VSTALT Weep OT | wars T e l : 0141-2292049 ARAN USE -0141-2292054 (wee U R a e Va WOT H a r e ) e e t /Fax :0141-2292049

(Ministry of Road Transport & Highways) aaita arate (eran) /Regional Office () WH-120, TIA, FAA PN, SAYL-302019 F-120, Janpath, Shyam Nagar, -302019 No.: NHAI/18013/1/2020-ROJ/ Permission-OverheadCrossing-765KV /65/NH-11, km 318-319/68 Date: 08,04.2021 INVITATION OF PUBLIC COMMENTS S u b . : Proposal for overhead c r o s s i n g c l e a r a n c e of NH-11 (old N H - 1 5 ) from - at Km. 3 1 8 & 319 near Village-Kanji K i Sird (Distt-) by LOOP-OUT o f 765 KV D {Cc -Bikaner Transmission Line at Bhadla-Il by M/s. PGCIL-reg. R e f . : 1 . RO, M o R T H Jaipur letter no. RW/JAI/RAJ/PS/ U t i l i t y /2020/424/1682 d t . 22.05.2020, 2 . PGCL L e t t e r n o . 1 3 8 dated 12.10.2020. 3 . PD, PIU-Bikaner letter n o . 13018/1/2015/ NOC- Others-(B-P)/ 7 6 3 2 dated 06.01.2021. 4 , This office letter no. NHAI/18013/1/2021-ROJ/Permission-Overhead Crossing-765KV / 65/NH-11, km 318-319/3830 dated 02.02.2021. 5 , PD, PIU-Bikaner letter n o . 13018/1/2015/ NOC- Others-(B-P)/8071 dated 23.03.2021. Sir, / I t i s to inform all concern t h a t Chief Manager, M/s. PGCIL, Bikaner vide letter under reference ( 2 ) h a s submitted a proposal t o R O , M o R T H , Jaipur/PD, PIU-Bikaner for t h e s u b j e c t e d work and PD, NHAI, PIU, Bikaner h a s forwarded t h e above proposal t o this o f f i c e vide letter under reference ( 3 ) & (5) for a p p r o v a l o f the Competent Authority, H i g h w a y Administrator. 25 T h e proposal is r e g a r d i n g permission for o v e r h e a d crossing clearance of NH-11 ( o l d N H - 1 5 ) f r o m Jaisalmer-Bikaner at Km, 3 1 8 & 319 near Village-Kanji K i Sird (Distt-Jodhpur) b y L O O P - O U T o f 7 6 5 KV D/C Ajmer-Bikaner Transmission L i n e at B h a d l a - I I by M/s. P G C I L . 3. As p e r Pata-4 o f Ministry's C i r c u l a r N o . RW/NH-33044/29/2015S&R(R) d a t e d 22.11.2016, the Highway Administration shall b e p u t o u t in t h e p u b l i c domain for 30 days for s e e k i n g c l a i m s a n d objections ( o n grounds o f p u b l i c inconvenience, safety and general p u b l i c interest). 4, I n view o f the above, b e f o r e approval o f t h e competent authority, t h e comments/objections o f _ a f f e c t e d public i s hereby i n v i t e d with reference t o t h e Ministry's circular d a t e d 22.11 . 2 0 1 6 due to overhead crossing clearance o f NH-11 ( o l d N H - 1 5 ) from Jaisalmer-Bikaner a t Km. 318 & 319 near Village-Kanji Ki S i r d (Distt-Jodhpur) b y LOOP-OUT o f 7 6 5 KV D/C Ajmer-Bikaner Transmission Line at Bhadla-II b y M/s. P G C I L . The objections/ comments may be a d d r e s s e d to the below mentioned address upto 07.05.2021, b e y o n d d u e d a t e , n o comments/ objections will be accepted. The Regional O f f i c e r , Regional Office - J a i p u r National Highways A u t h o r i t y o f I n d i a , F-120, J a n p a t h , Shyam Nagar, Jaipur (Raj.)-302019, Tel : 0141-2292049, 2 2 9 2 0 5 4 Email : [email protected] This i s issued with t h e approval o f t h e Regional O f f i c e r , NHAL, RO, J a i p u r (Rajasthan). Yours faithfully,

a——~ Blot 29 (Kuldeep Songara) Dy. General Manager (T)

