Infrastructure Projects

Last updateJuly, 2020 Milestone 1: Award TRANSACTION

HYDROCARBONS

Massive use of Natural Gas Central and Southern Peru Status: (USD 200 Million) The estimated award The project comprises the design, financing, construction, operation is expected during the and maintenance of the natural gas distribution pipeline networks in 2nd semester 2020. seven (7) ´s Center and South, and their transfer to the Peruvian State at the end of the concession period.

RAILWAYS

Huancayo - Huancavelica Railway Status: (USD 227 Million) The estimated award The project consists on the rehabilitation and improvement of the is expected during the – Huancavelica railroad, it comprises he design, finance, 2nd semester 2020. works execution, acquisition of rolling stock materials, operation and maintenance. ELECTRICITY

138 KV - Iberia Transmission Line and 20/60/23 KV of 100 MVA Valle del Chira Substation (USD 27 Million) The purpose of the transmission line, of simple circuit and 160 km Status: in length, is to supply electricity to the city of Iberia, as well as the The estimated award population and industrial loads of the zone, with energy coming from the National Interconnected Electric Grid (SEIN, by its acronym in is expected during the Spanish). As part of the project, the Puerto Maldonado substation 2nd semester 2020. must be expanded, to complete the connection cells of the existing transformer and to install the exit bay of the Puerto Maldonado- Iberia line. Likewise, the project aims to provide relatability to the energy provision in the department of . STRUCTURE

ELECTRICITY

500 KV Piura Nueva Frontera Substation Transmission Line (USD 112 Million) Status: The Comprehensive Peru-Ecuador Interconnection Project includes the construction of a 500 kW Transmission Line that will link the The estimated award Chorrillos Substation in Ecuador with the La Niña Substation in is expected during the Peru (The Line). The Line includes the construction of two new 2nd semester 2020. midway substations: Pasaje Substation in Ecuador and Piura Nueva Substation in Peru.

ROADS

Longitudinal de la Sierra Road - Tranch IV Status: (USD 464 Million) The estimated award The project consists on the rehabilitation and upgrade works of 117 is expected during the km of roads, the regular initial maintenance of 280 km of roads and 1st semester 2021. the operation and continuous maintenance of 970 km of roads in order to conserve the highway at established levels of service. HEALTH

Two new high complexity hospital (ESSALUD) Status: (USD 254 Million) The estimated award The projects consist of the design, construction, equipment, operation and is expected during the maintenance of supplementary services (gray coats) of Highly Specialized 2nd semester 2020. Hospitals for the Social Security System of Peru (ESSALUD); one will be located in the department of Piura and the other in Ancash.

SANITATION AND WATER SYSTEM

Status: Puerto Maldonado’s new wastewater treatment plant The estimated award (USD 20 Million) is expected during the The project will consist in the financing, construction, operation and 1st semester 2021. maintenance of a wastewater installation in Puerto Maldonado.

Headwaters and pipeline works for ’s potable water supply (USD 720 Million) The project consists on the Design, financing, construction, operation and Status: maintenance of the following new works: (i) Expansion of Pomacocha The estimated award and Huallacocha Bajo reservoirs (to 90 MMC), (ii) Captchment channels is expected during the (12 km), (iii) Trans-Andean tunnel (10 km), (iv) Huachipa II Water Treatment Plant (5m3/s), (v) Additional reservoirs (137,000 m3), (vi) 2nd semester 2020. South branch line (40 km) inc. 7 reservoirs, and (vii) Interconnecting Lines (90 km). Includes the O&M of the following existing facilities: (i) Huachipa water up-take, (ii) Huachipa I Plant (5 m3 /s), and (iii) North branch line (27 km) incl. 4 reservoirs. FORMULATION

ELECTRICITY

220/60 KV Chincha nueva substation and 220/60 KV Nazca Status: nueva substation The estimated award (USD 41 Million) is expected during the This projects aim to provide relatability to the energy provision in the 2nd semester 2020. department of Ica.

