Assam Power Sector Investment Program – Tranche 1

Total Page:16

File Type:pdf, Size:1020Kb

Assam Power Sector Investment Program – Tranche 1 Assam Power Sector Investment Program (RRP IND 47101) Initial Environmental Examination Document Stage: Final Document Project Number: 47101 June 2014 India: Assam Power Sector Investment Program – Tranche 1 Prepared by Assam Power Generation Corporation (APGC), Government of Assam. i Table of Contents ABBREVIATIONS iii WEIGHTS AND MEASURES iii EXECUTIVE SUMMARY 1 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Scope of Work and Methodology Adopted 2 1.3 Applicable Environmental Policies and other Legislations 4 2.0 DESCRIPTION OF THE PROJECT 5 2.1 The Project 5 2.2 Category of Project 5 2.3 Need for the Project 5 2.4 Location 6 2.5 Size and Magnitude of Operation 12 2.6 Implementation Plan 17 3.0 DESCRIPTION OF ENVIRONMENT 19 3.1 Physical Resources 19 3.2 Ecological Resources 28 3.3 Economic Development 34 3.4 Social and Cultural Development 37 3.5 Historical, Cultural and Archaeology Sites/Places 38 4.0 SCREENING OF POTENTIAL ENVIRONMENTAL IMPACT AND MITIGATION MEASURES 39 4.1 Analysis of Alternatives (Technology & Site) 39 4.2 Environmental Impacts 41 4.3 Environmental Management Plan 48 4.4 Social, Labor Issues and Corporate Social Responsibility (CSR) 51 5.0 INSTITUTIONAL REQUIREMENTS AND ENVIRONMENTAL MONITORING PROGRAMME 52 5.2 Environmental Monitoring Plan (EMoP) 56 5.3 Critical Environmental Review Criteria 57 5.4 Environmental Management Plan Budget Costs 57 5.5 Associated facilities 59 5.6 Disaster Management, Health and Safety 59 5.7 Disposal of Dismantled Gas Turbine Power plant: 59 6.0 GRIEVANCE REDRESS MECHANISM 61 7.0 PUBLIC CONSULTATION AND INFORMATION DISCLOSURE 64 7.1 Information Disclosure 64 7.2 Public Consultation 64 7.3 Consultation Findings 64 8.0 FINDINGS AND RECOMMENDATIONS 66 9.0 CONCLUSIONS 67 ANNEXURES 69 ANNEXURE 1: SUMMARY OF NATIONAL, LOCAL, OTHER APPLICABLE ENVIRONMENTAL LAWS, REGULATIONS, AND STANDARDS 69 ANNEXURE 2: ENVIRONMENTAL MANAGEMENT PLAN (EMP) 74 ANNEXURE 3: APPROVAL OF ENVIRONMENT IMPACT ASSESSMENT 78 ANNEXURE 4: PUBLIC CONSULTATION 89 ANNEXURE 5: ENVIRONMENT MONITORING REPORT 92 ABBREVIATIONS ADB – Asian Development Bank AEGCL – Assam Electricity Grid Corporation AERC – Assam Electricity Regulatory Commission APGC – Assam Power Generation Corporation APDC – Assam Power Distribution Company APCB – Assam Pollution Control Board ASI – Archaeological Survey of India ASEB – Assam State Electricity Board CEA – Central Electricity Authority CERC – Central Electricity Regulatory Commission CPCB – Central Pollution Control Board, Government of India DC or D/C – Double Circuit DPR – Detailed Project Report EA – Executing Agency EARF – Environmental Assessment and Review Framework EHV – Extra High Voltage EIA – Environmental Impact Assessment EMoP – Environmental Monitoring Plan EMP – Environmental Management Plan ESMU – Environment and Social Management Unit GHG – Green House Gas GOA – Government of Assam GoI – Government of India GSS – Grid Sub-station GRM – Grievance Redress Mechanism IA – Implementing Agency IEE – Initial Environmental Examination IMD – India Metrological Department LRPP – Lakwa Replacement Power Project LTPS – Lakwa Thermal Power Station MFF – Multi-tranche Financing Facility MOEF – Ministry of Environment and Forests, Government of India MOP – Ministry of Power MSL – Mean Sea Level PCB – Poly Chlorinated Biphenyl PGCIL – Power Grid Corporation of India PLF – Plant Load Factor PTCC – Power Telecom Co-ordination Committee PIU – Project Implementing Unit PMU – Project Management Unit ROW – Right of Way RP – Resettlement Plan SC or S/C – Single Circuit SF6 – Sulphur Hexafluoride WEIGHTS AND MEASURES Cusec – Measure of flow rate (28.317 litres per second) Ha. (hectare) – 10,000 sq m = 2.47105 Acre GW – Giga watt km (kilometer) – 1,000 meters kV – kilovolt (1,000 volts) kW – kilowatt (1,000 watts) MW – Mega Watt MMSCMD – Metric Million Standard Cubic Metre per Day Ppm – Parts per million 1 EXECUTIVE SUMMARY 1. ADB is proposing to extend a multi-tranche financing facility to the Government of Assam under Assam Power Sector Investment Program – Tranche 1. Assam State Power Generation Company (APGC) intends to fund the 70 MW Lakwa Replacement Power Project (LRPP) which will replace obsolete 60 MW Gas turbines with 70 MW Gas Engines at the gas based generation Lakwa Thermal Power Station (LTPS). 