SHEET STATE PROJECT Flowline NUMBER _ n o ' ) s 0 . n 1 n h i o
J m . ( a l NOTE: e g n A
1. Excavation for placement of riprap will : r s e not be measured for payment. n s a U h l
_ t p g 2. Furnish geotextile filter type conforming n e e h l t to Subsection 714.01 (a). See summary A e n Cut limits l i Toe of tables for class and type. b Variable length 10' (min.) a n i fill r w as shown in the plans a o V h s
s Existing ground a A FL at end of 12" Flowline roadway ditch (min.) Roadway ditch CUT
FL Waterway FILL 18" Variable slope to fit field (min.) original ground condition Slope variable 40"± 24"± 24" 24"± 40"±
Subgrade End of roadway ditch ELEVATION (min.) shoulder PLAN VIEW 1 :2
:2 ) .
1 " Geotextile filter n 2 i
TYPE 1 - NOT CONTIGUOUS TO FILL SLOPE See note 2 1 m ( (Qmax = 5 cfs) 18" (min.) Placed riprap, Class 2 (min.)
SECTION A-A
Cut limits 0' 1 e h n gt .) li Variable length 10' n ns in w le la m o e p B ( l bl e F as shown in the plans (min.) ria th a in V n w ho Variable ground slope Flowline Approx. s as at toe of fill in line with toe of fill 12" B (min.) n g Flowline d .
1 Roadway ditch 5 - CUT 1
5 Original ground Flowline at 18" Original ground 2
C end of roadway (min.) \ FILL at toe of fill s l i ditch a t e
D Flowline of Waterway
_ End of roadway ditch Subgrade 4
1 shoulder P ELEVATION F
\ PLAN VIEW 4 1 - P F \ s g n i w a r D \ Fill T I
P slope D - L F 24"± 5'± 24"± 24"± C \ :
N
)
M .
A n
i
2 "
0 m 8
: ( 1 U.S. DEPARTMENT OF TRANSPORTATION 5
2 FEDERAL HIGHWAY ADMINISTRATION :
0 Geotextile filter CENTRAL FEDERAL LANDS HIGHWAY DIVISION 1 See note 2 U.S. CUSTOMARY DETAIL Placed riprap, 18" Variable slope Class 2 (min.) (min.) original ground PLACED RIPRAP SECTION B-B BETWEEN CUT AND FILL
0 TYPE 2 - CONTIGUOUS TO FILL SLOPE 2 0
2 NO SCALE (Qmax = 5 cfs) DETAIL APPROVED FOR USE DETAIL / 8
2 REVISED: 08/2006 08/2014 08/2020 / C251-51 8
NOTES TO THE DESIGNER Last Updated: August 2020
General Information
1. Maximum Flow. Qmax = 5 cfs. For other flows, use the Hydraulics Toolbox
Applicable SCRs 1. None
Typical Pay Items Used 25101-2200 Placed riprap, method B, class 2 Geotextile quantity is shown for information only
Updates
March 2009 Added Qmax Minor drafting edits October 2000 Updated border to FLH Standard February 2005 Updated to MicroStation V8 August 2014 Updated for FP-14 Updated border August 2020 Updated geotextile note
Designer Notes for CFLHD Detail Drawing C251-51