(BORED PILE / D-WALL) TRACK RECORD Item Project Contractor

Total Page:16

File Type:pdf, Size:1020Kb

(BORED PILE / D-WALL) TRACK RECORD Item Project Contractor SONIC LOGGING TEST (BORED PILE / D-WALL) TRACK RECORD Type of Item Project Contractor Year piles Alpha Focus (Singapore) 1 ER403 Nicoll Highway / Guillemard Road Junction Bored pile 2013 Pte Ltd Tuas West Extension C1686 Cambrian Engineering 2 - Construction of Tuas West Road and Tuas Link Bored pile 2013 Corporation Pte Ltd Stations Downtown Line 3 Contract 923 Dongah Geological 3 - Construction of Upper Changi Station and Associated Bored pile 2013 Engineering Co. Ltd Tunnels 4 235 Balestier Road Leong Hin Piling Pte Ltd Bored pile 2013 5 M+S Ophir Rochor Resource Piling Bored pile 2013 Downtown Line 2 C920 Shanghai Tunnel 6 D-wall 2013 - Construction of Newton Station Engineering Co Ltd Downtown Line Stage 3 Contract 927 - Construction of Cambrian Engineering 2013- 7 Bored pile Bedok Reservoir Station and Tunnels Corporation Pte Ltd 2014 Downtown Line Stage 3 Contract 937 Dongah Geological 2013- 8 D-wall - Construction of Fort Canning Station Engineering Co. Ltd 2014 Dongah Geological 9 UIC Redevelopment @ Shenton Way D-wall 2014 Engineering Co. Ltd Thomson Line Contract T202 10 Civil Tech Pte Ltd Bored pile 2016 - Construction of Woodlands North Station C9061 Design and Construction of Stabiling Yard at 11 W Foundations Pte Ltd Bored pile 2017 Gali Batu Depot Thomson Line Contract T217 12 W Foundations Pte Ltd Bored pile 2017 - Construction of Napier Station and Tunnels HSL Ground Engineering 2017 - 13 Improvement Works to Bedok Canal Contract 1 and 2 Bored pile Pte Ltd 2018 Proposed Erection of 2 Blks of 7/8-Storey Multi-User Research & Development Building with Auditorium, Shops and Restaurants at 1st & 2nd Storey and 1 Blk of HSL Ground Engineering 14 9-Storey Office Building with a Basement Carpark Bored pile 2018 Pte Ltd (Western Water Catchment Planning Area) at MK 09 LOT01759N PT, MK 09 LOT01814T PT, Cleantech Loop Thomson-East Coast Line Contract T301 HSL Ground Engineering 2018 - 15 - Construction of 4-in-1 Rail and Bus Depot and Bored pile Pte Ltd 2019 Reception Tunnels Thomson-East Coast Line Contract T302 16 Zap Piling Pte Ltd Bored pile 2018 - Construction of Facility Building and Tunnels Dongah Geological 17 SP underground Substation (UGSS) D-wall 2019 Engineering Co. Ltd 18 SGA @ Sunview Drive Zap Piling Pte Ltd Bored pile 2019 Thomson-East Coast Line Contract T309 HSL Ground Engineering 19 D-wall 2019 - Construction of Siglap Station Pte Ltd PUB DTSS Koh Brothers-China 20 D-wall 2021 - Tuas Water Reclamation Plant Contract 2A Harbour Joint Venture PDA / PIT TEST (BORED PILE / MICROPILE / RC PILE / H-PILE) TRACK RECORD FOR YEAR 2020 S/N Project Contractor Type of Type of Pile Test 1 Canberra Link EC Asia Piling Co Pte Ltd Bored Pile PDA / PIT 2 SIT Campus Bored Pile PDA / PIT 3 Corporation Drive Hiap Seng Piling RC Pile PDA 4 14A Tuas South Link 2 Construction Pte Ltd RC Pile PDA 5 De Souza