Design & Access Statement

Total Page:16

File Type:pdf, Size:1020Kb

Design & Access Statement Design & Access Statement - (Outline Application) Re sidential Development & Additional Park & Ride Car Park Proposal Ref: 1403 At Garth Works, Taffs Wells. Revision A: September 2013 – Layout amended. Revision B: September 2013 – Updated Layout, Extra information added. 1 Design & Access Statement GARTH WORKS, TAFFS WELLS Contents 1.0 Introduction 2.0 Policy Context 3.0 Site Analysis 4.0 Economic, Social & Character Analysis 5.0 Response to Context 6.0 Community Safety 7.0 Accessibility and Movement 8.0 Indicative Design Layout 9.0 Sustainability 10.0 Conclusion 2 1.0 Introduction Existing Site. The land parcel in question is approximately 3.406 Hectares. Located opposite Taffs Well railway station, approximately 2.4km (1.5 miles) from Junction 32 of the M4 via the A470 and 10km (6 miles) from Cardiff city centre. It is approximately 400 metres from the existing site entrance to the centre of Taffs Well (using the railway bridge). The site is bound by the A470 to the East and Moy Road to the West. Beyond Moy Road is the main railway line from Aberdare and Merthyr Tydfil to Cardiff. The existing site consists of self contained industrial and office units Development Proposals. In essence, the development will seek to deliver a residential scheme comprising of: – Mixed size residential units with off street parking & secure garage parking. – Percentage of Housing Association units including flats. – Open Space areas. – Extension to the existing ‘Park & Ride’ car park facility All of the above components are equally important in enabling the Scheme to be delivered as a comprehensive development. 3 2.0 Policy Context Rhondda Cynon Taf Local Development Plan up to 2021 - Adopted March 2011 • The Local Development Plan (LDP) is a land use document which sets out how the County Borough will be developed over 15 years. Some areas will be identified for new development whilst other areas will be protected. The LDP will also contain detailed policies which will control the form of new development and setting out what new development should look like. • The proposals map (shown below) illustrates the local policies for the Taffs Wells area. These policies are guided by more general region and national planning objectives through various guidance and technical advice notes. • The proposals will deliver a Residential area. The whole site subject to this Outline planning application is within the settlement boundary as depicted by policy SSA13. 4 2.0 Policy Context National Planning Guidance Planning Policy Wales (PPW, Edition 5, November 2012) PPW outlines the importance of design as a means to protect the environment, promote social inclusion and enhance quality of life. In addition to this, PPW recognises that careful planning can help to reduce the need to travel, especially by private car and enhance access to new development by public transport, bicycle and on foot. Chapter 4 of PPW deals with promoting sustainability through good design and recognises good design to mean relationship between all elements of the natural and built environment. It should go beyond aesthetics and consider social, environmental and economic aspects of the development. Meeting the objectives of good design is required to be an aim of all those involved in the development process and applied to all development proposals. The objectives of good design are summarised as follows. In relation to Design and Access Statements, paragraph 4.11.14 states that “A design and access statement is a communication tool explaining how the objectives of good design have been considered from the outset of the development process. In preparing design and access statements, applicants should take an integrated and inclusive approach to sustainable design, proportionate to the scale and type of development proposal. They should be ‘ living’ documents dealing with all aspects of design throughout the process and the life of the development, clearly stating the comprehensive design principles and concepts adopted and include illustrative material in plan elevation and section where relevant”. Technical Advice Note (TAN) 12: Design (June 2009) This Technical Advice Note should be read in conjunction with PPW. This document provides further detail on how the promotion of good design through sustainability can be facilitated and also provides advice on the preparation of design and access statements. Mirroring PPW, TAN12 re-emphasises the identified 9 objectives of good design in guiding our approach to achieving good design but also provides further information on how to assess and respond to these objectives. 