Hood River – White Salmon Interstate Bridge

Total Page:16

File Type:pdf, Size:1020Kb

Hood River – White Salmon Interstate Bridge Appendix C Finding of Effects Forms Hood River-White Salmon Bridge Replacement Project Appendix C Draft Historic Resources Technical Report October 1, 2020 This page intentionally left blank. Hood River-White Salmon Bridge Replacement Project Appendix C Draft Historic Resources Technical Report October 1, 2020 OREGON INVENTORY OF HISTORIC PROPERTIES Section 106 LEVEL OF EFFECT FORM Agency/Project: Federal Highway Administration and Oregon Department of Transportation Hood River—White Salmon Interstate Bridge Replacement Project FHWA Federal-Aid No. 0000 (268), ODOT Key No. 21280 Property Name: Hood River—White Salmon Interstate Bridge, ODOT Bridge No. 06645 (Hood River Bridge) City, County: Hood River, Hood River, OR Location: Columbia River between Hood River, OR, and White Salmon, WA While Salmon, Klickitat, WA Preliminary Finding of Effect: No Historic Properties Affected No Historic Properties Adversely Affected Historic Properties Adversely Affected State Historic Preservation Office Comments: Concur Do Not Concur: No Historic Properties Affected No Historic Properties Adversely Affected Historic Properties Adversely Affected Signed _____________________________________________________ Date ______________________________ Comments: Provide written description of the project, and its potential effects on the subject property per 36 CFR 800. Include maps, drawings, and photographs as necessary to effectively describe and discuss the project. Use continuation sheets as needed. Introduction This statement of finding discusses the effects of the proposed Hood River – White Salmon Interstate Bridge Replacement Project (Project) on the Hood River—White Salmon Interstate Bridge (Hood River Bridge) that spans the Columbia River between Hood River, Hood River County, Oregon, and White Salmon, Klickitat County, Washington. The Hood River Bridge was previously determined eligible for the National Register of Historic Places (NRHP). In 2004, the Federal Highway Administration (FHWA), in conjunction with the Washington Department of Transportation (WsDOT), determined the Hood River Bridge as NRHP-eligible under Criteria A, B, and C (Chapman and O’Brien 2004). The Determination of Eligibility (DOE) received concurrence from the Washington and Oregon State Historic Preservation Officers (SHPOs). On April 23, 2019, the Oregon SHPO confirmed to FHWA and ODOT that the Hood River Bridge had previously been determined eligible for listing in the NRHP. In April 2020, the information relating to the description, history, and application of the NRHP criteria pertaining to the Hood River Bridge was updated (Opp-Beckman and Jones 2020). Using this updated information, an updated DOE was submitted by FHWA, in conjunction with Oregon Department of Transportation (ODOT) and WsDOT, to the Oregon and Washington SHPOs for review and concurrence. It is the finding of the FHWA, in concurrence with ODOT and WSDOT, that the Project will result in adverse effects to the characteristics that make the Hood River Bridge eligible for the NRHP and thus a finding of Historic Properties Adversely Affected pursuant to 36 CFR 800.5(d)(2) is appropriate and requires that the agency official consult further to resolve the adverse effect pursuant to § 800.6. This statement of finding is made pursuant to the requirements of the National Historic Preservation Act of 1966 (36 CFR Part 800), Executive Order 11593, and the National Environmental Policy Act. Project Description The Port of Hood River (the Port) plans to replace the Hood River-White Salmon Interstate Bridge, which connects Hood River County, Oregon and Bingen/White Salmon, Klickitat County, Washington. The Project, funded in part by the FHWA, ODOT, WsDOT, and the Port is located between Hood River, Oregon, and Bingen/White Salmon, Washington. Logical termini for the Project are at the highway connections to the north at Washington State Route (SR) 14 and Exit 64 on Interstate 84 (I 84) to the south in Oregon. The Hood River Bridge approaches tie into the federal, state, and local transportation facilities within the city limits of White Salmon and within the urban growth boundary of the City of Hood River. The existing bridge is owned and maintained by the Port