South Midlands Route Strategy March 2017 Contents 1

Total Page:16

File Type:pdf, Size:1020Kb

South Midlands Route Strategy March 2017 Contents 1 South Midlands Route Strategy March 2017 Contents 1. Introduction 1 Purpose of Route Strategies 2 Strategic themes 2 Stakeholder engagement 3 Transport Focus 3 2. The route 5 Route Strategy overview map 7 3. Current constraints and challenges 9 A safe and serviceable network 9 More free-flowing network 9 Supporting economic growth 9 An improved environment 10 A more accessible and integrated network 10 Diversionary routes 13 Maintaining the strategic road network 14 4. Current investment plans and growth potential 15 Economic context 15 Innovation 15 Investment plans 15 5. Future challenges and opportunities 19 6. Next steps 25 i R Lon ou don to Scotla te nd East London Or bital and M23 to Gatwick str Lon ategies don to Scotland West London to Wales The division of rou tes for the F progra elixstowe to Midlands mme of route strategies on t he Solent to Midlands Strategic Road Network M25 to Solent (A3 and M3) Kent Corridor to M25 (M2 and M20) South Coast Central Birmingham to Exeter A1 South West Peninsula London to Leeds (East) East of England South Pennines A19 A69 North Pen Newccaastlstlee upon Tyne nines Carlisle A1 Sunderland Midlands to Wales and Gloucest M6 ershire North and East Midlands A66 A1(M) A595 South Midlands Middlesbrougugh A66 A174 A590 A19 A1 A64 A585 M6 York Irish S Lee ea M55 ds M65 M1 Preston M606 M621 A56 M62 A63 Kingston upon Hull M62 M61 M58 A1 M1 Liver Manchest A628 A180 North Sea pool er M18 M180 Grimsby M57 A616 A1(M) M53 M62 M60 Sheffield A556 M56 M6 A46 A55 A1 Lincoln A500 Stoke-on-Trent A38 M1 Nottingham A52 Derby A50 A483 A5 A453 A38 A42 A46 A458 M54 Norwich A5 M42 A47 M6 M6 Toll Leicester A47 M69 A1 Birmingham M6 Peterborough A12 A5 M5 M42 A1(M) Coventry A14 A11 A49 M45 M1 A45 A14 Worcesester A14 A46 A5 A428 A421 Cambridge M40 A11 M50 A1 Ipswich A43 Milton A12 A14 A40 Keynes M1 A120 A40 Glou A417 A5 A1(M) cester A120 Oxford M11 M5 A34 M25 M48 M40 A419 A12 M4 Swindon M4 A404 M4 SoSouuthethendnd--onon-S-Seea Br A13 istol M32 Reading London M4 M2 A249 A34 M5 A36 A303 M26 M3 M25 A2 M20 A3 Crawley M23 A36 A303 A21 A20 Folk A23 estoonne Yeovil A31 A259 M27 A3(M) Exeter A27 A30 A30 A27 Bright A259 A35 Portsmouth on Torquay A30 Plymouth A38 Engliglishsh Chhanannel 0 k ilometres 60 0 mi les 40 Highways Agency media se © C rvices MCR N1302 rown copyright and dat 06 abase rights 2015 Ordna nce Survey 100030649 ii z 1iii z Highways England 1. Introduction The modernisation of England’s motorways and major A roads, also known as the strategic road network (SRN), is making a vital contribution to economic wellbeing and growth. This Route Strategy – one of 18 such reports – provides a statement on the current performance of, and perceived pressures on, the South Midlands route to inform the planning of future investment. The SRN supports national and local economic prosperity by: ▪ linking together major cities ▪ connecting with extensive local road networks ▪ providing links to major ports, airports, and rail terminals ▪ enabling good access to regions and cross-border routes between the nations of the United Kingdom The establishment of Highways England through the Infrastructure Act 2015 has changed fundamentally the way we plan investment in the network. Funding is now determined every 5 years, in the Road Investment Strategy (RIS), which is set by Government. We are currently delivering on the commitments that were set out in the first RIS covering 2015 to 2020, which are already making a difference for road users across the network. At the same time, we are working closely with the other 3 bodies with statutory responsibility for the RIS – Department for Transport, Office of Rail and Road and Transport Focus – on preparing for the next RIS (RIS2) for the period after 2020. 