to baseload electricity, or an OCGT power station to supplement electricity supply during times of peak demand. The Stage B Power Station will be sited adjacent to the Tallawarra A CCGT Power Station. A shortfall in electricity supply is predicted to occur in NSW within the next few years. The key objective of the proposal is to provide additional electricity supply in NSW to address the predicted shortfalls. Determination of the nature of the market need (i.e. base load electricity or peaking supply) will be subject to detailed market analysis following approval for the project. The preliminary desktop investigations and site visit conducted in February 2007 indicate that the key environmental issues for the Tallawarra Stage B OCGT/CCGT project include: Air quality impacts; Greenhouse gas emissions; Noise impacts; Water impacts; and Hazards and risk impacts. A summary of the key environmental issues listed above is provided in the report. The intent of the discussion provided in this report is to demonstrate the proponent’s existing understanding of the issues and the need for further environmental assessment of these issues. The potential impacts and management of other issues such as land use, flora and fauna, heritage, socio-economics, traffic, waste management, soils, surface water and groundwater and the reasons they have not been designated as key issues to this process, are also discussed in this report. It is proposed that these other issues will be addressed in sufficient detail to assess the level of their SINCLAIR KNIGHT MERZ I:\ENVR\Projects\EN02239\Deliverables\PEA\CCGT\PEA_combined_final_V2.doc PAGE 1 Preliminary Environmental Assessment impacts (if any). It is anticipated that any impacts identified will be able to be managed through appropriate mitigation measures and management plans. The management of both key issues and these secondary issues will be handled through a Statement of Commitments and the Conditions of Approval of the project, which will determine the requirements for environmental management. SINCLAIR KNIGHT MERZ PAGE 2 I:\ENVR\Projects\EN02239\Deliverables\PEA\CCGT\PEA_combined_final_V2.doc Preliminary Environmental Assessment 1. Introduction TRUenergy is currently constructing a 400MW Combined Cycle Gas Turbine (CCGT) Power Station at Yallah, on the shores of Lake Illawarra some 13 kilometres south of Wollongong. The Power Station is located on the part of the site previously occupied by the Tallawarra coal fired power station. TRUenergy is now looking to proceed with Stage B of the project which involves development of either a CCGT Power Station, to provide intermediate to baseload electricity, or an Open Cycle Gas Turbine (OCGT) Power Station to supplement electricity supply during times of peak demand. Determination of the nature of the market need (i.e. base load electricity or peaking supply) will be subject to detailed market analysis following approval for the project. The development of any additional Power Station on the site adjacent to the Tallawarra A Power Station provides economic and practical benefits through the co location of the facilities and use of existing resources. The project will comprise, either: A single unit gas fired CCGT plant with a notional capacity of 400MW; or Two or three OCGT peaking units with a notional capacity of 300 - 450MW. The units will require duel fuel burners with a liquid fuel as a backup. The project site and surrounding “Tallawarra Lands” owned by TRUenergy is shown on Figure 1. Approximately 2 hectare of the Tallawarra Lands area (565 hectares) is required for Tallawarra Stage B project (refer to Figure 2), although a buffer area around the Power Station of approximately 35 hectares will be maintained. The Project is considered to be classed as a ‘Major Project’ under Part 3A of the Environmental Planning and Assessment Act 1979 (refer to Section 3.1). TRUenergy have since sought Ministerial authorisation to proceed under Part 3A of the Environmental Planning and Assessment Act 1979. 