and provides a critical connection for residents and visitors to the Columbia River Gorge National Scenic Area (CRGNSA). The Project’s purpose is to rectify current and future transportation inadequacies and deficiencies associated with the existing bridge. Once the replacement bridge is constructed and open for use, the existing Hood River Bridge would be removed. Surveyor/Agency: Shoshana Jones, AECOM Date Recorded: May 2020 Pg 1 Section 106 Level of Effect Rev. 08/03 OREGON INVENTORY OF HISTORIC PROPERTIES Section 106 LEVEL OF EFFECT FORM Continuation Sheet Agency/Project: Federal Highway Administration and Oregon Department of Transportation Hood River—White Salmon Interstate Bridge Replacement Project FHWA Federal-Aid No. 0000 (268), ODOT Key No. 21280 Property Name: Hood River—White Salmon Interstate Bridge, ODOT Bridge No. 06645 (Hood River Bridge) City, County: Hood River, Hood River, OR Location: Columbia River between Hood River, OR, and White Salmon, WA While Salmon, Klickitat, WA Figure 1. Project Area Surveyor/Agency: Shoshana Jones, AECOM Date Recorded: May 2020 Pg 2 Section 106 Level of Effect Rev. 08/03 OREGON INVENTORY OF HISTORIC PROPERTIES Section 106 LEVEL OF EFFECT FORM Continuation Sheet Agency/Project: Federal Highway Administration and Oregon Department of Transportation Hood River—White Salmon Interstate Bridge Replacement Project FHWA Federal-Aid No. 0000 (268), ODOT Key No. 21280 Property Name: Hood River—White Salmon Interstate Bridge, ODOT Bridge No. 06645 (Hood River Bridge) City, County: Hood River, Hood River, OR Location: Columbia River between Hood River, OR, and White Salmon, WA While Salmon, Klickitat, WA Identification and Description of the Historic Resource The existing Hood River Bridge crosses the Columbia River between Oregon and Washington at approximately river mile 169.8 on the Bonneville Pool within the CRGNSA. The 4,418-foot-long steel truss toll bridge was completed in 1924 and substantially modified in 1938. The bridge’s center span is a 262-foot riveted steel Pennsylvania-Petit through-truss vertical lift main span, which is a historic modification of the bridge’s original center fixed-span to address higher water elevations in the Bonneville Pool (Burrow et al. 2013:94). The center span is flanked by 18 206-foot steel Pratt deck truss spans, 10 south of the main span and eight north of the main span. The bridge is supported by 20 reinforced concrete “dumbbell” piers and the lift span is located near the center of the bridge between piers 8 and 9, over the river’s main shipping channel. The horizontal clearance at the lift span is 246 feet. The bridge has vertical clearances of 148 feet in the fully open position and 67 feet in the closed position relative to 73.0 feet Mean Sea Level, which is the typical elevation of the Bonneville Pool (Parsons Brinckerhoff 2001:9). The steel grate bridge deck provides two narrow travel lanes but no sidewalks or bikeways. The tollbooth, completed in 1965, is located at the bridge’s Oregon entrance. The tollbooth is a single-story, utilitarian building with a parapet roof and sheet metal siding that rests atop a poured concrete foundation. The tollbooth and adjacent roadway sections are sheltered by a front-gabled sheet metal canopy. The present building replaced the bridge’s original tollbooth. The Hood River bridge is eligible for the NRHP under Criteria A and C. Under Criterion A, the bridge has statewide significance in the area of Transportation as the second oldest Columbia River vehicle crossing between Oregon and Washington and for its association with private bridge development and operation during the early twentieth century. The bridge also has local significance under Criterion C in the area of Engineering for the design of its central span, which embodies the distinctive characteristics of the vertical-lift Pennsylvania-Petit steel through-truss. The period of significance for Criterion A begins in 1924, when the bridge opened, and ends in 1950, when the Oregon Washington Bridge Company, a private entity, transferred ownership and operations of the bridge to the Port, a public entity. This period of significance encompasses the bridge modification project associated with the historic construction of Bonneville Dam. Although the Hood River Bridge dates from 1924, the period of significance under Criterion C is 