2. Based on the proposed capacity, proposed replacement project is within the existing LTPS Complex; therefore project is supposed to fall under category B of Project Activity 1(d), Thermal Power Plants <500 MW (coal/ lignite/ naptha & gas based) under the schedule as per Environment Impact Assessment notification issued on 14th September, 2006. However the project attracts general condition of the notification as the Nagaland state boundary is falling within 10 km radius from the project site (4 km in South direction) and hence the project falls under Category A of the Government of India which required an Environmental Clearance from Expert Appraisal Committee, MoEF, GoI. 3. In May 2013, a comprehensive environment assessment for the power project prepared by M/s Ramky Enviro Engineers Ltd., Hyderabad was approved by the Ministry of Environment and Forests (MoEF), Government of India for the 70 MW LRPP. However, to comply with ADB‘s requirements, the government-approved environment assessment for the 70 MW LRPP was supplemented by an IEE following the outline given in Annex to Appendix 1 of the SPS June 2009. This IEE was based on Appendix 3 of the ADB‘s 2003 Environmental Assessment Guidelines because all the sub-project components are situated inside the LTPS site and are contiguous. 4. The project activities would support cost-effective development of energy resources through modernisation of obsolete gas plant in Assam. The table below gives the list of Tranche 1 components and summary of environmental issues. Tranche 1 Components and Summary Environmental Issues No Subproject Environmental Issues Component I: - APGC Component I. Lakwa Replacement Power Project Environment Impact Assessment for the 70 MW replacement project has Replacement of existing 4 x 15 MW (60 been prepared by M/s Ramky Enviro Engineers Ltd. which has been MW) Gas Turbine Units with 70 MW approved by the Ministry of Environment and Forests at the 74th Meeting of capacity of Gas Engines and replacement the reconstituted Expert Appraisal Committee (Thermal) held during May of existing 3 Gas Compressor Units 20-21, 2013. Land required for the LRPP is about 7 acres which is inside the premises of the LTPS plant. Water requirement has been assessed as 0.9 m3/hr (21.6 m³/day) for Gas engine based power plant. This water shall be drawn from the water clarifier inside the plant. Desang River flows 5.5 km N of the site and Suffry canal flows 0.7 km E. LTPS is located at 110m MSL, whereas Desang River and Suffry Canal are at 99 m MSL and 103m MSL respectively thereby providing the least risk of flooding LTPS. There is minimal habitation in the SW direction within 1.2 Km. which is most windy as per windrose diagram in environment assessment document. No Wildlife Sanctuaries or National parks exist in 4 km radius of the project site. The Chala Reserve Forest which is about 1.6 km North-west, Abhaypur Reserve Forest which is about 3.6 km south. Sola Reserve Forest is situated 8 km from LTPS in NW. Singphan Wildlife Sanctuary which lies in the state of Nagaland is 4.4 km south of the proposed project site and does not lie to the SW direction. The Panidehing Wildlife Sanctuary in Shivsagar district about 50 km lies to the NE. Power generated will be evacuated through existing 132 kV feeders as per the scheme of State Transmission Utility (STU) and no additional feeders are envisaged. Component II. Capacity Development Component 2. Capacity Building No associated social and environment impact. 