Deliverable Title D1.3. Management Plan

Deliverable Lead: Agencia Estatal Consejo Superior de Investigaciones Científicas

Related Work Package: WP1: Coordination & Management

Related Task(s): T1.3. Strategic and Scientific Management (including )

Author(s): Pilar Raya (CSIC), Sandra Correas (INN), Diego Torricelli (CSIC)

Dissemination Level: Public

Due Submission Date: 31/03/2018

Actual Submission: 31/03/2018

Project Number 779963

Instrument: Research and Innovation Action

Start Date of Project: 01.01.2018

Duration: 48 months

Risk management plan identifying sources of and severity, likelihood of occurrence and controllability assessment, risk responses (strategy to reduce negative impact, mitigation and contingency plans Abstract as preliminary defined) and adjust the plan and managing events that may have a positive (opportunities) or negative (threats) effect on project’s development and sustainability. Released in M3, it will remain a living document during the whole project duration.

This project has received funding from the European Union’s Horizon 2020 research and innovation

program under grant agreement No 779963

17

2

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

revision Internal Torricelli Diego 02/04/2018 v.03

updates and Review Correas Sandra 21/03/2018 v.02

version First Raya Pilar 19/03/2018 v.01

reason Modification by Modified Date Version

History Contribution and Versioning

Plan Communication EUROBENCH D8.3

17

3

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

Indicator Performance Key KPI

Project coordinator Project PC

Work Package Work WP

European Commission European EC

Description of Action of Description DoA

Meaning Abbreviation/Acronym

List of Abbreviations and Acronyms and Abbreviations of List

...... Conclusion 4 17 ......

...... Control and Monitoring Risk 3.4 8

...... planning Response 3.3 7 ......

...... Analysis Risk 3.2 6 ......

...... Identification Risk 3.1 6 ......

...... procedure management Risk 3 6

...... responsibilities and roles Specific 2 5

...... Summary Executive 1 4 ......

...... Acronyms and eviations Abbr of List 3

...... Contents of Table 3 ......

...... History Contribution and Versioning 2

Contents of Table

Plan Communication EUROBENCH D8.3

17

4

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

allocations.

nts to project strategy, changes to implementation arrangements and changes in budget budget in changes and arrangements implementation to changes strategy, project to nts adjustme

plans to reduce the impact of risk occurring. Responses may include: strengthened supervision, supervision, strengthened include: may Responses occurring. risk of impact the reduce to plans

order to take the necessary actions. In case there is no resolution, the the resolution, no is there case In actions. necessary the take to order will establish mitigation mitigation establish will SC

rbes r eas te teig omte w Committee Steering the delays, or problems and it may set up task in in forces task up set may it and consulted, be ill

budget must be reported to the corresponding WP Leader or to the Project Coordinator. In case of of case In Coordinator. Project the to or Leader WP corresponding the to reported be must budget

their successful completion. Any change in the time schedule of the deliverables or in the allocated allocated the in or deliverables the of schedule time the in change Any completion. successful their

Technical Coordinator any risky situation that may arise and may affect the project project the affect may and arise may that situation risky any Coordinator Technical objectives or or objectives

Each partner has the responsibility to report immediately to their respective WP leader and to the the to and leader WP respective their to immediately report to responsibility the has partner Each

Plan. Management Risk is th in included and updated continuously be

against milestones and KPIs and to apply procedures. Both KPIs and Risk and KPIs Both procedures. Management Risk apply to and KPIs and milestones against will will s

The Project Coordinator (PC) will be ultimately responsible for the oversight of the entire project entire the of oversight the for responsible ultimately be will (PC) Coordinator Project The

etc. , quality poor errors,

onal errors: planning planning errors: onal operati uman h consortium, the leaving artners p feasibility, or budget of terms

bjectives not achievable in in achievable not bjectives o partners, the by shortage esource r partners, the between operation - co

oor communication or or communication oor p findings, scientific or difficulties technical nexpected u from arise can Risks

progress towards its objectives, in order to carry out mitigation actions as early as possible as early as actions mitigation out carry to order in objectives, its towards progress .

monitor technical and management risks as well as any other issues that might affect the project project the affect might that issues other any as well as risks management and technical monitor

he management process will identify and and identify will process management he t , project EUROBENCH the of implementation the During

Summary xecutive E 1

Plan Communication EUROBENCH D8.3

17

5

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

-

control. and monitoring risk with associated activities in Coordinator Project the Assisting

-

Reporting on the progress of the risk response to to response risk the of progress the on Reporting . Coordinator Project the

-

. assigned steps response risk the Performing

-

. strategies response risk the developing in assisting and owners risk the identify to Helping

-

Identifying and describing any risk any describing and Identifying .