Ave RC Pile PDA 6 56 South Bouna Vista Road (Kent Ridge Hill) RC Pile PDA / PIT 7 Senoko Drive RC Pile PDA 8 Tanglin Trust School HSL Ground Engineering Pte Bored Pile PDA / PIT 9 Tengah Garden C2 Ltd Bored Pile PDA / PIT 10 Blk 206A Punggol Place Kwang Sing Engineering Pte Steel Pipe PDA Ltd Pile 11 990 Bendeemer Road Steel Pipe PDA Pile 12 Changi Cargo Econ2 Builder Pte Ltd RC Pile PDA / PIT 13 C190 ITTC Hiap Seng Piling RC Pile PDA / PIT 14 Citimac Complex Construction Pte Ltd H-Pile PDA 15 Jurong Island GMT RC Pile PDA 16 Kentridge Hill RC Pile PDA 17 Mandai Rain Forest RC Pile PDA / PIT 18 Naval Base RC Pile PDA 19 Offshore Marine Centre 2 Spun Pile PDA / PIT 20 Punggol North C1/C2 H-Pile PDA 21 Punggol West C39 RC Pile PDA 22 N109 POB-19 Deck Post HSB-Chye Joo-Ho Lee JV H-Pile PDA 23 17 Kallang Junction HSL Ground Engineering Pte Bored Pile PDA / PIT 24 SIN-06 Woodlands Data Centre Ltd Bored Pile PDA / PIT 25 Tuas Water Reclamation Plant C1A Bored Pile PDA 26 6 Serenade Walk Kwang Sing Engineering Pte Steel Pipe PDA Ltd Pile 27 33 Faber Green Steel Pipe PDA Pile 28 Punggol Town Hub Asia Piling Co Pte Ltd Bored Pile PDA 29 Sky Everton Bored Pile PDA 30 T311 Bedok South Station China Jinye Engineering Bored Pile PDA 31 92 Tuas South Ave 3 Hiap Seng Piling RC Pile PDA 32 South Buona Vista Road Construction Pte Ltd RC Pile PDA / PIT 33 Bedok Canal 2 HSL Ground Engineering Pte Bored Pile PDA 34 Shimano Ltd Bored Pile PDA PDA / PIT TEST (BORED PILE / MICROPILE / RC PILE / H-PILE ) TRACK RECORD FOR YEAR 2019 Type of S/N Project Contractor Type of Pile Test 1 18CBLEC PDA 2 Areana Residence Asia Piling Co Pte Ltd Bored Pile PDA 3 Huamin Primary School PDA 4 27 Ewart Park RC Pile PDA 5 HTA 5 RC Pile PDA 6 Tuas South Boulevard Yard RC Pile PDA 7 Tuas Bay Close RC Pile PDA / PIT 8 JIWE RC Pile PDA 9 No.28 Jalan Buroh RC Pile PDA 10 20 Loyang Crescent RC Pile PDA 11 T227 Marina South Station RC Pile PDA / PIT 12 CAG PKG 2 (Area 10, 11, 12 & 16) Hiap Seng Piling Construction RC Pile PDA / PIT 13 Changi Airbase Shelter 3 Pte Ltd Spun Pile PDA 14 JTC New Pipe Rack C1805 RC Pile PDA 15 SMC Manufactor RC Pile PDA 16 Punggol North Phase 3A RC Pile PDA / PIT 17 Corporation Drive RC Pile PDA / PIT 18 56 South Bouna Vista Road (Kent Ridge Hill) RC Pile PDA / PIT 19 TTF2 RC Pile PDA 20 Bedok Reservoir RC Pile PDA 21 Verdale (JJK) RC Pile PDA 22 National Skin Centre Bored Pile PDA 23 Shimano @ Jalan Bahar Bored Pile PDA 24 T211 Bright Hill Station Micropile PDA HSL Ground Engineering Pte 25 Rochester Park Bored Pile PDA Ltd 26 SMU-X @ Fort Canning Link Bored Pile PDA 27 Tengah Airbase Bored Pile PDA 28 Tank Farm Modifictaion @ Tuas South Ave 6 Micropile PDA 29 No.148 Saraca Road Steel Pipe Pile PDA 30 817 Bukit Batok West Ave 5 Steel Pipe Pile PDA Kwang Sing Engineering Pte 31 Kranji Loop Ltd Steel Pipe Pile PDA 32 31 Cornwall Garden Steel Pipe Pile PDA 33 104 Kampong Java Road Steel Pipe Pile PDA Peck Brothers Construction Pte 34 60 Marsiling Road Steel Pipe Pile PDA Ltd 35 C10-12 @ Bidadari Park Drive Bored Pile PDA / PIT 36 Punggol Town Hub Bored Pile PDA Progress Piling Pte Ltd 37 Punggol North C13 Bored Pile PDA / PIT 38 9 Amber Road Bored Pile PDA 39 UMC @ 3 Pasir Ris Drive 12 Ryobi Geotech Pte Ltd Micropile PDA 40 Geylang C26A Sengfa Piling Pte Ltd Bord Pile PDA 41 A&A @ Nee Soon Shen Sheng EC & E Pte Ltd Bord Pile PDA PDA / PIT TEST (BORED PILE / MICROPILE / RC PILE / H-PILE) TRACK RECORD FOR YEAR 2018 Type of S/N Project Contractor Type of Pile Test 1 Punggol North C4 Asia Piling Co Pte Ltd Bored Pile PDA / PIT 2 Bidadari Park Drive @ C10-12 Bored Pile PDA / PIT 3 Hougang N3C13 Bored Pile PDA / PIT 4 No.13 & 15 Sungei Kadut St 4 Bored Pile PDA 5 66KV ESS @ Tagore Road Bored Pile PDA 6 Bedok North C8 Bored Pile PDA 7 ISH @ Red Swastika School Bored Pile PDA 8 Bedok Green Secondary School Bored Pile PDA 9 Orchid Park Secondary School Bored Pile PDA 10 Bukit Batok N4 C22-23 Bored Pile PDA / PIT 11 Bukit Batok N1C15 Bored Pile PDA / PIT 12 13 International Business Park Bored Pile PDA 13 Punggol Phase 2B Chang Tai Foundation Pte Ltd RC Pile PDA Chye Joo Construction Pte 14 Jurong Community Club Bored Pile PIT Ltd 15 No.3 Aroozoo Lane Singapore 539796 (Plot 1) Hiap Seng Piling Construction RC Pile PDA 16 ER521A Pte Ltd RC Pile PDA 17 T227 Marina Boulevard RC Pile PDA / PIT 18 Changi Airport PKG-2 (CAG-PKG) Area 2, 4,10, 11 RC Pile PDA / PIT ASAHI Kasei SSP Expansion at Jurong Island 19 RC Pile PDA Singapore 20 NASH (KMG) RC Pile PDA 21 Changi Hangar Complex RC Pile PDA 22 No. 118 Pioneer Road RC Pile PDA 23 Bukit Timah First Diversion Canal RC Pile PDA 24 Tuas Shipyard Phase 1 RC Pile PDA 25 Tuas Shipyard Phase 3A RC Pile PDA 26 T301 Bus Depot Zone 4 RC Pile PDA / PIT 27 T301 Bus Depot Zone 2 RC Pile PDA / PIT 28 Jalan Remaja RC Pile PDA 29 Buangkok Drive RC Pile PDA / PIT 30 JTC Jalan Terusan RC Pile PDA 31 Tampines N6C2B RC Pile PDA 32 Twin View @ West Coast Vale Bored Pile PDA HSL Ground Engineering Pte 33 Contract T309 Bored Pile PDA Ltd 34 JTC Cleantech 3 Bored Pile PDA 35 Geylang C15 JF Foundation Pte Ltd Bored Pile PDA Kim Lian Bee Piling 36 CAG PKG 1 (Area 39-3) RC Pile PDA Construction Pte Ltd 37 33/35 Loyang Drive Leong Hin Piling (Pte) Ltd Bored Pile PDA 38 LTA T303 Tanjong Rhu Ryobi Geotech Pte Ltd Micropile PDA T301-Construction of 4 in 1 Rail & Bus Depot & 39 Sambo E&EC Pte Ltd Bored Pile PDA / PIT Reception Tunnels Thomson-East Coast Line 40 No.16 Soon Lee Road Singapore 628079 Steel Pipe Pile PDA Shintai Piling Pte Ltd 41 Shaft 1 Plan at Banyan Avenue Steel Pipe Pile PDA PDA / PIT TEST (BORED PILE / MICROPILE / RC PILE / H-PILE ) TRACK RECORD FOR YEAR 2017 Type of S/N Project Contractor Type of Pile Test 1 Pulau Sebarok Jetty 2, Singapore BMT Asia Pacific Spun pile PIT Thomson Line Contract T202 - Construction of 2 Civil Tech Pte Ltd Bored pile PIT Woodlands North Station & Tunnels 3 Yishun Ave 4 - Bus Shelter 2 Hiap Seng Piling RC pile PIT 4 Kranji Recreation Centre Construction Pte Ltd RC pile PDA / PIT RC pile / Steel 5 No.