1.1 Purpose of the Document This Preliminary Environmental Assessment has been prepared to: support TRUenergy’s Project Application for the Tallawarra Stage B Project; brief the relevant government agencies about the proposed development; assist the Director-General of the Department of Planning (DoP) to develop Environmental Assessment requirements; introduce the environmental studies conducted to date; and SINCLAIR KNIGHT MERZ I:\ENVR\Projects\EN02239\Deliverables\PEA\CCGT\PEA_combined_final_V2.doc PAGE 3 Legend ° WOLLONGONG Tallawarra Lands PORT KEMBLA DAPTO Stage B Area 0 250 500 ALBION PARK Metres JAMBEROO KIAMA 1:25,000AtA4 GERROA Source: Aerial supplied by NSW Dept of Lands, Figure 1- Locality Plan Topographic data by Streetworks. March 2, 2007 EN02239 - Tallawarra Site Masterplan I:\ENVR\Projects\EN02239\Technical\GIS\Template\EN02239_To_002.mxd Legend ° WOLLONGONG PORT KEMBLA Stage B Area DAPTO 0 50 100 ALBION PARK Metres JAMBEROO KIAMA 1:5,000 AtA4 GERROA Source: Aerial supplied by NSW Dept of Lands, Figure 2 - Site Layout Topographic data by Streetworks. February 13, 2007 EN02239 - Tallawarra Site Masterplan I:\ENVR\Projects\EN02239\Technical\GIS\Template\EN02239_To_001.mxd Preliminary Environmental Assessment identify key issues to be addressed in the Environmental Assessment Report prepared to support the Project Application. References in this document to the ‘project area’ relate to the proposed Tallawarra Stage B site and land required for ancillary facilities associated with the project, including existing facilities and their immediate surrounds. 1.2 The Proponent TRUenergy is part of the CLP Group. The CLP Group strives to be the leading investor-operator in the Asia-Pacific electric power industry. CLP invests and operates power plants and systems in Hong Kong, the Chinese mainland, Australia, India, Thailand and Taiwan. TRUenergy comprises the former TXU Australia, Yallourn Energy and Auspower businesses. TRUenergy provides electricity and natural gas to residents and businesses in Victoria, South Australia, New South Wales, Australian Capital Territory and Queensland. It also owns power stations in Victoria, South Australia and has the Tallawarra Power Station under development in New South Wales. 1.3 Background In 1954 a coal fired power station was constructed on the site, which operated until 1989. The former plant and much of its ancillary buildings have been demolished and the operational areas of the site remediated. The then owner of the site, Pacific Power, prepared an Environmental Impact Statement in 1998 to support the Development Application for a new combined cycle gas turbine CCGT power station.
Recommended publications
  • Tallawarra Lands Community Update
    News Issue 03, December 2006 Tallawarra Lands Community Update Welcome to the third in a series of community updates to keep you informed of the planning process for the Tallawarra power station and surrounding lands. In November, we started construction of Australia’s most energy efficient gas-fired power station, TRUenergy Tallawarra. Located on the shores of Lake Illawarra, the power station will occupy a small portion of a larger, 600 hectare site that will be developed to provide environmental, recreational, residential and employment opportunities. Thank you to all those who attended our second Tallawarra consultation session held in September. Since then, the project team has been busy finalising the Local Environment Study to ensure it is consistent with findings of the specialist background studies of the site and also responds to issues raised in consultation. We look forward to presenting a more detailed planning scheme to the community early next year. Until then, our best wishes for the holiday season. Anthony Savenkov Project Manager TRUenergy Tallawarra Lands sporting activities, picnic & BBQ areas, as well as playgrounds, etc. • Minimising the visual impact of any development. • Following conservation, the preferred option for the northern part of the site near Koonawarra was low density residential and retirement accommodation. Outcomes of the September Community Consultation Session Community feedback from the consultation process The second Community Consultation Session for the has been provided to Willana Associates, Tallawarra Lands project was held on 2 September independent environmental planning specialists who 2006 and was well attended by members of the local are coordinating development of a Local community.
