Served Proposed Station(S)

Total Page:16

File Type:pdf, Size:1020Kb

Served Proposed Station(S) CURRENT PROPOSED ROUTE NAME JURISDICTION PROPOSED MODIFICATION STATION(S) STATION(S) SERVED SERVED Discontinue Service -N ew proposed Routes 21 and 99 would provide service along Jesse Hill Ave., Coca Cola Pl. and Piedmont Ave. segments. New proposed Route 99 would provide service along the Martin Luther King, Jr. Dr. segment. New proposed Routes 32 and 51 would provide service on Marietta St. between Forsyth St. and Ivan Allen Jr. Blvd. New proposed Route 12 would provide service on the Howell Mill Rd segment between 10th St. and Marietta Chattahoochee Ave.. New proposed Route 37 would provide service on Chattahoochee Ave. between Hills Ave. and Marietta Blvd and Marietta Blvd City of Atlanta, 1 Boulevard/Centennial between Bolton Dr. and Coronet Way. New proposed Routes 37 and 60 would provide service on Coronet Way between Marietta Blvd and Bolton Rd Georgia State Fulton County Olympic Park segments. Service will no longer be provided on Edgewood Ave. between Piedmont Ave. and Marietta St.; Marietta St. between Edgewood Ave. and Forsyth St.; Marietta St. between Ivan Allen, Jr. Blvd and Howell Mill Rd; Howell Mill Rd between Marietta St. and 10th St.; Huff Rd, Ellsworth Industrial Blvd and Marietta Blvd; Chattahoochee Ave. between Ellsworth Industrial Blvd and Hill Ave.; Bolton Pl., Bolton Dr.; Coronet Way between Defoors Ferry Rd and Moores Mill Rd, and Moores Mill Rd between Bolton Rd and Coronet Way. Proposed modification includes Route 2 operate from Inman Park station via Moreland Ave. (currently served by Route 6-Emory) Freedom Parkway and North Avenue, North Avenue City of Atlanta, 2 Ponce De Leon Avenue Ralph McGill Blvd (currently served by Route 16-Noble), continuing via Blvd,and North Ave. terminating at North Ave. Station. Service will no longer be Decatur & Station & Inman DeKalb County provided from Avondale Station along Ponce de Leon Ave. to Moreland Ave. Avondale Park Station Proposed modification includes maintaining current service from Hamilton E. Holmes Station along Martin Luther King Jr., Dr., Northside Dr., Fair St., Peters H.E. Holmes, Martin Luther King, Jr. City of Atlanta, H.E. Holmes and 3 St., Forsyth St. and Alabama St. terminating at Five Points Station. Service will longer be provided on Barfield Ave., Larchwood St., and Wynwood Dr.. West Lake and Drive Fulton County Five Points Addiitionally, Route 3 will longer serve MARTA's West Lake Station. Five Points McDonough Proposed modification includes maintining current service from Inman Park Station along Moreland Ave. and terminating at Constitution Rd. Service will no City of Atlanta, Five Points & Inman Park 4 Boulevard/Moreland longer be provided on Norwood Rd, Belhaven Lane, Haven St. and Villie St.. Additionally no service will be provided along Forest Park Dr., Redford Dr. and DeKalb County Inman Park Station Avenue Rebel Forest Dr. Service along McDonough Blvd Lindbergh Center Lindbergh Center Piedmont Road/Sandy City of Atlanta, Station and Station and 5 No proposed modification to current route. Springs DeKalb County Dunwoody Dunwoody Station Station Proposed modification includes maintinaing current service between Lindbergh Station and Briarcliff Rd at Ponce de Leon Ave. via the Emory Complex along City of Atlanta, Lindbergh Center Lindbergh Center Clifton Rd continuing along Ponce de Leon Ave. terminating at North Ave. Station. Service