Cable Tray Manual Cable Tray Manual 2014 CABLE TRAY MANUAL Based on the 2014 National Electrical Code®† Cable Tray Manual Tray Cable ®† Mark shown is the property of its respective owner. B-Line series Cable Tray Systems MAN-1 Eaton Cable Tray Manual Table of Contents Page No. Introduction ........................................................................................................................................................................................................ MAN-3 Why Cable Tray? Safety ................................................................................................................................................................................................ MAN-4 Dependability .............................................................................................................................................................. MAN-4 – MAN-5 Space Savings ................................................................................................................................................................................. MAN-5 Cost Savings ............................................................................................................................................................... MAN-5 – MAN-8 An In-depth Look at the 2011 NEC®, Section 392 Types of Cable Trays (NEC® 392.1 Scope) ................................................................................................. MAN-9 – MAN-10 EMI/RFI Cable Tray ...................................................................................................................................................................... MAN-10 Cable Tray Materials .................................................................................................................................................................... MAN-11 392.2 Definition of Cable Tray System .............................................................................................................................. MAN-11 392.10 Uses for Cable Tray ............................................................................................................................. MAN-11 – MAN-16 (A) Wiring Methods and Cable Types ..................................................................................... MAN-12 – MAN-13 (B) Industrial Usage ......................................................................................................................... MAN-13 – MAN-14 (1) Single Conductor Cable ............................................................................................... MAN-13 – MAN-14 (2) Medium Voltage Cable ........................................................................................................................ MAN-14 (C) Hazardous (Classified) Locations ...................................................................................... MAN-14 – MAN-16 (D) Usage of Nonmetallic Tray ............................................................................................................................ MAN-16 392.12 Uses Not Permitted ................................................................................................................................................... MAN-16 392.18 Cable Tray Installation ........................................................................................................................ MAN-16 – MAN-20 (A) Complete System ..................................................................................................................... MAN-16 – MAN-18 (B) Completed Before Installation .................................................................................................................... MAN-18 (C) Covers ..................................................................................................................................................................... MAN-19 (D) Through Partitions & Walls ............................................................................................................................ MAN-19 (E) Exposed & Accessible ..................................................................................................................................... MAN-19 (F) Adequate Access ............................................................................................................................................... MAN-19 (G) Raceways, Cables, Boxes, and Conduit Bodies Supported from Cable Tray Systems ......................................................................................................... MAN-19 – MAN-20 392.20 Cables and Conduit Installation ................................................................................................... MAN-21 – MAN-22 (A) Multiconductor Cables, 600V or less ...................................................................................................... MAN-21 (B) Cables Rated over 600V ................................................................................................................................ MAN-21 (C) Connected in Parallel ............................................................................................................... MAN-21 – MAN-22 (D) Single Conductor ............................................................................................................................................... MAN-22 392.22 Number of Conductor of Cable ................................................................................................... MAN-23 – MAN-26 392.30 Securing and Supporting Cables and Conductors ..................................................................................... MAN-26 392.46 Bushed Conduit and Tubing ................................................................................................................................... MAN-27 392.56 Cable Splices ................................................................................................................................................................. MAN-27 392.60 Grounding and Bonding ................................................................................................................... MAN-28 – MAN-31 392.80 Ampacity of Conductors ................................................................................................................. MAN-31 – MAN-33 392.100 Construction Specifications ........................................................................................................ MAN-33 – MAN-35 (A) Strength and Rigidity ............................................................................................................... MAN-33 – MAN-35 (B) Smooth Edges .................................................................................................................................................... MAN-35 (C) Corrosion Protection ........................................................................................................................................ MAN-35 (D) Siderails .................................................................................................................................................................. MAN-35 (E) Fittings ..................................................................................................................................................................... MAN-35 (F) Nonmetallic Cable Tray .................................................................................................................................... MAN-35 Cable Tray Wiring System Design and Installation Hints ........................................................................................ MAN-36 Cable Tray Manual Tray Cable Cable Tray Accessories ............................................................................................................................................................. MAN-37 Fireproofing Tray ........................................................................................................................................................................... MAN-37 Cable Tray Maintenance & Repair ....................................................................................................................................... MAN-37 Expansion and Contraction ............................................................................................................................ MAN-38 – MAN-39 Appendix Index & Appendix Sheets ...................................................................................................................... MAN-40 – MAN-47 Cable Tray Sizing Flowchart ......................................................................................................................................... MAN-48 – MAN-49 Cable Tray Installation & Specification Checklists ......................................................................................... MAN-50 – MAN-51 Footnotes ........................................................................................................................................................................................................... MAN-52 Eaton MAN-2 B-Line series Cable Tray Systems Cable Tray Manual INTRODUCTION The B-Line series Cable Tray Manual was produced by our technical staff. We recognize the need for a complete cable tray reference source for electrical engineers and designers. The following pages address the 2014 National Electrical Code® requirements for cable tray systems as well
Recommended publications
  • Best Practice Guide to Cable Ladder and Cable Tray Systems
    Best Practice Guide to Cable Ladder and Cable Tray Systems Channel Support Systems and other Associated Supports November 2012 BEAMA Best Practice Guide to Cable Ladder and Cable Tray Systems Including Channel Support Systems and other Associated Supports Companies involved in the preparation of this Guide Contents INTRODUCTION 5 DEFINITIONS AND ABBREVIATIONS 6 1. Packing Handling and Storage 8 1.1 General Packing and Handling 8 1.2 Loading and offloading recommendations 9 1.3 Storage 11 2A. Installation of the system 12 2.1 Common tools for Installation 12 2.2 Structural characteristics 12 2.3 Support Systems 18 2.4 Straight cable ladder and cable tray lengths 29 2.5 Coupler types (refer to manufacturer’s literature) 32 2.6 Fixings 36 2.7 Fittings 36 2.8 Accessories 39 2.9 Site modification 39 2.10 Earth protection and EMC 40 2B. Installation of Cable 41 2.11 Preparation 41 2.12 Wiring Regulations 41 2.13 Power Cables 41 2.14 Data Cables 46 2.15 Expansion 46 2.16 Electro Mechanical Effects 46 3. Environment 48 3.1 Selecting the right material and finish 48 3.2 Finishes 56 3.3 Non-Metallic systems 61 3.4 Loadings 63 3.5 Temperature 65 4. Health & Safety 67 5. Maintenance 68 5.1 Inspection 68 5.2 Removal of cables 68 5.3 On site repairs 68 6. Sustainability 69 6.1 Sustainable development 69 6.2 REACH regulations 69 6.3 The management of WEEE and RoHS 69 6.4 Environmental footprint 70 7. Applicable Standards 71 Companies involved in the preparation of this Guide 72 FIGURES Figure 1: Methods of removal 9 Figure 2: Loaded beams 13 Figure
    [Show full text]
  • New Microsoft Excel Worksheet (2).Xlsx
    Knowledge Assessment ( Written Test) QP Name - Assistant electrician QP Code:CON/Q0602 Total marks: 210 marks Duration: 90 minutes Each NOS carries 30 marks Infrastructure: Classroom, Benches, Pens, pencils Marks CON/N0602: Select and use hand tools, power tools, and electrical devices relevant to construction electrical works 1 Which device is used to measure current in a circuit? 4 a. Voltmeter b. Ammeter c. Tester d. Megger 4 2 Identify the item form the image below? a. Wattmeter b. Digital Multi meter c. Energy meter d. Analog multi meter 3 Which device is used to avoid overload current in a circuit? 4 a. Residual current circuit breaker b. Miniature circuit breaker c. Earth Leakage circuit breaker d. Molded Case circuit breaker 4 Identify the tool form the image below? 4 a. Channel loch plier b. Combination plier c. Nose plier d. Snippers 5 Which of the following is an ideal instrument used to measure the thickness of conduit? 4 a. Vernier Caliper b. Multi meter c. Measuring tape d. Total station 6 Identify the item form the image below? 5 a. Semi enclosed or re-wire able fuse b. Cartridge type fuse c. D type fuse d. Link type fuse 7 Which of the following tools is used to strip the insulation of cable? 5 a. Plier b. Scissor c. Splicer d. Tester CON/N0603: Install temporary lighting arrangement at construction sites Marks 8 What is the maximum number of 1sq.mm wires that can be drawn through a 25mm diameter conduit 4 a. 5 b. 2 c. 4 d.