2 5. APGC had studied technological and location specific alternatives for replacement of obsolete gas turbines for power generation in Phase I LTPS plant. The existing plant site does not affect any biodiversity rich area, or any forest area and is situated away from any densely populated or agricultural area – with no schools, temples and other places of social and cultural importance coming within the boundary of the plant. 6. Clearances from Assam Forest Department would not be required as none of the project components require construction on any forest land or require cutting of forest trees. No additional land is being acquired for LRPP as the project will utilise the existing 132 kV power evacuation system at LTPS for power evacuation thereby eliminating the need for additional transmission lines. The LRPP Gas Based Generation plant and power evacuation substation extension is proposed to be set up on existing plant premises and therefore acquisition of land will not be required from the surrounding communities. This proposed land area is barren with some scrubs and weed plants, there is no need for removal of trees. The LRPP shall utilise the existing 132 kV LTPS’s substation to connect to the Assam Electricity Grid Corporation’s (AEGCL’s) 132 kV network at Dibrugarh, Nazira, Namrup and Mariana GSS’s through transmission lines mostly run through cultivated lands and to a lesser extent runs through human settlements. 7. The proposed project will have a number of positive impacts and negative impacts on the existing environment as follows: Positive Impacts: The proposed project will improve operational efficiency and quality of power, reliability of the system and at the same time will reduce losses due to interconnection with Discom network and hence better voltage profile. Evacuation of power to the local areas will boost overall economic development of the state. There no emission control systems installed on the old gas turbines and the hot flue gases are escaping into the atmosphere. With this new gas engine, the system will have monitoring systems for Sox, Nox, O, CO, CO2 and other. This will help improve the pollution footprint of the gas generation plant.
Recommended publications
  • The Forgotten Saga of Rangpur's Ahoms
    High Technology Letters ISSN NO : 1006-6748 The Forgotten Saga of Rangpur’s Ahoms - An Ethnographic Approach Barnali Chetia, PhD, Assistant Professor, Indian Institute of Information Technology, Vadodara, India. Department of Linguistics Abstract- Mong Dun Shun Kham, which in Assamese means xunor-xophura (casket of gold), was the name given to the Ahom kingdom by its people, the Ahoms. The advent of the Ahoms in Assam was an event of great significance for Indian history. They were an offshoot of the great Tai (Thai) or Shan race, which spreads from the eastward borders of Assam to the extreme interiors of China. Slowly they brought the whole valley under their rule. Even the Mughals were defeated and their ambitions of eastward extensions were nipped in the bud. Rangpur, currently known as Sivasagar, was that capital of the Ahom Kingdom which witnessed the most glorious period of its regime. Rangpur or present day sivasagar has many remnants from Ahom Kingdom, which ruled the state closely for six centuries. An ethnographic approach has been attempted to trace the history of indigenous culture and traditions of Rangpur's Ahoms through its remnants in the form of language, rites and rituals, religion, archaeology, and sacred sagas. Key Words- Rangpur, Ahoms, Culture, Traditions, Ethnography, Language, Indigenous I. Introduction “Look on my Works, ye Mighty, and despair! Nothing beside remains. Round the decay of that colossal Wreck, boundless and bare, the lone and level sands stretch far away.” -P.B Shelley Rangpur or present day Sivasagar was one of the most prominent capitals of the Ahom Kingdom.