Recommended publications
  • 20130830 Holleczek Etal Digit
    ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! This paper might be a pre-copy-editing or a post-print author-produced .pdf of an article accepted for publication. For the definitive publisher-authenticated version, please refer directly to publishing house’s archive system. Digital breadcrumbs: Detecting urban mobility patterns and transport mode choices from cellphone networks Thomas Holleczek, Liang Yu, Joseph K. Lee, Oliver Senn, Kristian Kloeckl, Carlo Ratti, Patrick Jaillet September 2, 2013 Many modern and growing cities are facing declines in public transport usage, with few efficient methods to explain why. In this article, we show that urban mobility patterns and transport mode choices can be derived from cellphone call detail records coupled with public transport data recorded from smart cards. Specifically, we present new data mining approaches to determine the spatial and temporal variability of public and private transportation usage and transport mode preferences across Singapore. Our results, which were validated by Singapore’s quadriennial Household Interview Travel Survey (HITS), revealed that there are 3.5 (HITS: 3.5 million) million and 4.3 (HITS: 4.4 million) million inter-district passengers by public and private transport, respectively. Along with classifying which transportation connections are weak or underserved, the analysis shows that the mode share of public transport use increases from 38 % in the morning to 44 % around mid-day and 52 % in the evening. 1Introduction Securing public transportation ridership is critical for developing a sustainable urban future. However, existing systems for analyzing and identifying weaknesses in public transport connec- tions face major limitations. In cities, origin-destination (OD) matrices—which measure the flow of people between di↵erent geographical regions—are often generated using household surveys and roadside monitoring, approaches which are time consuming, expensive, and lack spatial and temporal accuracy [1].
    [Show full text]
  • The Intervention of Plants in the Conflicts Between Buildings and Climate
    THE INTERVENTION OF PLANTS IN THE CONFLICTS BETWEEN BUILDINGS AND CLIMATE ─ A CASE STUDY IN SINGAPORE CHEN YU (B. Arch., M.A. (Arch.)) A THESIS SUBMITTED FOR THE DEGREE OF DOCTOR OF PHILOSOPHY DEPARTMENT OF BUILDING NATIONAL UNIVERSITY OF SINGAPORE 2006 ACKNOWLEDGMENTS I could not come this far without my supervisor, Associate Prof. Wong Nyuk Hien, who guided, encouraged, and supported me not only as a patient teacher but also a great friend. I did benefit a lot from the unrestricted research environment and the tradition of being productive in his team. My appreciation should also extend to my thesis committee members, Dr. Lim Guan Tiong and Dr Liew Soo Chin for their invaluable advices and interests in my research work. It is also my deep gratitude that I can work under many different research projects during the last few years with Dr Tan Puay Yok, Ms Ong Chui Leng, Ms Angelia Sia from National Parks Board (NParks), Mr Wong Wai Ching from Building and Construction Authority (BCA), Mr Wong Siu Tee and Mr Calvin Chung From JTC Corporation, and Ms Tay Bee Choo from Housing and Development Board (HDB). The invaluable experience and the related research findings are of great help in this dissertation writing. Of particular significant is the experimental environment and the plants provided by NParks in its Pasir Panjiang nursery. I am grateful to Ms Boo Chih Min, Dr Tan Puay Yok, and Ms Angelia Sia for their effort in expediting the process. Meanwhile, without the kind help provided by Madam Chua-Tan Boon Gek and Ms Sanisah Rasman on the spot, the tedious field work would exhaust my patience at the very beginning.