    [Show full text]
  • University of Wollongong Campus News 7 October 1986
    THE UNIVERSITY OF WOLLONGONG CAMPUS NEWS Distributed each Tuesday Deadline for copy noon Monday Editor: George Wilson, tel. (042) 270926 of previous week 7 October 1986 'THERE IS WIDESPREAD DISSATISFACTION WITH EDUCATION'-PROFESSOR DAME LEONIE KRAMER There is widespread community dissatisfaction with education. The status of teachers is not as high as it used to be or as it ought to be. These two statements formed the basis of a controversial lecture titled 'Community Expectations of Schools' which was presented to final year teacher trainees by Professor Dame Leonie Kramer when she visited the Wollongong University campus on Monday afternoon. In a lecture in which she raised issues related to stand­ ards and quality in education. Professor Kramer referred to curricula, syllabi and teacher training and expertise. In her concluding remarks Professor Kramer claimed that teachers have a tremendous influence on pupils, therefore they had a responsibility to present subject matter in a disinterested way. This type of presentation would enable pupils to formulate their own views. Teachers are not now seen to practise the objectivity and impartiality that the community expects, she said. UNIVERSITY IS ON-LINE WITH VIATEL Viatel is the national videotex service run by Telecom Australia. In 18 months it has attracted over 150 service providers (organisations who want to provide information on their services and activities) and 15,000 subscribers Professor Kramer giving tier address during tier Wollongong visit (people who want to find out what is going on from a huge database at a cost usually belowthat of buying a newspaper). If the British experience is anything to go by, the service will expand by orders of magnitude over the next few years University Open Day and will provide the University with a shopfront window to the world which could in the end rival the other media.
    [Show full text]
  • Berkeley Prepares for War
    60 July lllawarra Historical Society Inc. BERKELEY PREPARES FOR WAR When she was researching the history of Berkeley, Society member, Kathleen Barwick, (now Kathleen Hooke) received the following information from the Australian Army: I refer to your letter of 7th April, 1963, in which you requested information in regard to the concrete blocks in Lake lllawarra and rank trap in the Berkeley Area. It is regretted that Army files containing the correspondence dealing with the concrete blocks and the tank traps have been destroyed, and as such, no specific information can be obtained for you. In reply to your questions, concerning the defence of Berkeley, I will answer each ques­ tion separately. Why was the tank trap necessary? It was designed to stop an armoured thrust along the coast from Port Kembla. Were there extensive precautions taken to stop the japanese entering here (Berkeley)? After the capture of Singapore, plans were prepared for the defence of Eastern Australian Coastline with special attention to possible landing areas near major cities and large industrial centres. Wollongong - Port Kembla was one of these areas to be defended. Was the japanese navy expected to force a landing near Port Kembla? It is generally not known where an enemy would strike on such an extensive coastline but Wollongong -Port Kembla is an industrial centre and as such was regarded as possible target for enemy assault. Were there other tank traps established along the Eastern coast ofAustralia? The Eastern Coast has many coastal rivers which would have been possible defensive barriers for tanks, but all major centres of population had plans for the construction of tank traps and many were actually built.
    [Show full text]
  • Department of Planning, Industry and Environment 4 Parramatta Square 12 Darcy Street PARRAMATTA NSW 2150
    28 July 2020 Mandana Mazaheri Planning Officer Planning & Assessment | Department of Planning, Industry and Environment 4 Parramatta Square 12 Darcy Street PARRAMATTA NSW 2150 Email: www.dpie.nsw.gov.au Shellharbour City Council Submission – Tallawarra B (MP07_0124-Mod-2) Dear Mandana Thank you for the opportunity to comment on the proposed modification to the Tallawarra B Power Station application (MP07_0124-Mod-2). This submission has been prepared by Council staff. Time constraints did not allow the submission to be endorsed by the full Council. Notwithstanding. Shellharbour City Council (Council) acknowledges and is grateful for the extension of time granted by the Department to prepare and lodge this submission. Council has consistently collaborated with the applicant, CASA and the Department of Planning, Industry and Environment (your Department) to ensure the proposed Open Cycle Gas Turbine is compatible with the Shellharbour Airport operations, the health of Lake Illawarra and the visual amenity of those areas within the city that look across the Lake to the subject land. It is understood that the Modification Application is seeking approval to extend the Project Approval lapse date by two years and amend the description of the proposal in condition 1.5 so that a single open cycle gas turbine may be used for the power plant. Having reviewed and carefully assessed the information accompanying the application Council has identified a number of matters of concern. These matters are discussed in detail below. Request to extend the Project Approval lapse date by two years: On 14 May 2020, s4.53 of the EPA Act was amended to provide that if a development consent commenced operation before 25 March 2020 and has not lapsed, it will now lapse 2 years after the date on which it would otherwise have lapsed.
