Water Services Backlog Eradication Strategy March 2015 Reference Framework Topic Extract

Total Page:16

File Type:pdf, Size:1020Kb

Water Services Backlog Eradication Strategy March 2015 Reference Framework Topic Extract Water Services Backlog Eradication Strategy March 2015 Reference Framework Topic Extract Limpopo Province Mookgophong WSA Produced for Water Services: Planning and Information Mookgophong WSA March 2015.pdf WATER SERVICES BACKLOG ERADICATION STRATEGY Index Chapter Title Description Page CHAPTER 1 SITUATIONAL ASSESSMENT Demographics 01.1 Water Service Levels: Total Combined Household Interventions 01.2 Water Service Levels: Backlog Solution Category - Summary 01.3A Water Service Levels: Backlog Solution Category: Class 1 01.3B Settlements having no formal water infrastructure Water Service Levels: Backlog Solution Category: Class 2 01.3C Settlements requiring extension to existing infrastructure Water Service Levels: Backlog Solution Category: Class 3 01.3D Settlements with access to infrastructure but no access to water because of functionality problems Water Service Levels: Backlog Solution Category: Class 4 01.3E Settlements with access to infrastructure but no access to water because of source problems CHAPTER 2 INTERVENTION PROGRAMMES Intervention Requirement Programmes - Summary 02.1A Intervention Requirement Program: Single Type Settlement 02.1B Individual settlement with rudimentary type solution Intervention Requirement Program: New Scheme Development 02.1C Not part of an existing scheme Intervention Requirement Program: Existing Scheme Refurbishment 02.1D Part of an existing scheme Intervention Requirement Program: Functionality 02.1E Functionality Intervention Requirement Program: Conservation & Demand Management 02.1F Conservation & Demand Management Total Projects Overview 02.2A Current Projects Overview 02.2B Future Projects Overview 02.2C CHAPTER 3 GAP ANALYSIS Unresolved Needy Settlements 03.1 CHAPTER 4 PROJECT FINANCIAL FRAMEWORK Committed Funding 04.1 WATER SERVICES BACKLOG ERADICATION STRATEGY Acknowledgements Joint Studyyy By: DEPARTMENT OF WATER AND SANITATION Directorate: Planning & Information FC van Zyl (Director) S Marais (National Coordinator) Invirocon C Stopforth 083 407 4507 GPM P Du Plessis 015 297 3888 As Represented By: WATER SERVICES PLANNING RF PSP Province: Limpopo Province EVN AFRICA L Geyer 015 291 2020 MURANGO D Hovy 015 296 4438 AECOM J Kilian 015 297 0662 iNVIROMAP C Stopforth 015 296 4584 T 1 T N N R E E E DEMOGRAPHICS M M T S S P S S A E E H S S C GENERAL OVERVIEW SETTLEMENT TYPES (2013) S S 1 A A WSA = Mookgophong LM Settlement Type Settlements Households Population L L Urban Centres: Metropolitan Area 0 0 0 A A N N Mookgophong Urban - Formal Town 4 6,103 24,119 O O I I Phomolong Urban - Former Township 1 274 1,084 T T A A Rural - Dense Villages > 5000 0 0 0 U U T T Rural - Small Villages <= 5000 0 0 0 I I S S Rural Scattered 1 50 198 Rural Scattered Dense 0 0 0 2 WSA POPULATION DISTRIBUTION Rural Scattered Low Density 0 0 0 Total Population 2013: 39,347 Rural Scattered Very Low Density 0 0 0 Total Number of Households 2013: 10,674 Farming (People living on farms) 1 3,328 10,313 Average Household Size: 3.69 Urban - Informal Settlements (Squatter Camp) 1 855 3,379 Total Area: ha 568,897 Rural - Informal Settlements (Squatter Camp) 0 0 0 Population Density: people per ha 0.07 Working