World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) Public Disclosure Authorized (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 Public Disclosure Authorized 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Public Disclosure Authorized Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Public Disclosure Authorized Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] July 9, 2010 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by <mention name of PIU> 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descriptio Estimate Packages Dome Review Commen No. n d stic by Bank ts Cost Prefer (Prior / US$ ence Post) million (yes/n o) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contract (Works) for Prior Review Summary 1.86 4 No Post 1st of the NCB contract (Goods) for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) III. Selection of Consultants July 9, 2010 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimate Packages Review Comments of d by Bank Assignment Cost (Prior / US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT India : IN Dam Rehabilitation and Improvement Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2019-11-28 Revised Plan Date(s): (comma delineated, leave blank if none)2020-12-09 Project ID: P089985 GPN Date: Project Name: IN Dam Rehabilitation and Improvement Project Loan / Credit No: IBRD / 79430, IBRD / 89090 Executing Agency(ies):UJVN Limited WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-UJVNL-146960-CW-RFB / Construction of Energy Dissipating Arrangement Rehabilitation and Under (EDA) and appurtenant works Single Stage - Two 2022-04- IBRD / 79430 Improvement of Dams and Post Request for Bids Open - National 8,421,273.00 0.00 Implementat 2019-11-27 2020-02-05 2019-12-02 2020-01-09 2020-01-31 2020-02-18 at downstream of Maneri dam Envelope 15 Associated Appurtenances ion spillway of Maneri Bhali stage–I, HEP at Maneri in Distt- Uttarkashi (Uttarakhand) IN-UJVNL-197784-CW-RFB / Providing and Laying of bituminous Macadam (BM) & Rehabilitation and Pending Single Stage - Two 2021-03- Semi Dense Bituminous IBRD / 89090 Improvement of Dams and Post Request for Bids Open - National 214,285.71 0.00 Implementat 2020-10-10 2020-10-13 2020-11-12 2020-11-24 2020-11-29 Envelope 30 Concrete (SDBC) and repair of Associated Appurtenances ion side drain, Retaining wall of Internal road of Ichari Dam IN-UJVNL-198127-CW-RFB / Raising of left side Rehabilitation and Pending Single Stage - Two 2021-03- Embarkment of pond Area & IBRD / 89090 Improvement of Dams and Post Request for Bids Open - National 328,174.86 0.00 Implementat 2020-10-10 2020-10-12 2020-11-11 2020-11-22 2020-11-28 Envelope 30 protection work of Nalas at Associated Appurtenances ion Virbhadra Barrage, Rishikesh IN-UJVNL-198354-GO-RFB / Refurbishment and interior Pending Dam Safety Institutional Request for Single Stage - One 2021-01- work of old conference room IBRD / 89090 Post Limited 12,857.14 0.00 Implementat 2020-10-17 2020-11-26 Strengthening Quotations Envelope 25 and waiting room at UJJWAL, ion Dehradun IN-UJVNL-198377-CW-RFQ / Providing and fixing of Pending Dam Safety Institutional Request for Single Stage - One 2021-01- furniture and furnishing for IBRD / 89090 Post Limited 14,285.71 0.00 Implementat 2020-10-19 2020-11-28 Strengthening Quotations Envelope 27 old conference room at ion UJJWAL, Dehradun GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-UJVNL-197797-GO-RFQ / Pending Dam Safety Institutional Request for Single Stage - One Purchase of furniture for IBRD / 89090 Post Limited 24,285.00 0.00 Implementati 2020-10-15 2020-11-20 2021-01-19 Strengthening Quotations Envelope office building at Dakpathar on IN-UJVNL-198136-GO-RFB / Design, Manufacture, Supply, Erection, Testing and Rehabilitation and Pending Single Stage - Two commissioning of Trash Rack IBRD / 89090 Improvement of Dams and Post Request for Bids Open - National 1,354,286.00 0.00 Implementati 2020-10-10 2020-10-12 2020-11-11 2020-11-22 2020-11-26 2021-03-30 Envelope Cleaning Machine at Associated Appurtenances on Virbhadra Barrage of Virbhadra Barrage, Pashulok, Rishikesh. IN-UJVNL-198209-GO-RFB / Supply, Installation Rehabilitation and Pending Single Stage - Two Commissioning and Testing IBRD / 89090 Improvement of Dams