    [Show full text]
  • Wollongong City Local Flood Plan a Sub-Plan of the Wollongong Local Disaster Plan
    WOLLONGONG CITY LOCAL FLOOD PLAN A SUB-PLAN OF THE WOLLONGONG LOCAL DISASTER PLAN Chair, Local Emergency Wollongong City SES Local Management Committee Controller JUNE 2010 EDITION TO BE REVIEWED NO LATER THAN JUNE 2015 ii CONTENTS TABLES ...................................................................................................................................................................... iv DISTRIBUTION LIST ............................................................................................................................................... v AMENDMENT LIST ................................................................................................................................................ vi LIST OF ABBREVIATIONS ................................................................................................................................... vii GLOSSARY .............................................................................................................................................................. viii PART 1 - INTRODUCTION ...................................................................................................................................... 1 1.1 Purpose .......................................................................................................................................................... 1 1.2 Authority ......................................................................................................................................................
    [Show full text]
  • RAPAC Meeting Minutes NSW 28 May 2019
    Start Time: 1300 NSW RAPAC 2019‐2 Finish Time: 1630 Venue: CASA Office, Level 2 Centennial Plaza (Tower A), 260 Elizabeth St Sydney Date: Tuesday 28 May 2019 Meeting Chair Matthew Bouttell Convenor Grahame Hill MINUTES Item No. Item 1. OPENING 2. REVIEW OF ACTION ITEMS 3. REGIONAL SAFETY MATTERS 4. CHANGE PROPOSALS 4.1 Amended VFR route in R421AB 5. AGENCY BRIEFINGS AND UPDATES 5.1 Bureau of Meteorology 5.2 Airservices Australia 5.3 Defence 6. OTHER BUSINESS 6.1 Restricted airspace for High Intensity Radio Frequency transmissions, Tidbinbilla 13:30 6.2 Airspace Modernisation Program (Airservices) 13:45 Tallawarra Power Station/Wollongong Regional Airport (Out of Session paper – 16 6.3 May 2019 & further information provided by Mr John Cleary) 6.4 JAPAT update 1 1. OPENING The Chair welcomed NSW RAPAC members along with those attending the meeting for the first time. It was noted that the NSW and ACT RAPACs would joining via video conference for two agenda items only – 6.1 and 6.2. 2. REVIEW OF ACTION ITEMS The status of outstanding action items was reviewed with comment included in the attached table. 3. REGIONAL SAFETY MATTERS There were no regional safety matters raised. 4. CHANGE PROPOSALS 4.1 Amended VFR route in R421AB SQNLDR Paul Scott presented the attached paper seeking feedback on a proposed change to the existing VFR Route around Nowra. During Discussions one member suggested that ‘Fisherman’s Paradise’ would be difficult to see from the air, however it was also noted that with the use of EFBs, tracking along this route would be made easier.
    [Show full text]
  • Risk to the Safety of Aviation at Shellharbour Airport
    UNITED UNDER THE COMMON GOAL OF ACHIEVING THE HIGHEST LEVELS OF AVIATION SAFETY 11 June 2021: Sent electronically via email The Hon. Rob Stokes, MP 52 Martin Place SYDNEY NSW 2000 Risk to the Safety of Aviation at Shellharbour Airport Dear Minister Stokes Our organisations collectively write to you to express our deep concern about the risk that the conditionally approved Tallawarra B project poses to the safety of aviation at Shellharbour Airport. Energy Australia have been working towards building an Open Cycle Gas Turbine (OCGT) power plant at Tallawarra since 2010. One of the main complexities associated with this proposal is that it poses a risk to aviation safety at the Shellharbour airport. The Civil Aviation Safety Authority (CASA) recommended modelling has shown that every OCGT unit studied in the period since 2010 would pose a significant risk to the safety of aviation. Energy Australia are now seek- ing full approval for an OCGT unit with the addition of a mechanical diffuser on the stack in order to reduce the impact to airport users. The following is relevant in understanding the level of concern we collectively have regarding the risk this proposal might pose to the safety of aviation at Shellharbour Airport: • The assessment consultant that the proponent used for all assessments since 2010 confirmed to En- ergy Australia in writing that a mechanical diffuser on the stack will not sufficiently reduce the plume velocity because the primary driver of vertical velocity is thermal, which the mechanical diffuser does not address. Energy Australia subsequently changed plume modelling consultants. • Every plume rise assessment completed for Tallawarra till recently has been fully transparently docu- mented and shared with NSW Department Infrastructure, Energy and Environment, CASA and Shellhar- bour City Council.