Work Package (WP) Leaders are responsible for the following tasks tasks following the for responsible are Leaders (WP) Package Work package(s): work their within

specifying the criteria used to assess the impact. the assess to used criteria the specifying

-

Assessing the impact of risks on project cost, time, scope, and quality objectives, and and objectives, quality and scope, time, cost, project on risks of impact the Assessing

. probability

-

Assessing the probability that a risk will occur and specif and occur will risk a that probability the Assessing ying the criteria used to assess the the assess to used criteria the ying

. project the to opportunities

-

Monitoring the assigned risks and informing the Project Coordinator of any threats or or threats any of Coordinator Project the informing and risks assigned the Monitoring

-

Developing and/or updating the risk response strategy response risk the updating and/or Developing .

responsibilities include: responsibilities Committee Steering

-

ordination with the WP Leaders. WP the with ordination - co in actions, risk on decision final the Making

-

. consortium the to regularly Reporting

-

. strategies management risk the of effectiveness the Monitoring

-

. deliverables on procedures control quality naging Ma

-

Coordinating with the consortium to monitor risks and implement risk response strategies response risk implement and risks monitor to consortium the with Coordinating .

-

. planning contingency and mitigation risk to Contributing

-

. consortium the of support the with list risk initial the Updating

-

. risks changing or new any identify to project the Monitoring

-

. Plan Assurance Quality the implementing and distributing Developing,

. schedule and budget project the of scope

-

Allocating the required resources and time to execute the Quality Assurance Plan within the the within Plan Assurance Quality the execute to time and resources required the Allocating

tasks: following the for ble responsi be will who

supervision of the Project Coordinator Project the of supervision the under performed be will management risk and uality Q , ,

responsibilities and oles r Specific 2

Plan Communication EUROBENCH D8.3

17

6

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

matrix: risk a sing u estimated is risk given a

The exposure to to exposure The . impact possible the of size the occurs, it if and occur may risk the that probability

After a risk or group of risks has been identified and documented, it is important to assess the the assess to important is it documented, and identified been has risks of group or risk a After

3.2 Analysis k Ris

platform. Intranet the through

be included into the Risk Management Register. This register will be accessible to the consortium consortium the to accessible be will register This Register. Management Risk the into included be

ntified risks will will risks ntified Ide strategy. response respective the on as well as priority risk final the on agree

ommittee, which will will which ommittee, C Steering the to priority risk the for suggestions and risks the report will

dentification will be performed within work packages. WP leaders leaders WP packages. work within performed be will dentification I Risk place. take can monitoring

emphasis on iden on emphasis tifying risks as early as possible so effective response planning and subsequent subsequent and planning response effective so possible as early as risks tifying

project, with an an with project, EUROBENCH the of cycle - life the throughout done be will identification Risk

Identification Risk 3.1

Figure Figure process processing Risk : 1

updated. ously continu be will and ebsite w intranet

egister will be placed on the the on placed be will egister R Management Risk The required. actions or sures mea subsequent

the project and any any and project the of risks possible all record to used be will and maintained be will ) 2 Table and

Register Management Risk This progress. project the during updated and completed 1 Table (See

This table will be be will table This . risks of table a ed forecast project the of beginning the before Consortium The

control. and monitoring and , planning

alysis, response response alysis, an identification, isk r steps: following the includes procedure management risk The

dure proce management Risk 3

Plan Communication EUROBENCH D8.3

17

7

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

Register. Management Risk the into included be will planning response of results The

reassessed. than rather monitored be should risk the that determines approach acceptance

nd/or schedule revision to accommodate known (or unknown) threats. Utilising a risk risk a Utilising threats. unknown) (or known accommodate to revision schedule nd/or a cost

nce is to develop a a develop to is nce accepta risk to approach active common most The active. or all, at taken

only be utilised for low for utilised be only priority risks. Risk acceptance can be passive, where no action is is action no where passive, be can acceptance Risk risks. priority -

ponses for every identified risk. Risk acceptance should normally normally should acceptance Risk risk. identified every for ponses res plan to difficult very