Towns and Service Centres - Mines, Prisons etc. 2 64 254 Unknown 0 0 0 TOTAL 10 10,674 39,347 3 STATS SA POPULATION COMPOSITION Population Group Distribution Metropolitan Area Settlements Population Group % of Total Population Urban - Formal Town Black/African 85.62 Urban - Former Township 20% Coloured 0.35 50% Indian/Asian 0.19 Rural - Dense Villages > 5000 White 13.24 Rural - Small Villages <= 5000 10% Other 0.60 Rural Scattered Rural Scattered Dense Rural Scattered Low Density Rural Scattered Very Low Density 10% Farming (People living on farms) Urban - Informal Settlements (Squatter Camp) 10% Rural - Informal Settlements (Squatter Camp) Black/African Coloured Indian/Asian White Other Working Towns and Service Centres - Mines, Prisons etc. Unknown 4 SETTLEMENT TYPE DISTRIBUTION Metropolitan Area Population MAIN TYPES: URBAN / RURAL (2013) Urban - Formal Town WSA Main Type Settlements Households Population Urban - Former Township 9% 1% Mookgophong Rural 4 3,442 10,764 Rural - Dense Villages > 5000 Mookgophong Urban 6 7,233 28,583 64% Rural - Small Villages <= 5000 26% Rural Scattered Settlements Population Rural Scattered Dense Rural Urban Rural Urban Rural Scattered Low Density 40% 27% Rural Scattered Very Low Density Farming (People living on farms) Urban - Informal Settlements (Squatter Camp) 60% Rural - Informal Settlements (Squatter Camp) 73% Working Towns and Service Centres - Mines, Prisons etc. 01.1 Unknown DEMOGRAPHICS LOCALITY MAP Capricorn Vhembe Mopani Waterberg Mogalakwena Sekhukhune Polokwane Rietbokvalley Settlement Types Capricorn Metropolitan Area Limpopo Lepelle-Nkumpi Formal Town Former Township Waterberg Working Towns & Service Centres Mookgophong (Mines, Prisons etc.) Informal Settlements Squatter Camp (Urban & Rural) Rural - Dense Village Mookgophong (Population > 5000) Naboomspruit Mookgophong Phomolong Mookgophong Rural - Small Village Modimolle Phomolong Squatter (Population <= 5000) Rural Scattered Roedtan - Dense - Low Density Thusang - Very Low Density Farming Military Base Sekhukhune Ephraim Mogale BASE MAP LEGEND Mookgophong WSA Provincial Boundaries District Municipal Boundaries Zoetfontein Local Municipal Boundaries Bela-Bela Settlements CHAPTER 1 SITUATIONAL ASSESSMENT 01.1 TT 1 NN R EE E WATER SERVICE LEVELS: TOTAL COMBINED HOUSEHOLD INTERVENTIONS MM T SS P SS A EE H SS C TOTAL HOUSEHOLD DIRECT BACKLOG: 1,186 SS AA LL AA LIMPOPO PROVINCE: MOOKGOPHONG WSA nn NN FORMAL INFORMAL oo OO ii ss ff II tt tt oo TT aa nn rr Adequate Infrastructure Needs rr Water ee ss AA ee ee ii O&M tt mm rr bb UU Resources No Services Adequate No Services aa ee oo ll TT Needs mm House Yard Shared tt II gg tt WW Stand Pipes Needs Upgrades Extensions Refurbishment uu ee SS ee Connections Connections Services NN tt SS aa HH % HH % HH % HH % HH % HH % HH % HH % HH % HH % HH % HH % CC 1 8 5,778 78 987 13 685 9 2 0 3 0 4 1 214 25 641 75 5 0 6 0 7 0 8 0 9 1 1,185 36 474 14 237 7 119 4 1,185 36 119 4 10 0 Total Household Interventions 5,778 987 1,870 0 474 237 119 1,185 119 0 214 641 Required This presents the Water Services Level in relation to settlement This presents the Water Services Level in relation to the need category totals category totals 1) Adequate: Formal Water Needs: Settlements Water Needs: Category Adequate: House Connections Households (2013) Households (2013) 2) Adequate: Informal Adequate: Yard Connections 214 641 CHART