Organogram of Central Water Commission 2014- 15 CHAIRMAN CWC
Total Page:16
File Type:pdf, Size:1020Kb
INDIA – LAND AND WATER RESOURCES: FACTS Geographical Area & Location 328.7 M ha Latitude; 80 4’N to 370 6’ N Longitude: 680 7’E to 970 25’ E Population (2011) 1210.19 Million Rainfall Variation 100 mm in Western most regions to 11000 mm in Eastern most region Major River Basin (Catchment Area more than 20,000 12 Nos. having total catchment area 253 Sqkm) Mha Medium River Basin (Catchment Area between 2000 and 46 nos. having total catchments area 25 20,000 Sq km) Mha Total Navigable Length of Important Rivers 14464 Km WATER RESOURCES Average Annual Rainfall 4000 BCM Annual Rainfall (2016) 3560 BCM Mean Annual Natural Run-Off 1869 BCM Estimated Utilisable Surface Water Potential 690 BCM Total Replenishable Ground Water Resources 433 BCM Ground Water Resources Available for Irrigation 369 BCM Ground Water Potential Available for Domestic, 71 BCM (approx.) Industrial And Other Purposes Ultimate Irrigation Potential 140 Mha From Surface Water 76 Mha From Ground Water 64 Mha Storage Available Due to Completed Major & Medium 253 BCM Projects (Including Live Capacity less than 10 M.Cum) Estimated Additional Likely Live Storage Available due 155 BCM to Projects Under Construction / Consideration LAND RESOURCES Total Cultivable Land 182.2 M ha Gross Sown Area (2013-14) 200.9 M ha Net Sown Area (2013-14) 141.4 M ha Irrigation Potential Created (upto March 2012) 113.5 M ha Gross Irrigated Area (2013-14) 95.8 M ha Net Irrigated Area (2013-14) 68.1 M ha HYDRO-POWER Ultimate Hydropower Potential 148701 MW Potential Developed by 31.3.2017 (Installed Capacity of 44478 MW plants above 25 MW) From Chairman’s Desk It is our pleasure to bring out this Annual Report of the Central Water Commission (CWC) for the year 2016-17. The report gives an insight into the organisation structure, functions and activities of CWC highlighting the contribution made in the development and management of water resources in the country. CWC continued to forge ahead in providing the necessary leadership and guidance for the development of the water sector and provided necessary support to the Ministry of Water Resources, River Development and Ganga Rejuvenation on all technical and policy matters during the year 2016-17. Officers of CWC represented in several committees and contributed substantially on various issues. CWC provided technical assistance to the Ministry on various issues related to inter-state matters, sharing of waters with neighbouring countries, bilateral treaties and MoUs etc. Regular activities of appraisal of major and medium irrigation projects and other water resources development schemes, monitoring of major, medium and extension/ renovation/ modernization (ERM) projects, environmental issues related to projects, design of hydraulic structures, hydrological observations and studies and flood forecasting services were successfully carried out during the year. During 2016-17, CWC provided design consultancy for DPR preparation and project construction in respect of 61 water resources development projects in India and neighbouring countries namely Afghanistan, Bhutan and Nepal. We have undertaken techno-economic appraisal of water resources development projects leading to acceptance of 40 projects comprising of 19 major & medium irrigation projects, 1 drinking water project and 20 flood control projects by the Advisory Committee of MoWR,RD&GR. In view of the goal of providing “Har Khet Ko Pani”, CWC has undertaken rigorous monitoring of irrigation projects as well as scrutiny of release proposals which resulted in release of funds to 69 major and medium irrigation projects to the tune of Rs. 3308 crore under PMKSY-AIBP programme. CWC has been monitoring storage position of 91 reservoirs in the country which has helped the States in planning of water utilisation during non-monsoon period. Flood Forecasting service at 23 new stations has been started during 2016-17. The timely issue of 6239 flood forecasts (with 95.34 % accuracy) during the monsoon period of 2016 has helped concerned authorities / society in effective flood fighting and relief. CWC has always worked for providing quality service to the nation in the field of water resources development and management. The National River Water Quality Laboratory, CWC, New Delhi is now accredited by National Accreditation Board for Testing and Calibration Laboratories (NABL) in accordance with Standard ISO/IEC 17025- 2005 in the discipline of testing. The dedicated effort and hard work of the officers and staff of CWC is the key behind above achievements. CWC is committed to provide full support to the State Governments in all