along Moreland Ave. and DeKalb Ave. into MARTA's Inman Park 6 Emory DeKalb County Station & Inman Station & North Station will be provided by proposed modification to Route 2-Ponce de Leon. No service will be provided on Moreland Ave. between Ponce de Leon and & Fulton County Park Station Avenue Station Freedom Parkway. Discontinue Service - Service on Second Ave. and all segments of McAfee Rd to Columbia Dr. will now be provided by proposed modification of Route 86. City of Atlanta & Service along the Shamrock Dr., Kennard Dr. and Green Forrest Dr. segment will be provided by proposed modifications to Route 186. Service along the Inman Park 7 McAfee Road DeKalb County Moreland Ave. segment will be provided by proposed modifications to Routes 4, 34, 74 and 107. Service along Glenwood Ave. segment will be provided by Station Route 107. Service will no longer be provided on Terry Mill Rd, Maynard Terrace and McPherson Ave. Discontinue Service - Service along the Valley Brook Rd segment will be provided by modifications to Route 75. Service along N. Druid Hills Rd segment Avondale Station 8 North Druid Hills Road DeKalb County between Clairmont Rd & Briarcliff Rd will be provided by modification to Routes 19 and 30. Service will no longer be provided along N. Druid Hills between & Brookhaven Lawrenceville Highway and Clairmont Rd, Briarcliff Rd, Sheridan Rd and Executive Park Dr., North Druid Hills Dr. to Briarwood Rd. Station Discontinue Service - Service to the Valley Ridge Dr. and Miriam Lane segment between Valley Ridge Dr. and Toney Dr. will be serviced by proposed modification to Route 186. Modifications to Route 74 will provide service to all segments on Flat Shoals Rd. The Memorial Dr. segment between Grant St. and Hill St. will be served by propsed modification of Route 21. Service on Martin Luther King, Jr Dr. segment between Jesse Hill, Jr Dr. and service between City of Atlanta, 9 Toney Valley Capitol Ave. and Mitchell St. to Five Points Station will be provided by modifications to Routes 32 & 55. Service will no longer be provided on the Pasley Ave., Five Points DeKalb County Braeburn Dr. and Clifton Rd, between Memorial Dr. and Hill St. to Glenwood Ave. and Moreland Ave., between Flat Shoals Rd and Keystone Dr. to Candler Rd. Additionally, no service will be provided on Lynda Pl., Sharon Way, Holly Hill Dr., Miriam Lane between Holly Hill Dr. and Toney Dr. between Candler Rd and Miriam Lane. Discontinue Service - Proposed modification of Route 26 would provide service on the Donald L. Hollowell Parkway segment, English Ave. segment, and Bankhead English Avenue/Atlanta City of Atlanta, Kennedy St. segment. Service on Northside Dr. between Martin Luther King, Jr. Dr. and Fair St. would be provided by proposed modification of Route 3. Station, Vine City 11 University Center Fulton County Service along Northside Dr. between Fair St. and McDaniel St. would be provided by proposed modification of Route 13. Service will no longer be provided on Station, and West Fox St., Paines Ave., Northside Dr. between Martin Luther King, Jr. Dr. and Kennedy St., Chapel St., Peters St. and Whitehall St. End Station Proposed modification includes Route 12 maintaining service along 10th St. between Midtown Station and Howell Mill Rd, Howell Mill Rd between 10th St. and West Wesley Rd, West Wesley Rd between Howell Mill Rd and Northside Dr. (current Route 44) and Northside Dr. between West Wesley Rd and City of Atlanta & 