VALUES: 119 2% 6% 3,319 3) Adequate: Shared Services (HH, %) 1,185 1% Adequate: Stand Pipes 29% 10% 5,778 119 Adequate: Shared Services 7,450 4) No Services: Informal 1% 50% 65% 237 Water Resources Needs 5) Water Resource Needs Only 2% O&M Needs 474 6) O&M Needs Only 4% Infra Needs: Upgrade 7) Infrastructure Needs Only Infra Needs: Extensions 641 Infra Needs: Refurbishment 8) Infrastructure & O&M Needs 1,870 6% 16% No Services 9) Infrastructure, O&M & Resource Needs 987 Adequate: Informal 8% 10) No Services No Services: Informal Water Infrastructure Infrastructure, Adequate: Resources 1 Adequate 3 5 7 Needs 9 O&M & Resource Shared Services Needs Only Needs Only O&M Adequate: No Services: Infrastructure & 2 4 6 Needs 8 10 No Services Informal Informal O&M Needs Only 01.2 WATER SERVICE LEVELS: TOTAL COMBINED HOUSEHOLD INTERVENTIONS LOCALITY MAP Capricorn Vhembe Mopani Waterberg Mogalakwena Sekhukhune Rietbokvalley Supply Polokwane Rietbokvalley Settlement Categorisation Formal Capricorn 1) Adequate Limpopo Lepelle-Nkumpi Waterberg 3) Adequate: Shared Services Mookgophong 5) Water Resource Needs 6) O&M Needs Mookgophong RWS Mookgophong Naboomspruit 7) Infrastructure Needs Mookgophong Phomolong Mookgophong Modimolle Phomolong Squatter 8) Infrastructure & O&M Needs Roedtan/ Thusang Supply Roedtan 9) Infrastructure, O&M & Resource Needs Thusang 10) No Services Military Base Supply Informal Military Base 2) Adequate 4) No Services Sekhukhune BASE MAP LEGEND Ephraim Mogale Mookgophong WSA Provincial Boundaries Zoetfontein Supply District Municipal Boundaries Zoetfontein Local Municipal Boundaries Bela-Bela Water Scheme Areas Settlements CHAPTER 1 SITUATIONAL ASSESSMENT 01.2 TT 1 NN R EE E WATER SERVICE LEVELS: BACKLOG SOLUTION CATEGORY - SUMMARY MM T SS P SS A EE H SS C SS AA TOTAL NEEDY HOUSEHOLDS & POPULATION LL Class 1 Class 2 Class 3 Class 4 AA NN Communities having no Communities requiring Communities with access to Communities with access to OO Total no of Total II WSA formal water infrastructure extension to existing infrastructure but no access infrastructure but no access TT Households Population infrastructure to water because of to water because of source AA UU functionality problems problems TT II SS HH Pop HH Pop HH Pop HH Pop Mookgophong 10,674 39,347 0 0 1,185 4,504 474 1,874 465 1,767 Total Cost Required R 0 R 7,500,000 R 3,500,000 R 6,500,000 R 17,500,000 TOTAL Committed Funding (MIG & MWIG & MLM) Short Term: Year 1 (2014/15) R 7,650,000 Medium Term: Year 2 (2015/16) R 13,630,000 Long Term: Year 3 (2016/17) R 13,630,000 R 34,910,000 TOTAL % of backlog eradicated by 2015 N/A 20% 25% 30% Total Number of Households per Class Total Population per Class 1,767 465 22% 22% 4,504 1,185 55% 56% Class 1 Class 1 Class 2 Class 2 Class 3 Class 3 474 1,874 22% Class 4 Class 4 23% Note: The information provided was based on estimations made from the settlement database backlogs. These backlogs were not determined by field visits to each settlement, but based on
Recommended publications
  • A Journey to Limpopo Wetlands