1 2 South Midlands Route Strategy RIS1 Strategic Vision as reiterated in RIS Post 2020: Planning ahe ad Purpose of Route Strategies RIS1 Strategic Vision as reiterated in RIS Route Strategies provide a high level view of the current Post 2020: Planning ahe ad performance of the SRN as well as issues perceived by E conomy Environment our stakeholders that affect the network. They are one of the key components of research required for developing E conomy Environment the RIS. This suite of Route Strategies builds upon the Network Integration analysis underpinning the first set of Route Strategies capability undertaken between 2013 to 2015, which together Network capability Integration provided the first comprehensive assessment of the entire Safety network. This time the Route Strategies aim to: bring together information from key partners, Safety ▪ motorists, local communities, construction partners, Figure 1.1 - RIS1 strategic vision environmental groups and across the business Highways England Strategic Business ▪ achieve a better understanding of the condition Plans key outcomes and performance of our roads, and local and Highways England Strategic Business regional aspirations Plans keyS outcomesupporting economic growth through a modernised and reliable network that reduces delays, cr eates jobs ▪ shape our investment priorities to improve the service and helps business compete and opens up new areas Suppforo dretingvelo epcmeo nnot m ic growth through a modernised for road users and support a growing economy and reliable network that reduces delays, cr eates jobs and helps business compete and opens up new areas help inform the next RIS1 More free-flowing network where routine delays ▪ for developme nt are more infrequent, and where journeys are safe r and more reliable More free-flowing network where routine delays Strategic themes are more infrequent, and where journeys are safe r andS mafeor ea ndrelia sbelerv iceable network where no one The Government’s vision for transforming the SRN is should be harmed when travelling or work ing on the network described in the Road Investment Strategy post 2020: Safe and serviceable network where no one Planning Ahead document available on www.gov.uk. This should be harmed when travelling or work ing on vision builds on the 5 broad aims published in the Road the Inmeprtworkoved environm ent where the impact of our activities is further reduced, ensuring a long-term and Investment Strategy for 2015-2020: economy; network sustainable benefit to the environment Improved environm ent where the impact of our capability; integration; safety; and the environment. It also activities is further reduced, ensuring a long-term and builds on Highways England’s 5 strategic outcomes (see susMtaoinraeb alecc beensse fitib tloe tahnde e innvtiroegnrmeatendt network that gives peop le the freedom to choose their mode of Figures 1.1 and 1.2). Using the evidence from this and the transport and enable safe movement acro ss and other 17 Route Strategies, we will develop proposals that Moalore nagccsideess thibel en eatndwor ikn t egrated network that gives peop le the freedom to choose their mode of can help bring the Government’s vision for roads to life. transport and enable safe movement acro ss and alongside the network Figure 1.2 - Highways England strategic outcomes 1See Chapter 6 for more information on the next RIS 2 Highways England Transport Focus We commissioned Transport Focus, the road user watchdog, to undertake research on road user priorities. More than 4,400 interviews were undertaken with drivers Stakeholder engagement across the SRN. Figure 1.4 below shows the breakdown Building on the engagement we started in the first by user type and purpose. round of Route Strategies, we have continued to work Completed interviews closely with a wide range of stakeholders to enhance our understanding of the strategic road network, and identify 3,487Completed interviews79% where users and other stakeholders feel investment is needed. 3,487322 79%7% We used a number of methods to collate information. For example, we launched an online tool for customers 322 7% and stakeholders over the summer of 2016 to inform us 407 9% of the issues and challenges on our roads that affected them. As well as information collated from a range of 206407 5%9% people within Highways England, more than 300 different stakeholder organisations provided important feedback 206 5% on the network during the evidence collection period. Commuting 501 11% There were also more than 370 individual members of the public who contributed information. In total, around 2,700 Commuting 501 11% Business 1,367 31% individual points were raised by external stakeholders. Business Leisure 2,4571,367 56%31% 233 354 Figure 1.4 - Driver sample breakdown Leisure250 fleet managers2,457 from 56%a mix Business of industries sie and regions Local authority 250 fleet managers from a mix 716 