    [Show full text]
  • Guidance Notes on Recommended Specifications of Junction Box and Cable Tray for Offshore Application
    Guidance Notes on Recommended Specifications of Junction Box and Cable Tray for Offshore Application GUIDANCE NOTES ON RECOMMENDED SPECIFICATIONS OF JUNCTION BOX AND CABLE TRAY FOR OFFSHORE APPLICATION FEBRUARY 2018 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2018 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA Foreword Foreword These Guidance Notes provide ABS recommendations for the design and construction of cable trays and junction boxes. These Guidance Notes are applicable to fixed and floating offshore structures as well as drilling units. These Guidance Notes provide recommendations and best practices for standard specifications of certain electrical and instrumentation components thus improving cost efficiency (i.e., design man-hours, operation and maintenance costs), and increasing predictability of operation without compromising quality and safety in offshore structures and units. The recommendations in these Guidance Notes are based on industrial experiences, project experience, shipyard practices, manufacturer’s data sheets, national regulations, international standards, and ABS Rules. These Guidance Notes become effective on the first day of the month of publication. Users are advised to check periodically on the ABS website www.eagle.org to verify that this version of these Guidance Notes is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to [email protected]. Terms of Use The information presented herein is intended solely to assist the reader in the methodologies and/or techniques discussed. These Guidance Notes do not and cannot replace the analysis and/or advice of a qualified professional.
    [Show full text]
  • Guideline on Through Penetration Firestopping
    GUIDELINE ON THROUGH-PENETRATION FIRESTOPPING SECOND EDITION – AUGUST 2007 SHEET METAL AND AIR CONDITIONING CONTRACTORS’ NATIONAL ASSOCIATION, INC. 4201 Lafayette Center Drive Chantilly, VA 20151-1209 www.smacna.org GUIDELINE ON THROUGH-PENETRATION FIRESTOPPING Copyright © SMACNA 2007 All Rights Reserved by SHEET METAL AND AIR CONDITIONING CONTRACTORS’ NATIONAL ASSOCIATION, INC. 4201 Lafayette Center Drive Chantilly, VA 20151-1209 Printed in the U.S.A. FIRST EDITION – NOVEMBER 1996 SECOND EDITION – AUGUST 2007 Except as allowed in the Notice to Users and in certain licensing contracts, no part of this book may be reproduced, stored in a retrievable system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of the publisher. FOREWORD This technical guide was prepared in response to increasing concerns over the requirements for through-penetration firestopping as mandated by codes, specified by system designers, and required by code officials and/or other authorities having jurisdiction. The language in the model codes, the definitions used, and the expectations of local code authorities varies widely among the model codes and has caused confusion in the building construction industry. Contractors are often forced to bear the brunt of inadequate or confusing specifications, misunderstandings of code requirements, and lack of adequate plan review prior to construction. This guide contains descriptions, illustrations, definitions, recommendations on industry practices, designations of responsibility, references to other documents and guidance on plan and specification requirements. It is intended to be a generic educational tool for use by all parties to the construction process. Firestopping Guideline • Second Edition iii FIRE AND SMOKE CONTROL COMMITTEE Phillip E.
    [Show full text]
  • Fire Protection Guide for Electrical Installations
    Fire protection guide for electrical installations Building Connections Table of contents In the second edition of this fire protection guide, we have again compiled lots of useful information. The in- terconnections of fire protection between different types of technical building equipment are now ex- plained in even more detail. Perhaps you will find some new information in this edition which can help you in the planning and implementation of fire protec- tion systems. BSS Brandschutzleitfaden für die Elektroinstallation / en / 2019/03/22 08:28:10 08:28:10 (LLExport_04692) / 2019/03/22 08:28:13 2 Table of contents Fire protection guide for electrical installations Table of contents 1 General introduction 7 1.1 Construction law 12 1.2 The four pillars of fire protection 18 1.3 Construction products 26 1.4 Fire protection concepts 32 2 Maintenance of the fire sections – protection aim 1 36 2.1 Components closing rooms – firewalls 36 2.2 Requirements for cable penetrations - insulation 36 2.3 Proofs of usability 39 2.4 Construction types of cable and combination insulation 42 2.5 Applications and special applications 52 2.6 Selection aid and OBO Construct BSS 60 2.7 Building in old buildings 62 2.8 Cable bandages 65 3 Protection of escape routes – protection aim 2 75 3.1 What is an escape and rescue route? 75 3.2 Installations in lightweight partitions 78 3.3 Installation in false ceilings 80 3.4 Installations in underfloor systems 91 3.5 Shielding with plate material 93 3.6 Cable routing in fire protection ducts 94 4 Maintaining the electrical
    [Show full text]
  • Commercial Conduit Rules and Regulations
    Exhibit C – Commercial Conduit Rules and Regulations Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATIONS S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies C-1 Exhibit C – Commercial Conduit Rules and Regulations 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875 Phone: (352) 351-6620 Fax: (352 ) 401-6961 Electric Engineering Division Dear Developer: Over the next few months, the City of Ocala Utility Services (OUS) will be working closely with you and your contractors to install the electrical conduit system for your project. We in the Electric Engineering Division are looking forward to working with your contractors and want the installation to proceed as smooth as possible. Attached, please find the OUS Commercial Conduit Rules and Regulations for use by your electrical conduit contractor. If the contractor has any questions that are not addressed in this guide, please contact the OUS representative responsible for the project. Respectfully Ocala Utility Services Engineering Division C-2 Exhibit C – Commercial Conduit Rules and Regulations TABLE OF CONTENTS i. LETTER TO DEVELOPER ........................................................................................... 2 I. RULES AND REGULATIONS A. TABLE OF CONTENTS ....................................................................................... 3 B. TERMS AND DEFINITIONS ............................................................................... 4 C. DEVELOPER’S RESPONSIBILITIES ...............................................................