    DEPARTMENT OF ECONOMIC DEVELOPMENT, ENVIRONMENT AND TOURISM STATE OF WETLANDS IN THE LIMPOPO PROVINCE Directorate: Biodiversity Management C/o Suid & Voortrekker Street, POLOKWANE, 0700, Private Bag X9484, POLOKWANE, 0700 Tel: (015) 293 8300, Fax: (015) 295 4120 Website: http/www.limpopo.gov.za 1. Introduction Ramsar Convention on wetlands conservation and wise use was adopted in Ramsar city, Iran in 1971 as contribution towards achieving sustainable development throughout the world. Ramsar Convention also works hand in hand with other convention such as Convention on biological diversity and other related organizations. As contracting party (country member) of Ramsar convention South Africa had designated about 12 wetlands as Ramsar site or site of international importance. Nysvley Nature Reserve and Makuleke floodplain are the two Ramsar sites in the Limpopo Province. According to Ramsar Convention wetlands are area of marshes, fen, peatland, wet grassland, lakes, estuaries, mangroves and coral reefs, whether natural or artificial, permanent or temporary, with water that is static or flowing, fresh, brackish or salt, including areas of marine water the depth of which at low tide does not exceed six metres. Wetlands have different names following the four dominant languages in the Limpopo province, nhlangasi (in Tsonga), Mohlaka or Monyuka (in Pedi) Maroroma or Matzhava (in Venda) and Vlei (in Afrikaans) Conservation, wise use and management of wetlands requires partnership of relevant government departments (e.g. Agriculture, Water Affairs and Forestry, Environmental Affairs and Tourism), local authorities (Municipalities and traditional), Non-governmental organizations (e.g. Working for Wetland, Mondi wetlands project) and other relevant research institutions. As a results wetland stakeholders in the Limpopo Province network and interact through the Limpopo wetlands Forum which is informally coordinated and chaired by SANBI (Working for Wetland) World Wetlands Day is celebrated every year on 2nd of February throughout South Africa and international community.
    [Show full text]
  • Improving Newborn Care in South Africa
    Improving Newborn Care in South Africa Lessons learned from Limpopo Initiative for Newborn Care (LINC) January 2011 Commissioned by UNICEF With technical guidance and collaboration with the National Department of Health, the Limpopo Provincial Department of Health, and the Department of Paediatrics, University of Limpopo in South Africa. Acknowledgements to Dr Fge Bonnici, Dr L Bamford, Dr S Crowley, Dr A Robertson-Sutton Published by UNICEF South Africa 6th Floor, Metro Park Building 351 Schoeman Street i Pretoria PO Box 4884 Pretoria 0001 Telephone: +27 12 354 8201 Facsimile: +27 12 354 8293 www.unicef.org/southafrica www.facebook.com/unicefsouthafrica First published 2011 Design and typesetting by Farm Design, www.farmdesign.co.za ii Contents List of abbreviations iv List of figures iv List of tables v Introduction – Newborn care in district hospitals in South Africa 1 Limpopo Province 5 Limpopo Province 6 Comparison with other Provinces 8 The LINC approach 11 What is LINC and how does it work? 12 Impact on capacity, quality and outcomes of neonatal care 15 Impacts on capacity for and quality of neonatal care 16 Impacts on human resources 22 Impact on neonatal health outcomes 24 Cost & resources 29 At provincial level 30 At facility level 31 Summary of key achievements 33 Advancing the commitment to newborn care 34 Building system-wide capacity 34 Outputs and outcomes 35 Lessons for policy makers & programme officers 37 At national and provincial levels 38 At health facility level 38 What are the key strengths and limitations of the
    [Show full text]