STBs/LEPs of industries sie and regions Individuals Others The research found that the South Midlands route was 1,233 166 well rated, with 61% of users rating their experience of the motorway sections as either extremely good or fairly good, with a slightly higher proportion (66%) giving the same rating to the A road sections. As Table 1.1 shows, Figure 1.3 - External stakeholder responses 30% of users experienced problems using the route, with congestion and roadworks cited as the two main causes. We are increasingly working with subnational transport bodies (STBs), including Midlands Connect, England’s The full report has been published on Transport Economic Heartland and Transport for the North, so we Focus’s website www.transportfocus.org.uk/research- can ensure that their developing strategies and planning publications/publications/road-to-the-future. are integrated into our thinking (and vice versa).
Recommended publications
  • Post-Medieval and Modern Resource Assessment
    THE SOLENT THAMES RESEARCH FRAMEWORK RESOURCE ASSESSMENT POST-MEDIEVAL AND MODERN PERIOD (AD 1540 - ) Jill Hind April 2010 (County contributions by Vicky Basford, Owen Cambridge, Brian Giggins, David Green, David Hopkins, John Rhodes, and Chris Welch; palaeoenvironmental contribution by Mike Allen) Introduction The period from 1540 to the present encompasses a vast amount of change to society, stretching as it does from the end of the feudal medieval system to a multi-cultural, globally oriented state, which increasingly depends on the use of Information Technology. This transition has been punctuated by the protestant reformation of the 16th century, conflicts over religion and power structure, including regicide in the 17th century, the Industrial and Agricultural revolutions of the 18th and early 19th century and a series of major wars. Although land battles have not taken place on British soil since the 18th century, setting aside terrorism, civilians have become increasingly involved in these wars. The period has also seen the development of capitalism, with Britain leading the Industrial Revolution and becoming a major trading nation. Trade was followed by colonisation and by the second half of the 19th century the British Empire included vast areas across the world, despite the independence of the United States in 1783. The second half of the 20th century saw the end of imperialism. London became a centre of global importance as a result of trade and empire, but has maintained its status as a financial centre. The Solent Thames region generally is prosperous, benefiting from relative proximity to London and good communications routes. The Isle of Wight has its own particular issues, but has never been completely isolated from major events.
    [Show full text]
  • Front Matter (PDF)
    GEOLOGICAL SOCIETY OF LONDON MEMOIR No. 2 GEOLOGICAL RESULTS OF PETROLEUM EXPLORATION IN BRITAIN I945-I957 BY NORMAN LESLIE FALCON, M.A.F.1K.S. (CHIEF GEOLOGIST, THE BRITISH PETROLEUM COMPANY LIMITED) AND PERCY EDWARD KENT, D.Sc., Ph.D. (GEOLOGICAL ADVISER, BP EXPLORATXON [CANADA]) LONDON 4- AUGUST, I960 LIST OF PLATES PLATE I, FIG. 1. Hypothetical section through Kingsclere and Faringdon borings. (By R. G. W. BRU~STRO~) 2. Interpretative section through Fordon No. 1. Based on seismic reflection and drilling results, taking into account the probability of faulting of the type exposed in the Howardian Hills Jurassic outcrop. II. Borehole sections in West Yorkshire. (By A. P. TERRIS) III. Borehole sections in the Carboniferous rocks of Scotland. IV. Type column of the Upper Carboniferous succession in the Eakring area, showing lithological marker beds. (By M. W. STI~O~C) V. Structure contour map of the Top Hard (Barnsley) Seam in the Nottinghamshire and Derbyshire Coalfield. Scale : 1 inch to 2 miles. LIST OF TABLES Data from exploration wells, 1945-1957, m-- TABLE I. Southern England and the South Midlands II. The East Midlands III. East and West Yorkshire IV. Lancashire and the West Midlands V. Scotland LIST OF FIGURES IN THE TEXT Page Fig. 1. General map of areas explored to the end of 1957 6 2. Arreton : gravity residuals and reflection contours . 8 Ashdown : seismic interpretation of structure after drilling. Depths shown are of Great Oolite below sea,level 9 4. Mesozoic borehole sections in southern England 10 5. Faringdon area : gravity residuals and seismic refraction structure 14 6.