12 Howell Mill/Cumberland Northside Parkway (current Route 44). New service on Moores Mill Rd between Northside Parkway and Howell Mill Rd. Service will no longer be provided on Midtown Station Midtown Station Fulton County 10th St. segment between Howell Mill Rd and Brady Ave., Brady Ave., Howell Mill Rd segment between West Wesley Rd and Moores Milll Rd, and North Creek Office Park. Page 1 of 10 2/24/2010 CURRENT PROPOSED ROUTE NAME JURISDICTION PROPOSED MODIFICATION STATION(S) STATION(S) SERVED SERVED Proposed modification includes Route 13 providing service to West Lake Ave. from West Lake Station to Joseph E. Boone Blvd (current Route 58), Holly Rd (current Route 51), Eason St. (current Route 51), Ezra Church Dr. (current Route 51), Chappell Rd (current Route 51), Martin Luther King Jr., Dr. (current Route West Lake Station City of Atlanta & 3), continue current Route 13 neighborhood routing (Laurel Ave., Wellington St., Mims St., Matthewson Pl., Altoona Pl., Westview Dr., Hcurrenterness St., and West Lake and 13 Fair Street and Five Points Fulton County Fair St.), Northside Dr. between Fair St. and McDaniel St.. New service on McDaniel St. and Peters St. segment between McDaniel St. and Fair St.. New Route Five Points Station 3 will serve Martin Luther King Jr. Dr. between West Lake Ave. and Laurel Ave. Service will no longer be provided on West Lake Ave. between Browning St. and Martin Luther King Jr., Dr. Proposed modification includes maintaining current service from Decatur Station to Clevemont Rd and Clevemont Court with selected trips operating via the City of Atlanta & Gallery at South DeKalb. Additionally, selective trips will provide service along Hosea Williams Dr. and E. Lake Dr. currently served by Route 24, continuing 15 South DeKalb Decatur Station Decatur Station DeKalb County Oakview Dr. to Decatur Station operating the current Route 18 routing. Service to Clifton Springs Health Center will no longer be provided by Route 15, instead modifications to Route 114 will provide service to the Health Center. Discontinue Service - P roposal includes service along the Ralph McGill Blvd segment between Blvd and Freedom Parkway will be provided by modifications to City of Atlanta & Route 2. Service along Peachtree St. into Five Points will be provided by Route 110. The Briarcliff Rd segment between Clifton Rd and N. Druid Hills Rd will be 16 Noble Five Points DeKalb County provided by proposed modifications to Routes 6 & 30. Service will no longer be provided north of North Highland and Freedom Parkway to Briarcliff Rd and Clifton Rd. Additionally, service will no longer be provided on N. Druid Hills Rd, Executive Park Dr. and Sheridan Rd segments. Discontinue Service- P roposed modification to Route 55 will provide service on Hank Aaron Dr., Ridge Ave. and Weyman Ave. segments. Prosed modification Hank Aaron Drive / 17 City of Atlanta of Routes 21 and 19 will provide service to Grady Hospital and Piedmont Ave. and Jesse Hill Jr. Dr. Segments. Service will no longer be provided on Crew St., Georgia State Grady Hospital Little St., Pollard St., Pulliam St., Washington St., and Weyman Ave., Decatur Station, Candler Park City of Atlanta & Station, King 18 South Decatur Discontinue Service - Hosea Williams segment will be provided by Route 86; Grady Hospital will be serviced by Routes 21 & 99.
Recommended publications
  • W . Howard Avenue