  • Accreditated Shooting Ranges
    A C C R E D I T A T E D S H O O T I N G R A N G E S CONTACT CONTACT PHYSICAL POSTAL NAME E-MAIL PERSON DETAILS ADDRESS ADDRESS EASTERN CAPE PROVINCE D J SURRIDGE T/A ALOE RIDGE SHOOTING RANGE DJ SURRIDGE TEL: 046 622 9687 ALOE RIDGE MANLEY'S P O BOX 12, FAX: 046 622 9687 FLAT, EASTERN CAPE, GRAHAMSTOWN, 6140 6140 K V PEINKE (SOLE PROPRIETOR) T/A BONNYVALE WK PEINKE TEL: 043 736 9334 MOUNT COKE KWT P O BOX 5157, SHOOTING RANGE FAX: 043 736 9688 ROAD, EASTERN CAPE GREENFIELDS, 5201 TOMMY BOSCH AND ASSOCIATES CC T/A LOCK, T C BOSCH TEL: 041 484 7818 51 GRAHAMSTAD ROAD, P O BOX 2564, NOORD STOCK AND BARREL FAX: 041 484 7719 NORTH END, PORT EINDE, PORT ELIZABETH, ELIZABETH, 6056 6056 SWALLOW KRANTZ FIREARM TRAINING CENTRE CC WH SCOTT TEL: 045 848 0104 SWALLOW KRANTZ P O BOX 80, TARKASTAD, FAX: 045 848 0103 SPRING VALLEY, 5370 TARKASTAD, 5370 MECHLEC CC T/A OUTSPAN SHOOTING RANGE PL BAILIE TEL: 046 636 1442 BALCRAIG FARM, P O BOX 223, FAX: 046 636 1442 GRAHAMSTOWN, 6140 GRAHAMSTOWN, 6140 BUTTERWORTH SECURITY TRAINING ACADEMY CC WB DE JAGER TEL: 043 642 1614 146 BUFFALO ROAD, P O BOX 867, KING FAX: 043 642 3313 KING WILLIAM'S TOWN, WILLIAM'S TOWN, 5600 5600 BORDER HUNTING CLUB TE SCHMIDT TEL: 043 703 7847 NAVEL VALLEY, P O BOX 3047, FAX: 043 703 7905 NEWLANDS, 5206 CAMBRIDGE, 5206 EAST CAPE PLAINS GAME SAFARIS J G GREEFF TEL: 046 684 0801 20 DURBAN STREET, PO BOX 16, FORT [email protected] FAX: 046 684 0801 BEAUFORT, FORT BEAUFORT, 5720 CELL: 082 925 4526 BEAUFORT, 5720 ALL ARMS FIREARM ASSESSMENT AND TRAINING CC F MARAIS TEL: 082 571 5714
    [Show full text]
  • Robinson R44 ZS-PZZ Fatal 9160 Tmed__
    Section/division Occurrence Investigation Form Number: CA 12-12a AIRCRAFT ACCIDENT REPORT AND EXECUTIVE SUMMARY Reference: CA18/2/3/9160 Aircraft ZS-PZZ Date of Accident 5 April 2013 Time of Accident 1630Z Registration Type of Type of Aircraft Robinson R44 II Raven (Helicopter) Private Flight Operation Commercial Pilot Pilot-in-command Licence Type Age 49 Licence Valid Yes Licence (CPL) Pilot -in -command Flying Total Flying Hours ± 7913,2 Hours on Type ± 2222,5 Experience Last point of departure Bela-Bela (private airfield) in Limpopo Province Next point of intended landing Roedtan (private airfield) in Limpopo Province Location of the accident site with reference to easily defined geographical points (GPS readings if possible) Nylstroom, near Bela-Bela in Limpopo province; GPS co-ordinates: S 24˚44’940” E028˚29’020”. Visibility: Low visibility, temperature:17˚, wind gusts: 20 kts, wind speed: 9 Meteorological Information kts. Number of people on 1 + 0 No. of people injured 0 No. of people killed 1 board Synopsis The pilot was the sole occupant on board the Robinson RH44 helicopter. He flew the helicopter from Bela- Bela to Roedtan. The pilot lost sight of the ground in the process of avoiding the thunderstorm. A thunderstorm intercepted the flight path to Roedtan. .The pilot was fatally injured. The helicopter was destroyed in the accident. An investigation determined that the pilot may have experienced spatial disorientation from which he could not recover. It resulted in the helicopter colliding with terrain (controlled flight into terrain – CFIT). The helicopter was investigated and no abnormality was identified with its operation, hence its operation was determined to be irrelevant to the accident.