Copy to: ( i ) W e b Admn., N H A L , H Q , N e w D e l h i - for uploading i n NHAI's website [[email protected]] (i) Director, NIC, New - for u p l o a d i n g in Ministry's website. [[email protected]] (iii) PD, PIU-Bikaner: for information. (iv) Chief Manager, M/s. PGCIL, B - 1 2 9 , Kanturia Colony, Bikaner-334003, E - m a i l : [email protected]; : for information.

apenas: Th-5 va 6 , S a e e - 1 0 , grea, ae facet - 1 1 0 0 7 5 , FAT : 011-25074100, 25074200 Tew : 011-25093507 / 2 5 0 9 3 5 1 4 C o r p o r a t e Office: G - 5 & 6 , Sector-10, Dwarka, New Delhi-110075, Phone: 041-25074100, 25074200 F a x : 011-25093507/25003514 aha Usa UsTart safreecer | Awea / Fax o:t0s1t5 1-z2z22c4a0r777 (ase oat ate Tort Aare) $a / E-mail [email protected] National Highways Authority of [email protected] {Ministry of Road Transport & Highways)

Project Implementation Unit, Bikaner ONE cermin 9 Si-as, wgeria, sears (ToreAT)- 334002 ‘ \ e C-38, Sadul Ganj, Bikaner (Raj.) - 334002 Jeno \ oa UNAAAT we ys No.13018/1/2015/NOC-Other(B-P)/8071 wT OF 2021 Qn AS YM nr Chief General Manager (T) / RO National Highways Authority of India Regional Office, Jaipur coal F-120, Janpath, Shyam Nagar Jaipur (Raj.) - 302019.

Sub: Widening & strengthening of existing Bikaner-Phalodi section to Four lane from Km. 4+200 to Km. 55+250 and Two Lane with PS from Km. 55+250 to km. 1634500 of NH-15 on BOT (Toll) basis in the State of Rajasthan: Proposal for overhead crossing clearance of NH-11 (old NH-15) from Jaisalmer — Bikaner at Milestone No. 318 & 319 near Vill. Kanji Ki Sird (Distt-Jodhpur) by LOOP- GUT of 765 KV D/C Ajmer-Bikaner TL at Bhadla-I in the state of Rajasthan- reg.

Ref: [1] NHAI RO Jaipur letter no. NHAI/18013 /1/ 2020-ROJ/ Permission-Overhead Crossing-765 KV / 65 / NH-11, km 318-319/3830 dated 02.02.2021 [2] This office letter no. 13018/1/2015/NOC-Other{B-P)/7854 dated 12.02.2021 [3] PGCIL Bikaner letter no. NIL dated 18.03.2021

Sir, Kindly refer RO NHAI Jaipur letter under reference (1) vide which you have made observation in proposal for overhead crossing clearance of NH-11 (old NH-15} from Jaisalmer — Bikaner at Milestone No. 318 & 319 near Vill. Kanji Ki Sird (Distt-Jodhpur) by LOOP-OUT of 765 KV D/C Ajmer-Bikaner TL at Bhadla-II in the state of Rajasthan of one time processing fee of Rs. 5.00 Lakh on PGCIL cases as per NHAI No. 7.5.3/2020 dated 03.11.2020.

This office vide letter reference (2} has requested to Power Grid Corporation of India Limited Bikaner to deposit one time processing fee of Rs. 5.00 Lakh for further processing of proposal.

Power Grid Corporation of India Limited Bikaner vide letter reference (3) has deposited one time processing fee of Rs. 5.00 Lakh in Bharat Khos Portal (copy enclosed).

Submitted for information and necessary approval please.