aspects related to planning, design, construction, operation and management of water resources projects in an efficient, sustainable and technically sound manner. (S. Masood Husain) Chairman, CWC (i) HIGHLIGHTS OF THE YEAR 2016 -17 DESIGNS o CWC provided design consultancy to States / Project Authorities for 61 water resources development projects involving detailed designs and preparation of drawings of various types of hydraulic structures. RIVER MANAGEMENT o Carried out hydrological observations, including snow and meteorological observations, at 954 sites in different basins spread over the entire country. o The National River Water Quality Laboratory, CWC, New Delhi has been accredited by National Accreditation Board for Testing and Calibration Laboratories (NABL) in accordance with Standard ISO/IEC 17025_2005 in the disciple of chemical as well as biological testing. o Provided Flood Forecasting Service at 199 flood forecasting stations (including 48 inflow forecasting stations) spread over 19 major river basins. During the flood season 2016, 6239 flood forecasts (4969 level forecast and 1270 inflow forecasts) were issued, out of which 5948 (98.1%) forecasts were within prescribed limits of accuracy. Daily flood bulletins and weekly flood news letters were also issued during the flood season. o Provided technical assistance to Royal Government of Bhutan for maintenance of 32 Hydro-Meteorological sites in Bhutan. WATER PLANNING o During the year 2016-17, 63 major / medium irrigation projects were under appraisal in CWC. 40 projects comprising 19 major / medium irrigation projects 1 drinking water project and 20 flood control projects were accepted by the Advisory Committee. o Monitored 47 Irrigation projects under General Category and 149 Irrigation projects (including Extension/Renovation/Modernization (ERM) projects) receiving grants under AIBP. o Storage positions of 91 important reservoirs, with total live storage of about 157.8 BCM, were monitored on weekly basis. o Processing of proposals for release of Rs. 3308 crore of Central Grant under AIBP programme to 69 Major and Medium Irrigation Projects were undertaken. o Provided technical assistance to MoWR in Inter-State water disputes resolution process in respect of Cauvery Water Dispute, Mandovi Water Dispute, Krishna Water Dispute and Vamsadhara Water Dispute. HRM o National Water Academy, CWC, Pune conducted 30 training programmes during 2016-17 including Workshop/Seminar for officers of Central / State Governments and Public sector undertakings with a total number of man weeks accomplished to the tune of 2067. (ii) C O N T E N T S Page From Chairman’s Desk (i) Highlights of the Year (ii) CHAPTER - I An Overview 1 CHAPTER - II Water Resources Development 15 CHAPTER - III River Management 23 CHAPTER - IV Basin Planning 43 CHAPTER - V Design & Consultancy 55 CHAPTER - VI Water Management 77 CHAPTER - VII Appraisal of Projects 81 CHAPTER - VIII Monitoring of Projects 91 CHAPTER - IX Construction Equipment Planning and Management 97 CHAPTER - X Inter-State Matters 99 CHAPTER - XI Environmental Management of Water Resources 113 Projects CHAPTER - XII External Assistance 119 CHAPTER - XIII International Cooperation with Neighbouring 125 Countries CHAPTER - XIV Water Resources Data Management 133 CHAPTER - XV Training 139 CHAPTER - XVI Vigilance 143 CHAPTER - XVII Representation of Central Water Commission in 145 Various Committees CHAPTER - XVIII Publicity and Publication 153 (iii) Organogram of Central Water Commission 2014- 15 CHAIRMAN CWC MEMBER MEMBER MEMBER DIR. (D & R CORDN.) DIR. (R.M. CORDN.) DIR. (WP & P CORDN.) DESIGNS & RESEARCH RIVER MANAGEMENT WATER PLANNING & PROJ. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. ADVISOR DESIGN DESIGN DESIGN DAM NARMADA HYD N.W.A IRRIG. PROJECT PROJECT PROJECT P.O. & HRM BPMO EMO CMO. I.S.O. APPR. MON. (NW & S) (N & W) (E & NE) SAFETY BASIN PROJ. STUDIES PUNE MANAGEMENT PREP. M.I SECY W.S. NP-I H.C.D H.C.D H.C.D. D.S.M. S.S.P.H. HYD.(N) & H & W.R. W. M. B.P. & P.A. (N) MON. (N) P & M I.P.O. INF. SYS. V.O. R.S. NPN TECH. SYSTEM C.M.D.D C.M.D.D. C.M.D.D. D.S.R. S.S.D. & C. HYD.(S) I.P. (S) RES. OPR . E.M. P.A. (S) MON. (C) C.M.C. .PE.A.-I. E.W.U. W.R.I.S. CORDN. ENGG. NARMADA GATES GATE GATES INSTR. HYD.(C) TRAINING A.&.C. I.P. (N) N.W.P. R.S. P.A. (C) MON. (W) C.B. NP-II H.D.S. CANAL DES. S NARMADA EMB EMB. EMB. F.E & S.A HYD.(NE) ADM A..I. & C.O. I.S.M. W.R.S.E. R & R C.A. (I) MON. (E) P.C.P. ECO. (DAM & HW) . B.C.D. ENV. ESTT-I N.J.P (N&W & B.C.D. S.M. R.H.S. & W.R.E. E.I.A. C.A.(HWF) MON. (S) T.D. SOC. NWS) HYD. ESTT-II NTPH P & P (DSR) NT (D&G) C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E. C.E C.E. FLOOD INDUSBASIN B.B.BASIN L.G.