1938, when the bridge was substantially modified by incorporation of the distinctive vertical-lift span. The bridge retains all aspects of historic integrity: location, design, setting, materials, workmanship, feeling, and association. Although the original bridge was substantially modified in 1938, the purpose of the design modifications was to accommodate higher river levels caused by the pool behind the new Bonneville Dam and the proliferation of larger vessels. The modifications do not diminish the integrity of design but contribute to its significance under Criterion A by conveying the evolution of the bridge in response to historic events. The standard for integrity of design tied to Criterion C significance relates back to that criterion’s period of significance, which is 1938. That year, the bridge’s main span was converted from a fixed span to its present design: a vertical-lift Pennsylvania-Petit steel through-truss. The distinctive vertical-lift
Recommended publications
  • White Salmon Interstate Bridge Replacement Project
    3. AFFECTED ENVIRONMENT, ENVIRONMENTAL CONSEQUENCES, AND MITIGATION Chapter 3 looks at the beneficial and adverse impacts of the Project on transportation operations, environmental resources, and the community. Each section begins with a description of the existing conditions for a specific resource and then compares how the resource would be positively or negatively affected by the No Action Alternative, the Preferred Alternative EC-2, and Alternative EC-3. The study area for each resource is illustrated in the respective appendices. Mitigation measures to avoid, minimize, or mitigate adverse impacts that could result from the build alternatives are also identified for each resource. 3.1. TRAFFIC OPERATIONS The Hood River Bridge provides an essential interstate connection between Oregon and Washington. The existing bridge connects White Salmon, Washington, and Hood River, Oregon, and was used by over 4.5 million vehicles in a 1-year period spanning July 2017 to June 2018. A substantial majority of the total vehicles crossing the Hood River Bridge per year are passenger automobiles or light-duty pickups. These vehicles make up over 97 percent total vehicles on the bridge, while larger vehicles (trucks and other heavy vehicles) make up approximately 2 percent to 3 percent of total traffic. Traffic analysis for the Project included eight study intersections (Exhibit 3-1) and examined for two peak hours when traffic volumes were Large vehicles crossing the existing bridge are advised to highest during the morning (7:30 am to 8:30 am) and afternoon (4:00 pm turn in mirrors due to narrow lanes. to 5:00 pm). Exhibit 3-1.
    [Show full text]
  • Hood River – White Salmon Interstate Bridge Replacement Project SDEIS
    (OR SHPO Case No. 19-0587; WA DAHP Project Tracking Code: 2019-05-03456) Draft Historic Resources Technical Report October 1, 2020 Prepared for: Prepared by: In coordination with: 111 SW Columbia 851 SW Sixth Avenue Suite 1500 Suite 1600 Portland, Oregon 97201 Portland, Oregon 97204 This page intentionally left blank. TABLE OF CONTENTS Executive Summary ................................................................................................................................. 1 1. Introduction .................................................................................................................................. 1 2. Project Alternatives ....................................................................................................................... 3 2.1. No Action Alternative .......................................................................................................... 7 2.2. Preferred Alternative EC-2 ................................................................................................... 8 2.3. Alternative EC-1 ................................................................................................................ 14 2.4. Alternative EC-3 ................................................................................................................ 19 2.5. Construction of the Build Alternatives ............................................................................... 23 3. Methodology ..............................................................................................................................