    [Show full text]
  • Road Investment Strategy: Overview
    Road Investment Strategy: Overview December 2014 Road Investment Strategy: Overview December 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General enquiries https://forms.dft.gov.uk ISBN: 978-1-84864-148-8 © Crown copyright 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum. Photographic acknowledgements Alamy: Cover Contents 3 Contents Foreword 5 The Strategic Road Network 8 The challenges 9 The vision 10 The Investment Plan 13 The Performance Specification 22 Transforming our roads 26 Appendices: regional profiles 27 The Road Investment Strategy suite of documents (Strategic Vision, Investment Plan, Performance Specification, and this Overview) are intended to fulfil the requirements of Clause 3 of the Infrastructure Bill 2015 for the 2015/16 – 2019/20 Road Period.
    [Show full text]
  • Appendix 1 I.01: DEPARTMENT for TRANSPORT (DFT) ROAD INVESTMENT STRATEGY (2014) Road Investment Strategy: Overview
    Appendix 1 I.01: DEPARTMENT FOR TRANSPORT (DFT) ROAD INVESTMENT STRATEGY (2014) Road Investment Strategy: Overview December 2014 Road Investment Strategy: Overview December 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General enquiries https://forms.dft.gov.uk ISBN: 978-1-84864-148-8 © Crown copyright 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum. Photographic acknowledgements Alamy: Cover Contents 3 Contents Foreword 5 The Strategic Road Network 8 The challenges 9 The Strategic Vision 10 The Investment Plan 13 The Performance Specification 22 Transforming our roads 26 Appendices: regional profiles 27 The Road Investment Strategy suite of documents (Strategic Vision, Investment Plan, Performance Specification, and this Overview) are intended to fulfil the requirements of Clause 3 of the Infrastructure Bill 2015 for the 2015/16 – 2019/20 Road Period.
    [Show full text]
  • Tackling High Risk Regional Roads Safer Roads Fund Full
    Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION The Royal Automobile Club Foundation for Motoring Ltd is a transport policy and research organisation which explores the economic, mobility, safety and environmental issues relating to roads and their users. The Foundation publishes independent and authoritative research with which it promotes informed debate and advocates policy in the interest of the responsible motorist. RAC Foundation 89–91 Pall Mall London SW1Y 5HS Tel no: 020 7747 3445 www.racfoundation.org Registered Charity No. 1002705 October 2018 © Copyright Royal Automobile Club Foundation for Motoring Ltd Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION About the Road Safety Foundation The Road Safety Foundation is a UK charity advocating road casualty reduction through simultaneous action on all three components of the safe road system: roads, vehicles and behaviour. The charity has enabled work across each of these components and has published several reports which have provided the basis of new legislation, government policy or practice. For the last decade, the charity has focused on developing the Safe Systems approach, and in particular leading the establishment of the European Road Assessment Programme (EuroRAP) in the UK and, through EuroRAP, the global UK-based charity International Road Assessment Programme (iRAP). Since the inception of EuroRAP in 1999, the Foundation has been the UK member responsible for managing the programme in the UK (and, more recently, Ireland), ensuring that these countries provide a global model of what can be achieved.