    19 MONDAY THRU FRIDAY - DE LUNES A VIERNES l Times given for each bus trip from beginning to end of route. Read down for times at specific locations. Horarios para cada viaje de autobús desde el principio hasta el fin del trayecto. Lea los horarios para localidades específicas de arriba hacia a bajo. ño a 19 p s E n itsmarta.com / 404-848-5000 E 2104 Leave: - Salida: East Lake Station Decatur Station V. A. Hospital V. Arrive: - Llegada: Chamblee Station V. A. Hospital V. Clairmont Rd. & Rd. LaVista Clairmont Rd. & Hwy. Buford Leave: - Salida: Chamblee Station Clairmont Rd. & Hwy. Buford Clairmont Rd. & Rd. LaVista Decatur Station Arrive: - Llegada: East Lake Station 2021 - 1 2 3 4 5 6 6 5 4 3 2 1 24 WHEELCHAIR ACCESSIBLE Accesible para silla de ruedas NORTHBOUND - DIRECCION NORTE SOUTHBOUND - DIRECCION SUR METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY Rail Stations Served: Clairmont Road/ Howard Avenue W. Chamblee Decatur East Lake Effective as of: 04- 5:45 5:53 6:02 6:09 6:20 6:27 5:50 5:57 6:06 6:13 6:24 6:31 6:15 6:23 6:34 6:41 6:52 6:59 6:20 6:28 6:38 6:45 6:56 7:03 6:45 6:53 7:04 7:14 7:27 7:34 6:50 6:58 7:08 7:15 7:29 7:36 7:15 7:24 7:39 7:49 8:02 8:09 7:20 7:28 7:39 7:46 8:00 8:07 7:45 7:54 8:09 8:19 8:30 8:37 + 7:50 7:59 8:10 8:17 8:31 8:38 8:15 8:24 8:39 8:49 9:00 9:07 + 8:20 8:29 8:40 8:47 9:01 9:07 8:45 8:54 9:09 9:18 9:29 9:36 + 8:50 8:59 9:10 9:15 9:29 9:35 9:15 9:24 9:36 9:45 9:56 10:03 + 9:25 9:34 9:44 9:49 10:03 10:09 9:45 9:54 10:06 10:15 10:26 10:33 + 10:05 10:14 10:24 10:29 10:43 10:49 10:25 10:34 10:46 10:55 11:06 11:13
    [Show full text]
  • BANKHEAD STATION Transit Oriented Development
    BANKHEAD STATION Transit Oriented Development AREA PROFILE Area Demographics at 1/2 Mile Population 2012 1,902 % Population Change 2000-2012 -38% % Generation Y (18-34) 28% % Singles 83% Photo: Transformation Alliance 1335 Donald Lee Hollowell Parkway Housing Units 752 Daily Entries: 1,902 Atlanta, GA 30318 Housing Density/ Acre 1.5 Parking Capacity: 11 Spaces Bankhead Station is a heavy rail transit station facility locat- % Renters 74% ed near the geographic center of the City of Atlanta, several Parking % Multifamily Housing 49% Utilization:* N/A miles west of Midtown Atlanta on MARTA’s Green Line. Bankhead provides rapid rail service to major destinations Median Household Income $22,232 Station Type: Elevated including the Buckhead shopping and business district (23 % Use Public Transit 31% minutes), Midtown (11 minutes), Downtown (7 minutes) and Business Demographics Total Land Area +/- 3 acres Hartsfield-Jackson International Airport (23 minutes). Employees 234 Weekly Daily Entries MARTA’s adopted Transit Oriented Development Guidelines Avg. Office Rent Per SF $9.51 1,902 1,907 classify Bankhead as a Town Center station. This classifica- Avg. Retail Rent Per SF N/A tion system reflects both a station’s location and its primary Avg. Apartment Rent (1-mile) $520 function. The Guidelines define two types of Town Center 1,834 stations, one in “…historic town centers, such as Decatur or East Point”, the other as “…focal points for new town center- Sources: Bleakly Advisory Group, 2012. TOD nodes planned and built from the ground up in re- FY13 FY14 FY15 sponse to twenty-first century transit opportunities”. Bank- head station will likely be the latter, particularly with its proximity to the Atlanta BeltLine and the Bellwood Quarry MARTA Research & Analysis 2016 which is planned to be developed into the Westside Reser- *Data is not gathered if below 100 voir Park.