and Post Request for Bids Open - National 40,802.13 0.00 Implementati 2020-10-10 2020-10-12 2020-11-11 2020-11-22 2020-11-28 2021-03-30 Envelope of Main LT Panel at Virbhadra Associated Appurtenances on Barrage, Pashulok, Rishikesh. IN-UJVNL-198260-GO-RFB / Supply of furniture and furnishing items for training Pending Dam Safety Institutional Single Stage - Two center, staying facility and IBRD / 89090 Post Request for Bids Open - National 61,028.57 0.00 Implementati 2020-10-30 2020-11-09 2020-12-14 2021-01-05 2021-01-10 2021-03-20 Strengthening Envelope office of the Executive on Engineer (Civil) at Lohiahead, Khatima. IN-UJVNL-198335-GO-DIR / Setup of video conferencing at Pending Dam Safety Institutional Request for Single Stage - One old conference room to IBRD / 89090 Post Limited 25,714.29 0.00 Implementati 2020-11-30 2020-12-29 2021-03-31 Strengthening
Recommended publications
  • Table of Contents
    Table of Contents Acknowledgements xi Foreword xii I. EXECUTIVE SUMMARY XIV II. INTRODUCTION 20 A. The Context of the SoE Process 20 B. Objectives of an SoE 21 C. The SoE for Uttaranchal 22 D. Developing the framework for the SoE reporting 22 Identification of priorities 24 Data collection Process 24 Organization of themes 25 III. FROM ENVIRONMENTAL ASSESSMENT TO SUSTAINABLE DEVELOPMENT 34 A. Introduction 34 B. Driving forces and pressures 35 Liberalization 35 The 1962 War with China 39 Political and administrative convenience 40 C. Millennium Eco System Assessment 42 D. Overall Status 44 E. State 44 F. Environments of Concern 45 Land and the People 45 Forests and biodiversity 45 Agriculture 46 Water 46 Energy 46 Urbanization 46 Disasters 47 Industry 47 Transport 47 Tourism 47 G. Significant Environmental Issues 47 Nature Determined Environmental Fragility 48 Inappropriate Development Regimes 49 Lack of Mainstream Concern as Perceived by Communities 49 Uttaranchal SoE November 2004 Responses: Which Way Ahead? 50 H. State Environment Policy 51 Institutional arrangements 51 Issues in present arrangements 53 Clean Production & development 54 Decentralization 63 IV. LAND AND PEOPLE 65 A. Introduction 65 B. Geological Setting and Physiography 65 C. Drainage 69 D. Land Resources 72 E. Soils 73 F. Demographical details 74 Decadal Population growth 75 Sex Ratio 75 Population Density 76 Literacy 77 Remoteness and Isolation 77 G. Rural & Urban Population 77 H. Caste Stratification of Garhwalis and Kumaonis 78 Tribal communities 79 I. Localities in Uttaranchal 79 J. Livelihoods 82 K. Women of Uttaranchal 84 Increased workload on women – Case Study from Pindar Valley 84 L.
    [Show full text]
  • Indian Society of Engineering Geology
    Indian Society of Engineering Geology Indian National Group of International Association of Engineering Geology and the Environment www.isegindia.org List of all Titles of Papers, Abstracts, Speeches, etc. (Published since the Society’s inception in 1965) November 2012 NOIDA Inaugural Edition (All Publications till November 2012) November 2012 For Reprints, write to: [email protected] (Handling Charges may apply) Compiled and Published By: Yogendra Deva Secretary, ISEG With assistance from: Dr Sushant Paikarai, Former Geologist, GSI Mugdha Patwardhan, ICCS Ltd. Ravi Kumar, ICCS Ltd. CONTENTS S.No. Theme Journal of ISEG Proceedings Engineering Special 4th IAEG Geology Publication Congress Page No. 1. Buildings 1 46 - 2. Construction Material 1 46 72 3. Dams 3 46 72 4. Drilling 9 52 73 5. Geophysics 9 52 73 6. Landslide 10 53 73 7. Mapping/ Logging 15 56 74 8. Miscellaneous 16 57 75 9. Powerhouse 28 64 85 10. Seismicity 30 66 85 11. Slopes 31 68 87 12. Speech/ Address 34 68 - 13. Testing 35 69 87 14. Tunnel 37 69 88 15. Underground Space 41 - - 16. Water Resources 42 71 - Notes: 1. Paper Titles under Themes have been arranged by Paper ID. 2. Search for Paper by Project Name, Author, Location, etc. is possible using standard PDF tools (Visit www.isegindia.org for PDF version). Journal of Engineering Geology BUILDINGS S.No.1/ Paper ID.JEGN.1: “Excessive settlement of a building founded on piles on a River bank”. ISEG Jour. Engg. Geol. Vol.1, No.1, Year 1966. Author(s): Brahma, S.P. S.No.2/ Paper ID.JEGN.209: “Geotechnical and ecologial parameters in the selection of buildings sites in hilly region”.