Acceptance is often taken as a risk strategy since it is is it since strategy risk a as taken often is Acceptance . Acceptance risks: priority - low For

realised risk has caused. Contingency planning is an example of risk mitigation. risk of example an is planning Contingency caused. has risk realised

en more effective than attempting to repair the damage a a damage the repair to attempting than effective more en oft is risk a against ion act

probability and/or the impact of a risk to an acceptable level. Taking early and proactive proactive and early Taking level. acceptable an to risk a of impact the and/or probability

For high and medium medium and high For Risk mitigation involves reducing the the reducing involves mitigation Risk . Mitigation risks: priority -

The following strategies will be taken (depending on the risk category): risk the on (depending taken be will strategies following The

planning. response during party responsible a to assigned be

risks should receive more attention than lower priority risks. Every risk that poses a threat should should threat a poses that risk Every risks. priority lower than attention more receive should risks

k to a point where it can be controlled and managed. During response planning, higher priority priority higher planning, response During managed. and controlled be can it where point a to k ris

During risk response planning, strategies and plans are developed to minimise the effects of the the of effects the minimise to developed are plans and strategies planning, response risk During

planning Response 3.3

Register. Management

h rsls f ik a risk of results The (Low/Medium/High). problem nalysis will be included into the Risk Risk the into included be will nalysis

Steering Committee Committee Steering the , risk each Concerning probability it could become a a become could it probability the estimate ll wi

High: more likely to happen than not than happen to likely more High:

possible Quite Medium:

Low: very unlikely, but not impossible. not but unlikely, very Low:

meaning: following the With

matrix Risk : 2 Figure

Plan Communication EUROBENCH D8.3

17

8

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

project. the of months three first the

that have been identified identified been have that R30) - (R24 risks new some includes currently , Register Management in in

represents the represents which , list is Th . EUROBENCH in out carried work technical the to relate which Risk Risk

more specific technical risks risks technical specific more and ) 1 Table ( risks management general as classified been , , ) 2 Table (

ly during proposal preparation. preparation. proposal during ly joint analysis risk a performed already partners The ave ave h risks The

. documented be will control and monitoring of

luated and modified accordingly and t and accordingly modified and luated eva - re continuously be will exposure Risk tools. the he results results he

egister and assess th assess and egister R anagement M isk R the update to order in plan mitigation and e relevance of of relevance e

about the status and effectiveness of each risk risk each of effectiveness and status the about Coordinator Project the communicate to partners

It is the responsibility of all all of responsibility the is It Leader. Package Work their with ning plan response EUROBENCH

Each project partner is highly encouraged to communicate and discuss any (possible) risks and and risks (possible) any discuss and communicate to encouraged highly is partner project Each

Each Work Package Leader is responsible for the Risk Management within their Work Package. Package. Work their within Management Risk the for responsible is Leader Package Work Each

Control and Monitoring Risk 3.4

Plan Communication EUROBENCH D8.3

17

9

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

consistent and timely communication. timely and consistent

project activities project

controlling mechanisms will be set in place to ensure ensure to place in set be will mechanisms controlling activities. and protocols communication the

and awareness of of awareness and

Low 2 1 Communication, cycle. project the throughout partners WP1 R4 establish establish - re to order in meeting emergency

communication communication

ensure that relationships are maintained with all of the the of all with maintained are relationships that ensure The Project Coordinator will call for an an for call will Coordinator Project The

Loss of internal internal of Loss

The project coordinator and communication board will will board communication and coordinator project The

project. the of partners of number

redistribution of tasks among the high high the among tasks of redistribution

order to ensure their commitment to the project the to commitment their ensure to order project the

characteristics 2) the assumption and and assumption the 2) characteristics

Low 2 1 WP1 R3

A partner leaves leaves partner A partner by another one of similar similar of one another by partner in verified continuously be will expectations Partner’s

two main options: 1) the substitution of of substitution the 1) options: main two the the

The project management board will analyse analyse will board management project The

over by one of the remaining participants remaining the of one by over project

so the role of the withdrawn participant can be taken taken be can participant withdrawn the of role the so the in people key

nd advisory boards. advisory nd a partners involved the

WP1 R2 Low 2 1

number of number or competencies participants with a similar level of expertise, expertise, of level similar a with participants

participant from the different networks of of networks different the from participant

