Infrastructure Projects

Last update September, 2020 Milestone 1: Award TRANSACTION

HYDROCARBONS

Masification Of The Use Of Natural Gas - Distribution Of Natural Gas Through A Network Of Pipelines In The Regions Of Apurímac, , Huancavelica, Junín, , Status: And Ucayali The estimated award (USD 200 Million) is expected during The Project consists of the implementation of the indispensable the 3rd quarter 2020. infrastructure to provide the Natural Gas Distribution Service for the diverse users, in the regions of Apurímac, Ayacucho, Huancavelica, Junín, Cusco, Puno and Ucayali. The minimum infrastructure to be implemented, as part of the concession, in each city will be: (i) Main Reception and Regulation Station; (ii) High Pressure Steel Network; (iii) District Regulation Stations; and (iv) Medium Pressure Polyethylene Network.

Integrated Gas Transportation System, South Zone (Investment amount to be defined) Status: The project is framed within the energy policy called “Energy The estimated award Security” and includes a natural gas and natural gas liquids transport is expected during the system, which will provide security of supply to the users of the National Interconnected Electric System (SEIN) and to the users of 1st semester 2021. natural gas (NG) and natural gas liquids (LNG); as well as to provide coverage of NG and LNG supply for the users of the main cities of the southern area of Peru: Cusco, Apurimac, Puno, , and , and the “Southern Peru Energy Node in Mollendo and Ilo” (Puerto Bravo and Ilo Thermal Power Plants, respectively). RAILWAYS

Huancayo - Huancavelica Railway (USD 232 Million) Status: The estimated award The project consists on the rehabilitation and improvement of the – Huancavelica railroad, it comprises he design, finance, is expected during the works execution, acquisition of rolling stock materials, operation and 4th quarter 2020. maintenance.

ELECTRICITY

138 KV - Iberia Transmission Line and 20/60/23 KV of 100 MVA Valle del Chira Substation (USD 50,613,27 Million) Status: The purpose of the transmission line, of simple circuit and 160 km The estimated award in length, is to supply electricity to the city of Iberia, as well as the is expected during the population and industrial loads of the zone, with energy coming from the National Interconnected Electric Grid (SEIN, by its acronym in Spanish). 2nd quarter 2021. As part of the project, the Puerto Maldonado substation must be expanded, to complete the connection cells of the existing transformer and to install the exit bay of the Puerto Maldonado-Iberia line. Likewise, the project aims to provide relatability to the energy provision in the department of . Relevant dates: • The Payment of the Participation Right may be made until January 29, 2021. • The Presentation of the Qualification Application of the interested bidders will be received until February 3, 2021. • The Qualification Announcement will be made on March 2nd, 2021. • The presentation offers and the awarding of the project is estimated for April 07, 2021. STRUCTURE

ELECTRICITY

500 KV Piura Nueva Frontera Substation Transmission Line Status: (USD 163,502,301.00 Million) The estimated call for Interconnection Project of the electrical systems of Peru and tenders is expected Ecuador. It comprises the construction of a 500 kV Transmission Line of simple circuit with an approximate length of 263.2 km, during the 2nd which will begin its trajectory in the substation Piura Nueva 500 kV semester of 2020. and will culminate in the border point with Ecuador. The project also includes the expansion of the Piura Nueva substation.

ROADS

Status: Longitudinal de la Sierra Road - Tranch IV The estimated award (USD 280 Million) is expected during the The project consists on the rehabilitation and upgrade works of 117 2nd quarter 2021. km of roads, the regular initial maintenance of 280 km of roads and Call for Tenders Date: the operation and continuous maintenance of 970 km of roads in order to conserve the highway at established levels of service. 2nd semester 2020. HEALTH

Status: Two new hospitals: Piura and Chimbote (ESSALUD) The estimated award (USD 254 Million) is expected during the The projects consist of the design, construction, equipment, operation and 2nd quarter 2021. maintenance of supplementary services (gray coats) of Highly Specialized Call for Tenders Date: Hospitals for the Social Security System of Peru (ESSALUD); one will be 1st quarter 2021. located in the department of Piura.

SANITATION AND WATER SYSTEM

Status: Puerto Maldonado’s new wastewater treatment plant The estimated award is expected during the (USD 58 Million) 2nd quarter 2021. The project will consist in the financing, construction, operation and Call for Tenders Date: maintenance of a wastewater installation in Puerto Maldonado. 1st quarter 2021. Headwaters and pipeline works for ’s potable water supply (USD 60 Million) Status: The project consists on the Design, financing, construction, operation and The estimated award maintenance of the following new works: (i) Expansion of Pomacocha and Huallacocha Bajo reservoirs (to 90 MMC), (ii) Captchment channels is expected during the (12 km), (iii) Trans-Andean tunnel (10 km), (iv) Huachipa II Water 2nd quarter 2021. Treatment Plant (5m3/s), (v) Additional reservoirs (137,000 m3), (vi) Call for Tenders Date: South branch line (40 km) inc. 7 reservoirs, and (vii) Interconnecting Lines (90 km). Includes the O&M of the following existing facilities: (i) Huachipa 4th quarter 2020. water up-take, (ii) Huachipa I Plant (5 m3 /s), and (iii) North branch line (27 km) incl. 4 reservoirs. PRODUCTION