    [Show full text]
  • Seismogenic Landslides in Himalaya with Special Reference to Uttaranchal
    Missouri University of Science and Technology Scholars' Mine International Conference on Case Histories in (2004) - Fifth International Conference on Case Geotechnical Engineering Histories in Geotechnical Engineering 15 Apr 2004, 1:00pm - 2:45pm Seismogenic Landslides in Himalaya With Special Reference to Uttaranchal Kishor Kumar Central Road Research Institute, New Delhi, India Dinesh Sati Central Road Research Institute, New Delhi, India Follow this and additional works at: https://scholarsmine.mst.edu/icchge Part of the Geotechnical Engineering Commons Recommended Citation Kumar, Kishor and Sati, Dinesh, "Seismogenic Landslides in Himalaya With Special Reference to Uttaranchal" (2004). International Conference on Case Histories in Geotechnical Engineering. 42. https://scholarsmine.mst.edu/icchge/5icchge/session02/42 This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License. This Article - Conference proceedings is brought to you for free and open access by Scholars' Mine. It has been accepted for inclusion in International Conference on Case Histories in Geotechnical Engineering by an authorized administrator of Scholars' Mine. This work is protected by U. S. Copyright Law. Unauthorized use including reproduction for redistribution requires the permission of the copyright holder. For more information, please contact [email protected]. Proceedings: Fifth International Conference on Case Histories in Geotechnical Engineering New York, NY, April 13-17, 2004 SEISMOGENIC LANDSLIDES IN HIMALAYA WITH SPECIAL REFERENCE TO UTTARANCHAL Kishor Kumar Dinesh Sati Central Road Research Institute Central Road Research Institute New Delhi, India, 110020 New Delhi, India, 110020 ABSTRACT The continued compression between Indian and Asian continental plates which ultimately led to the collision of the two, is regarded as the most likely phenomenon responsible for the emergence of Himalaya.
    [Show full text]
  • Treatment of Left Bank Slopes of Ichari Dam
    Missouri University of Science and Technology Scholars' Mine International Conference on Case Histories in (1988) - Second International Conference on Geotechnical Engineering Case Histories in Geotechnical Engineering 02 Jun 1988, 10:30 am - 3:00 pm Treatment of Left Bank Slopes of Ichari Dam Bhagwat V. K. Lavania University of Roorkee, Roorkee, India Follow this and additional works at: https://scholarsmine.mst.edu/icchge Part of the Geotechnical Engineering Commons Recommended Citation Lavania, Bhagwat V. K., "Treatment of Left Bank Slopes of Ichari Dam" (1988). International Conference on Case Histories in Geotechnical Engineering. 54. https://scholarsmine.mst.edu/icchge/2icchge/2icchge-session3/54 This work is licensed under a Creative Commons Attribution-Noncommercial-No Derivative Works 4.0 License. This Article - Conference proceedings is brought to you for free and open access by Scholars' Mine. It has been accepted for inclusion in International Conference on Case Histories in Geotechnical Engineering by an authorized administrator of Scholars' Mine. This work is protected by U. S. Copyright Law. Unauthorized use including reproduction for redistribution requires the permission of the copyright holder. For more information, please contact [email protected]. Proceedings: Second International Conference on Case Histories in Geotechnical Engineering, June 1-5, 1988, St. louis, Mo., Paper No. 3.54 Treatment of Left Bank Slopes of lchari Dam Bhagwat V.K. Lavania Professor of Earthquake Engineering, University of Roorkee, Roorkee, India SYNOPSIS : The left bank of Jchari Diversion Dam was anticipated unstable because of toe submergence and drawdown effects after the construction of the dam, on the weak geological formations. Extensive laboratory and field investigations were carried out to determine the extent of stabilising measures needed.