COMMUNICATIONS

Radio spectrum bands: (I) 1 750 – 1 780 MHZ and 2 150 – 2 180 MHZ; and (II) 2 300 -2 330 MHZ

Status: (USD 291 Million) The estimated award The project consists on the expand nationwide the development of is expected during the mobile broadband systems in the country, for technologies such as 4G, 5G, or higher. The AWS-3 and 2.3 GHz bands will offer better 2nd semester 2020. coverage characteristics and greater data capacity. Milestone 2: Interest Declaration STRUCTURE

ROADS

Status: Peripheral ring road Direct Award: 3rd (estimated USD 2,000 Million) quarter 2020. The project comprises of the construction of a highway of Competitive Scenario: approximately 33.2 km between Elmer Faucett Avenue, Canta 2nd quarter 2020. Avenue and Circunvalacion Avenue.

EDUCATION

High-performance schools: Coar Center Region Status: Direct Award: 4th (USD 58.74 Million) quarter 2020. The project will consist of the construction, implementation, Competitive Scenario: maintenance and operation of 4 high- performance schools (COAR) in the regions of Junín, Pasco, Huancavelica and . 3rd quarter 2021. FORMULATION

MINING

Algarrobo mining Project Status: (USD 350 Million) Direct Award: 4th The project will consist of the exploration, mining operation through quarter 2020. an underground mine and processing a mineralized deposit located Competitive Scenario: in the mining concessions Tambo Grande N° 4, Tambo Grande N° 1st quarter 2021. 5, Tambo Grande N° 9 and Tambo Grande N° 10, which form “El Algarrobo Project”.

EDUCATION

Schools at risk: Villa María del Triunfo Status: (USD 72 Million) Direct Award: 1st The project is located in the Villa María del Triunfo district, Lima, and semester 2021. would consist on the construction, implementation, maintenance Competitive Scenario: and operation of the complementary services in the Educational 2022. Public Centers of five schools at risk, which are located on Villa María del Triunfo. Schools at risk: Lima Metropolitana (USD 227 Million) Status: Direct Award: 1st The project is located in the Villa El Salvador and district, Lima, and would consist on the construction, semester 2021. implementation, maintenance and operation of the complementary Competitive Scenario: services in the Educational Public Centers of five schools at risk, 2022. which are located on Villa El Salvador and San Juan de Miraflores.

Schools at risk: Ate and Status: (USD 148 Million) Direct Award: 1st The purpose of the project is the construction, equipment, semester 2021. operation of the complementary services and maintenance of the Competitive Scenario: infrastructure, furniture, and equipment for educational institutions 2022. at risk in the districts of Ate and San Juan de Lurigancho in Lima.

SANITATION AND WATER SYSTEM

New wastewater treatment plant for Huancayo, El Tambo Status: and Chilca Direct Award: 2nd (USD 90 Million) quarter 2021. The project consists in the construction of a new treatment plant Competitive Scenario: of 80,700 m3/h capacity, the installation of 4 stations for water 1st quarter 2022. pumping among other infrastructure. Status: New wastewater treatment plant for Chincha Direct Award: 4th (USD 35 Million) quarter 2021. The project consists in the Improvement of water service and Competitive Scenario: creation of sanitary sewerage in San Luis CC.PP., District of El 2nd quarter 2022. Carmen - Chincha – Ica.

New wastewater treatment plant for Tarapoto Status: (USD 27 Million) Direct Award: 4th The project consists in design and construction of sanitary quarter 2021. infrastructure (Interceptors, Pumping Stations, Wastewater Competitive Scenario: Treatment Plant and Emitter) and the operation and maintenance of 2nd quarter 2022. a wastewater treatment plant in the city of Tarapoto. If you need further information, contact us Milagros Maraví Partner Administrative and Regulatory Practice Area [email protected] (+51) 999 497 257

Andrés Kuan-Veng Partner Corporate and Finance Practice Area [email protected] (+51) 997 552 266

Carlos Arata Partner Corporate and Finance Practice Area [email protected] (+51) 951 029 069

Daniela García Belaunde Partner Natural Resources: Energy Practice Area [email protected] (+51) 998 698 479 #RubioMovingForward