5 2.0 Policy Context Technical Advice Note (TAN) 18: Transport (2007) TAN18 seeks to promote resource and travel efficient settlement patterns. This can be achieved by locating development where there is or will be good access by public transport, walking and cycling. This will minimise the need for travel by car and fostering social inclusion by ensuring accessibility for everyone. Technical Advice Note (TAN) 22: Sustainable Buildings (2010) TAN22 provides guidance on delivering sustainable and low carbon buildings. It also provides some further guidance on the content of design and access statements in explaining how the design of the development will meet or exceed sustainable building standards. Development Plan Policy The statutory Development Plan covering the site is the Rhondda Cynon Taff Local Development Plan (LDP) 2006-2021, which was adopted in March 2011. The following policies from the LDP are of relevance to this application. • Policy CS 2: Development in the South • Policy CS4 – Housing Requirements • Policy CS5 – Affordable housing • Policy AW 2: Sustainable Locations • Policy AW 5: New Development • Policy AW 6: Design and Place Making • Policy SSA 11: Housing Density • Policy SSA 12: Affordable Housing; and, • Policy SSA 13: Housing Development with Settlement Boundaries • Policy SSA20 – Park and ride/park and share provision • Policy NSA 16 – Re-development of Vacant / Redundant Industrial Sites Supplementary Planning Guidance (SPGs) Relevant SPGs include: 1) Supplementary Planning Guidance: Design and Place Making – Creating new places to live and the regeneration of existing communities (Adopted March 2011); 2) Supplementary Planning Guidance: Delivering Design and Place Making – Access, Circulation and Parking Requirements (Adopted March 2011); 3) Supplementary Planning Guidance: Nature Conservation (Adopted March 2011). 6 3.0 Site Analysis Context. The site is bound by the A470 to the east and Moy Road to the west. Beyond Moy Road is the main railway line from Aberdare and Merthyr Tydfil to Cardiff and Taffs Well railway station is located immediately opposite the main vehicular entrance to the site. Landscaping & Boundaries. Existing landscaping to the West boundary is very mature bit on the site large areas of concrete hard standing and parking areas provide very little areas for landscaping. The existing boundaries consist of a mix between timber post & rails. Sheet metal & concrete post & chain link secure fence. Existing Buildings/Site . The site is currently utilised for employment purposes and has a number of small-scale occupiers. These are predominantly involved in light industrial and storage activities. The existing buildings are of mixed design including cladded warehouses, brick and render 2 storey units, all with different window and door styles. Existing industrial units are to the North of the site with existing residential developments with local amenities, to the West and North East. The site level is generally flat will very little gradients due to the nature of the existing site being of commercial / industrial use, with large footprint buildings and concrete hard standings. This will benefit the proposed development from a storey height perspective. Access. The main road at the single site entrance running North to South serves an established bus route with an existing park and ride service. A proposed park and ride parcel of land will be provided to increase the number of parking spaces (+50) and provide access to inner cities (Cardiff) via public transport. Opposite to site is Taffs Well railway station. The site is in a prime location for public transport links. The existing access point will not be changed. Flood Risk. In accordance with TAN 15, the Flood Risk Assessment (FRA) prepared by Quad Consult Limited to accompany this application also assesses the risk of flooding from other sources such as streams and rivers, groundwater, sewers and highway drains, surface water and infrastructure failure. The FRA deems the greatest risk of flooding at the site to be from failure or surcharge of the site’s drainage infrastructure. However, this risk can be managed by designing the infrastructure appropriately to ensure the development remains flood free for a 1:100+ Climate Change year event. The risk of flooding from other sources is considered negligible but precautionary mitigation measures could be taken to design property thresholds so as to direct water towards soft landscaping areas in order to provide safe routes of access and egress. 7 3.0 Site Analysis Ecology. An extended Phase 1 survey (July 2013) has been carried out by David Clements Ecology Ltd at the site in order to classify the types of habitat at the site and the presence/ potential presence of flora and fauna, including any rare or protected species. This included a bat survey in order to identify any evidence of actual use or potential use of the buildings and larger trees at the site by bats. Details of the findings from these surveys are detailed in the Ecological Assessment accompanying this planning application (July 2013). Much of the site was found to be of negligible value with the semi-natural habitats provided to the periphery of the site being of merely local value for wildlife. The survey found no evidence the site was currently being used by roosting bats but considered they might potentially use the exterior buildings on occasion. The report concludes that nothing of wildlife significance would be lost as a result of the redevelopment.