    [Show full text]
  • Annexure-V State/Circle Wise List of Post Offices Modernised/Upgraded
    State/Circle wise list of Post Offices modernised/upgraded for Automatic Teller Machine (ATM) Annexure-V Sl No. State/UT Circle Office Regional Office Divisional Office Name of Operational Post Office ATMs Pin 1 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA PRAKASAM Addanki SO 523201 2 Andhra Pradesh ANDHRA PRADESH KURNOOL KURNOOL Adoni H.O 518301 3 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM AMALAPURAM Amalapuram H.O 533201 4 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Anantapur H.O 515001 5 Andhra Pradesh ANDHRA PRADESH Vijayawada Machilipatnam Avanigadda H.O 521121 6 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA TENALI Bapatla H.O 522101 7 Andhra Pradesh ANDHRA PRADESH Vijayawada Bhimavaram Bhimavaram H.O 534201 8 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA VIJAYAWADA Buckinghampet H.O 520002 9 Andhra Pradesh ANDHRA PRADESH KURNOOL TIRUPATI Chandragiri H.O 517101 10 Andhra Pradesh ANDHRA PRADESH Vijayawada Prakasam Chirala H.O 523155 11 Andhra Pradesh ANDHRA PRADESH KURNOOL CHITTOOR Chittoor H.O 517001 12 Andhra Pradesh ANDHRA PRADESH KURNOOL CUDDAPAH Cuddapah H.O 516001 13 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM VISAKHAPATNAM Dabagardens S.O 530020 14 Andhra Pradesh ANDHRA PRADESH KURNOOL HINDUPUR Dharmavaram H.O 515671 15 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA ELURU Eluru H.O 534001 16 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudivada Gudivada H.O 521301 17 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudur Gudur H.O 524101 18 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Guntakal H.O 515801 19 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA
    [Show full text]
  • Annual Report 2015-16
    ANNUAL REPORT 2015-16 NATIONAL CULTURE FUND Annual Report 2015-16 NATIONAL CULTURE FUND 1 P R E F A C E uring the year 2015-16, National Culture Fund (NCF) has Dunrelentingly continued its thrust on reframing & revitalizing its ongoing projects and strived towards their completion. Not only has it established new partnerships, but has also taken forward the existing relationships to a higher level. Year on Year the activities and actions of NCF have grown owing to the awareness as well as necessity to preserve and protect our heritage monuments. This Annual Report for the year 2015-16 records the efforts made by NCF to ensure accountability, effective management and rebuilding of NCF's credibility and brand image for the Government , Corporate Sector and Civil Society. The field of heritage conservation and development of the art and culture is vast and important and NCF will continue to develop and make a positive contribution to the field in the years to come. ANNUAL REPORT 2015-16 4 NATIONAL CULTURE FUND ANNUAL REPORT 2015-16 CONTENTSCONTENTSCONTENTS S. Details Page No. No. 1 Introduction to National Culture Fund 6 2 Management and Administration 7 3 Structure of the National Culture Fund 8 4 Activities and Highlights 2015-16 9 5 On-Going Projects 9 6 New Projects Initiated in 2015-16 10 7 Projects Completed /Ongoing 13 8 Audited Statement Of Accounts 33 NATIONAL CULTURE FUND 5 ANNUAL REPORT 2015-16 1. INTRODUCTION he National Culture Fund (NCF) was set up by the Govt. of India, TDepartment of Culture (now Ministry of Culture), as a Trust under the Charitable Endowment Act, 1890 through a Gazette Notification published in the Gazette of India, 28th November, 1996.