Each expert group in the project is composed of a a of composed is project the in group expert Each critical of Loss

It will be possible to involve a new new a involve to possible be will It

statement preparation) of the whole project whole the of preparation) statement

etc. expenditure,

financial state (cost monitoring, accounting, cost cost accounting, monitoring, (cost state financial

- over guarantee the results. the guarantee to order

by the Coordinator will control the economic and and economic the control will Coordinator the by

WP1 changes, internal R1 committed to find a sustainable in in solution sustainable a find to committed Low 2 1

deviations. INNCOME, in charge of Task 1.4, 1.4, Task of charge in INNCOME, deviations. supported supported

of budget due to to due budget of In case of budget deviations partners are are partners deviations budget of case In

amounts on a six a on amounts monthly base to identify potential potential identify to base monthly -

Partners run out out run Partners

The partners will review their expenditure / budgeted budgeted / expenditure their review will partners The

3) - (1

Nº category 3) - (1

WPs RISK CONTINGENCY PLAN CONTINGENCY PLAN MITIGATION

RISK RISK Risk Risk Impact

Likelihood

Risk Management Register: Register: Management Risk . 1 Table risks related dissemination & Management

Plan Communication EUROBENCH D8.3

17

10

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

dedicated to Dissemination activities, Communication Communication activities, Dissemination to dedicated

directly allocated to perform the the perform to allocated directly

different Tasks fully fully Tasks different : impact the maximise to actions

from indirect costs or own resources will be be will resources own or costs indirect from

addition, EUROBENCH includes a s a includes EUROBENCH addition, ignificant set of of set ignificant

WP8 activities Project

situation. If needed, extra budget comin budget extra needed, If situation. g g

that guarantee relevant connections and channels. In In channels. and connections relevant guarantee that

, , of awareness R9 Medium 2 2

users will be intensify to counteract the the counteract to intensify be will users - end

etc. most of them affiliated to international Committees Committees international to affiliated them of most etc.

WP2 public of Lack

projects, testing facilities, stakeholders and and stakeholders facilities, testing projects,

industrial partners, end users, standardization partners, partners, standardization users, end partners, industrial

Dissemination activities and contact with with contact and activities Dissemination

The network is diverse and includes leading scientists, scientists, leading includes and diverse is network The

problem.

related issue. related - IPR

experts in order to deal with the specific specific the with deal to order in experts

targeted market and deal with any any with deal and market targeted geographical each etc. liability, IPR,

High 3 1 WP8 R8 of the situation and make use of IPR IPR of use make and situation the of

Legal problems: problems: Legal the adequacy of protecting the Intellectual Property in in Property Intellectual the protecting of adequacy the

results will perform a preliminary evaluation evaluation preliminary a perform will results

The Project includes a task dedicated to the review of of review the to dedicated task a includes Project The

The Manager in charge of the affected affected the of charge in Manager The

failures. Earlier actions are encouraged to avoid this. avoid to encouraged are actions Earlier failures. review) reviewers detect major failures. major detect reviewers

severe corrective measures if reviewers detect major major detect reviewers if measures corrective severe WP1 (EC evaluation R7 launch severe corrective measures if if measures corrective severe launch High 3 1

The management structures are prepared to launch launch to prepared are structures management The of results Poor The management structures are are structures management The prepared to to prepared

agreement.

establish the terms of the consortium consortium the of terms the establish - re to

will call for an emergency meeting in order order in meeting emergency an for call will agreed. scope the affect not do

this proves improvements for results’ achievement and and achievement results’ for improvements proves this execution control level, the Project Coordinator Coordinator Project the level, control - of - out

adaptations and modifications to the project execution if if execution project the to modifications and adaptations WP1 planning R6 reached. If the situation should arrive to an an to arrive should situation the If reached. Medium 2 2

allow changes and it is designed to permit permit to designed is it and changes allow on Changes order to ensure that project objectives are are objectives project that ensure to order smooth

The structure of the management of the project will will project the of management the of structure The uest any corrective actions in in actions corrective any uest req and plan

working groups will reschedule the work work the reschedule will groups working

The Project Coordinator together with the the with together Coordinator Project The

targets. and progress the

deliverables

meetings will be held to ensure partners are clear on on clear are partners ensure to held be will meetings

delay in in delay the terms of the consortium agreement. consortium the of terms the

of deliverables. Regular checks and WP and technical technical and WP and checks Regular deliverables. of