    [Show full text]
  • Press Release
    EMBARGOED TILL 8.00PM, 8 SEPTEMBER 2016 PRESS RELEASE Unveiling the Masterplan for Tengah : At Home With Nature Minister for National Development, Mr Lawrence Wong unveiled the masterplan for Singapore’s 24th HDB town, Tengah, at the HDB Awards Ceremony on 8 September 2016. Following the announcement, a public exhibition on the key planning concepts for Tengah will be held from 9 to 25 September 2016 at HDB Hub. 2 As the master planner and developer of Singapore’s public housing estates, HDB is constantly on the lookout for innovative ideas to provide residents with a quality living environment. In line with HDB’s Roadmap to provide well-designed, sustainable and community-centric towns, we have seen the steady completion of a new generation of public housing projects in recent years, each with their own distinctive designs, abundant green spaces, seamlessly-connected cycling and pedestrian networks, and vibrant community spaces for interaction. The upcoming new “Forest Town”, Tengah, will further raise the bar for public housing, with its fresh planning concepts, bold ideas and innovative designs. 3 Located in the Western region of Singapore, Tengah is bounded by the Kranji Expressway (KJE), Pan-Island Expressway (PIE), Brickland Road and Bukit Batok Road. The key driving planning concept behind Tengah is the creation of a “Forest Town”, with homes surrounded by lush greenery and nature, where residents can enjoy quality living and connect with the community in a myriad of amenities and green spaces. Tengah, Singapore’s 24th HDB town, will be transformed into a “Forest Town” that is green, sustainable and smart EMBARGOED TILL 8.00PM, 8 SEPTEMBER 2016 4 The development of Tengah will be guided by six key ideas as follows: Creating an evergreen forest town Provisions for moving around with ease Provisions for walking and cycling everywhere Creating five unique housing districts Enabling close-knit communities Creating a Smart and sustainable town 5 Tengah will see several ‘firsts’ in its development.
    [Show full text]
  • (NSS)'S Position on HDB's Tengah Forest Plan Summary Introduction
    Nature Society Singapore (NSS)’s Position on HDB’s Tengah Forest Plan Summary The HDB’s plan for a ‘Forest Town’ at Tengah is laudable in the setting aside of a 5km-long and 100m-wide green corridor called the ‘Tengah Nature Way’ (TNW) --- for wildlife dispersal between the Western Catchment and the Central Nature Reserve (Bukit Timah & Central Catchment). The plan to green and soften up the one and large Canal in the area running north into the Kranji Reservoir extends admirably what has been accomplished at the Kallang River in Bishan Park. But disappointingly, HDB’s vision of a forest town involves only about 7 % or slightly more of the original forest being set aside for the conservation of biodiversity. Given the impressive records from NParks’ survey of wildlife in the area, NSS’ position is that this will be tragic for the rich wildlife currently inhabiting the area. In terms of ecological sustainability, there is lacking a robust plan for the ‘Forest Town’. Here, NSS proposes that there should be two core forest areas set aside at both ends of the TNW as havens for the remaining wildlife in the area after the completion of the housing development --- both of which can also function as resting and calming stop-overs for those wildlife on long-range dispersal. NSS also indicates here the directional thrust on both the western and the eastern end of TNW for an effective connectivity between the Western Catchment and the Central Nature Reserve --- as well as a green waterway connectivity from the Canal to the marshland of the Kranji Marshes Park to the north.
    [Show full text]
  • BBR Holdings Reported S$114.6 Million Revenue for Its First Nine Months Ended 30 September 2017
    MEDIA RELEASE For Immediate Release BBR Holdings reported S$114.6 million revenue for its first nine months ended 30 September 2017 Highlights: Earning per share improved at 1.07 cents Net Asset Value per share stood at 41.54 cents Acquisition of Goh & Goh completed with developmental plans on track SINGAPORE, 6 November 2017 – MAINBOARD-LISTED BBR Holdings (S) Ltd (BBR 控股) (“BBR” or “the Group”) announced today that the Group has recorded revenue of S$114.6 million in the first nine months of FY2017 (9M2017) compared to S$212.4 million in the first nine months of FY2016 (9M2016). Net profit attributable to equity holders of the Company rose to S$3.4 million in 9M2017 compared to a net loss of S$8.5 million in 9M2016, mainly from improved results of associates’ and joint ventures’ profits. Group revenue decreased by 46.1% from S$212.4 million in 9M2016 to S$114.6 million in 9M2017. The decline in revenue in both the General Construction Segment and Specialist Engineering Segment were due to lower project work activities in the current financial year. However, gross profit increased by S$8.1 million with an improvement in the gross profit margin from 3.6% to 13.8% over the two periods in comparison. Share of results of joint ventures jumped 219.4% from S$0.7 million in 9M2016 to S$2.3 million in 9M2017. This was largely due to the progressive recognition of income from the sale of condominium units of The Wisteria. To date, all 216 units were sold and TOP was expected in the second half of 2018.