    [Show full text]
  • Updated in June, 2016 SALE COUNTERS OF
    Updated in June, 2016 SALE COUNTERS OF ARCHAEOLOGICAL SURVEY OF INDIA IN INDIA Total Sale Counters : 107 Sl. Circle/Branch/Office Place of Sale Counter Address of Sale Counter No. 1. ASI, Hqrs, Office, New Directorate Office Janpath, New Delhi - 110 011 Delhi (1) 2. Agra Circle (5) Shilpgram Eastern Gate, O/o Conservation Asstt. ASI, Sub- Taj Mahal Circle, Taj Mahal, Agra Agra Fort O/o Conservation Asstt. ASI, Sub- Circle, Agra Fort, Agra Fatehpur Sikri O/o Conservation Asstt. ASI, Sub- Circle, Fatehpur Sikri, Agra Sikandra, Agra O/o Conservation Asstt. ASI, Sub- Circle, Sikandra, Agra Itimadaulla O/o Conservation Asstt. ASI, Sub- Circle, Itimadaulla, Agra 3. Aurangabad Circle (6) Along with Booking O/o The Sr. Conservation Assistant Counter Archaeological Survey of India, Ajanta Caves, Ajanta Ajanta Sub-Circle, Ajanta, Post : Faradapur - 431 118 District : Aurangabad - 431004 Along with Booking O/o The Sr. Conservation Assistant Counter Archaeological Survey of India, Ellora Caves, Ellora Ellora Sub-Circle, Ellora, Taluka : Khultabad District : Aurangabad - 431 004 Along with Booking O/o The Jr. Conservation Assistant Counter Archaeological Survey of India, Bibi-ka-Maqbara, Bibi-ka-Maqbara Sub-Circle, Aurangabad Begampura, District : Aurangabad - 431 004 Along with Booking O/o The Jr. Conservation Assistant Counter Archaeological Survey of India, Daulatabad Fort, Daultabad Fort Ta Aurangabad Daulatabad Dist. Aurangabad - 431 002 Along with Booking O/o The Sr. Conservation Assistant Counter Archaeological Survey of India, Pnadavlena Caves, Nasik Sub-Circle, Ambed, District : Nasik Nasik - 422 010 Along with Booking Archaeological Survey of India, Counter Aurangabad Caves, Aurangabad, Aurangabad Caves District : Aurangabad - 431 004 4.
    [Show full text]
  • Annexure-V State/Circle Wise List of Post Offices Modernised/Upgraded
    State/Circle wise list of Post Offices modernised/upgraded for Automatic Teller Machine (ATM) Annexure-V Sl No. State/UT Circle Office Regional Office Divisional Office Name of Operational Post Office ATMs Pin 1 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA PRAKASAM Addanki SO 523201 2 Andhra Pradesh ANDHRA PRADESH KURNOOL KURNOOL Adoni H.O 518301 3 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM AMALAPURAM Amalapuram H.O 533201 4 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Anantapur H.O 515001 5 Andhra Pradesh ANDHRA PRADESH Vijayawada Machilipatnam Avanigadda H.O 521121 6 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA TENALI Bapatla H.O 522101 7 Andhra Pradesh ANDHRA PRADESH Vijayawada Bhimavaram Bhimavaram H.O 534201 8 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA VIJAYAWADA Buckinghampet H.O 520002 9 Andhra Pradesh ANDHRA PRADESH KURNOOL TIRUPATI Chandragiri H.O 517101 10 Andhra Pradesh ANDHRA PRADESH Vijayawada Prakasam Chirala H.O 523155 11 Andhra Pradesh ANDHRA PRADESH KURNOOL CHITTOOR Chittoor H.O 517001 12 Andhra Pradesh ANDHRA PRADESH KURNOOL CUDDAPAH Cuddapah H.O 516001 13 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM VISAKHAPATNAM Dabagardens S.O 530020 14 Andhra Pradesh ANDHRA PRADESH KURNOOL HINDUPUR Dharmavaram H.O 515671 15 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA ELURU Eluru H.O 534001 16 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudivada Gudivada H.O 521301 17 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudur Gudur H.O 524101 18 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Guntakal H.O 515801 19 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA
    [Show full text]
  • Background of the Capital Cities of the Ahoms
    www.ijcrt.org © 2020 IJCRT | Volume 8, Issue 4 April 2020 | ISSN: 2320-2882 BACKGROUND OF THE CAPITAL CITIES OF THE AHOMS Luhit Buragohain Senior Assistant Professor, Deptt of History Tingkhong College, Tingkhong Dist-Dibrugarh(Assam)-786612 ABSTRACT The Ahoms belong to the Tai or Shan race inhabiting in Southern Siam and Southern China happened to be the early settler of Eastern Assam of the Brahmaputra Valley. They ruled over six hundred years (1228-1826 AD) with a reasonable stable government, and their kings governed till the British’s annexation in the 1st half of 19th century. The first Ahom King Sukapha established his Caraideo in 1253 AD. After him the later Ahom kings established another four Capital cities at Charagua ,Garhgaon, Rangpur and Jorhat. In this paper, we are trying to discuss the background of the Capital cities of the Ahoms. KEY WORDS: Ahoms, Capital cities, background. INTRODUCTION The Ahoms belong to the Tai or Shan race inhabiting in Southern Siam and Southern China happened to be the early settler of Eastern Assam of the Brahmaputra Valley. In the early part of 13th century they established their state in the eastern division of the Assam State where from the actual ruling of the Ahom dynasty started.(Gait 2013:38) They ruled over six hundred years (1228-1826 AD) with a reasonable stable government, and their kings governed till the British’s annexation in the 1st half of 19th century. It is learnt that they had efficient political and administrative system for which they could establish their dynasty in five capital cities at Charaideo, Chargua, Gargaon, Rongpur and Jorhat.