    [Show full text]
  • Corridor Plan
    HOOD RIVER MT HOOD (OR HIGHWAY 35) Corridor Plan Oregon Department of Transportation DOR An Element of the HOOD RIVER-MT. HOOD (OR 35) CORRIDOR PLAN Oregon Department of Transportahon Prepared by: ODOT Region I David Evans and Associates,Inc. Cogan Owens Cogan October 1997 21 October, 1997 STAFF REPORT INTERIM CORRIDOR STRATEGY HOOD RIVER-MT. HOOD (OR HWY 35) CORRIDOR PLAN (INCLUDING HWY 281 AND HWY 282) Proposed Action Endorsement of the Hood River-Mt. Hood (OR HWY 35) Corridor Strategy. The Qregon Bep ent of Transportation (ODOT) has been working wi& Tribal and local governments, transportation service providers, interest groups, statewide agencies and stakeholder committees, and the general public to develop a long-term plan for the Hood River-Mt. Hood (OR HWY 35) Corridor. The Hood River-Mt. Hood Corridor Plan is a long-range (20-year) program for managing all transportation modes within the Oregon Highway 35 corridor from the 1-84 junction to the US 26 junction (see Corridor Map). The first phase of that process has resulted in the attached Interim Com'dor Stvategy. The Interim Corridor Strategy is a critical element of the Hood River- Mt. Hood Corridor Plan. The Corridor Strategy will guide development of the Corridor Plan and Refinement Plans for specific areas and issues within the corridor. Simultaneous with preparation of the Corridor Plan, Transportation System Plans (TSPs) are being prepared for the cities of Hood River and Cascade Locks and for Hood River County. ODOT is contributing staff and financial resources to these efforts, both to ensure coordination between the TSPs and the Corridor Plan and to avoid duplication of efforts, e.g.
    [Show full text]
  • Historic Columbia River Highway: Oral History August 2009 6
    HHHIIISSSTTTOOORRRIIICCC CCCOOOLLLUUUMMMBBBIIIAAA RRRIIIVVVEEERRR HHHIIIGGGHHHWWWAAAYYY OOORRRAAALLL HHHIIISSSTTTOOORRRYYY FFFiiinnnaaalll RRReeepppooorrrttt SSSRRR 555000000---222666111 HISTORIC COLUMBIA RIVER HIGHWAY ORAL HISTORY Final Report SR 500-261 by Robert W. Hadlow, Ph.D., ODOT Senior Historian Amanda Joy Pietz, ODOT Research and Hannah Kullberg and Sara Morrissey, ODOT Interns Kristen Stallman, ODOT Scenic Area Coordinator Myra Sperley, ODOT Research Linda Dodds, Historian for Oregon Department of Transportation Research Section 200 Hawthorne Ave. SE, Suite B-240 Salem OR 97301-5192 August 2009 Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. OR-RD-10-03 4. Title and Subtitle 5. Report Date Historic Columbia River Highway: Oral History August 2009 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Robert W. Hadlow, Ph.D., ODOT Senior Historian; Amanda Joy Pietz, ODOT Research; and Hannah Kullberg and Sara Morrissey, ODOT Interns ; Kristen Stallman, ODOT Scenic Area Coordinator; Myra Sperley, ODOT Research; and Linda Dodds, Historian 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Oregon Department of Transportation Research Section 11. Contract or Grant No. 200 Hawthorne Ave. SE, Suite B-240 Salem, OR 97301-5192 SR 500-261 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Oregon Department of Transportation Final Report Research Section 200 Hawthorne Ave. SE, Suite B-240 Salem, OR 97301-5192 14. Sponsoring Agency Code 15. Supplementary Notes 16. Abstract The Historic Columbia River Highway: Oral History Project compliments a larger effort in Oregon to reconnect abandoned sections of the Historic Columbia River Highway.