    [Show full text]
  • Organogram of Central Water Commission 2014- 15 CHAIRMAN CWC
    INDIA – LAND AND WATER RESOURCES: FACTS Geographical Area & Location 328.7 M ha Latitude; 80 4’N to 370 6’ N Longitude: 680 7’E to 970 25’ E Population (2011) 1210.19 Million Rainfall Variation 100 mm in Western most regions to 11000 mm in Eastern most region Major River Basin (Catchment Area more than 20,000 12 Nos. having total catchment area 253 Sqkm) Mha Medium River Basin (Catchment Area between 2000 and 46 nos. having total catchments area 25 20,000 Sq km) Mha Total Navigable Length of Important Rivers 14464 Km WATER RESOURCES Average Annual Rainfall 4000 BCM Annual Rainfall (2016) 3560 BCM Mean Annual Natural Run-Off 1869 BCM Estimated Utilisable Surface Water Potential 690 BCM Total Replenishable Ground Water Resources 433 BCM Ground Water Resources Available for Irrigation 369 BCM Ground Water Potential Available for Domestic, 71 BCM (approx.) Industrial And Other Purposes Ultimate Irrigation Potential 140 Mha From Surface Water 76 Mha From Ground Water 64 Mha Storage Available Due to Completed Major & Medium 253 BCM Projects (Including Live Capacity less than 10 M.Cum) Estimated Additional Likely Live Storage Available due 155 BCM to Projects Under Construction / Consideration LAND RESOURCES Total Cultivable Land 182.2 M ha Gross Sown Area (2013-14) 200.9 M ha Net Sown Area (2013-14) 141.4 M ha Irrigation Potential Created (upto March 2012) 113.5 M ha Gross Irrigated Area (2013-14) 95.8 M ha Net Irrigated Area (2013-14) 68.1 M ha HYDRO-POWER Ultimate Hydropower Potential 148701 MW Potential Developed by 31.3.2017 (Installed Capacity of 44478 MW plants above 25 MW) From Chairman’s Desk It is our pleasure to bring out this Annual Report of the Central Water Commission (CWC) for the year 2016-17.
    [Show full text]
  • Report on Women and Water
    SUMMARY Water has become the most commercial product of the 21st century. This may sound bizarre, but true. In fact, what water is to the 21st century, oil was to the 20th century. The stress on the multiple water resources is a result of a multitude of factors. On the one hand, the rapidly rising population and changing lifestyles have increased the need for fresh water. On the other hand, intense competitions among users-agriculture, industry and domestic sector is pushing the ground water table deeper. To get a bucket of drinking water is a struggle for most women in the country. The virtually dry and dead water resources have lead to acute water scarcity, affecting the socio- economic condition of the society. The drought conditions have pushed villagers to move to cities in search of jobs. Whereas women and girls are trudging still further. This time lost in fetching water can very well translate into financial gains, leading to a better life for the family. If opportunity costs were taken into account, it would be clear that in most rural areas, households are paying far more for water supply than the often-normal rates charged in urban areas. Also if this cost of fetching water which is almost equivalent to 150 million women day each year, is covered into a loss for the national exchequer it translates into a whopping 10 billion rupees per year The government has accorded the highest priority to rural drinking water for ensuring universal access as a part of policy framework to achieve the goal of reaching the unreached.