    [Show full text]
  • Section 16050 - Basic Electrical Materials and Methods
    Revised 10/03/19 SPECIFICATIONS - DETAILED PROVISIONS Section 16050 - Basic Electrical Materials and Methods C O N T E N T S PART 1 - GENERAL ............................................................................................................................. 1 1.01 SCOPE ........................................................................................................................................ 1 1.02 RELATED SECTIONS ................................................................................................................... 1 1.03 STANDARDS AND CODES ......................................................................................................... 1 1.04 SUBMITTALS ............................................................................................................................. 3 1.05 COORDINATION OF WORK AND TRADES ................................................................................ 4 1.06 DELIVERY, STORAGE, AND HANDLING……………………………………………………………………………….. 5 PART 2 - PRODUCTS .......................................................................................................................... 5 2.01 GENERAL ................................................................................................................................... 5 2.02 CONDUCTORS AND CABLES ..................................................................................................... 6 2.03 CONDUCTOR AND CABLE CONNECTORS ................................................................................
    [Show full text]
  • Power Distribution and Grounding of Audio, Video And
    Integrating Electronic Equipment and Power into Rack Enclosures Optimized Power Distribution and Grounding for Audio, Video and Electronic Systems MAIN PANEL SUB PANEL (optional) Grounding Conductor Grounded Conductor (neutral) Ground Bar Neutral & Ground Bar Neutral (On insulators) Technical (isolated) Grounded Conductor “single-point” ground bar (Neutral & Ground on insulators combined) Enclosure From Technical (isolated) ground wire terminated Transformer in main panel only (no connection to sub panel ground) Building ground wire or conduit Isolated ground outlet conventional outlet Rev. 4b Table of Contents Preface ........................................................................................................................... 1 Neutral-Ground reversals .............................................................................................. 30 A Note about Signal Paths .............................................................................................. 2 Steps to Troubleshoot Bootleg Grounds and Neutral-Ground Reversals ....................... 32 Ground Loops and Signal Interconnections .................................................................... 2 Auxiliary Ground Rods ................................................................................................... 34 Signal Wiring: Unbalanced & Balanced Interfaces .......................................................... 3 Intersystem Bonding (Cable TV, Satellite TV, Telephone) ............................................. 35 AC Magnetic Fields
    [Show full text]
  • Specification 270528 Interior Communications Pathways
    GUIDELINES HAS/PDC/Design Division Project Title Houston, Texas Proj./CIP No. (These Guidelines are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer/Contractor/Installation Team.) SECTION 270528 INTERIOR COMMUNICATION PATHWAYS (REV.01-23-2020-SJS) PART 1 GENERAL 1.01 PROJECT SCOPE SUMMARY Designer shall provide a detailed narrative/scope of the tasks to be performed under this specification sections. 1.02 SECTIONS INCLUDES A. This section includes specifications for the installation of interior communications pathways. B. Related Documents: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division - 1 Specification sections, apply to the work of this section. C. Interior Communication Pathways are defined to include, but are not limited to innerduct, flexible multi-cell innerduct, conduit, pull boxes, cable/j-hooks, cable trays, supports, accessories, associated hardware and fire stopping materials. 1.03 REFERENCES A. Related Sections: Use these Specifications for all related work not specifically covered in this specification. 1. Section 270526: Telecommunication Grounding and Bonding 2. Section 270543: Exterior Communication Pathways 3. Section 270553: Identification and Labeling of Communication Infrastructure 4. Section 271100: Communication Cabinets and Equipment Rooms 5. Section 271300: Backbone and Riser Media Infrastructure 6. Section 271500: Horizontal Media Infrastructure 7. Section 272100: Data Communication Network Equipment 8. Section 272200: PC, Laptop, Servers and Equipment 9. Section 275113: Audio Communication System 10. Section 281300: Access Control System 11. Section 232313: Video Surveillance Control and Management System B. American National Standards Institute / Telecommunications Industry Association / Electronic Industries Alliance (ANSI/TIA/EIA): Most current standard revision 1.