Recommended publications
  • Roman Conquest, Occupation and Settlement of Wales AD 47–410
    no nonsense Roman Conquest, Occupation and Settlement of Wales AD 47–410 – interpretation ltd interpretation Contract number 1446 May 2011 no nonsense–interpretation ltd 27 Lyth Hill Road Bayston Hill Shrewsbury SY3 0EW www.nononsense-interpretation.co.uk Cadw would like to thank Richard Brewer, Research Keeper of Roman Archaeology, Amgueddfa Cymru – National Museum Wales, for his insight, help and support throughout the writing of this plan. Roman Conquest, Occupation and Settlement of Wales AD 47-410 Cadw 2011 no nonsense-interpretation ltd 2 Contents 1. Roman conquest, occupation and settlement of Wales AD 47410 .............................................. 5 1.1 Relationship to other plans under the HTP............................................................................. 5 1.2 Linking our Roman assets ....................................................................................................... 6 1.3 Sites not in Wales .................................................................................................................... 9 1.4 Criteria for the selection of sites in this plan .......................................................................... 9 2. Why read this plan? ...................................................................................................................... 10 2.1 Aim what we want to achieve ........................................................................................... 10 2.2 Objectives.............................................................................................................................
    [Show full text]
  • Create Wealth Management Mountain Goats One Million Metre Challenge
    Create Wealth Management Mountain Goats One Million Metre Challenge The Planned Routes Two routes are part of larger organised events and so the dates are fixed. Route 8 (Dragon Ride) on 11th June and Route 13 (Velothon Wales) is on 9th July. Route numbers give orders of distance - shortest to longest - of each route. Dates for the other 11 routes haven't been set yet but are listed in the order we expect to do them and the date of the week we are targeting them for. Route 3 - Starting at Ystradfellte w/c 17th April Route Statistics: 70km of riding, 1459m of ascent. Classic Climbs: Glynneath; Heol Lan; Cray/Heol Senni; Devil's Elbow. Riding south from Ystradfellte to Glynneath we then climb along Inter-Valley Road (Glynneath 3.2km, 180m, average gradient 5.6%, max gradient 8%) and on to Pen- y-Cae. Following the A4067 we pass through Crai-y-nos before turning off left to commence Heol Lan (5.6km, 277m, average gradient 4.9%, max gradient 13%) eventually reaching the village of Cray. We turn south to Cnewr and continue southwards along the A4067 until we reach the point at which we turned off to commence the Heol Lan climb. Here we do a U-Turn as this is the starting point of Cray/Heol Senni (7.2km, 264m, average gradient 3.7%, max gradient 10%) which takes us back up the A4067 and on to Heol Senni. From here we turn south again, towards Ystradfellte but not before undertaking the Devil's Elbow (1.8km, 189m, average gradient 10.5%, max gradient 22%).
    [Show full text]
  • The Taff Trail Is Just One of a Series of Trails Running Right Rivals the Best in the World
    Feel Rested Other Trails in Merthyr Tydfil Aberfan Community Centre Merthyr has plenty of other trails on offer, Located in the centre of the village. so why not try one of these? The Open: 8am-8pm Mon - Fri and 9am – 4pm Sat & Sun. P Key Taff Trail (Route 8) Taff Trail Merthyr Tydfil Leisure Centre Trevithick Trail Located in Merthyr’s Leisure Village, just (Route 477) Merthyr Tydfil a short walk from the town centre. Celtic Trail (Route 4) Open: 8am-8pm Mon - Fri and 9am – 4pm Sat & Sun. Heads of the Valley Trail (Route 46) Steam Train Merthyr Town Centre St Tydfil’s Shopping centre provides a modern semi-covered pedestrian area with a diverse range of places to eat and drink. Various opening times. P Cyfarthfa Retail Park Various retail outlets including eateries. Open 9am – 8pm Mon – Sat, 11am -4pm Sun. MERTHYR TYDFIL M4 Cefn Coed Village A small car park is found on the High Street. Just look for the Church spire as it’s next door to it. The village has places to eat and drink. Looking for more? Open at various times. P visitmerthyr.co.uk Parkwood Outdoors Dolygaer Café For further information contact us at: A great stop at a stunning location for anyone visiting the National Park. You can also pick up needed repair tubes for your bikes. Email: [email protected] Open 9.30 – 5.30. Phone: 01685 725000 Merthyr Section 14 miles P Mail: VisitMerthyr, MerthyrTydfilCounty Borough Council, Tourism Dept. Largely TRAFFIC FREE There’s ample parking throughout the Borough with designated Civic Centre, Castle Street, National Cycle Route 8 car parks.