    [Show full text]
  • Full List 14Aug2018
    Reference number Registration date Title Postal Code APPLICATION FOR IN-PRINCIPLE AGREEMENT OF FIRE SAFETY ENGINNERING BRIEF - FOR THE FIRE ENGINEERING ANALYSIS ON THE USE OF ALPOLIC/FR 30% PERFORATION PANELS FEDB/001061/04 15/7/2004 819663 AT THE BOTTOM OF THE ROOF TRUSS (BELOW THE CEILING) IN TERMINAL 3S DEPARTURE HALL PROPOSED ERECTION OF SINGLE STOREY EXHIBITION HALL HALL 7 TO 10 FOR SINGAPORE FEDB/001100/04 17/11/2004 EXPO EXPANSION ON LOTS 09788T PT(SL) 07360L PT(SL) 09566A PT(SL)07361C PT(SL) 98328L(SL)MK 27 AT EXPO DRIVE/UPPER CHANGI ROAD EAST/CHANGI SOUTH AVENUE 1 PROPOSED ERECTION OF PART SINGLE STOREY/PART 2-STOREY, SOUTHERN TRABSPORT TRANSIT COMPLEX WITH BASEMENT CAOMPRISING OF CARPARKS MONORAIL STATION AND FEDB/001120/05 7/1/2005 DEPOT BUILDING ON LOT 254PT(SL), 451PT(SL), 497PT(SL), 589PT(SL) MK 34 PALAWAN BEACH, SENTOSA (SOUTHERN ISLANDS PLANNING AREA) PROPOSED ADDITIONS & ALTERATIONS TO BLOCK A, B, C, D AND CANOPY OVER THE INTERNAL STREETS ON LOT 152 155 158 159 161 AND STATE LAND LOTS 275PT 273PT FEDB/001160/05 24/1/2005 273PT[SLRD] 274PT 276PT AND 277PT TS 09 AT CLARKE QUAY (CONSERVATION AREA) RIVER VALLEY ROAD SINGAPORE PROPOSED EXTENSION WITH ALTERATIONS AND ADDITIONS TO EXISTING SINGLE-STOREY FEDB/001200/05 21/2/2005 GROCERY WAREHOUSE WITH 3-STOREY ANCILLARY OFFICE ON LOT 2292K MK 7 AT NO. 37 629062 JOO KOON CIRCLE (JURONG INDUSTRIAL ESTATE - PIONEER PLANNING DGP) PROPOSED CARPARK VENTILATION SYSTEM TO THE PROPOSED CONDOMINIUM DEVELOPMENT COMPRISING 7 BLOCKS OF 10-STOREY APARTMENTS (TOTAL: 318 UNITS) FEDB/001220/05
    [Show full text]
  • The Orchid and the Singaporean Identity. Jonathan Alperstein Vassar College
    Vassar College Digital Window @ Vassar Senior Capstone Projects 2018 Commodity, conservation, and nation building: the orchid and the Singaporean identity. Jonathan Alperstein Vassar College Follow this and additional works at: https://digitalwindow.vassar.edu/senior_capstone Recommended Citation Alperstein, Jonathan, "Commodity, conservation, and nation building: the orchid and the Singaporean identity." (2018). Senior Capstone Projects. 733. https://digitalwindow.vassar.edu/senior_capstone/733 This Open Access is brought to you for free and open access by Digital Window @ Vassar. It has been accepted for inclusion in Senior Capstone Projects by an authorized administrator of Digital Window @ Vassar. For more information, please contact [email protected]. Commodity, Conservation, and Nation Building: The Orchid and the Singaporean Identity. By Jonathan Alperstein BA thesis submitted to the Department of Anthropology Vassar College, Poughkeepsie, NY Thesis Readers: Xiaobo Yuan, Post-Doctoral Fellow and Luis Philippe Römer, Visiting Assistant Professor May 2018 Alperstein 2 Chapter 1: The Growth of a Nation and its Orchids A miniscule seed difficult to see by the naked eye is thrust into a small flask of sterile agar gel, with a swirl of necessary nutrients. The flask is thrown on to a large centrifuge, spun to allow the tiny seed to begin to germinate. The seed after some time will soon erupt, revealing a small, two-leaved plant. Kept in the confines of its personal sterile green house, the plant uses photosynthesis to achieve a more mature form. Eventually the plant will be moved to a larger flask until it is large enough to be de-flasked. The young plant will be brought out of artificial light to its new home: a small medicine-cup-sized plastic pot.