    [Show full text]
  • Installation Guide
    Installation Preparation of the hood for installation: To facilitate the installation it is recommended to remove the panel before installing the hood. Attention! Keep both hands on the panel when disassembling or reassembling it into place to prevent it from falling and causing damage to persons or property. Disassembly: - Pull the panel (FRONT SIDE) firmly down, - Push the small lever, located in the right side of the panel, to the left, - Unhook it from the rear joints. 8 Installation - Ducting version 1. Pre-installation calculations 2. Preparation of mounting surface K = Kitchen Height Installing supports above ceiling drywall. C = Counter Height (36" standard) P = Prefered Height of Hood Bottom above counter (Recommended 24”-30”) H = Hood height your installation H = K – C – P a) Select a hood preference height P that is comfortable for the user. (from 24” to 30“). b) Calculate Hood height your installation H = K-C-P. c) Confirm that H is within the range of min to max H found for your model (See “Dimensions and clearances” paragraph). If not adjust your installation. Note: Take into consideration the hood depth; the hood could be much deeper than the cooktop. a. Mark center lines of cooktop or range on ceiling above. Use centerlines marked on ceiling to position the mounting template. Note location of hood front (that indicated with a printed arrow), side, and mounting holes indicated on template. Note: Remember that printed arrow on template corresponds to front of the hood and consequently to side where control panels will be located at the end of installation) b.
    [Show full text]
  • Electrical Conduits
    Electric Level 5 Electrical Conduits What’s it all About? Electrical conduits refer to an electrical system used to protect and provide route of electrical wiring. Electrical conduits are made of metal, plastic, or fiber and could be rigid or flexible. Conduits must be installed by following standard regulations, as those provided by the manufacturer and the National Electrical Code (NEC). Keys to Remember • The 2017 NEC covers 12 types of conduits. Articles 342 through 362 specify use, installation, and construction specifications. • Fill rates, or how many wires can be put in the conduit, is covered in the 2017 NEC Annex C. • Sizing - Conduit tubing uses Outside Dimensions (OD); conduit piping uses Nominal Pipe Size (NPS). Sizes range from 3/8” to 6”. • With any wiring project, safety for people and property is most important. Any metallic conduit should be grounded/bonded to the electrical grounding system. For the Project • Material List with Costs • References • Diagrams • Planning and Research • Dimensions • Title and Labels • Pictures (if exhibiting a report or poster) • Record Sheet Nine Common Types of Electrical Conduit 1. Galvanized Rigid Conduit A conduit made from galvanized steel tubing is commonly referred to as a rigid conduit. The thickness of a galvanized rigid (GR) conduit protects the electrical wiring from being hit and allows it to be threaded. 2. Electrical Metallic Tubing An electrical metallic tubing (EMT) conduit is made of steel; in some cases aluminum is also used. EMT is cheaper than a galvanized rigid conduit and lighter than a GR conduit. EMT is also a very popular material because it can be bent to specific radius and directions.
    [Show full text]
  • Answer the Purpose: 4
    Page 26 1. CONDUCTORS Conductors are defined as materials that easily allow the flow of _________. Metals are _______ conductors while insulators are ______ . The 2 common metals used for conductors in the electrical trade are: ___________ and ______________. Aluminium has become more prevalent for larger C.S.A. conductors as it is cheaper and lighter but more brittle than copper. Current/ Copper/ Aluminium Thermoplastic-sheathed cable (TPS) consists of an outer toughened sheath of polyvinyl chloride (PVC) (the thermoplastic element) covering one or more individual cables which are PVC insulated annealed copper conductors. It is a commonly used type of wiring for residential and light commercial construction in many countries. The flat version of the cable with two insulated conductors and an uninsulated earth conductor all within the outer sheath is referred to as twin and earth. In mainland Europe, a round equivalent is more common. Flat cables (or festoon cables) are made in PVC and Neoprene and are used as trailing cables for cranes, open filed conveyors and shelve service devices. Flat cables offer the advantages of extremely small bending radius’s, high flexibility and minimum wastage of space. Thermoplastic-sheathed cable (TPS) consists of an outer toughened sheath of polyvinyl chloride (PVC) (the thermoplastic element) covering one or more individual cables which are PVC insulated annealed copper conductors. It is a commonly used type of wiring for residential and light commercial construction in many countries. The flat version of the cable with two insulated conductors and an uninsulated earth conductor all within the outer sheath is referred to as twin and earth.