    [Show full text]
  • Planning, Access and Rights of Way Committee
    Brecon Beacons National Park Authority PLANNING, ACCESS AND RIGHTS OF WAY COMMITTEE RECOMMENDATIONS OF THE DIRECTOR OF PLANNING ON APPLICATIONS FOR DETERMINATION BY THE PLANNING, ACCESS AND RIGHTS OF WAY COMMITTEE Page 1 of 52 APPLICATION NUMBER: 17/15291/FUL APPLICANTS NAME(S): Powys County Council SITE ADDRESS: Land Off Cerrigcochion Road Brecon Powys LD3 9SR GRID REF: E: 305287 N:229237 COMMUNITY: Brecon DATE VALIDATED: 21 September 2017 DECISION DUE DATE: 5 December 2107 CASE OFFICER: Donna Bowhay PROPOSAL Construction of a new high school, access, parking and associated works ADDRESS Land Off Cerrigcochion Road, Brecon , Powys Page 2 of 52 CONSULTATIONS/COMMENTS Mid And West Wales Wales Fire And Rescue Service 28th Sep 2017 I acknowledge receipt of your e-mail and letter dated 25th September 2017 in relation to the above proposed development. The Fire and Rescue Service will make comment on the submission once planning has been approved and the necessary plans are submitted to this Service by the local authority Building Control department or an Approved Inspector as part of the full consultation process. Should you require any further advice please contact the above-named Officer. Powys County Council Leisure And Recreation No comments received to-date. Sustrans Cymru 17th Oct 2017 Thanks you for allowing Sustrans the opportunity to comment on the design of the new school The 21st Century schools program all over Wales has consistently ignored the design outside of the school boundary and has not considered or provided adequate means to allow pupils and staff to access the new school by foot or cycle.
    [Show full text]
  • CPO Table 1 June 09
    The Schedule Table 1 1 2 3 Number Extent, description and situation of the land Qualifying persons under paragraph 3 of Schedule 1 to the Acquisition of Land act 1981 on map Owners or reputed owners Lessees or reputed Tenants or reputed Occupiers lessees tenants (other than lessees) IN THE TOWN OF PORTHMADOG IN THE COUNTY OF GWYNEDD 1/1 12148 square metres of part of half width of Mr R Williams Mr I Williams - Mr I Williams the A487 and part of full width of the Dinam Hall Ty Canol Ty Canol A498 at the junction between the Llangaffo Golan Golan A498 and A487 including part Gaerwen Garndolbenmaen Garndolbenmaen lengths of masonry highway Gwynedd Gwynedd Gwynedd boundary walls, part of full width of LL60 6LR LL51 9RQ LL51 9RQ an existing drainage ditch and pasture land in fields 0101, 0104, 0106 (A) and 0207(B) west of Tremadog. 1/1a 514 square metres of pasture land in Mr R Williams Mr I Williams - Mr I Williams field 0101(A) south of the A487 Dinam Hall Ty Canol Ty Canol Trunk road opposite Ysbyty Alltwen Llangaffo Golan Golan Community Hospital. Gaerwen Garndolbenmaen Garndolbenmaen Gwynedd Gwynedd Gwynedd LL60 6LR LL51 9RQ LL51 9RQ 1/1b 62 square metres of pasture land in Mr R Williams Mr I Williams - Mr I Williams field 0101(A) south of the A487 Dinam Hall Ty Canol Ty Canol Trunk road opposite Ysbyty Alltwen Llangaffo Golan Golan Community Hospital. Gaerwen Garndolbenmaen Garndolbenmaen Gwynedd Gwynedd Gwynedd LL60 6LR LL51 9RQ LL51 9RQ 1/1c 23 square metres of part of full width of Mr R Williams Mr I Williams Mr I Williams an existing drainage ditch between Dinam Hall Ty Canol Ty Canol fields 0101 and 0104(A) west of Llangaffo Golan Golan Tremadog.