    [Show full text]
  • Assessment of Environmental Flows for the Upper Ganga Basin
    Supported By: Assessment of Environmental Flows for the Upper Ganga Basin Untitled-1 1 05/06/12 4:01 PM AUTHORS Jay O’Keeffe, Nitin Kaushal, Luna Bharati, Vladimir Smakhtin ACKNOWLEDGEMENTS Working on this initiative has been a challenge. We would not have reached this stage without the inputs and support of several individuals and institutions that have helped us in our endeavour. Dr. Tom Le Quesne at WWF-UK provided us the initial conceptual framework, taught us about E-Flows and got us started on the journey. We also express our gratitude to Mr. Ravindra Kumar from SWaRA, Government of Uttar Pradesh, for being a constant source of encouragement and for his valuable contribution to this work. We would like to thank Mr. Paritosh Tyagi, Former Chairman of Central Pollution Control Board, who has been associated with the Living Ganga Programme since its inception and shared his rich knowledge on the subject, and Dr. Savita Patwardhan from Indian Institute of Tropical Meteorology, Pune for providing us with much needed climate data. Key partners who have been part of this study, and without whom it would not have been possible to complete this work are Dr. Ravi Chopra and Ms. Chicu Lokgariwar, People’s Science Institute, Dehradun; Prof Vinod Tare, Prof. Rajiv Sinha and Dr. Murali Prasad, IIT Kanpur; Dr. Vikrant Jain, Delhi University; Prof. Prakash Nautiyal, Garhwal University; Prof. AK Gosain, IIT Delhi; and Dr. Sandhya Rao, INRM. We would like to thank Ms. Laura Forster for the technical editing of this report. At WWF-India, we are highly obliged to Mr.
    [Show full text]
  • Order on Tariffs for FY 2020-21
    Order On True up for FY 2018-19, Annual Performance Review for FY 2019-20 & Annual Fixed Charges for FY 2020-21 For UJVN Ltd. April 18, 2020 UTTARAKHAND ELECTRICITY REGULATORY COMMISSION Vidyut Niyamak Bhawan, Near I.S.B.T., P.O. MajraDehradun–248171 Table of Contents 1 Background and Procedural History ..................................................................................... 4 2 Stakeholders ‘Objections/Suggestions, Petitioner’s Responses and Commission’s Views ........................................................................................................................................... 8 2.1 Tariff Increase ................................................................................................................................ 8 2.1.1 Stakeholder’s Comments ................................................................................................ 8 2.1.2 Petitioner’s Reply ............................................................................................................. 9 2.1.3 Commission’s Views ....................................................................................................... 9 2.2 Capital Cost and RoE .................................................................................................................... 9 2.2.1 Stakeholder’s Comments ................................................................................................ 9 2.2.2 Petitioner’s Reply ..........................................................................................................
    [Show full text]
  • Flood Forecasting
    Report of the Comptroller and Auditor General of India on Schemes for Flood Control and Flood Forecasting Union Government Ministry of Water Resources, River Development & Ganga Rejuvenation Report No. 10 of 2017 (Performance Audit) Report No. 10 of 2017 Table of Contents Contents Pages Preface iii Executive Summary v Recommendations x Chapter 1 Introduction 1 Chapter 2 Financial Management of Flood Management Programme 9 Chapter 3 Execution of Flood Management Programme 23 Chapter 4 Flood Forecasting 49 Chapter 5 Other Schemes for Flood Control 59 Chapter 6 Implementation of the recommendations of Review and 71 Oversight Committees for Flood Control measures Chapter 7 Monitoring and Evaluation 83 Annexures 97 Abbreviations 109 i Report No. 10 of 2017 Preface India is highly vulnerable to floods. Out of the total geographical area of 329 million hectares, about 45.64 million hectares is flood prone. Floods are a recurrent phenomenon, which cause huge loss of lives and damage to livelihood systems, property, infrastructure and public utilities. As per the report of the Working Group on Flood Control Management Programme (December 2006) for the XI Five Year Plan (2007-2012), on an average, every year, 7.55 million hectares of land is affected, 1,560 lives are lost and the damage caused to crops, houses and public utilities due to floods is estimated at ` 1,805 crore. The Performance Audit on “Schemes for Flood Control and Flood Forecasting” examined whether schemes for flood control and flood forecasting were efficient and effective; and whether the review and oversight mechanisms were effective. The Performance Audit showed that there were long delays in approval of Detailed Project Reports leading to technical designs becoming irrelevant at the time of actual funding.