    [Show full text]
  • The Primary Care Pharmacy Team Wish You a Merry Christmas and a Happy New Year
    The Primary Care Pharmacy Team Wish You a Merry Christmas And a Happy New Year This bulletin contains information about the following topics: Page 1. Reminder to patients – Christmas prescription requests 2 2. Have you updated your NHS Choices profile for Xmas 2 3. Controlled Drugs Requisitions forms 3 4. CD prescribing – recommended quantity 3 5. Provision of current pharmacy email address 3 6. Patient Returned Medicines 4 7. New member of Primary Care Pharmacy Team 4 8. Useful Contacts 5 1 Reminder to patients – Christmas prescriptions requests The Christmas and New Year period is one of the busiest of the year. Please help patients by making sure that you remind them to request their repeat prescription in plenty of time to ensure that they do not run out of medication over the holiday period. Have you updated your NHS Choices profile with your Christmas opening hours? NHS Choices is the online presence for the NHS, providing the public with access to searchable databases of NHS providers to help them locate their nearest healthcare provider, including community pharmacies. As such your NHS Choices profile may provide the first impression of your pharmacy to members of the public and so it is vital to ensure it is kept up-to- date, and that you have updated the profile with regular opening hours. It is also worth adding in any variations to those hours, such as reminders of which days you will be closed over Christmas and the New Year holiday period. Don’t forget, utilising this free resource could also help promote your pharmacy by letting potential patients know of the services you offer as well as other useful information such as car parking arrangements.
    [Show full text]
  • Neolithic to Early Bronze Age Buckinghamshire: a Resource Assessment
    Neolithic to Early Bronze Age Buckinghamshire: a resource assessment Inheritance Mobility Although Neolithic populations are thought to have had continued mobility, more and more evidence for Neolithic settlement has come to light. In Buckinghamshire the most important evidence comes from excavations in advance of the construction of Eton Rowing Course (ERC) and the Maidenhead to Windsor and Eton Flood Alleviation Scheme (MWEFAS), mainly in the parish of Dorney in South Bucks on the Thames. The evidence points to intensive use of the area by people in the Early Neolithic but it is not certain that it represents year-round sedentary occupation rather than seasonal re-use (Allen et al 2004). Other evidence does point to continued mobility, such as the artefact scatters at Scotsgrove Mill, Haddenham (Mitchell 2004) and East Street, Chesham (Collard 1990) for example, reflecting visits over a long period of time. Persistent places Mesolithic persistent places continue to have meaning for Early and later Neolithic populations. These persistent places include East Street, Chesham (Collard 1990, 18) and Late Neolithic to Early Bronze Age activity at Chessvale Bowling Club nearby (Halsted 2006, 23-8). Another persistent place seems to have been the lower reaches of the River Colne. Recent excavations at the Sanderson Site, Denham (Halsey 2005) continued the activity from nearby Three Ways Wharf, Uxbridge (Lewis 1991). Other persistent places include the attractive river valley location at Bancroft in Milton Keynes (Williams 1993, 5), and Scotsgrove Mill, Haddenham, where the River Thame meets one of its tributaries (Mitchell 2004, 1). These persistent places may have been the basis of evolving ideas about land tenure.