WP1 and/or partners R5 emergency meeting in order to re to order in meeting emergency Low 2 1 establish establish -

goals, objectives, requirements, and quality standards standards quality and requirements, objectives, goals,

performance of of performance Project Coordinator will call for an an for call will Coordinator Project The

areas of the project closely against the project plan, plan, project the against closely project the of areas

- Non

The project coordinator will monitor the progress in all in progress the monitor will coordinator project The

Plan Communication EUROBENCH D8.3

17

11

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

financing + previous interim interim previous + financing - pre with achieved

, ,

(interim payments will be done if 90% has not been been not has 90% if done be will payments (interim

To be discussed with discussed be To High 3 3 flow - Cash R25 PO.

WP7

Because of the limitations established in the G.A. G.A. the in established limitations the of Because

M48 in project the of completion full

and activities will be schedules to guarantee guarantee to schedules be will activities and

eriod will be reduces reduces be will eriod p development project

2 Action the the Action 2 - FSTP in happens delay the In

M36. by framework

timeline. full integration of the EUROBENCH EUROBENCH the of integration full

n the the n maintai will evaluator internal as acting consortium schedules in order to guarantee guarantee to order in schedules - re activities

delays proposal per evaluator will by assigned. Partners of the the of Partners assigned. by will evaluator per proposal period should be reduced and the planned planned the and reduced be should period

WP7 R24 Low 2 1

FSTP Committee and a maximum number of ten ten of number maximum a and Committee FSTP Evaluation FSTP month integration integration month - 6 the 1 - FSTP in planned

previously planned) will be appointed to be part of the the of part be to appointed be will planned) previously longer than than longer takes process evaluation the If

At least ten external experts (and not three as as three not (and experts external ten least At week. additional one just in conflict

immediately assigned in order to solve the the solve to order in assigned immediately

evaluation report a third expert will be be will expert third a report evaluation

come to a consensus regarding the the regarding consensus a to come

In addition, if assigned evaluators cannot cannot evaluators assigned if addition, In

(WP8). rates participation

Communication Actions will ensure the FSTP expected expected FSTP the ensure will Actions Communication

contingency plan contingency

beginning (Task 2.1) and Dissemination and and Dissemination and 2.1) (Task beginning

WP8 directly allocated to perform the the perform to allocated directly

In addition, addition, In involvement of stakeholders from the the from stakeholders of involvement

, , s action FSTP the from indirect costs or own resources will be be will resources own or costs indirect from

WP7 in participation R10 situation. If needed, extra budget coming coming budget extra needed, If situation. Medium 3 1

potential. expected FSTP

, , of rates Low users will be intensify to counteract the the counteract to intensify be will users - end

Support Letters) represent a preliminary analysis of the the of analysis preliminary a represent Letters) Support

WP2 projects, testing facilities, stakeholders a stakeholders facilities, testing projects, nd nd

their interest in participating to the the to participating in interest their s (see (see s action FSTP

Dissemination activities and contact with with contact and activities Dissemination

Partners and supporting projects and entities showing showing entities and projects supporting and Partners

Previous contacts and background of the EUROBENCH EUROBENCH the of background and contacts Previous

beginning. first very the from

the participation participation the users and stakeholders stakeholders and users - end relevant of

Testing Facilities. In addition, Task 2.1 will guarantee guarantee will 2.1 Task addition, In Facilities. Testing

Strategies and collaboration with other EU other with collaboration and Strategies contingency plan contingency and Projects -

Plan Communication EUROBENCH D8.3

17

12

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

benches can be be can benches test of set minimum

delays

implemented. This will ensure that at least a a least at that ensure will This implemented.

beginning in order to detect delays promptly. delays detect to order in beginning WP4 benches test

R13 Medium 2 2 version of the test benches will be be will benches test the of version

The Consortium will monitor the activities from the very very the from activities the monitor will Consortium The WP3, of manufacturing

In the case a delay is detected, simpler simpler detected, is delay a case the In

The design and and design The

ability).