    [Show full text]
  • Census of Population 2020 : Administrative Report ISBN 978-981-18-1383-2
    CENSUS OF Administrative POPULATION Report 2020 www.singstat.gov.sg Census of Population 2020 : Administrative Report ISBN 978-981-18-1383-2 © Department of Statistics, Ministry of Trade & Industry, Republic of Singapore Reproducing or quoting any part of this publication is permitted, provided this publication is accredited as the source. Please refer to the Statistics Singapore Website Terms of Use (http://www.singstat.gov.sg/terms-of-use) for more details on the conditions of use of this publication PREFACE The Census of Population 2020 was the sixth census carried out in Singapore since Independence and the fifteenth in the series of census taking from 1871. The census is the most comprehensive source of information on population and households and provides benchmark data for demographic and social statistics. Similar to Census 2000 and 2010, Census 2020 adopted a register-based approach with a large-scale sample survey. Basic population count and characteristics were compiled from administrative records. More detailed information on language, economic characteristics, transport, religion, difficulty in performing basic activities as well as housing and household characteristics were obtained from a sample enumeration of about 150,000 households. For Census 2020, a tri-modal data collection strategy comprising Internet enumeration, Computer-Assisted Telephone Interviewing (CATI) and face-to-face interviews using mobile devices was adopted to facilitate data collection for the households in the census sample. Leveraging technological advances, machine learning was also applied to improve the data processing processes. This Administrative Report provides a comprehensive documentation of the Census of Population 2020 planning and operations. It outlines the major milestones including preparations for the sample enumeration, implementation of the IT application system as well as documenting the collection, processing, dissemination, administrative activities and resources utilised to conduct Census 2020.
    [Show full text]
  • Digital Breadcrumbs: Detecting Urban Mobility Patterns and Transport Mode Choices from Cellphone Networks
    Digital breadcrumbs: Detecting urban mobility patterns and transport mode choices from cellphone networks Thomas Holleczek, Liang Yu, Joseph K. Lee, Oliver Senn, Kristian Kloeckl, Carlo Ratti, Patrick Jaillet September 2, 2013 Many modern and growing cities are facing declines in public transport usage, with few efficient methods to explain why. In this article, we show that urban mobility patterns and transport mode choices can be derived from cellphone call detail records coupled with public transport data recorded from smart cards. Specifically, we present new data mining approaches to determine the spatial and temporal variability of public and private transportation usage and transport mode preferences across Singapore. Our results, which were validated by Singapore’s quadriennial Household Interview Travel Survey (HITS), revealed that there are 3.5 (HITS: 3.5 million) million and 4.3 (HITS: 4.4 million) million inter-district passengers by public and private transport, respectively. Along with classifying which transportation connections are weak or underserved, the analysis shows that the mode share of public transport use increases from 38 % in the morning to 44 % around mid-day and 52 % in the evening. 1 Introduction arXiv:1308.6705v1 [cs.SI] 30 Aug 2013 Securing public transportation ridership is critical for developing a sustainable urban future. However, existing systems for analyzing and identifying weaknesses in public transport connec- tions face major limitations. In cities, origin-destination (OD) matrices—which measure the flow of people between different geographical regions—are often generated using household surveys and roadside monitoring, approaches which are time consuming, expensive, and lack spatial and temporal accuracy [1].
    [Show full text]
  • Typifying Tongkat Ali and Other Notes on the Simaroubaceae in Singapore
    Gardens’ Bulletin Singapore 73(1): 9–16. 2021 9 doi: 10.26492/gbs73(1).2021-02 Flora of Singapore precursors, 22: typifying Tongkat Ali and other notes on the Simaroubaceae in Singapore I.M. Turner1,2 1Singapore Botanical Liaison Officer, Royal Botanic Gardens Kew, Richmond, Surrey, TW9 3AE, U.K. [email protected] 2Singapore Botanic Gardens, National Parks Board, 1 Cluny Road, 259569 Singapore ABSTRACT. The native Simaroubaceae of Singapore (four genera with one species each) are listed with full synonymy and typification. In the absence of any original material, a neotype is designated for Eurycoma longifolia Jack. Recent collections confirmSamadera indica Gaertn. as native in Singapore. In total 14 lectotypes and 3 neotypes are designated. Keywords. Ailanthus, Brucea, Eurycoma, Samadera Introduction The Simaroubaceae are a family of some 22 genera with about 110 species in total (Clayton, 2011). The family is included in the Sapindales, forming a major clade with the larger families Meliaceae and Rutaceae. Members of the Simaroubaceae are mostly trees and shrubs, with species found throughout the tropics and subtropics, and a few extending into the northern temperate regions. The ‘Tree of Heaven’ is a vernacular name applied to certain species and the family in general. The origins of this lie with the great Dutch botanist Rumphius (Georg Eberhard Rumpf; 1627–1702) who lived on the island of Ambon in the Moluccas for many years. According to Rumphius (1743), a very tall tree species on the island was known locally as ‘Aylanto’ which Rumphius translated into Latin as ‘Arbor Coeli’ or in English, Tree of Heaven.