    [Show full text]
  • 1.00 Pm  SIAMBR Y CYNGOR, SWYDDFEYDD Y COUNCIL CHAMBER, COUNCIL CYNGOR, LLANGEFNI OFFICES, LLANGEFNI Ann Holmes Swyddog Pwyllgor Committee Officer 01248 752518
    Mr Richard Parry Jones, MA. Prif Weithredwr – Chief Executive CYNGOR SIR YNYS MÔN ISLE OF ANGLESEY COUNTY COUNCIL Swyddfeydd y Cyngor - Council Offices LLANGEFNI Ynys Môn - Anglesey LL77 7TW Ffôn / tel (01248) 752500 Ffacs / fax (01248) 750839 RHYBUDD O GYFARFOD NOTICE OF MEETING PWYLLGOR CYNLLUNIO A PLANNING AND ORDERS GORCHMYNION COMMITTEE DYDD MERCHER, 2 HYDREF, 2013 WEDNESDAY, 2 OCTOBER DYDDIAD 2013 1:00 pm 1.00 pm SIAMBR Y CYNGOR, SWYDDFEYDD Y COUNCIL CHAMBER, COUNCIL CYNGOR, LLANGEFNI OFFICES, LLANGEFNI Ann Holmes Swyddog Pwyllgor Committee Officer 01248 752518 AELODAU / MEMBERS Cynghorwyr / Councillors: W T Hughes (Cadeirydd/Chair) Ann Griffith (Is-Gadeirydd/Vice-Chair) John Griffith Vaughan Hughes Victor Hughes Richard Owain Jones Raymond Jones Jeffrey M.Evans Lewis Davies K P Hughes Nicola Roberts A g e n d a Members are reminded that background papers referred to within committee reports are available for inspection in electronic format on the day of the meeting at the Council Chamber from 12.30 p.m. onwards; alternatively these may be inspected at the Development Management during normal office hours. Documents referred to in reports may also be viewed in full on the electronic application files. Any additional information to hand following publication of reports will be verbally reported upon to the meeting. Before a decision notice is released conditions of approval or reasons for refusal given in written reports may be subject to minor amendments to account for typographical errors. Index 1 APOLOGIES 2 DECLARATION OF INTEREST 3 MINUTES OF THE 4TH SEPTEMBER, 2013 MEETING (Pages 1 - 10) To submit for confirmation, the minutes of the previous meeting of the Planning and Orders Committee held on 4th September, 2013.
    [Show full text]
  • Menai Strait Crossing Report (2016)
    DOCUMENT 9.6 Menai Strait Crossing Report (2016) National Grid (North Wales Connection Project) Regulation 5(2)(q) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 First published September 2016 Application Reference EN020015 September 2018 Page intentionally blank North Wales Connection Project Menai Strait Crossing Report (Document 2.3) National Grid National Grid House Warwick Technology Park Gallows Hill Warwick CV34 6DA September 2016 North Wales Connection Project Menai Strait Crossing Report Page intentionally blank North Wales Connection Project Menai Strait Crossing Report Table of Contents 1. INTRODUCTION 1 1.1 Background 1 1.2 Purpose of Report 4 1.3 Structure of the Report 4 1.4 Outcome 5 2. NATIONAL GRID DUTIES AND POLICIES 6 2.1 Introduction 6 2.2 Duty to Provide a Connection 6 2.3 Economic Duties 7 2.4 Duty to Protect the Environment 7 2.5 Stakeholder, Community and Amenity Policy 8 2.6 Transmission Line Design and Routeing 8 3. CONTEXT FOR THE APPRAISAL 9 3.1 Factors in Appraising Options 9 3.2 Statutory Duties 9 3.3 Planning Act 2008 9 3.4 National Policy Statements 10 4. OVERVIEW 15 4.1 Introduction 15 4.2 Landscape 15 4.3 Historic Environment 15 4.4 Ecology 16 4.5 Marine Ecology 17 4.6 Local Economy 17 4.7 Transport 17 4.8 Hydrology and Flood Risk 18 4.9 Geology 18 4.10 Topography and Bathymetry 19 4.11 Seabed Morphology 19 5. CONSTRUCTION CONSIDERATIONS – NEW NATIONAL GRID INFRASTRUCTURE 26 5.1 Introduction 26 5.2 Overhead Line 26 5.3 Cable Sealing End Compounds 27 5.4 Underground Cables 28 5.5 Crossing Techniques for the Menai Crossing 30 September 2016 North Wales Connection Project Menai Strait Crossing Report 5.6 Initial Preference 45 6.