T4.1)

definitions. protocol some is delays accept to able be previous benchmarking efforts (e.g. Motion Motion (e.g. efforts benchmarking previous

protocols (T3.1, (T3.1, protocols

defined, e.g. those already identified in in identified already those e.g. defined, will process This parallel. in activities iterative including WP4

exper R12 imental imental Low 1 2

experimental protocols into benchmarking tools, tools, benchmarking into protocols experimental WP3, on those scenarios and abilities more easily easily more abilities and scenarios those on

of of definition

plan is flexible in the process of turning turning of process the in flexible is plan work The benches will be initiated initiated be will benches - test and ms algorith

Delay in the the in Delay

The development of benchmarking benchmarking of development The

(T2.1)

communities. and committees

Support). of Letters (see activities survey initial the

several partners are chairs of international international of chairs are partners several

they formally agreed to collaborate in the project project the in collaborate to agreed formally they in stakeholders

WP2 R11 action has high probability of success, since since success, of probability high has action Low 2 1

entities, associations) have been already contacted and and contacted already been have associations) entities, and/or users - end

be involved in the definition of need. This This need. of definition the in involved be

Several potential stakeholders (companies, academic academic (companies, stakeholders potential Several of participation

Directs contacts of Consortium partners w partners Consortium of contacts Directs ill ill

Poor Poor

3) - (1

Nº category 3) - (1

WPs RISK CONTINGENCY PLAN CONTINGENCY PLAN MITIGATION

RISK RISK Risk Risk Impact

Likelihood

Risk Management Register: Register: Management Risk . 2 Table risks related - Research

d include Parties. Third with contract e th in

within the Working Group on Sustainability, and and Sustainability, on Group Working the within

IPR Parties Third R26 To be defined. be To High 3 2

methods produced by Thir by produced methods be defined defined be l wil Parties d

A plan for exploitation of IPR IPR of exploitation for plan A s and and s testbed specific or f

guarantee fund will be released) be will fund guarantee

the end of the project (when payment of balance and and balance of payment (when project the of end the

financing payment and the first interim payment until until payment interim first the and payment financing

payments), partners will probably receive only the pre the only receive probably will partners payments), WP1 -

Plan Communication EUROBENCH D8.3

17

13

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

system system share to

Development (TDD) methodology, so a set set a so methodology, (TDD) Development the and requirements functional of definition

Users reluctant reluctant Users

contractual relationship with the consortium, but also the the also but consortium, the with relationship contractual Driven Driven - Test follow will confidentiality, and

R18 Medium 2 2 WP6

Critical functionalities, such as data security security data as such functionalities, Critical users only not drive will confidentiality and Privacy

Parties. Third

developed by by developed description.

Parties.

benches benches benches will be included as a requireme a as included be will benches nt in the call call the in nt

different design will be asked to the Third Third the to asked be will design different

Maximum dimensions for test test for dimensions Maximum budget. allocated the with WP7 - test successful

Low 2 1 R17 facility, a a facility, corresponding the in included be

include all all include the of all Third Parties that can be financed financed be can that Parties Third all of solutions the WP5,

case that a test bench is excessively big to to big excessively is bench test a that case

considerable number of test benches, which should cover cover should which benches, test of number considerable to facilities

1 project monitoring, in the the in monitoring, project 1 - FSTP the During

available at IIT and CSIC is sufficient to host a a host to sufficient is CSIC and IIT at available space The e th at space

Lack of enough enough of Lack

discussion.

levels ability ability). Motion

international community, for their their for community, international

can be applied successfully to bipedal locomotion (e.g. locomotion bipedal to successfully applied be can WP4 quantifying

R16 questions that will be proposed to the the to proposed be will that questions Medium 3 1

benchmarks, already identified by the Consortium, which which Consortium, the by identified already benchmarks, WP3, on algorithms of

analysed and converted into scientific scientific into converted and analysed

The implementation activity will give priority on simple simple on priority give will activity implementation The performance Low

The causes of low performance will be be will performance low of causes The

waiting for ethical/recruitment. for waiting

procedures

activities. other the affect existing database, while while database, existing - pre on data of

permission permission

up to 6 months in human testing will not considerably considerably not will testing human in months 6 to up More resource will be dedicated to analysis analysis to dedicated be will resource More

WP4 Ethical to due

project, to obtain response before month 6. month before response obtain to project, R15 Low 1 1 of delay The