    [Show full text]
  • Amazon Missions
    AMAZON MISSIONS APRIL 2015 LIMPOPO & MPUMALANGA TOUR Chief Gustavo (Get us to work ) OUR TOUR COVERS THESE AREAS YOU’RE WELCOME TO INVITE US LIMPOPO: Ellisras, Soutpansberg, Valley of the Olifants, Ba-Phalaborwa, Bela-Bela, Bosbokrand, Me and Grant Duiwelskloof, Lephalale, Giyani, Hoedspruit, Waterberg, Letsitele, Leydsdorp, Louis Trichardt, Modimolle, Mogwadi, Mokopane, Potgietersrus, Nylstroom, Dendron, Giant Water Lily Leaves Messina, Naboomspruit, Mookgophong, Phalaborwa, Polokwane (Pietersburg), Seshego, Thabazimbi, Thohoyandou, Tzaneen, Vaalwater, Soutpansberg, Capricorn, Moria, Bandelierkop, Dendron, Roedtan. MPUMALANGA: Witbank, White River, Waterval Boven, Wakkerstroom, Volksrust, Vaalbank, Trichardt, Standerton, Skukuza, Makuna Mask Secunda, Sabie, Piet Retief, Ohrigstad, Komatipoort, Kaapmuiden, Hectorspruit, Hartebeeskop, Greylingstad, Amersfoort, Amsterdam, Avontuur, Asai Palm Fruit Badplaas, Balfour, Balmoral, Barberton, Belfast, Bethal, Breyten, Bushbuckridge, Carolina, Chrissiesmeer, Delmas, Dullstroom, Ermelo, Greylingstad. And everywhere in between. Please CALL, WHATSAPP or SMS us if you, your family or friends live in these areas and we’d love to arrange and address your group at your home, school, church, guesthouse, men’s -, ladies’ group etc. HOT OFF THE PRESS 2014 flowed excellently into 2015 which began with a bang! After a seasonal stretch in South America, we’re excited to share about the progress amongst the Indian Tribes. With Grant from NZ in Colombia Presently here now in April until May 2015, we’re on tour in Limpopo and Mpumalanga, sharing about reaching the unreached Indian Tribes in the Amazon jungle and supporting reached communities. Makuna Chiefs You’re welcome to invite us to share at any venue in your community or any other gathering you can think of! We do this with music, video, photo projection, props from the Amazon and testimonies of “Saved from the claws of death.” (See contact details below.) The pictures in this newsletter give you a good idea about what is happening.
    [Show full text]
  • LIMPOPO © for The2010worldcup, Besure Toalsogetoutoftown
    © Lonely Planet 482 Limpopo If South Africa’s northernmost province sounds familiar, it could be from Rudyard Kipling’s Just So Stories, in which the curious young elephant treks to ‘the great grey-green, greasy Limpopo River, all set about with fever trees’. While Kipling’s pachyderm unintentionally gains a trunk, curious humans might, similarly, cross Limpopo to access Kruger National Park and stumble upon the less-visited Valley of the Olifants. The subtropical area packs in misty Magoebaskloof, where waterfalls crash in the forests, and mysterious Modjadji, home of rain-summoning queens and Modjadji palms (cycads). The mystique continues in the Venda region, a traditional area where a python god is believed to live in Lake Fundudzi, and artists produce highly original work. And that’s just to the east of the N1. To the west, attractions include the Waterberg, where the Big Five, the endangered Cape vulture and, yes, fever trees are found in the mountains. Heading north from there, the savannah gives way to the Soutpansberg, an island of biodiversity with 540 bird species, and secluded lodges at the top of steep tracks. Then the baobab trees appear, and the empty roads lead to Mapungubwe National Park, where the remains of a millennium-old civilisation overlook the confluence of the Limpopo and Shashe Rivers. With icons ranging from Mapungubwe’s gold-plated rhino figurine to ‘Breaker’ Morant, the second Anglo-Boer War folk hero, Limpopo is an extraordinarily diverse province. If one thing unites its tourist operators, including Fair Trade lodges and art or birding routes, it’s that they offer visitors something completely different.