    [Show full text]
  • White Salmon Interstate Bridge Replacement Supplemental Draft EIS I
    ODOT Key No.: 21280 This page intentionally left blank. This page intentionally left blank. Notice of Document Availability This Supplemental Draft EIS is available for review at the following locations: Port of Hood River (by appointment) 1000 E. Port Marina Drive Hood River, OR 97031 Note: Washington residents can contact the Port to schedule an appointment to view the document in Klickitat County White Salmon Valley Community Library (limited services during the COVID-19 pandemic) 77 NE Wauna Avenue White Salmon, WA 98672 Stevenson Community Library (limited services during the COVID-19 pandemic) 120 NW Vancouver Avenue Stevenson, WA 98648 These documents are also available on the Project website: https://portofhoodriver.com/bridge/bridge-replacement- project/. At the time of publication, Port of Hood River offices are closed due to COVID-19. If you would like to review a hard copy of the Supplemental Draft EIS, please contact the Port at [email protected] or 541-386-1645 to make arrangements for review of the hard copy. The Supplemental Draft EIS can also be viewed at the White Salmon Valley Community Library and the Stevenson Community Library which are open with limited services during the COVID-19 pandemic. How to Submit Comments Written comments on the Supplemental Draft EIS can be submitted during the public comment period (November 20, 2020, through January 4, 2021) by email to [email protected] or regular mail to: Hood River Bridge Supplemental Draft EIS Kevin Greenwood Port of Hood River 1000 E. Port Marina Drive Hood River, OR 97031 Comments can be submitted orally and in writing at the public hearing for the Supplemental Draft EIS on December 3, 2020.
    [Show full text]
  • White Salmon Interstate Bridge Replacement Project TS&L Type, Size, and Location TSP Transportation System Plan TSS Total Suspended Solids U.S
    ODOT Key No.: 21280 This page intentionally left blank. This page intentionally left blank. Notice of Document Availability This Supplemental Draft EIS is available for review at the following locations: Port of Hood River (by appointment) 1000 E. Port Marina Drive Hood River, OR 97031 Note: Washington residents can contact the Port to schedule an appointment to view the document in Klickitat County White Salmon Valley Community Library (limited services during the COVID-19 pandemic) 77 NE Wauna Avenue White Salmon, WA 98672 Stevenson Community Library (limited services during the COVID-19 pandemic) 120 NW Vancouver Avenue Stevenson, WA 98648 These documents are also available on the Project website: https://portofhoodriver.com/bridge/bridge-replacement- project/. At the time of publication, Port of Hood River offices are closed due to COVID-19. If you would like to review a hard copy of the Supplemental Draft EIS, please contact the Port at [email protected] or 541-386-1645 to make arrangements for review of the hard copy. The Supplemental Draft EIS can also be viewed at the White Salmon Valley Community Library and the Stevenson Community Library which are open with limited services during the COVID-19 pandemic. How to Submit Comments Written comments on the Supplemental Draft EIS can be submitted during the public comment period (November 20, 2020, through January 4, 2021) by email to [email protected] or regular mail to: Hood River Bridge Supplemental Draft EIS Kevin Greenwood Port of Hood River 1000 E. Port Marina Drive Hood River, OR 97031 Comments can be submitted orally and in writing at the public hearing for the Supplemental Draft EIS on December 3, 2020.
    [Show full text]
  • Hood River – White Salmon Interstate Bridge Replacement Project SDEIS
    Appendix B Determination of Eligibility Forms Hood River-White Salmon Bridge Replacement Project Appendix B Draft Historic Resources Technical Report October 1, 2020 This page intentionally left blank. Hood River-White Salmon Bridge Replacement Project Appendix B Draft Historic Resources Technical Report October 1, 2020 DRAFT OREGON INVENTORY OF HISTORIC PROPERTIES DRAFT SECTION 106 BRIDGE DETERMINATION OF ELIGIBILITY FORM Agency/Project: ODOT/Hood River—White Salmon Interstate Bridge Replacement Project ODOT Key No. 21280, Federal-Aid No. 0000(268) Structure Name and Number: Hood River—White Salmon Interstate Bridge No. 06645 City, County: Hood River, Hood River, OR Location: White Salmon, Klickitat, WA The Intersection of Button Bridge Road and Port Marina Drive East, Hood River, OR 97031 USGS Quad Name: General Class of Main Structure Township: 03N Range:10E Section: 25 Truss Arch Moveable Northing: 45.718339 Easting: 45.718339 Slab/Beam/Girder Other Structural Information: Dimensions: Date of Construction: 1924 (original Super Structure: Multiple Roadway Width: 18 feet construction), 1938 (substantial alterations) span steel truss bridge. 9.5 inches Designer: Harry Gray and E. M. Chandler, with Main Span: Pennsylvania- Structure Length: 4,418 C.B. Wing (consulting engineer) Petit Truss Movable Span. feet Contractor: Gilpin Construction Company (Charles Secondary Span(s): Pratt Structure Width: N. McDonald, Vice-President and construction Deck Truss. Approximately 25” supervisor) Floor/decking: Metal grate Floor/decking: Metal grate Alterations/moved (dates): Support Structure: Plaque Sidewalk 1938: Substantial bridge alterations related to Concrete Piers. construction of Bonneville Dam: fixed span Material: converted to lift span, and new piers and steel Concrete Steel spans installed.
