Design Process & 1) Assembly and Solid Models Installation Instructions (CAE) 2) “As-Built” Package Sketches (2-D Drawings & 3) Creating Design Packages Schematics)

Jim Glancey MEEG 304 – Design Elements

Visualization Communication Documentation

Drawing Packages Package Elements

• Contains all the descriptive documentation needed to •Package Content ensure a part or system can bfddbe manufactured and • DiDrawings f or eac h component tlikdt linked to parent assembled. assembly • One or more assembly drawings • Drawing Package = a group of drawings that •2D or 3D communicate the details of a system or sub-system. • Assembled or Exploded • Label all components • NdtbfiihdbfNeeds to be finished before any part s can b e mad e. • Incldlude a B i lill f of Materials • Link to component drawings • The final drawing package will be given to your • May also include wiring, pneumatic and other customer. to communicate and illustrate connectivity and installation.

1 Class 2

Drawing Package Organization Exploded Assembly

• Full Assembly & Bill of Materials • Sub Assembly #1 • Sub Assembly #2 • Sub Assembly #3 • Parts in Sub Assembly #1 • PtiSbAParts in Sub Assembl bl#2y #2 • Parts in Sub Assembly #3 •Etc…

Part 1 Part 2

2 Class 2

Example Engineering Drawings 2D Sectioned Assembly Typical Content

• GfbjGeometry of an object • Material type and characteristics • Manufacturing requirements • Surface finishes and features • Tolerances (primarily geometric) • Other (eg. assembly information)

Drawing Title Block

• Typical Title Block Contents: Typical • Material •Scale •Tolerance •Description • Team name • Part number • Sheet “number” of “total number of UDME sheets” • PtdPart drawn by an ddtdd date drawn • Checked by and date checked • File Name • Quantity

3 Class 2

Engineering Drawings Dimensioning The Legal Context

• Dimension with intent to manufacture • Engineering Drawing: • All dimensions from one setup coming • Binding document or set of documents that from the same datum disclosed graphically and in text the form • Parts with many dimensions may need and function of an object. two or more different drawings or • Legally binding if created by or approved enldilarged views. (i. e. stamped) by a professional engineer.

Bill of Materials

• Bill of Materials Contents: •Part No. • Quantity • Material/Stock Size • Sheet # •Source • Bill of Materials are needed for each full and sub Bill of Materials assembly • If the same part appears in multiple subassemblies it only needs to appear once in the drawing package. • Common format: with Columns • Typically included on the assembly drawing.

4 Class 2

Purchased Parts

• Most manufactures provide eltlectroni idc drawi ngs.

• Do not need to be fully dimensioned in drawing unless modified after they are Stepper Motor purchased

• Add a note for the material giving the part number and contact info of the company the part was purchased from

Drawing Provided by Manufacturer

Diagrams Don’t Forget about Sketching • Technical sketches (i.e. to scale) are a great • Same principles apply to wayconveyideasway convey ideas. assembly diagrams • Circuits • Attempting to sketch in SolidWorks often • Pneumatic presents more obstacles than just using pencil • Hydraulic and paper. •Logic • Jumping into • Used to show SolidWorks before your connectivity and design intensions are clear causes problems. operation. i.e. origins, planes, etc…

5 Class 2

Installation Drawing Requirements

• Necessary to insure proper installation of a Installation Drawings new design. • Adapting into or onto an existing system. • Demolition • Modifications (holes, cutouts, etc.) • Can integrate/illustrate several sub-systems (mechanical, electrical, controls, etc.).

Valve Installation

6 Class 2

Cuttoff System Installation

7 Class 2