    [Show full text]
  • A Choice of Entry and Exit Points Fair Pricing
    M6 Toll Junction Information A choice of entry Entry points Exit points Toll stations Northbound from A4097 Northbound and exit points T1 Southbound from M42 to M42 Southbound None T2 only You can join the M6 Toll at various junctions along the road. You just T3 Northbound and Northbound and On Entry (S) either pay at a junction, or at one of two main Toll Plaza stations which Southbound Southbound On Exit (N) Northbound and Northbound and On Exit stretch across the whole motorway at Great Wyrley on the northbound T4 Southbound Southbound carriageway and Weeford Park on the southbound carriageway. Northbound Southbound Pull out all On Exit T5 only only the stops. Southbound and Southbound and On Exit Fair pricing T6 Northbound Northbound Southbound Northbound T7 only only The toll system automatically classifies vehicles and charges separate Southbound Northbound rates for each category, depending on the size of the vehicle. Each T8 only only time you pass through a Toll Lane our sensors tell us how many axles Welcome to the M6 Toll – the most your vehicle has and how high it is from the point of the first axle. This tells us which class your vehicle falls into. exciting development in British What class is my vehicle? www.m6toll.co.uk transport history for many years. As a Vehicle Class Number Number Height at free-flowing alternative to the M6, the of Wheels of Axles 1st Axle* M6 Toll offers reliably shorter journey Z-CARD™ (trademarks used by Z industries Ltd under license). Class One Under 4 Any This product is a doubly-folded sheet card.
    [Show full text]
  • Annual Assessment of Highways England's
    Annual Assessment of Highways England’s Performance April 2020 to March 2021 HC454 Annual Assessment of Highways England’s Performance April 2020 to March 2021 Presented to Parliament pursuant to section 10(8) of the Infrastructure Act 2015 Ordered by the House of Commons to be printed 15 July 2021 HC454 © Crown copyright 2021 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/ open-government-licence/version/3. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at www.gov.uk/official-documents. © Crown copyright 2020 Any enquiries regarding this publication should be sent to us at This 25 Cabot Square, London, E14 publication is licensed under 4QZ. the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/ open-government-licence/version/3ISBN 978-1-5286-2760-3 . Where we have identified any third party copyright information you will need to obtain CCS0621812220 07/21 permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum This publication is available at orr.gov.uk Printed in the UK by the APS Group on behalf of the Controller of Her Majesty’s Stationery OfficeAny enquiries regarding this publication should be sent to us at orr.gov.uk/contact-us Office of Rail and Road | Annual Assessment of Highways England’s Performance: April 2020 to March 2021 Contents Foreword ..............................................................................................................6 Executive summary ..................................................................................................8 1.
    [Show full text]
  • Flooding Survey June 1990 River Tame Catchment
    Flooding Survey June 1990 River Tame Catchment NRA National Rivers Authority Severn-Trent Region A RIVER CATCHMENT AREAS En v ir o n m e n t Ag e n c y NATIONAL LIBRARY & INFORMATION SERVICE HEAD OFFICE Rio House, Waterside Drive, Aztec West, Almondsbury. Bristol BS32 4UD W EISH NRA Cardiff Bristol Severn-Trent Region Boundary Catchment Boundaries Adjacent NRA Regions 1. Upper Severn 2. Lower Severn 3. Avon 4. Soar 5. Lower Trent 6. Derwent 7. Upper Trent 8. Tame - National Rivers Authority Severn-Trent Region* FLOODING SURVEY JUNE 1990 SECTION 136(1) WATER ACT 1989 (Supersedes Section 2 4 (5 ) W a te r A c t 1973 Land Drainage Survey dated January 1986) RIVER TAME CATCHMENT AND WEST MIDLANDS Environment Agency FLOOD DEFENCE DEPARTMENT Information Centre NATONAL RIVERS AUTHORrTY SEVERN-TRENT REGION Head Office SAPPHIRE EAST Class