    [Show full text]
  • Hood River, Oregon
    3.9. ENVIRONMENTAL JUSTICE POPULATIONS EXISTING CONDITIONS The environmental justice populations in the API include low-income households, minorities, and Hispanic/Latino populations that reside within the API and the Native Americans who travel to and use the White Salmon TFAS and East White Salmon Fish Processing Facility. The proportion of low-income households, minorities, and Hispanic/Latino populations within the API are higher than county averages; and, these populations are more highly concentrated in the cities near the bridge: Bingen and White Salmon, Washington, and Hood River, Oregon. The 2010 U.S. Current tolls are collected at both a toll booth and Census data and American Community Survey estimates (2013-2017) electronically. Tolls are $2.00 cash or $1.00 electronically indicate a greater proportion of racial minorities living south and east of for passenger vehicles. the bridge in the City of Hood River (Exhibit 3-26). As shown in Exhibit 3-27, Hispanic/Latino populations reside on both sides of the Columbia River, with concentrations in the City of Bingen, downtown White Salmon, and areas west and east of the bridge connection in the City of Hood River. There are no permanent residences within 0.38 miles from the bridge touchdown in the City of Hood River or 0.25 miles of the bridge touchdown in Washington; however, seasonal and temporary camping by tribal members commonly occurs at the White Salmon TFAS. The average proportion of low-income households in Klickitat County is 13.4 percent, whereas the proportion of low-income households in Bingen is 18.8 percent.
    [Show full text]
  • 2020 BUILD Application FINAL
    HOOD RIVER/WHITE SALMON INTERSTATE BRIDGE REPLACEMENT Pre-Construction Phase 2 2020 BUILD TRANSPORTATION PLANNING GRANT APPLICATION Submitted jointly by Klickitat County (Wash.) Port of Hood River (Ore.) TABLE OF CONTENTS Letter from Applicants ....................... 2 Project Description ............................. 3 Project Location ................................. 7 Grant Funds, Sources & Uses ............. 9 Selection Criteria .............................. 12 Environmental Risk Review ............. 25 Bibliography/Appendices ............... 29 Submitted to USDOT on May 15, 2020 LEAD APPLICANT AND IDENTIFIED AWARD RECIPIENT: Port of Hood River, 1000 E. Port Marina Drive, Hood River, OR 97031 Michael McElwee, Executive Director / Kevin Greenwood, Project Director, (541) 961-9517 Letter from Applicants Hood River-White Salmon Interstate Bridge Replacement Project 2 BUILD 2020 Grant Application Project Description The Mid-Columbia River Region seeks to replace the nearly century old Hood River (Ore.) - White Salmon (Wash.) Interstate Bridge. The original bridge – built in 1924 – has a number of restrictions limiting its full use for the residents, businesses and visitors to this 100-mile stretch of the Columbia River. The purpose of this project is to fund 15% design and accompanying financing studies to improve multi-modal transportation of people and goods across the River between the White Salmon/Bingen (Wash.) and Hood River (Ore.) communities. The need for this project is significant: to rectify current and future transportation
    [Show full text]
  • Draft Environmental Impact Statement, Complete
    SR-35 Columbia River Crossing Draft Environmental Impact Statement and Section 4(f) Evaluation December 2003 Washington State Oregon Department Department of Transportation of Transportation SR-35 Columbia River Crossing Project Draft Environmental Impact Statement and Section 4(f) Evaluation December 2003 Persons with disabilities may request this information be prepared and supplied in alternate forms by calling the WSDOT ADA Accommodation Hotline collect 206-389-2839 Persons with vision or hearing impairments may access the WA State Telecommunications Relay Service at TT 1-800-833-6388, Tele-Braille 1-800-833-6385, or Voice 1-800-833-6384, and ask to be connected to 360-705-7097. The Washington State Department of Transportation (WSDOT) hereby gives public notice that it is the policy of the department to assure full compliance with Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987, Executive