    [Show full text]
  • This Re-Route Will Start at the Biginning of Revenue Service Untill B.C.C
    THIS RE-ROUTE WILL START AT THE BIGINNING OF REVENUE SERVICE UNTILL B.C.C. GIVES THE ALL CLEAR. REROUTE ADVISORY: Route #2 Ponce De Leon, #3 Auburn Ave, #6 Emory, #9 Boulevard/Tilson Road, #21 Memorial Drive, #26 Marietta Street, #36 Virginia Highland, #40 Downtown, #42 Pryor Road, #49 McDonough Blvd, #50 D.L. Hollowell Pkwy, #51 J.E. Boone, #55 Jonesboro Road, #94 Northside Drive, #102 Little Five Points, #107 Glenwood, #186 Rainbow Drive, #809 Monroe Drive, #813 Atlanta Student Movement, #816 North Highland Ave, #832 Grant Park, and #899 Old Fourth Ward. WHAT: 2020 Publix Atlanta Marathon & 5k WHERE: The Marathon will start at Marietta Street and Centennial Olympic Park Drive. The Route/Course will travel through various streets in the City of Atlanta and Dekalb County. WHEN: Sunday, March 1, 2020 TIMES: 7:00 a.m. – 2:00 p.m. or Until the All clear is given by B.C.C. Buses in and around the Marathon will be rerouted during the Marathon/5k. Bus routes intersecting with Race/Runners will be delayed. Atlanta Police will allow traffic to flow between gaps in the Race. Reroute as follows: OUTBOUND: Route #2 from North Avenue Station to East Lake Station (South Loop) Regular route Expect Delays crossing North Highland Avenue. INBOUND: Route #2 from East Lake Station to North Avenue Station Regular route Expect Delays crossing North Highland Avenue. Regular route Page 1 of 20 OUTBOUND: Route #3 from H.E. Holmes Station to West End Station Continue M.L.K. Jr. Drive Right – Joseph E. Lowery Blvd.
    [Show full text]
  • Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT
    Proposed Program of High Capacity Transit Improvements City of Atlanta DRAFT Estimated Capital Cost (Base Year in Estimated O&M Cost (Base Year in Millions) Millions) Project Description Total Miles Local Federal O&M Cost Over 20 Total Capital Cost Annual O&M Cost Share Share Years Two (2) miles of heavy rail transit (HRT) from HE Holmes station to a I‐20 West Heavy Rail Transit 2 $250.0 $250.0 $500.0 $13.0 $312.0 new station at MLK Jr Dr and I‐285 Seven (7) miles of BRT from the Atlanta Metropolitan State College Northside Drive Bus Rapid Transit (south of I‐20) to a new regional bus system transfer point at I‐75 7 $40.0 N/A $40.0 $7.0 $168.0 north Clifton Light Rail Four (4) miles of grade separated light rail transit (LRT) service from 4 $600.0 $600.0 $1,200.0 $10.0 $240.0 Contingent Multi‐ Transit* Lindbergh station to a new station at Emory Rollins Jurisdicitional Projects I‐20 East Bus Rapid Three (3) miles of bus rapid transit (BRT) service from Five Points to 3 $28.0 $12.0 $40.0 $3.0 $72.0 Transit* Moreland Ave with two (2) new stops and one new station Atlanta BeltLine Twenty‐two (22) miles of bi‐directional at‐grade light rail transit (LRT) 22 $830 $830 $1,660 $44.0 $1,056.0 Central Loop service along the Atlanta BeltLine corridor Over three (3) miles of bi‐directional in‐street running light rail transit Irwin – AUC Line (LRT) service along Fair St/MLK Jr Dr/Luckie St/Auburn 3.4 $153 $153 $306.00 $7.0 $168.0 Ave/Edgewood Ave/Irwin St Over two (2) miles of in‐street bi‐directional running light rail transit Downtown – Capitol
    [Show full text]
  • MARTA Proposed Modifications for Routes 49, 50, 79, 95, 172 (To Be Replaced by the New 872), New 177, 178, 192, 850, 853, for April 2019 Service Modifications
    MARTA proposed modifications for Routes 49, 50, 79, 95, 172 (to be replaced by the New 872), New 177, 178, 192, 850, 853, for April 2019 Service Modifications. Route 49: McDonough Boulevard: It is proposed that Route 49 be realigned to operate along Ted Turner Drive to Mitchell Street (inbound) and Martin Luther King Jr. Drive (outbound). Service along Trinity Avenue and Forsyth Street will continue to be provided by Route 813. Route 50: Donald Lee Hollowell Parkway: It is proposed that all Route 50 trips serve the UPS Distribution Center on Fulton Industrial Boulevard. Service to Atlanta Industrial Park is proposed to be served by modifications to Route 850. Route 79: Sylvan Hills It is proposed that Route 79 be realigned to provide service to the Martel Homes community. At Springdale Road & Cleveland Avenue, the proposed Route 79 will turn right (west) on Cleveland Avenue, left on Norman Berry Drive and left on Marie Head Terrace, assuming the Martel Homes loop from Route 192. From here, Route 79 is proposed to continue along the current Route 192 alignment to East Point Station via Calhoun Avenue, Bayard Street, Holcomb Avenue, Randall Street, Washington Avenue, R.N. Martin Street, Irene Kidd Parkway and Main Street. Current Route 79 passengers along Sylvan Road (north of Langston Avenue) and Murphy Avenue are proposed to be served by new Route 872. Stops along East Cleveland Avenue, Jefferson Terrace, Jefferson Avenue and R.N. Martin Street (north of Irene Kidd Parkway) are proposed for discontinuation due to underutilization. Instead, these areas will be accessible to transit services along Cleveland Avenue (Route 78) and Sylvan Road (Route 872).