Ancon Industrial Park Status: Direct Award: 1st (USD 650 Million) semester 2021. The project comprises of the construction of a Industrial Park in Estimated call for Ancon, Lima. The modality is Asset Transfer and has a deadline of 30 years. Tenders Date: 2nd semester 2020. FORMULATION

ELECTRICITY

220/60 KV Chincha nueva substation and 220/60 KV Nazca nueva substation (USD 39,793,000.00 Million) Status: This project aims to provide a connection to strengthen the energy The estimated award supply in the region of Ica. The project includes the implementation of the main facilities and equipment of the 220/60 kV Chincha Nueva is expected during the substation and 220/60 kV Nazca Nueva substation 4th quarter 2020. Relevant dates: • The Payment of the Participation Right will be possible until October 13, 2020. • The Presentation of the Qualification Application of the interested bidders will be received until October 16, 2020. • The Qualification Announcement will be made on October 30, 2020. • The Presentation of offers and the awarding of the project will be made on November 30, 2020. COMMUNICATIONS

Status: Radio spectrum bands: (I) 1 750 – 1 780 MHZ and 2 150 – 2 180 MHZ; and (II) 2 300 -2 330 MHZ The estimated award is expected during the (USD 291 Million) 2nd quarter 2021. The project consists on the expand nationwide the development of Call for Tender Date: mobile broadband systems in the country, for technologies such as 4G, 5G, or higher. The AWS-3 and 2.3 GHz bands will offer better 4th Quarter 2020. coverage characteristics and greater data capacity. Milestone 2: Interest Declaration STRUCTURE

ROADS

Status: Peripheral ring road Direct Award: 2nd (estimated USD 2,049 Million) quarter 2021. Competitive Scenario: The project comprises of the construction of a highway of approximately 33.2 km between Elmer Faucett Avenue, Canta 4th quarter 2021. Avenue and Circunvalacion Avenue. Estimated Interest Declaration Date: 4th quarter 2020. EDUCATION

Status: High-performance schools: Coar Center Region Direct Award: 2nd (USD 60 Million) quarter 2021. The project will consist of the construction, implementation, Competitive Scenario: maintenance and operation of 4 high- performance schools (COAR) 4th quarter 2021. in the regions of Junín, Pasco, Huancavelica and Cusco. Estimated Interest Declaration Date: 4th quarter 2020. FORMULATION

MINING

Status: Algarrobo mining Project Direct Award: 2nd quarter 2021. (USD 350 Million) Competitive Scenario: The project will consist of the exploration, mining operation through 4th quarter 2021. an underground mine and processing a mineralized deposit located in the mining concessions Tambo Grande N° 4, Tambo Grande N° Estimated Interest 5, Tambo Grande N° 9 and Tambo Grande N° 10, which form “El Declaration Date: 4th Algarrobo Project”. quarter 2020.

EDUCATION

Status: Schools at risk: Villa María del Triunfo Direct Award: 2nd (USD 72 Million) semester 2021. Competitive Scenario: The project is located in the Villa María del Triunfo district, Lima, and 2022. would consist on the construction, implementation, maintenance and operation of the complementary services in the Educational Estimated Interest Public Centers of five schools at risk, which are located on Villa Declaration Date: 2nd María del Triunfo. quarter 2021. Schools at risk: Lima Metropolitana (USD 227 Million) Status: Direct Award: 2nd semester The project is located in the Villa El Salvador and district, Lima, and would consist on the construction, 2021.Competitive Scenario: implementation, maintenance and operation of the complementary 2022. Estimated Interest services in the Educational Public Centers of five schools at risk, Declaration Date: 2nd which are located on Villa El Salvador and San Juan de Miraflores. quarter 2021.

Schools at risk: Ate and Status: (USD 148 Million) Direct Award: 2nd semester 2021.Competitive Scenario: The purpose of the project is the construction, equipment, operation of the complementary services and maintenance of the 2022. Estimated Interest infrastructure, furniture, and equipment for educational institutions Declaration Date: 2nd at risk in the districts of Ate and San Juan de Lurigancho in Lima. quarter 2021.

Schools at risk: Comas - San Martin de Porre Status: (USD 95 Million) Direct Award: 2nd semester 2021.Competitive Scenario: The purpose of the project is the construction, equipment, operation of the complementary services and maintenance of the 2022. Estimated Interest infrastructure, furniture, and equipment for educational institutions Declaration Date: 2nd at risk in the districts of Comas and San Martin de Porres. quarter 2021.

SANITATION AND WATER SYSTEM

Status: New wastewater treatment plant for Huancayo, El Tambo Direct Award: 2nd semester and Chilca 2021.Competitive Scenario: (USD 165 Million) 1st semester 2022. Estimated Interest The project consists in the construction of a new treatment plant of 80,700 m3/h capacity, the installation of 4 stations for water Declaration Date: 2nd pumping among other infrastructure. quarter 2021. If you need further information, contact us Milagros Maraví Partner Administrative and Regulatory Practice Area [email protected] (+51) 999 497 257

Andrés Kuan-Veng Partner Corporate and Finance Practice Area [email protected] (+51) 997 552 266

Carlos Arata Partner Corporate and Finance Practice Area [email protected] (+51) 951 029 069

Daniela García Belaunde Partner Natural Resources: Energy Practice Area [email protected] (+51) 998 698 479

Franco Soria Partner Real Estate, Land Remediation and Land Titling [email protected] (+51) 995 065 425 #RubioMovingForward