Order 12898 on Environmental Justice, and related statutes and regulations in all programs and activities. Title VI requires that no person in the United States of America shall, on the grounds of race, color, sex, or national origin, be excluded from the participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity for which WSDOT receives federal financial assistance. Any person who believes he or she has been aggrieved by an unlawful discriminatory practice protected under Title VI has the right to file a formal complaint with the WSDOT. Any such complaint must be in writing and filed with WSDOT Title VI Coordinator within one hundred eighty (180) days following the date of the alleged discriminatory incident.
    [Show full text]
  • Hood River – White Salmon Interstate Bridge Replacement Project SDEIS
    Final Cumulative Impacts Technical Report November 2020 Prepared for: Prepared by: 851 SW Sixth Avenue Suite 1600 Portland, Oregon 97204 This page intentionally left blank. TABLE OF CONTENTS 1. Introduction .................................................................................................................................. 1 2. Project Alternatives ....................................................................................................................... 3 2.1. No Action Alternative .......................................................................................................... 6 2.2. Preferred Alternative EC-2 ................................................................................................... 8 2.3. Alternative EC-1 ................................................................................................................ 13 2.4. Alternative EC-3 ................................................................................................................ 17 2.5. Construction of the Build Alternatives ............................................................................... 21 3. Methodology ............................................................................................................................... 25 3.1. Area of Potential Impact .................................................................................................... 25 3.2. Regulations, Standards, and Guidelines ............................................................................
    [Show full text]
  • Regional Transportation Plan for Klickitat County, Washington
    Regional Transportation Plan for Klickitat County, Washington November 2018 Southwest Washington Regional Transportation Council Regional Transportation Plan for Klickitat County, Washington Clark County Skamania County Klickitat County, Washington Klickitat County City of Vancouver City of Camas City of Washougal Published: November 2018 City of Battle Ground City of Ridgefield City of La Center Town of Yacolt City of Stevenson City of North Bonneville City of White Salmon City of Bingen City of Goldendale C‐TRAN Washington DOT Southwest Washington Port of Vancouver Port of Camas‐Washougal Regional Transportation Council Port of Ridgefield Street Address Mailing Address Port of Skamania County 1300 Franklin Street P.O. Box 1366 Vancouver, WA 98660 Vancouver, WA 98666‐1366 Port of Klickitat Metro Phone: 564‐397‐6067 Oregon DOT 14th Legislative District https://www.rtc.wa.gov 17th Legislative District 18th Legislative District 20th Legislative District 49th Legislative District Introduction ii Preparation of this Report was funded by grants from the Washington State Department of Transportation (WSDOT) and local funds from RTC member jurisdictions. RTC Respects Civil Rights RTC operates its programs without regard to race, color, national origin, religion, sex, sexual orientation, marital status, age or disability in accordance with applicable laws, including Title VI of the Civil Rights Act of 1964 and RCW 49.60. To request additional information on RTC’s Title VI nondiscrimination requirements, or if any person believes they have been aggrieved by an unlawful discriminatory practice under Title VI or other applicable law and would like to file a complaint, contact us at 564.397.6067 TTY 711 or email [email protected].
    [Show full text]