Yours faithfully,

Encl : As above(2 Fiex)

ufeorat Freee / Project Director NT LS, Aa / HAL PRY ener

TRECTH: Si-5 Ua 6, HaET- 10, HLaHT, Ae feet - 110075 FLATT 011250741007200 WRT 011-25093507 wor www nhai.org Head Offi ce: G-5 & 6, Sector-10, Dwarka, New Delhi-110075, Phone: 011-25074100 , 25074200 Fax: 011-25093507 (i POWER GRID CORPORATION OF INDIA LIMITED = = POWERGRID (A Goverment of India Enterprises) marie - at- 729, Sra Gitar siete, arena - 334003, ¢ata thidiert@si Office - B-129, tenaia Kanta Khaturia Colony, Bikaner-334003, E-mail [email protected] To,

Project Director,

National Highways Authority of India

Project Implementation Unit, Jaipur

C-38, Sadul Ganj, Bikaner (Raj}

Sub: Re garding Submission of One time processing fee of Rs 5 lac for Overhead Crossing of NH 11 (Jaisalmer-Bikaner) at Milestone no. 318& 319 ne ar village kanji ki sird by LOOP OUT of 765 KY D/C Ajmer-Bikaner TL in the state of Rajasthan.

Your reference letter no, 13018/1/201 5/NOC-Other (B-P)/7854 dated 12.02.2021; Dear Sir,

One time processing fee of Rs5 fac has to be submitted to NHAI as per NHAI Circular No.7,5.3/2020 dated 03.11.2020.Please find enclosed herewith Receipt of bharat koshportal: 1803210002883 dated 18.03.2021 amounting to Rs. 5,00,000 in favour of National Highway Authority of India for construction of LOOP QUT of 765 KV D/C Ajmer-Bikaner Transmission Line at Bhadla-2 PS under Solar Energy Zones of Rajasthan. Thanking you

(e- ry | Yours truly "i Fasye\r Ree" B..S. Chouhan, WR TIE Manager, Bikes P/B.S. CHOURAN WSIS / MANAGER “3 Pe * TGS, gab PE 0, EANER7 ral

vale arate ; sath aha, ute wont - 1, asta yam, aah a. - 05 F 10, daet-16 a, weterere-121002, Regd. Office : Northern Region rama Transmission System-1, Regional Head Quarter, SCO Bay No. 05 to 10, Sec-16A, F —————— aridabad-121002, : CIN: 40101DL198G01038724 SSS S S= —S—S———a” SSS

dis’ bharatk@sh. gov.in

a Government of IndiaR eceipt Porta

RECE/PT

Transaction Ref.No. 1803210002883 Dated: Mar 18 2621 11:52AM

Received from M/S. POWER GRID CORP OF INDIA LTD with Transaction Ref.No. 1803210002883 Dated Mar 18 2021 11:52AM the sum of INR 500000 (FiveLakhs Oni through Internetb ased Online payment in the account of

Processing fee for permission to access to NH, , NH11 milestone 318 &

Disclaimer:- This is a system generated electronic receipt, hence no physical signature is required for the purpose of authentication Printed On: 18-03-2021 11:55:27 ages hi

CHECK- LIST Annexure-03

Guidelines for processing the proposal for laying of Utility ine in the land along National Highways vested with NHAI/PWD/BRO.

General Information

Name and Address of the Applicant/Agency: Mr. Soan Singh Yadav,DGM. Bikaner, Power grid corporation of india ltd. 765/400/220 KV Sub- Station (Const) House No.6-B-41 Jai Narayan Vyas Colony, Bikaner - 334001 (Rajasthan), india. 1. National Highway No. NH-11 2. State : Rajasthan } 3, Location : VilkBapleird Rony BS Dadway 4. Chain-age in km : 318.584KM. ~~ rs’ 5. Lengthinm : 236 M va am Leader ltd. 6. Width of available ROWinbothside : SFM GORY Acting Engine ec 7. Side of NH ; Across the National HISAWZ gion (left or right side of NH towards increasing chainage/Km direction) 8. Name of Highway Authority of : NHAI, wv 9. NHAI/PWD/BRO

10. Highway Administration address : National Highways Authority of India Project Implementation Unit-Jaipur D-148, Behind RSEB Sub-siation, Vaishali Nagar, Jaipur-302021(Raj.) Phone - 01412351427, L- [email protected]

Team Ceader Ltd. Corsulting Engineers Group ect Bikaner-Phalodi Proj vol Bikaner Tech.) ise lee

5.No Item Measurement. MORTH Norms Whether Observations as complying per site conditions with MORTH Norms

1 Details of already laid utility service, if NA . Enclosed ° any 2 Whether up gradation of the stretch in NO ~~ near future is proposed or not

(a) If yes, provision of utility adversely - Not affect plan of affect the plan of up-gradation up-gradation 3 Laying of the utility service along the NA (/ National Highways.