WP3, WP3, possible not are

the RRD institution. RRD the

processes will be initiated at the very beginning of the the of beginning very the at initiated be will processes

humans delay or or delay humans

already received ethical permissions from from permissions ethical received already

Ethical permissions for for permissions Ethical experiments, and recruiting recruiting and experiments,

Testing trials on on trials Testing

Testing will be perform be will Testing ed on tasks that that tasks on ed

s delay tasks. other on impact high

the availability of humanoids) can be postponed with no no with postponed be can humanoids) of availability the WP5 C - Reem the other humanoid platforms available at IIT. at available platforms humanoid other

R14 Low 1 2

Facility (e.g. I (e.g. Facility WP3, of manufacturing Initial testing trials will be performed on the the on performed be will trials testing Initial by (triggered T3.6 task The . COMAN) cub, -

Other huma Other The the IIT IIT the at available are platforms noid

manufactured

Plan Communication EUROBENCH D8.3

17

14

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

needed, delaying the software software the delaying needed, be could work additional for time on ready interfaces are early on implemented, and and implemented, on early are interfaces

with a lean model in whi in model lean a with unexpected that so specification the of description not is Software ch the required required the ch

WP6 R22 Medium 2 2

We consider this risk could be mainly due to a bad bad a to due mainly be could risk this consider We Benchmarking The software implementation is envisioned envisioned is implementation software The

constraints.

software

Benchmarking software software Benchmarking the to fit could that

Benchmarking Benchmarking

replacing them by equivalent algorithms algorithms equivalent by them replacing

Package. Work concerned WP6 Unified

them within compliant environments, or of of or environments, compliant within them

deployed into a a into deployed R21 Medium 3 1 all of specifications the within beginning the from WP4,

implementing implementing - re of possibility the consider

cannot be easily easily be cannot The algorithm module deployment will be considered yet yet considered be will deployment module algorithm The WP3,

the Benchmarking Software, we will will we Software, Benchmarking the

algorithms algorithms

modules cannot be easily embedded within within embedded easily be cannot modules

Benchmarking Benchmarking

specific benchmarking algorithms algorithms benchmarking specific If

available. not is reporting analytic time

model consortium experience will make up for the the for up make will experience consortium

and forecasting forecasting and on modelling. Consulting services based on on based services Consulting modelling. on task. following their easier make

data format requirements and data base structure to to structure base data and requirements format data WP6 analytic target R20 unformatted data can be used to get ahead ahead get to used be can data unformatted Low 1 2

Analytic modelling will drive the definition of a set of of set a of definition the drive will modelling Analytic reaching delay going to be considered, so previous, raw or or raw previous, so considered, be to going

strong strong or Failure consortium platforms and experience are are experience and platforms consortium

Information from other data bases and and bases data other from Information

product.

expected consideration, a licensed and a costless costless a and licensed a consideration, defined. been have budget

following a prioritized order. Also a conservative plan and and plan conservative a Also order. prioritized a following than higher 2 solutions will be always under under always be will solutions 2

development is to focus on functional availability, availability, functional on focus to is development WP6 unacceptably R19 investments. During the WP6 development, development, WP6 the During investments. m Mediu 3 1

level. One of the reasons for an incremental and iterative iterative and incremental an for reasons the of One level. are costs service and so are ways to avoid strong strong avoid to ways are so and service

The development cost should be kept in reasonable reasonable in kept be should cost development The Development frameworks, hardware and software as software and hardware frameworks, - a -

source software modules and and modules software source - Open

with anyone who requires it. requires who anyone with

acceptance test procedures can be shared shared be can procedures test acceptance

results feature. Security and confidential and Security feature. ity ity

benchmarking benchmarking implemented in order to probe the required required the probe to order in implemented

development of security assurance features. assurance security of development or detail of functional test are going to be define and and define be to going are test functional of

Plan Communication EUROBENCH D8.3

17

15

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

with other European projects (e.g. SciRoc, ROSin, ROSin, SciRoc, (e.g. projects European other with

also establishing joint actions actions joint establishing also are We topics. important

stimulating the submission of proposals on more more on proposals of submission the stimulating

in advance about the priorities of the framework, and and framework, the of priorities the about advance in

requirements

planning to have different Info Days, in order to inform inform to order in Days, Info different have to planning

the framework framework the Parties. Third by addressed not aspects

R28 Medium 2 2 WP7 in participating, and on what topics. We are also also are We topics. what on and participating, in

not covering all all covering not The Consortium will cover those important important those cover will Consortium The

groups are interested interested are groups which advance in know to website,

proposals proposals FSTP

“Declaration of Interest Form”, currently available in the the in available currently Form”, Interest of “Declaration

participating has been implemented, thorugh the the thorugh implemented, been has participating