    [Show full text]
  • Piedmont Area Trans Study.Indd
    piedmont area transportation study final report Several portions of the corridor, such as near the northern and southern activity centers, do have more consistent and attractive streetscape environments. However, other portions existing of the corridor have not received improvements during recent years. This creates a disconnected corridor and provides unattractive and difficult conditions for individuals wishing to walk between the areas with nicer aesthetics and well-kept conditions streetscapes. This discontinuity between areas is even more noticeable to motorists who drive along the corridor. Zoning Structure Portions of the corridor lie within Special Public Interest (SPI) districts which provide an additional layer of zoning. These areas are located on the east side of Piedmont Road north of Peachtree Road as well as on both sides of Above: Recently completed Phase I Peachtree Road Piedmont Road in the Lindbergh Center Complete Streets streetsape area. These overlay districts allow for Right: Lindbergh Center as common goals pertaining to aesthetics, a model of good streetscape attractiveness to all user groups, and unity of appearance in these locations as development occurs. Several areas that are prime for redevelopment are currently not within overlay districts (along the west side of Piedmont Road south and north of Peachtree Road), making them vulnerable to development that does not support the common goals of the corridor. “ … We have worked with the City of Atlanta very closely throughout this process so that our recom- mendations can be put directly into the plan they create for the entire city. That gives Buckhead a fast start on making vital transportation improvements.” 22 23 piedmont piedmont area area transportation transportation study final report study final report 3.0 Existing Conditions The current state of Piedmont Road is the result of decades of substantial use without requisite investment in maintenance and improvement to the transit, pedestrian, bicycle, and roadway infrastructure along the corridor.
    [Show full text]
  • MARTA Tunnel Construction in Decatur, Georgia
    . 4 I lit. 18.5 . a37 no UOT- f SC- UM TM UMTA-MA-06-002 5-77-1 7 7 -2 4 T NO MARTA TUNNEL CONSTRUCTION IN DECATUR GEORGIA— A Case Study of Impacts Peter C. Wolff and Peter H. Scholnick Abt Associates Inc. 55 Wheeler Street Cambridge MA 02138 of TR4 A( JULY 1977 FINAL REPORT DOCUMENT IS AVAILABLE TO THE U.S. PUBLIC THROUGH THE NATIONAL TECHNICAL INFORMATION SERVICE, SPRINGFIELD, VIRGINIA 22161 Prepared for U.S, DEPARTMENT OF TRANSPORTATION URBAN MASS TRANSPORTATION ADMINISTRATION Office of Technology Development and Deployment Office of Rail Technology Washi ngton DC 20591 . NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Govern- ment assumes no liability for its contents or use thereof NOTICE The United States Government does not endorse pro- ducts or manufacturers. Trade or manufacturers' names appear herein solely because they are con- sidered essential to the object of this report. Technical Report Documentation Page 1 . Report No. 2. Government Accession No. 3. Recipient's Catalog No. UMTA-MA-06-0025- 77-14 4. Title and Subti tie 5. Report Date July 1977 iJfYlTfl- MARTA TUNNEL CONSTRUCTION IN DECATUR GEORGIA— A Case Study of Impacts 6. Performing Organization Code 8. Performing, Organi zation Report No. 7. Authors) DOT-TSC-UMTA-77-24 AAI 77-18 Peter Co Wolff and Peter H. Scholnick 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Abt Associates Inc. UM704/R7706 55 Wheeler Street 11. Contract or Grant No.