3.1. | Location of proposed utility service - Utility Duct/ beyond along the stretch the toe line of the embankment and 1 }— drains, and close to the extreme edge of the RoW.

3.2 | Depth of top of utility service from - O.6meter 1 ground level

3.3 | Mechanism fer crossing water channel - Through utility duct(if provision exists) or beneath the bed of water channel 3.4 | Whether ROW is restricted in this - stretch?

3.4.1 | If yes, whether provision of land - acquisition is required to lay utility

(a) If yes, whether undertaking for land - acquisition along with relevant £.A. details has been furnished

3.4.2 | Width of concrete duct, if utility - Not less than one services are proposed to be laid in lane concrete ducts 4 Laying of utility services across the NH YES, Overhead crossing

4.1 | Whether Existing drainage structures is NA Not to be allowed Agreed allowed to carry the utility lines. A —

4.2 | Proposed crossing of utility service Overhead power | Perpendicular te NH | Agreed line, perpendicular : to NH & a 4.3 | Type of casing pipe/conduit carrying the Overhead ACSR_ Steel, cast iron,or” Agieed — utility line. ZEBRA Conductbr| reinforced cement

pees me anh) eamrteaeer s Group Ltd. a Consulting Engin tndi Project. y wean al ech) Fee Bikaner-P?? yatta. 1), Bkane bewiicl , aR 4 Uae aere/weF POWCRGIO, BIKANER (RAJ) ‘concrete and have Crossing C1 strength adequate 4.4 | Whether ends of the casing/conduit NA \/ | Sealed pipe are sealed from the outside

4.5 | Length of casing/Transmission line NA Extend from drain to crossing NH. a drain in cuts and toe to toe of slope inthe” ills

4.6 | Depth of top of the casing/conduit pipe. NA WA At least 1.2 m below }- the top of subgrad

4.7 | Crossing method in case of CC NA LOnly boring method pavement. ie{ VV (HDD)

4.8 | Horizontal and vertical clearances in 25.8 M Vertical In accordance with Agreed case utilities are allowed overhead, clearance IRCcodes. H ~-124m. & 112m. {rom center|pf~ Road 2

5 Document / Drawings enclosed with Yes \ Enclosed ye AgreedV the proposal

5.1 | Cross-Secticen showing the size of NA _| Enclosed, if trench for open trenching method \_~” | applicable

(a)Trench width - Way leave clearance 33.5 m. either side from C.L of tower

(b) Filling of trench - as per Ministry . guidelines vide fetter No. RW/NH-34044/ u 29/2015/S&R (R) dated 22.11.2016

(c) location of trench - extreme edge of the |. ROW

3.2 | Cross section showing the size of pit NA Enclosed, if and location of conduit for HDD method ye applicable —

5.3 | Strip planf Route pian showing utility | Checklist Enclosed ae. line, chainage, width of ROW, distance = of proposed utility from the edge of (A? 9) ROW, important mile stone, ma cs 60) intersections, cross drainage works etc. ATE v

5.4 Plan and profile drawing of stretch Profile Enclosed | Enclosed ey be Wah \ showing cross section of road at 20m ee age’! distance along with ROW and proposed

6 Methodology for laying of utility line if te) 7 Enclosed Enclosed

Feam téader Group Ltd. gasulting Engineers ea! odi Pr oject : Bikaner-Phal p ee? Bixanet H Wind LsE ngi Rrpstl2 Bagi (RAJ) POWER pe AY AMER