A preliminary analysis of the Third Parties interested in in interested Parties Third the of analysis preliminary A

databases

issues. compatibility the advance

other different different other

tasks, starting ata month 6), in order to identify in in identify to order in 6), month ata starting tasks,

integration with with integration R27 WP6 created be will Database Internal An Medium 2 1

already ongoing (anticipated with respect to the WP6 WP6 the to respect with (anticipated ongoing already

compatibility and and compatibility

A specific analysis of the databases existing is is existing databases current the of analysis specific A

Software Software

and will propose countermeasures propose will and .

risk. this mitigate to help will Facilities will directly contact the FSTP participants participants FSTP the contact directly will

collaboration with other EU other with collaboration Projects and Testing Testing and Projects - minimum thresholds, Evaluation Committees Committees Evaluation thresholds, minimum

quality expectations. Proper dissemination activities and and activities dissemination Proper expectations. quality s action FSTP is not a question a not is it contrary, the On of of

FSTP expected potential not just in number but also in in also but number in just not potential expected FSTP to proposals

WP7 R23 Low 2 1

no proposals are considered valid. considered are proposals no

Support submitted Letters) represent a preliminary analysis of the the of analysis preliminary a represent Letters)

criteria will be reviewed if if reviewed be will criteria ese th so, that’s their interest in participating to the the to participating in interest their of quality Low s (see (see s action FSTP

the problem is not the evaluation criteria. If If criteria. evaluation the not is problem the Partners and supporting projects and entities showing showing entities and projects supporting and Partners

analyse the reasons in order to be sure that that sure be to order in reasons the analyse Previous contacts and background of the EUROBENCH EUROBENCH the of background and contacts Previous

INN and the Evaluation Committee will will Committee Evaluation the and INN

the other features. other the

still be usable to permit the evalua the permit to usable be still tion of of tion

aligned. jointly are requirements

in some functionalities, the system could could system the functionalities, some in

effort in other WP, which help to make sure all all sure make to help which WP, other in effort

evaluation targeted functionality. If a delay is observed observed is delay a If functionality. targeted

The system specification is coordinated with the similar similar the with coordinated is specification system The

external external progressively implemented to reach the the reach to implemented progressively

internal & & internal the core of the functionalities is is functionalities the of core the delivery.

Plan Communication EUROBENCH D8.3

17

16

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

order to order apply Abilities. System of definitions suitable find

with other Euro other with doesn’t MAR created and discussed with the community. the with discussed and created in ERL) (e.g. entities nd a projects an pe

WP2 R31 Medium 1 2

workshops (e.g. the last workshop at ERF 2018), also also 2018), ERF at workshop last the (e.g. workshops the in defined as s defin s e abiliti System New tions will be be will tions i

We are discussing this aspect in international forum and and forum international in aspect this discussing are We abilities System

the same time ensuring the creativity of proposals. of creativity the ensuring time same the testbeds

replicated. not and

replicability of test beds, as well as integrability, while at at while integrability, as well as beds, test of replicability WP5 of replicability R30 Medium 2 2

Test beds will be used only in the facilities, facilities, the in only used be will beds Test

We are designing modular elements that should ensure ensure should that elements modular designing are We of Lack

Robmosys), to cover all important aspects. important all cover to Robmosys),

Plan Communication EUROBENCH D8.3

17

17

research and innovation program under grant agreement No 779963 No agreement grant under program innovation and research

2020 Horizon Union’s European the from funding received has project This

project. the of execution the during consortium the for reference

will serve as a a as serve will it , established been has EUROBENCH for plan management risk l initia he t that Now

. Project EUROBENCH

hnical work carried out in in out carried work hnical tec the to relate that risks technical specific more as also but risks,

ied as general management management general as ied classif be can risks The deliverable. this writing of time the at foreseen

with the main risks risks main the with along methodology, management risk its introduced has deliverable This

Conclusion 4