    [Show full text]
  • Soohueyyap Capstone.Pdf (6.846Mb)
    School of City & Regional Planning COLLEGE OF DESIGN A Text-Mining and GIS Approach to Understanding Transit Customer Satisfaction Soo Huey Yap MS-GIST Capstone Project July 24, 2020 1 CONTENTS 1. INTRODUCTION 1.1 Transit Performance Evaluation……………………………………………………………………………….. 3 1.2 Using Text-Mining and Sentiment Analysis to Measure Customer Satisfaction………… 5 2. METHODOLOGY 2.1 Study Site and Transit Authority……………………………………………………………………………….. 9 2.2 Description of Data…………………………………………………………………………………………………… 9 2.3 Text-Mining and Sentiment Analysis 2.3.1 Data Preparation……………………………………………………………………………………….. 11 2.3.2 Determining Most Frequent Words…………………………………………………………… 12 2.3.3 Sentiment Analysis……………………………………………………………………………………. 13 2.4 Open-Source Visualization and Mapping………………………………………………………………… 14 3. RESULTS AND DISCUSSION 3.1 Determining Most Frequent Words………………………………………………………………………… 16 3.2 Sentiment Analysis…………………………………………………………………………………………………. 17 3.3 Location-based Analysis…………………………………………………………………………………………. 19 4. CHALLENGES AND FUTURE WORK……………………………………………………………………………………. 24 5. CONCLUSION………………………………………………………………………………………………………………….… 25 6. REFERENCES……………………………………………………………………………………………………………………… 26 7. APPENDICES……………………………………………………………………………………………………………………… 29 Appendix 1: Final Python Script for Frequent Words Analysis Appendix 2: Results from 1st Round Data Cleaning and Frequent Words Analysis Appendix 3: Python Script for Sentiment Analysis using the NLTK Vader Module Python Script for Sentiment Analysis using TextBlob Appendix 4:
    [Show full text]
  • Decatur's Transportation Network, 2007
    3 • Decatur’s Transportation Network, 2007 CHAPTER • 3 Decatur’s Transportation Network, 2007 othing speaks louder of a city’s transportation system than how its residents use it. A public survey conducted as part of the CTP revealed that sixty-seven N percent of commuters drive alone to get to work or school. Over 20 percent of commuters in Decatur either walk, bike or take transit. Even more interesting, 79 percent of residents reported having walked or ridden a bike to downtown Decatur. Additionally, the majority of residents feel that it is easy to get around the City. These results indicate a system that already provides a lot of choice for travelers. The following sections detail the extent of these choices, i.e. the facilities that make up the existing Decatur transportation network. The CTP uses this snapshot of how Decatur gets around in 2007 to recommend how the City can build upon its existing strengths to realize its vision of a healthy and well-connected community. Existing Street Network Streets are where it all comes together for travel in and through Decatur. The streets and their edges provide places for people to walk, bicycle and travel in buses and other vehicles. Compared with the MARTA rail system and off-road paths and greenways, the street system in Decatur accommodates the majority of travel and is detailed below. Roadway Classification in Decatur In 1974, the Federal Highway Administration (FHWA) published the manual Highway Functional Classification - Concepts, Criteria and Procedures. The manual was revised in 1989 and forms the basis of this roadway classification inventory.