    [Show full text]
  • Tallawarra B Project Fact Sheet
    Tallawarra B Project fact sheet Tallawarra power station is on the traditional Country of the Dharawal peoples. EnergyAustralia respects and acknowledges their continued connection to fully offset over Country, culture and community. operational life New South Wales requires fast start gas to and gas capable power plant, with direct balance the energy system and we have carbon emissions from the project offset located in responded with the Tallawarra B project. The over its operational life. Yallah, NSW project is the development of a fast-start open The Tallawarra B project will be ready for the cycle power station, which in peak periods will summer of 2023-24, ahead of the scheduled deliver reliable power to an additional 60,000 retirement of the Liddell power station. New South Wales homes. Its construction will 316 MW contribute $300 million to the economy and With its fast-start flexible capacity, the proposed create 250 jobs. Tallawarra B project will play a vital role in capability maintaining system security, complementing Located on the shores of Lake Illawarra at renewables coming into the system, and EnergyAustralia’s existing Tallawarra power providing reliable power to customers in station, the Tallawarra B project will deliver New South Wales. 150,000 Australia’s first net zero emissions hydrogen homes powered annually The Tallawarra B project sets a new benchmark for how gas generators can be consistent with the NSW Government’s plan CO2e to be net zero by 2050 by using green hydrogen and offsetting natural gas residual emissions. Matt Kean MP, Minister for Energy and Environment and green hydrogen blend 250 jobs during construction 2021 construction due to commence in late 2021 2023 ready for summer of 2023-24 Above: EnergyAustralia’s existing Tallawarra power station.
    [Show full text]
  • Ecological Studies on Illawarha Lake
    ECOLOGICAL STUDIES ON ILLAWARHA LAKE WITH SPECIAL REFERENCE TO Zostera capricorni Ascherson. By Malcolm McD. Harris, B.A. ( Univ. of New England, Armidale ) A thesis submitted in fulfilment of the requirements for the degree of Master of Science of the University of New South Wales. School of Botany, University of New South Wales. January, 1977 UNIVERSITY OF N.S.W. 19851 16 SEP. 77 LIBRARY THIS IS TO CERTIFY that the work described in this thesis has not been submitted for a higher degree at any other university or institution. (iii) SUMMARY This thesis describes aspects of the ecology of Illawarra Lake, with special reference to the biology of the seagrass, Zostera capricomi Aschers. Observations were made from the air, from power boats, by wading and by SCUBA diving, over the period 1972 - 1976. Use has also been made of aerial photographs. The environmental factors studied include both sediment characteristics and water quality. Correlation coefficients have been calculated and used in the assessment of the functional relationships between the parameters examined. Reference has been made to corroborative evidence from a number of sources. The relationship between the distribution and biomass of the benthic flora of Illawarra Lake, and the selected environmental parameters, is examined. Seven other coastal saline lagoons were observed so that observations made and the conclusions drawn for Illawarra Lake, could be seen in the wider context. Long term observations and analyses have been made of the morphology, growth and flowering cycles of Z. capricomi. Evidence is presented showing some diagnostic features,used in published accounts to distinguish between Z.