N o 550 STREETSBROOK ROAD SOLIHULL cession No W MIDLANDS B91 1QT ENVIRONMENT AGENCY 0 9 9 8 0 6 CONTENTS Contents List of Tables List of Associated Reports List of Appendices References G1ossary of Terms Preface CHAPTER 1 SUMMARY 1.1 Introducti on 1.2 Coding System 1.3 Priority Categories 1.4 Summary of Problem Evaluations 1.5 Summary by Priority Category 1.6 Identification of Problems and their Evaluation CHAPTER 2 THE SURVEY Z.l Introduction 2.2 Purposes of Survey 2.3 Extent of Survey 2.4 Procedure 2.5 Hydrological Criteria 2.6 Hydraulic Criteria 2.7 Land Potential Category 2.8 Improvement Costs 2.9 Benefit Assessment 2.10 Test Discount Rate 2.11 Benefit/Cost Ratios 2.12 Priority Category 2.13 Inflation Factors
    [Show full text]
  • River Mease Walkover Survey Report Natural England APEM Ref 413482 March 2016 This Project Is Part of the IPENS Programme (LIFE1
    River Mease Walkover Survey Report Natural England APEM Ref 413482 March 2016 This project is part of the IPENS programme (LIFE11NAT/UK/000384IPENS) which is financially supported by LIFE, a financial instrument of the European Community Dr Peter Stone Client: Natural England Address: APEX Court City Link Nottingham NG2 4LA Project reference: 413482 Date of issue: April 2015 ________________________ Project Director: Dr David Fraser Project Manager: Dr Peter Stone Other: Hugh Graham ________________________ APEM Ltd Riverview A17 Embankment Business Park Heaton Mersey Stockport SK4 3GN Tel: 0161 442 8938 Fax: 0161 432 6083 Registered in England No. 2530851 “This is a draft document and should not be cited” Registered in England No. 2530851, Registered Address Riverview A17 Embankment Business Park, Heaton Mersey, Stockport, SK4 3GN Revision and Amendment Register Version Date Section(s) Page(s) Summary of Changes Approved by Number 1 10/2/15 Draft for client review PS 2 27/02/15 5 27 Final following client comment PS Contents 1. Introduction ...................................................................................................................... 1 1.1 Project Background ................................................................................................... 1 1.3 Aims and Objectives ................................................................................................. 1 2. Methodology ...................................................................................................................
    [Show full text]
  • Post Opening Project Evaluation M6 Toll Five Years After Study
    Post Opening Project Evaluation M6 Toll Five Years After Study Post Opening Project Evaluation M6 Toll Five Years After Study October 2009 Document History JOB NUMBER: 5081587/905 DOCUMENT REF: M6T_FYA_Final.doc Revision Purpose Description Originated Checked Reviewed Authorised Date 1 Draft for client review SB PW NM PR Sep ‘09 2 2nd Draft with HA (POPE) SB PW NM PR Sep ‘09 revisions 3 Final Draft SB PW NM PR Oct ‘09 5081587/POPE _ M6T FYA report _ Final Post Opening Project Evaluation M6 Toll Five Years After Study Contents Section Page Glossary of Terms iv Executive Summary vii Traffic vii Safety viii Environment viii 1. Introduction 1 Post Opening Project Evaluation (POPE) 1 Aims of this Study 1 Background to the M6 Toll 1 Scheme Description 5 Scheme Objectives 5 Scheme History 5 Midland Expressway Limited (MEL) 6 Current Economic Climate 6 Fuel Prices 6 Roadworks 7 Contents of this Report 7 2. Long Term Trends in Traffic Volumes 8 Major Roadworks affecting Midlands Motorways 8 Other Important Nearby Schemes 9 Variation in Numbers of M6 Toll Users 9 Annual Change in Average Number of M6 Toll Users 10 Changes in the Number of Electronic Tag Users 11 M6 Parallel to M6 Toll 12 M6 North and South of M6 Toll 13 Key Findings: Long Term Trends in Traffic 16 3. Daily Traffic Volumes 17 Factoring Methodology 17 Locations of Automatic Traffic Count (ATC) Sites on M6 Toll 17 Changes in 24hr Traffic Flows on the M6 Toll since 2004 18 Changes in Directional Flows on M6 Toll 24 Traffic Flows on the M6 and other Motorways and Strategic Routes 25 Key Findings: Daily Traffic Volumes 36 4.
    [Show full text]