    [Show full text]
  • Behind the Scenes
    ©Lonely Planet Publications Pty Ltd 1224 Behind the Scenes SEND US YOUR FEEDBACK We love to hear from travellers – your comments keep us on our toes and help make our books better. Our well-travelled team reads every word on what you loved or loathed about this book. Although we cannot reply individually to your submissions, we always guarantee that your feed- back goes straight to the appropriate authors, in time for the next edition. Each person who sends us information is thanked in the next edition – the most useful submissions are rewarded with a selection of digital PDF chapters. Visit lonelyplanet.com/contact to submit your updates and suggestions or to ask for help. Our award-winning website also features inspirational travel stories, news and discussions. Note: We may edit, reproduce and incorporate your comments in Lonely Planet products such as guidebooks, websites and digital products, so let us know if you don’t want your comments reproduced or your name acknowledged. For a copy of our privacy policy visit lonelyplanet.com/ privacy. OUR READERS WRITER THANKS Many thanks to the travellers who used the last Abigail Blasi edition and wrote to us with helpful hints, useful Thanks to all the people who helped me in Delhi, advice and interesting anecdotes: including my Delhi family Jyoti and Niranjan Desai, A Adeline Bouchery, Amanda Larson-Mekler, Amber to Danish Abbas, Nicholas Thompson, Sarah Foth- Richardson, Andy Foster, Ansuya Patel-Yorke, Anthony eringham, Toby Sinclair and the Delhi Walla himself, Naylon, Arpita Singh B Bernd Scholz, Borja Ramirez, Mayank Austen Soofi.
    [Show full text]
  • Syllabus for Three Year Diploma Course Architectural Assistantship 1
    1 PROPOSED SYLLABUS FOR THREE YEARS DIPLOMA COURSE IN ARCHITECTURAL ASSISTANTSHIP FOR THE ACADEMIC SESSION JULY’ 18 ONWARDS 2 SYLLABUS FOR THREE YEAR DIPLOMA COURSE ARCHITECTURAL ASSISTANTSHIP 1STSEMESTER 3 COURSE STRUCTURE OF 1ST SEMESTER ARCHITECTURE ASSISTANTSHIP Sl. Code Subject Study Evaluation Scheme No No. Scheme Practical (Contact Theory Total Cr Hours) Mark ed s it Pass (The L T P ES Sessional (SS) Pass Prac Prac (PT+P ory+ E (ESE + tical tical A) Prac TA H Total SS) Test Asse tical) A (TA+HA) (PT) ssm ent( PA) 1 Hu/101 Communication 3 0 0 70 10 20 30 30/100 100 3 in English-I 2 Sc-102 Mathematics-I 3 1 0 70 10 20 30 30/100 100 4 3 Si-105 Applied Science-I 3 1 2 70 10 20 30 30/100 50 50 30/100 200 5 4 AA-105 Basic Design-I 4 0 3 100 33 67 100 60/200 200 5 5 AA-107 Basic Workshop 0 0 6 - - - - - 50 100 45/150 150 3 6 AA-106 Descriptive 3 0 3 100 33 67 100 60/200 200 4 Geometry-I 7 Ls-110 Development of 1 0 2 25 25 15/50 50 2 Life skill-I 17 2 16 1000 26 TOTAL 4 1. Course Title: Communication in English-I 1. Course Title: COMMUNICATION IN ENGLISH-I 2. Course Code: Hu/101 3. Semester: I 4. Aim of the course: The general aim of a course in English language and communication is aimed at the three domains of learning: knowledge, skills and attitudes.