    [Show full text]
  • Trace Metal Contamination of Soils and Sediments in the Port Kembla Area, New South Wales, Australia
    University of Wollongong Thesis Collections University of Wollongong Thesis Collection University of Wollongong Year 2009 Trace metal contamination of soils and sediments in the Port Kembla area, New South Wales, Australia Yasaman Jafari University of Wollongong Jafari, Yasaman, Trace metal contamination of soils and sediments in the Port Kem- bla area, New South Wales, Australia, Master of Environmental Science - Research thesis, School of Earth & Environmental Sciences - Faculty of Science, University of Wollongong, 2009. http://ro.uow.edu.au/theses/3133 This paper is posted at Research Online. Chapter 5 Discussion This chapter discusses the results of the current study including the grain size and total metal concentration analysis of soil and sediment samples from the Port Kembla area, the extractable concentrations of trace elements in these soils, as well as a comprehensive comparison of these results to previous world-wide studies. 5.1 Sources and Amounts of Trace Metals in Soils and Sediments of the Port Kembla Area. Studies by Beavington (1973), Ellis and Kanamori (1977), Crisp (1981, 1982) and Chenhall et al. (1994) have concluded that the main sources of trace metal contaminants found in Port Kembla area and Lake Illawarra are industrial discharges, atmospheric depositions of particulate matter especially within a distance of < 4 km from the Port Kembla copper smelter stack (Martley et al., 2004), leaching of soils and other terrestrial deposits, urban pollution, runoff from roads and freeways, and natural weathering of the surrounding rocks. Considering industrial particulate matter, it is believed that recent and historically deposited industrially derived trace metals play a major role in trace metal loading in soils and sediments of the area.
    [Show full text]
  • Draft Wollongong Local Environmental Plan 2009
    DRAFT WOLLONGONG LOCAL ENVIRONMENTAL PLAN 2009 Summary of rezoning proposals December 2008 Draft Wollongong LEP 2009 Summary of rezoning proposals considered by Council This document contains a summary of rezoning proposals considered by Council in the preparation of the draft Wollongong Local Environmental Plan 2009. 1. PRECINCT REZONING PROPOSALS – ENDORSED BY COUNCIL FOR EXHIBITION................................. 2 1.1 Tallawarra – Yallah Bay Road, Yallah........................................................................................................... 2 1.2 Cavions precinct - Princes Highway, Bulli ..................................................................................................... 7 1.3 Dion’s precinct – Fairy Meadow .................................................................................................................10 2. RESIDENTIAL REZONING PROPOSALS – ENDORSED BY COUNCIL FOR EXHIBITION ...........................13 2.1 Excelsior No. 2 Colliery, Thirroul.................................................................................................................13 2.2 Bulli Brickworks, Bulli ................................................................................................................................16 2.3 Wyndarra Way, Koonawarra.......................................................................................................................19 2.4 No. 24 O’Briens Lane, Figtree.....................................................................................................................22
    [Show full text]
  • Lake Illawarra NSW Coastal Conference Paper-Wiecek 2016
    Quantifying change and impacts to Lake Illawarra from a permanent opening D Wiecek 1, C Regena 2, R Laine 1, RJ Williams 3 1Office of Environment and Heritage, Wollongong, NSW 2University of Wollongong, Wollongong, NSW 3Department of Primary Industries, NSW Fisheries, Sydney (retired) Abstract Lake Illawarra is a large coastal lake located on the NSW south coast, 85km south of Sydney. A number of changes have occurred to Lake Illawarra since the finalisation of works to create a permanent entrance opening in 2007 through training walls/breakwaters and associated entrance dredging. Lake Illawarra previously functioned as an ICOLL, and during drought would close off to the ocean for extended periods. Significant community pressure regarding concerns with poor water quality and estuary health during periods of closure culminated in the NSW Government (the now disbanded Lake Illawarra Authority) implementing a staged process of construction to create the permanently opened entrance. Since the completion of the training walls/breakwaters and dredging, a number of hydrodynamic, physical, and biological changes to the Lake have been observed. These include changes to the tidal regime, entrance channel morphology, water quality and estuarine vegetation. Extensive data collection exercises to quantify these changes have included three separate hydrosurveys and tidal gauging exercises post 2007, ongoing water quality monitoring, and mapping of estuarine vegetation. This paper summarises the major changes that have occurred in Lake Illawarra since 2007 and highlight key impacts that have implications for the ongoing management of the Lake. Introduction Entrance training to permanently open NSW estuaries that intermittently close to the ocean is often raised as a solution to declines in water quality and estuary health by local communities.
    [Show full text]