    [Show full text]
  • "Ivanplats Approved Social and Labour Plan, June 2021"
    SOCIAL AND LABOUR PLAN 2021-2025 Submitted as Annexure G, as contemplated in Regulation 46 of the Mineral and Petroleum Resources Development Act, 2002 (Act number 28 of 2008) Social and Labour Plan Regulation 46 (a) to (f) Revised March 2021 1 IVANPLATS (PTY) LTD- SOCIAL AND LABOUR PLAN: 2021 – 2025 – Rev11 Table of Contents LIST OF TABLES .............................................................................................................................................................. 5 LIST OF FIGURES ............................................................................................................................................................ 7 ABBREVIATIONS ............................................................................................................................................................. 8 DEFINITIONS .................................................................................................................................................................... 9 PART ONE ...................................................................................................................................................................... 10 Regulation 46 (a): Preamble ......................................................................................................................................... 10 About Ivanplats (Pty) Ltd ........................................................................................................................................... 10 Submission
    [Show full text]
  • Mookgophong Local Municipality Mookgophong Local Municipality
    Mookgophong Local Municipality Mookgophong Local Municipality 2012/2017 INTERGRATED DEVELOPMENT PLAN 0 Mookgophong Local Municipality CHAPTER 1 FOREWORD BY THE MAYOR: Honourable Councillors, distinguished guests as well as the distinguished Community of Mookgophong, all of us we to take action to ensure that we are heading for a better life for all who lives in Mookgophong. Over the past year through active participation of our community in planning, we have worked hard to ensure that our community have access to basic services and housing provision. During the compilation of our integrated development plan which remains the strategic planning instrument that guide and inform all planning, development and decisions with regard to development in this Municipality. We have taken into consideration that triple challenge of unemployment, poverty and inequality still persist, Africans, women and the youth continue to suffer most from this challenge. As a municipality it is our top priority to take the decision that we should do more to grow the Municipality’s economy, in order to get rid of the problems of unemployment, poverty and inequality in the municipality. Those are the three things that we will face head on, this year and in the coming years as it’s also a national priority. We will be focusing on job creation, stimulating growth of robust local economy, social cohesion and Nation building as well as environmental sustainability. Our priorities to achieve the above outputs, in this FY, will still be focusing on the following: Provision of water Provision of sanitation Provision of sites for middle income earners Adequate storm water control Creation of jobs to eradicate poverty.
    [Show full text]
  • Grain Production Regions Silo/Intake Stands Per Region Indicating Type of Storage Structure
    Grain Production Regions Silo/Intake stands per region indicating type of storage structure Region 17: North-West Central Northern Region (Ottosdal) NWK Boschpoort (Bags/Bins/Bulk) NWK Vermaas (Bins) NWK Kleinharts (Bins) Senwes Hartbeesfontein (Bins) NWK Ottosdal (Bins) Senwes Melliodora (Bins) NWK Rostrataville (Bins) Senwes Werda (Bins) Region 18: North-West Central Region (Ventersdorp) NWK Bodenstein (Bins) Senwes Makokskraal (Bins) NWK Coligny (Bins) Senwes Potchefstroom (Bins) Senwes Buckingham (Bins) Senwes Ventersdorp (Bins) Senwes Enselspruit (Bins) Region 19: North-West Central Region (Lichtenburg) Afgri Lichtenburg (Bunkers) NWK Lottie Halte (Bins) NWK Grootpan (Bins) NWK Lusthof (Bins) NWK Halfpad (Bins) NWK Lichtenburg Silo 3 (Bins) NWK Hibernia (Bins) NWK Lichtenburg Silo 5 (Bins) Region 20: North-West Eastern Region Afgri Battery (Bins) NWK Koster (Bins) Afgri Brits (Bins) NWK Swartruggens (Bins) NWK Boons (Bins) NWK Syferbult (Bins) NWK Derby (Bins) Region 21: Free State North-Western Region (Viljoenskroon) Senwes Attie (Bins) Senwes Vierfontein (Bins) Senwes Groenebloem (Bins) Senwes Viljoenskroon (Bins) Senwes Heuningspruit (Bins) Senwes Vredefort (Bins) Senwes Koppies (Bins) Senwes Weiveld (Bins) Senwes Rooiwal (Bins) Region 24: Free State Central Region Senwes Bloemfontein (Bins) Senwes Petrusburg (Bins) Senwes Brandfort (Bins) Senwes Theunissen (Bins) Senwes De Brug (Bins) Senwes Van Tonder (Bins) Senwes Geneva (Bins) Senwes Welgeleë (Bins) Senwes Hennenman (Bins) Senwes Winburg (Bins) Senwes Kroonstad (Bins) 13 South
    [Show full text]
  • 2020 – 2021 Reviewed Integrated Development Plan
    2020 – 2021 REVIEWED INTEGRATED DEVELOPMENT PLAN (2016-2021 IDP) 1 2020/21 IDP TABLE OF CONTENTS List of Acronyms .......................................................................................................................................... 3 Foreword by the Mayor ................................................................................................................................ 5 Executive Summary ..................................................................................................................................... 6 PRE-PLANNING PHASE Municipal Vision, Mission & Values ........................................................................................................... 7 Chapter One – The Planning Framework ................................................................................................... 8 ANALYSIS PHASE Chapter Two – Municipal Profile ............................................................................................................................... 28 Chapter Three – Spatial Analysis .............................................................................................................................. 34 Chapter Four – Environmental, Social and Economic Analysis ............................................................................. 52 Chapter Five – Basic Services Analysis ................................................................................................................... 81 Chapter Six – Financial Analysis ..............................................................................................................................