    [Show full text]
  • ANNEX 5 DRAFT MASTER PLAN 2013 Key Highlights of Five Regions – North, North-East, East, West, Central
    ANNEX 5 DRAFT MASTER PLAN 2013 Key highlights of five regions – North, North-East, East, West, Central 1. The Draft Master Plan will exhibit plans for the five regions – North, North-East, East, West and Central. The plans cover the highlights unique to each region. North Region 2. Besides offering a variety of public and private housing options, the North region is also home to waterbodies and nature areas with rich biodiversity, and is well-connected to other parts of the island through a comprehensive network of public transport and roads. The region is set to expand further in the next few years. 3. The North region covers about 13,900 ha of land and comprises the planning areas of Woodlands, Sembawang, Yishun, Simpang, Lim Chu Kang, Sungei Kadut, Mandai, and the Central Water Catchment. Quality homes 4. New homes close to existing towns will come up in the North, including new Build-To- Order (BTO) flats on the riverfront at Sembawang, and new Three Generation (3Gen) homes in Yishun. 5. The rejuvenation of Yishun town centre will see a new commercial and residential development integrated with a bus interchange and community club, the first community club to be located in a shopping centre. Residents can also enjoy the landscaped pedestrian mall and town plaza within the town centre. 6. To encourage interaction and community bonding between residents, integrated hubs such as the integrated development at Woodlands next to Admiralty MRT station will bring various amenities under one roof. Job and retail options closer to home 7. Envisioned as the gateway to the North, the Woodlands Regional Centre will bring new business and job opportunities, with retail space and amenities.
    [Show full text]
  • 1 Ductile and Brittle Deformation in Singapore: a Record of Mesozoic Orogeny and 2 Amalgamation in Sundaland, and of Post-Orogenic Faulting 3 4 A
    1 Ductile and brittle deformation in Singapore: a record of Mesozoic orogeny and 2 amalgamation in Sundaland, and of post-orogenic faulting 3 4 A. Graham Leslie*1, Thomas J.H. Dodd1, Martin R. Gillespie1, Rhian S. Kendall2, Thomas P. 5 Bide3, Timothy I. Kearsey1, Marcus R. Dobbs3, Michael Kim Woon Lee4, and Kiefer Chiam5 6 7 1British Geological Survey, Lyell Centre, Research Avenue South, Edinburgh, EH14 4AP, United Kingdom. 8 2British Geological Survey, Cardiff University, Main Building, Park Place, Cardiff, CF10 3AT, United Kingdom. 9 3British Geological Survey, Environmental Science Centre, Keyworth, Nottingham, NG12 5GG, United Kingdom. 10 4Neptune Court, 8 Marine Vista #15-33, Singapore 449032. 11 5BCA Academy, 200 Braddell Rd, Singapore 579700 12 *(Corresponding author e:mail: [email protected]) 13 14 Keywords: Singapore, Mesozoic, orogeny, fold and thrust tectonics, faulting. 15 16 Abstract: Singapore bedrock geology is dominated by late Permian to Triassic arc magmatism and 17 a genetically related, essentially Middle to Upper Triassic, marine to fluvial volcano-sedimentary 18 inner forearc succession. These Mesozoic strata are deformed into a pattern of NE-translated 19 ductile–brittle deformation structures during the latest Triassic to earliest Jurassic collision and 20 amalgamation of the Sibumasu continental block with the southern part of the Sukhothai Arc. The 21 subduction-related magmatic complex represented in Singapore by the granitic to gabbroic plutons 22 of the Bukit Timah Centre likely acted as a backstop to thrusting at this time. Collisional tectonics 23 drove progressive shortening and steepened earlier-formed inclined asymmetrical folds, 24 culminating in the regional-scale development of a non-coaxial, NE-vergent and NE-facing, fold 25 and thrust system.
    [Show full text]