    [Show full text]
  • SCOPING OPINION Proposed Wylfa Newydd Project
    SCOPING OPINION Proposed Wylfa Newydd Project Planning Inspectorate Reference: EN010007 June 2017 Scoping Opinion for Wylfa Newydd Project TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................... 3 1 INTRODUCTION .......................................................................... 5 BACKGROUND ..........................................................................................5 THE SECRETARY OF STATE’S CONSULTATION ..............................................7 STRUCTURE OF THE DOCUMENT .................................................................8 2 THE PROPOSED DEVELOPMENT .................................................. 9 INTRODUCTION ........................................................................................9 THE APPLICANT’S INFORMATION ................................................................9 THE SECRETARY OF STATE’S COMMENTS .................................................. 15 3 EIA APPROACH AND TOPIC AREAS ........................................... 21 INTRODUCTION ...................................................................................... 21 EU DIRECTIVE 2014/52/EU ...................................................................... 21 NATIONAL POLICY STATEMENTS (NPS) ..................................................... 21 ENVIRONMENTAL STATEMENT APPROACH ................................................. 22 ENVIRONMENTAL STATEMENT STRUCTURE ................................................ 22 MATTERS TO BE SCOPED IN/ OUT ...........................................................
    [Show full text]
  • Isle of Anglesey County Council Cycling Strategy
    ISLE OF ANGLESEY COUNTY COUNCIL Committee: Executive Committee Date: 13 January 2014 Portfolio Holder: Councillor Richard A Dew Corporate Director: Arthur W Owen Title: Isle of Anglesey County Council Cycling Strategy 1.0 Purpose of Report 1.1 To gain Executive approval for the Isle of Anglesey County Council Cycling Strategy. 2.0 Background 2.1 The need for a co-ordinated approach across the Council to maximise the benefits to Anglesey of cycling has been highlighted by a number of issues. A strategy has therefore been produced to address these points and assist Anglesey to grow economically, in health and with an improved environment. 2.2 In November 2013 the Active Travel (Wales) Act 2013 was given Royal Assent and it will bring with it a number of new statutory functions which aim to encourage active travel to work, education and other destinations which would otherwise be made by car. 2.3 A number of potential major projects across the island are set to be developed over the next few years which emphasise the need for a strategy to ensure that the island receives the legacy benefits which should come from such schemes. 2.4 Tourism initiatives such as the Ymweld â Môn project will be assisted by a cycling strategy helping to target funding to encourage Anglesey as a cycling destination. 3.0 Recommendations 3.1 That the Council approve the Cycling Strategy for use as a lead document for the development of cycle facilities on Anglesey. Report by: Dewi R Williams Job Title: Head of Service (Environment and Technical Service) Department: Sustainable Development Department Date: 20th November 2013 Appendices: Isle of Anglesey County Council Cycling Strategy Background Papers: None Isle of Anglesey County Council Cycling Strategy November 2013 Isle of Anglesey County Council Cycling Strategy Contents Executive Summary ................................................................................................................................
    [Show full text]
  • Chapter 7 Townscape and Visual
    Environmental Statement Volume 1 March 2021 Chapter 7 Townscape and Visual Figure 7.1 Site Location Figure 7.2 Historical Development Figure 7.3 Townscape Character Figure 7.4 Building Heights Figure 7.5 Urban Grain Figure 7.6 Land Use Figure 7.7 Landscape Character Figure 7.8 LANDMAP Landscape Visual Sensitivity Figure 7.9 Public Open Space and Environmental Designations Figure 7.10 Movement and Linkages Figure 7.11 Site Character Figure 7.12 Key Viewpoints 7. Townscape and Visual Introduction 7.1 This Chapter reports the outcome of the assessment of likely significant environmental effects arising from the Proposed Scheme in relation to townscape and views. 7.2 The Chapter describes the consultation that has been undertaken during the EIA, the scope of the assessment and assessment methodology, and a summary of the baseline information that has informed the assessment. 7.3 In line with Chapter 2. Approach to EIA, the assessment reports on the likely significant environmental effects, the further mitigation measures required to prevent, reduce or offset any significant adverse effects, or further enhance beneficial effects. The conclusions are provided both in terms of the residual effects and whether these are considered significant. The assessment of effects takes into consideration both Primary and Tertiary mitigation (see Chapter 2: Approach to EIA for further details), as well as applying proportionality to those effects considered within the EIA, based on the outputs of the EIA Scoping process (Appendix 2.1 - 2.2). 7.4 This Chapter, and its associated Figures 7.1-7.12 and Appendix 7.1-7.4, is intended to be read as part of the wider ES with particular reference to the introductory Chapters of this ES (Chapters 1 - 5), as well as Chapter 8.