    [Show full text]
  • Village & Town Directory, Sibsagar, Part XIII-A, Series-3, Assam
    CENSUS OF INDIA 1981 SERIES- 3 : ASSAM DISTRICT CENSUS HANDBOOK PART XIII-A VILLAGE & TOWN DIRECTORY SIBSAGAR DISTRICT N. K.CHOUDHURY of the Indian Administrative Service DIRECTOR OF CENSUS OPERATIONS ASSAM "intMI III GIRIJA PRINTERS 9 PUBLISHERS KahiIJpara. Guwahllri.78101!1 CONTENTS Pages Foreword AI-All Preface B A nalytical Note I-xxxx Section I Village Directory: 1-385 Note explaining the codes used in the Village Directory (3). Majuli P.S.- Alphabetical Jist of villages (7). Amenities and land used (12); lorhat P.S.- Alphabetical list of villages (37), Amenities and land uses (40), Teok P.S.- Alphabetical list of villages (66), Amenities and land used (70); Mariani P.S.- Alphabetical list of villages (94), Amenities and land used (96); Titabar P,S.- Alphabetical list of villages (109) Amenities and land used (112); Amguri P.S.- Alphabetical list of villages (136), Amenities and land used (138): Nazira P.S.- Alphabetical list of villages (154), Amenities and land used (158), Sibsagar P.S. - Alphabetical list of villages (179) Amenities and land u~ed (182); Demow P.S. - Alphabetical list of villages (199) Amenities and land used (~02); Moranhat P.S.- Alphabetical list 0/ villages (~20), Amenities and land used (222); ~ onari P.S.- Alphabefical list of villages (236), Amenities and land used (238); Borhat P.S.- Alphabetical list of villages (252), Amenities and land used (254); Bokakhat P.S. - Alphbetical list of villages (264), Amenities and land used (2M), Dergaon P.S.- Alphabetical list of villages (276), Amenities and land used (278), Golaghat P.S.- Alphabetical list of Villages (293), Amenities and land used {3L 0) Sarupathar P.S.- Alphabetical list of villages (346); Amenities and land used (~5?).
    [Show full text]
  • World Heritage Week Celebration Swachh Smarak
    A Report on “World Heritage Week Celebration & Swachh Smarak, Swachh Bharat Abhiyan” At Charaideo, Sivasagar,Assam Unakoti, Tripura Talatal Ghar, Joysagar, Sivasagar Devidol, Sivasagar Shri Suryapahar,Goalpara, Assam Bamuni Hill, Tezpur,Assam Gaurisagar, Sivasagar From th th 19 to 25 November, 2014 Archeological Survey of India Guwahati Circle, G.N.B.Road Ambari, Guwahati 781001 Assam Report on “World Heritage Week Celebration & Swachh Smarak, Swachh Bharat Abhiyan” 19th to 25th November 2014, Archeological Survey of India Guwahati Circle World Heritage week is celebrated throughout the world every year for creating awareness among people about cultural heritages and protection of those heritage sites. Prime objective of the celebration was to spread the message among the people for the conservation/preservation of the glorious monuments and hand it over to the future generations. A glimpse of the celebration in different places of Assam and Tripura Charaideo, Sivasagar: The Guwahati Circle of Archeological Survey of India celebrated the World Heritage Week from 19th to 25th November, 2014 at protected monuments of North East India, like Charaideo,Talatal ghar, Sivadol, Gaurisagar in Sivasagar district and Shri Suryapahar in Goalpara, at Bamuni Hill, Tezpur and also at Unakoti ,Tripura. The main event was held at Charaideo as it is selected as the site was nominated in the UNESCO „World heritage Tentative List‟ in 2014.It was once the original capital of the Ahom kings and is also known as the „Jerusalem of Assam‟. Shri S.S. Meenakshi Sundaram (IAS), D.C. of Sivasagar district , was the Chief Guest of the inaugural function , while among the distinguished guests were Sri Tridip Mahanta, as Associate Professor of Sivasagar College, as keynote speaker, S.N.