    [Show full text]
  • Draft Integrated Development Plan
    DRAFT INTEGRATED DEVELOPMENT 2021/22 PLAN 1 THIS IS A COPY OF A DRAFT INTEGRATED DEVELOPMENT PLAN 2021/22 TO BE NOTED BY COUNCIL END MARCH 2021 2 Chairperson of Executive Committee In terms Section 79 of Municipal Structures Act No. 117 of 1998 And Also The Custodian of Integrated Development Plan and Municipal Budget In terms of Section 21 of Municipal Finance Management Act 56 of 2003 ------------------------------------------------------------------------------------- His Worship, Mayor John Michael Fischer 3 Chairperson of Council and custodian of rules and code of ethics For Councillors In terms of Section 36 of Municipal Structures Act No. 117 of 1998 -------------------------------------------------- Honourable Speaker, Cllr Thane Hearne 4 5 BRIEF DESCRIPTION OF THE COAT OF ARMS Description of the elements of the Coat of Arms for Thabazimbi Local Description of the colours of the Coat of Arms of Thabazimbi Municipality: Municipality: The Sun: Symbolizes a brighter future for the municipality. Red: The rich soil upon which our livelihood depends that must be The Density (horizontal w shape): This shape represents the mountain ranges sustainable exploited for future generations. that create the spectacular scenic beauty that characterizes the plains of Thabazimbi and the Greater Waterberg area. It is also related to the name of the municipality, "Thaba" meaning mountain while "Zimbi" means iron. Blue: Represents the ever important dependence on the water elements we The Hut: Symbolizes the need for unity and encourages all people regardless of find in the Crocodile River, streams and underground water resources. race, colour and creed to feel that the town is their home. The Hut also represents the cultural and traditional life of the people of Thabazimbi.
    [Show full text]
  • Eskom Chromore DWAF03 DWAF02 Gompies Revised 02 (Reduced).Pdf
    Prepared for: MOKWALE CONSULTING 76 Hans Van Rensburg Street Parklane Building Polokwane 0699 Tel 0152970030 Fax 0152975757 A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR ESKOM’S PROPOSED 132kV POWER LINES BETWEEN THE GOMPIES AND DWAF02 SUBSTATIONS AND BETWEEN THE CHROMORE AND DWAF03 SUBSTATIONS ON THE NORTHERN EDGES OF THE SPRINGBOK FLATS IN THE LIMPOPO PROVINCE PREPARED BY: DR JULIUS CC PISTORIUS Archaeologist & Heritage Consultant 352 Rosemary Street Lynnwood 0081 PO Box 1522 Roodekuil Bela Bela 0480 November 2012 Tel and fax 0147362115 Cell 0825545449 EXECUTIVE SUMMARY A Phase I Heritage Impact Assessment (HIA) study as required in terms of Section 38 of the National Heritage Resources Act (No 25 of 1999) was done for Eskom’s proposed construction of 132kV power lines on the northern edges of the Springbok flats between Roedtan and Zebediela in the Limpopo Province. The construction of the proposed 132kV power lines between the Gompies and the DWAF02 Substations and between the Chromore and DWAF03 Substations is referred to as the Eskom Project whilst the footprint to be affected by the project is referred to as the Eskom Project Area. The aims with the Phase I HIA study were the following: To establish whether any of the types and ranges of heritage resources (‘national estate’) as outlined in Section 3 of the National Heritage Resources Act (No 25 of 1999) do occur in the Eskom Project Area and, if so to determine the significance of these heritage resources, and To make recommendations regarding the mitigation and management of significant heritage resources that may be affected by the Eskom Project.
    [Show full text]