    [Show full text]
  • 3 Overview of Landslide in India
    A SELECTED ANNOTATED BIBLIOGRAPHY AND BIBLIOGRAPHY ON LANDSLIDES IN INDIA Compiled by Surya Parkash and Anil Kathait NATIONAL INSTITUTE OF DISASTER MANAGEMENT Ministry of Home Affairs, Government of India 5-B, I.P. Estate, M.G. Road New Delhi – 110 002 Table of Contents S. No. Content Page No. Foreword ii Preface iii Acknowledgement iv 1. Background 1 2. About Landslides 2 3. Overview of Landslides in India 5 4. Annotated Bibliography 9 5. Bibliography 87 6. List of Publications / Periodicals related to landslides 109 7. Web links for landslide publications 111 8. Glossary 113 9. Index 115 i Foreword The document on “A Selected Annotated Bibliography and Bibliography on Landslides in India” is prepared to provide a source of inventory for those who are interested in the landslide subject or willing to do research on it. It is a compilation of the available literature and research work pursued on Indian landslides. American Psychological Association (APA) citation style, one of the most used citation method is used for the referring the research work. The annotated bibliography and bibliography are placed in alphabetical order. The document has been formulated by Dr. Surya Parkash, Associate Professor, NIDM. It is divided in two parts: annotated bibliography and bibliography. Annotated bibliography is provided with the summary of the research work carried by the researcher. NIDM acknowledges the valuable support from all resource persons and institutes for providing technical inputs on the document and reviewing the same at various stages of preparation and publication. ii Preface The contemplation of available literature or research work carried out on any subject facilitates in understanding that particular subject.
    [Show full text]
  • Dam Rehabilitation and Improvement Project (P089985) Tf0a9856
    DAM REHABILITATION AND IMPROVEMENT PROJECT (P089985) TF0A9856 Japan-World Bank Annual Consultations 9 January 2020, Tokyo Jun Matsumoto Senior Water Resources Management Specialist World Bank PRESENTATION STRUCTURE • Strategic Objectives • Background and Context • Development Rationale • Leveraging Japanese Knowledge and Experiences • Project Activities and Achievements • Key Factors Affecting Implementation and Outcomes • Future Activities • Lessons Learned and Recommendations PRESENTATION STRUCTURE Strategic Objectives Japan-World Bank Program for Mainstreaming Disaster Risk Management in Developing Countries: • aimed at mainstreaming disaster risk management (DRM) into national development planning and investment programs, including through World Bank country strategies and operations. • The Program also strives to connect Japanese and global expertise in DRM with developing countries. India’s Dam Rehabilitation and Improvement Project: • Improve safety and operational performance of selected dams, along with institutional strengthening with system wide management approach. PRESENTATION STRUCTURE BACKGROUND AND CONTEXT INTRODUCTION LARGE DAMS WORLDWIDE (TOP 8 ) Canada 1170 (6) China Spain 23842 (1) 1063 (8) USA Japan 9261 (2) 3112 (4) India 5701 (3) South Africa Brazil 1114 (7) 1411 (5) AGE OF INDIAN LARGE DAMS 2 5 T o 5 0 < 25 YEARS YEARS 1186 Nos. 2982 Nos. 55 % 22 % 16 % 5 % > 1 0 0 YEARS 293 Nos. 5 0 T o 1 0 0 YEARS 878 Nos. DAM FAILURES IN INDIA 1991 -2001 2001 -2019 03 1981 - 1990 12 01 03 ✓ 39 dam failures reported. 1971 - 1980
    [Show full text]
  • Dam Rehabilitation and Improvement Project (DRIP) DRAFT
    CENTRALWATER COMMISSION GOVERNMENT OF INDIA Public Disclosure Authorized Dam Rehabilitation and Improvement Project (DRIP) DRAFT Public Disclosure Authorized UPDATED ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) Public Disclosure Authorized June, 2018 Public Disclosure Authorized TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................................................... 3 1. INTRODUCTION ................................................................................................................................................. 9 1.1 Project Background ...................................................................................................................................... 9 1.2 Implementation Status ....................................................................................................................................... 10 1.3 Additional Financing– Scope............................................................................................................................. 11 1.4 Purpose of ESMF ............................................................................................................................................... 13 1.5 Implementation Experience of ESMF in DRIP ................................................................................................. 14 1.6 Need and approach to revision of ESMF for Additional Financing .................................................................
    [Show full text]