    [Show full text]
  • 2020 Comprehensive Transportation Plan Update
    2020 Comprehensive Transportation Plan Update FINAL REPORT | SEPTEMBER 2020 This document is the final report as approved and adopted by the City of Brookhaven Mayor and City Council on October 13, 2020. 2020 Comprehensive Transportation Plan Update Prepared by Prepared for The City of Brookhaven John Arthur Ernst, Jr. – Mayor Linley Jones – City Council District 1 John Park – City Council District 2 Madeleine Simmons – City Council District 3 Joe Gebbia – City Council District 4 Christian Sigman – City Manager Public Works Department Hari Karikaran – Director September 2020 2020 Comprehensive Transportation Plan Update Table of Contents TABLE OF CONTENTS ...................................................................................................................................................................................I LIST OF FIGURES .......................................................................................................................................................................................... II LIST OF TABLES ............................................................................................................................................................................................ II CHAPTER 1: INTRODUCTION ..................................................................................................................................................................... 1 REPORT ORGANIZATION .....................................................................................................................................................................
    [Show full text]
  • The Transformation Alliance
    The TransFormation Alliance Strengthening Communities Through Transit The TransFormation Alliance is a diverse collaboration of organizations including, community advocates, policy experts, transit providers, and government agencies working toward a common goal to change how transit and community development investments shape the future, to offer all residents the opportunities for a high quality of life, linked by our region’s critically important transit system. Issues Driven People and Creative Placemaking Housing Choice and Transit Innovative Capital Equitable TOD Climate and Job Access Health Why It Matters Housing Cost Jobs Access 48% The percentage of income paid in 3.4% rent by City of Atlanta HH of jobs are accessible by a earning the lowest 20th 45 minute trip on transit. percentile. - Brookings Institute, 2016 Income Mobility 4% A child raised in the bottom fifth income bracket in Atlanta has just 4% chance of reaching the top fifth - Brookings Institute, 2016 MARTA links disparate communities The five highest median The five lowest median household incomes by MARTA household incomes by MARTA stop stop 1) Buckhead Station: 1) West End Station: $19,447 $104,518 2) Ashby Station: $21,895 2) Brookhaven-Oglethorpe 3) Oakland City Station: Station: $104,168 $23,000 3) East Lake Station: $97,037 4) Lakewood-Ft. McPherson 4) Lenox Station: $90, 766 Station: $25,236 5) Medical Center Station: 5) Bankhead Station: $26,168 $89,281 Station Area Typology Type A: • In/near major job centers • Improve job access Low Vulnerability + • Affluent
    [Show full text]
  • MARTA Jurisdictional Briefing City of Atlanta
    MARTA Jurisdictional Briefing City of Atlanta October 10, 2018 Jeffrey A. Parker | General Manager/CEO PRESENTATION OVERVIEW • More MARTA Atlanta Program / Approved Plan • State of Service • Ongoing Coordination Issues • Q & A 2 MORE MARTA ATLANTA PROGRAM / APPROVED PLAN MORE MARTA ATLANTA PROGRAM • Unanimous Approval by MARTA Board of Directors • $2.7 billion in sales tax over 40 years • Additional public/private funding to be sought • Targeted Investments: 22 Miles - Light Rail Transit (LRT) 14 Miles - Bus Rapid Transit (BRT) 26 Miles - Arterial Rapid Transit (ART) 2 New Transit Centers Additional Fixed-Route Bus Service Upgrades to existing Rail Stations • Two Years of Comprehensive Planning and Outreach • Nine Guiding Principles • Opportunities for more transit 4 THE PEOPLE’S PRIORITIES Based on public feedback, MARTA and City leaders refined the program, with emphasis on: Atlanta BeltLine Southeast/Southwest Station Enhancements $570M $600M+ $200M Plan builds out 61% of City‐adopted Includes LRT on Campbellton & SW Includes better access, amenities Atlanta BeltLine Streetcar Plan BeltLine and BRT link to downtown and ADA enhancements Clifton Corridor Downtown/Streetcar Bus System $250M $553M $238M Plus additional $100M contingent Connects BeltLine with downtown Includes more frequent bus on securing other local funding destinations and existing Streetcar service and new circulator routes 5 APPROVED PROGRAM 6 MORE MARTA Program MORE MARTA IMPLEMENTATION TO DATE • MARTA has already responded to public feedback. Since 2017, the
    [Show full text]