    [Show full text]
  • Answered On:29.07.2002 Artefects Lying in Forts Ashok Namdeorao Mohol;Ramsheth Thakur
    GOVERNMENT OF INDIA TOURISM AND CULTURE LOK SABHA UNSTARRED QUESTION NO:2138 ANSWERED ON:29.07.2002 ARTEFECTS LYING IN FORTS ASHOK NAMDEORAO MOHOL;RAMSHETH THAKUR Will the Minister of TOURISM AND CULTURE be pleased to state: (a) whether attention of the Government has been drawn to the news-item captioned `Historical Wealth lying in dust` appearing in The Hindu dated July 14, 2002; (b) if so, the facts in this regard; (c) whether any survey was conducted by Archaeological Survey of India (ASI) to prepare a report on excavation; (d) if so, the details thereof; ( (e) if not, the reasons therefor; (f) whether lack of recording important data nullifies the entire excavation process; and (g) if so, the details of the excavation done by the ASI during the Ninth Five Year plan? Answer MINISTER FOR TOURISM AND CULTURE (SHRI JAGMOHAN) (a) Yes, Sir. (b) to (e) Information is given at Annexure I. (f) No Sir, findings of all excavations are scientifically documented and recorded in the site note-book as well as through drawings and photographs. These are also published in the departmental publication Indian Archaeology - A Review for the corresponding year. (g) Information is furnished at Annexure II. ANNEXURE-I ANNEXURE REFFERED IN REPLY TO PART (b) to (e) OF LOK SABHA UNSTARRED QUESTION NO.2138 TO BE ANSWERED ON 29.07.2002 But for the introductory chapter, report on the excavation of Burzahom (Srinagar, J&K) has been written and submitted to the Archaeological Survey of India (ASI) by the excavator, Shri T. N. Khazanchi and some chapters by Shri B.
    [Show full text]
  • Assam Travel Guide
    GOODEARTH PUBLICATIONS Assam Travel Guide GOODEARTH PUBLICATIONS Eicher Goodearth Private Limited New Delhi Assam Tourism AN EICHER GOODEARTH PUBLICATION CONTENTS Copyright @ 2011 Eicher Goodearth Private Limited, New Delhi ISBN 978-93-80262-04-8 Introducing Assam 4 The Land 5 Brahmaputra 10 Editor and Publisher: Swati Mitra History 13 Design: Kadambari Misra Editorial Team: Anupriya Roy, Bodhisattva Sen Roy, Exploring Assam 17 Parvati Sharma Photographs: Wildlife in Assam 18 Ananda Banerjee pp 26, 28; Anupriya Roy pp 12-13, 20-21, 24, 29, 31B, 47M, 50-53, 56, 60AR & B, 65A, 66, 67B, 69, 71A, 72B, 78B, 79, 81B, Guwahati and Around 36 85, 90-93, 98, 99AR, 101M, 103A & B, 104A & M, 105, 111A, 121L, 136- Kamakhya Temple 57 38, 147; Bodhisattva Sen Roy pp 9A, 10, 14, 15B, 20A, 25, 31A, 33, 35B, 40-45, 47A, 48-49, 54-55, 63, 65M, 67A, 68, 69B, 70, 72A, 73B, 74B, 76, Sualkuchi 64 78A, 80, 83, 86-87, 88A, 94, 96, 99A & B, 101A & B, 102 A & M, 103R, Hajo 66 104B, 105BL, 108, 110, 111B, 112, 113B, 115, 116A, 117A & BL, 126-27, 134, Madan-Kamdev Temple 70 140A, 142, 145, 149, 152L; Dipankar Ghose p 18; Tezpur 75 Kamalendu Bhadra pp 7A, 39, 62B; Nidhi Dhingra pp 131, 139; OIL p 121AR; Rituraj Konwar pp 4, 6, 22A, 27, 36, 82, 95, 122-25, 129, 141; Sasank Barua pp 106-07; Swati Mitra pp 8, 15A, 46, 53AR, 57,59, Jorhat and Around 84 60AL, 64, 65B, 71B, 73A, 74A, 75, 77A, 81A, 87M, 88M, 97ML, 99ML, Jorhat 84 102B, 109A, 113A, 114, 116B, 117BR, 135A, 137B, 140B, 143, 152R, 154 Tea in Assam 90 Cover (Above Left & Below): Rituraj Konwar Majuli 95 Sivasagar
    [Show full text]