    [Show full text]
  • Merthyr Tydfil
    bbc.co.uk/weathermanwalking © 2013 Weatherman Walking Merthyr Tydfi l Walk Approximate distance: 7.5 miles For this walk we’ve included OS grid references should you wish to use them. 6 5 7 8 4 1 2 Start End N 3 W E S Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right 2009.All rights reserved. Ordnance Survey Licence number 100019855 The Weatherman Walking maps are intended as a guide to help you walk the route. We recommend using an OS map of the area in conjunction with this guide. Routes and conditions may have changed since this guide was written. The BBC takes no responsibility for any accident or injury that may occur while following the route. Always wear appropriate clothing and 1 footwear and check weather conditions before heading out. bbc.co.uk/weathermanwalking © 2013 Weatherman Walking Merthyr Tydfi l Walk Start: Cyfarthfa Castle (free car parking at the castle and also by entrance gates) Starting ref: SO 041 073 Distance: About 7.5 miles Grade: Easy/Moderate Walk time : Allow 3.25 hours This is a fascinating walk through both town and country, packed full of history with a few surprises thrown in for good measure. Walking in the footsteps of iron workers and their wealthy masters, our route starts from Cyfarthfa Castle and heads down over the river Taff to the site of the old Cyfarthfa ironworks before heading up the Taff Trail along a green corridor out of town. Calling in at Vaynor Church, the route then loops back to climb to the summit of Morlais Hill, site of a ruined Norman castle, before returning down along the banks of the delightful cascading Taf Fechan river, and back to the start.
    [Show full text]
  • Planning & Development Committee 5 July 2018
    PLANNING & DEVELOPMENT COMMITTEE 5 JULY 2018 REPORT OF THE SERVICE DIRECTOR, PLANNING PURPOSE OF THE REPORT Members are asked to determine the planning application outlined below: APPLICATION NO: 18/0314/34 (DJB) APPLICANT: Transport for Wales DEVELOPMENT: Hybrid Planning Application to deliver a rolling stock depot on the existing Garth Works Industrial Estate site comprising of the following: Part A: Full planning application for the demolition of existing warehouses on the existing Garth Works Industrial Estate site. Part B: Outline planning application to provide a rolling stock depot comprising of a warehousing building, stabling area accommodating rolling stock, substation, wash down point, sanding facility and delivery tracks, ancillary workshop and offices, decked car parking providing a maximum of 214 car parking spaces, demolition and relocation of existing railway footbridge and platforms, and associated landscaping, highways and access infrastructure works. LOCATION: LAND AT THE GARTH WORKS INDUSTRIAL ESTATE, TAFFS WELL, DATE REGISTERED: 03/04/2018 ELECTORAL DIVISION: Ffynon Taf RECOMMENDATION: APPROVE REASONS: The proposed development forms an important element of the development of the South Wales Metro Phase 2, which focuses on the Core Valley Lines (CVL). This important commercial/industrial site, which is currently partially vacant and of a tired and run-down appearance, lies adjacent to the A470 on an important gateway into Rhondda Cynon Taf. The proposal to develop the site as a major Transport for Wales Rail Depot is a positive boost to the regeneration of Rhondda Cynon Taf which will also have a significant impact on growth in the Cardiff Capital Region. It is considered that this investment will lead to new employment opportunities in the area and also improve access to employment for commuters in the region by its contribution to the South Wales Metro as well as a significant improvement and modernisation of the Taffs Well Station and the associated Park and Ride facility.
    [Show full text]