7 Draft License Agreement is as per Enclosed pT Enclosed = Ministry guidelines vide letter No. RW/NH-34044/29/2015/S&R (R) dated 22.11.2016 and signed by two ted witnesses a () ty

8 License fees in Favor of MoRTH RPAO Yes ) As per Ministry vide bid ar Jaipur circular no. RE/N - 33044/29/2015/S&( - ne*~ R)dated 22.11.2016 A_h

9 Whether Bank Guarantee has been ES ) As per Ministry vide/ obtained circular no. RE/NH- 33044/29/2015/S&( re) f R)dated 22.11.2016 | _)

{a} If yes, whether Confirmation of BG - has been obtained as per MoRTH/NHAI Ny guidelines eniet KZ, 10 «| Affidavit / Undertaking from the es, 3 Lie ‘Applicant for gone . a ator owe 10.1 | Undertaking for not to damage other Enclosed \_7 Enclosed ll existing utility, if damaged then to pay the losses to either to MoRTH/NHAI or to the concerned agency.

10.2 | Undertaking for renewal of Bank Enclosed Enclosed Guarantees and when asked by NHAI/ MoRTH 10.3 | Undertaking for confirming all standard Enclosed \ Enclosed [~~ condition of MoRTH/NHAji guidelines.

10.4 | Undertaking for shifting of utility as and Enclosed \-7Enclosed VV when asked by MoRTH/ NHAI within a month at their own cost.

10.5 | Undertaking for indemnity against all Enclosed {_} Enclosed = damages and claims.

10.6 | Undertaking for management of traffic Enclosed \ | Enclosed Ww movement during laying of utility tine without hampering the traffic. 10.7 | Undertaking that lf any claim is raised Enclosed ‘~| Enclosed\~ by the Concessionaire/contractor then the same has to be paid by the applicant fe

10.8 | Undertaking that the applicant has Enclosed | Enclosed ‘~~ obtained various safety clearances from the representative authorities such as , directorate of Electricity, Chief controller of Explosives, Petroleum and Explosive Safety Organization, Oil Industry Safety Directorate, ea)

Gar ater gm Consulting Engineers Group Ltgeg _ ee Bikaner-Fhalodi Project LETT. WITH/S.S. YADAV Bikaner tg

POWERGE

State/Central Pollution Control Board and any other statutory clearance s applicable, before applying to Highway Administration

The Right of the Way{ROW) of the National Highway available at the proposed location from the center line of divided carriageway is (3 (from center of ROW to edge of ROW towards proposed utility) “ The above particulars along with the drawings and documents have been verified and certified as site conditions. correct as per prevailing a a dam Leader ( es Group Lid. Consulting Engineersa ikaner-Phalodi Projec a Bikaner K — nw aan Wy\

[Name Designation. =. and signature—— of [Name Desi ion and signature of the authorized representative of concerned fi rity, f

applicant] _ NHAI/PWD/BRR)) ows CUTE. WaG/S.S. YADAV BY ARURFUGY/DY. GENCRAL MARASER > POWERGRID. BIKANER (RAJ)

CERTIFICATE . Undersigned has examined the proposal of the applicant for laying of Overhead CROSSING CLEARANCE FOR LILO OFF (LOOP OUT PORTION) 765 KV D/C AJMER-BIKANER AT BHADLA —-II TRANSMISSION LINE K.M 318 TO 319 CROSSING CHAINAGE 318.584 and confirm that the all standard conditions issued vide Ministry circular No: RW/NH-33044/29/2015/S&(R)dated 22.11.2016 has been followed.

. It is certified that any other location of utility line would be extremely difficult and unreasonable costly and installation of utility line within ROW will not adversely affect the design stability & traffic safety of the highway nor the likely future improvement such as widening of the carriageway ,casing of curve etc.

. I will ensure supervision of the work of laying of utility and ensure that the defects in road portion after laying of utility are corrected.

. I will notify/forfeit the BG for claims for damages done/disruption in working, if any.

. T will ensure that proposed permission in entered the register of records

. The record of previous approval, if any has been considered and copy of same is enclosed with the proposal.

iName Designation and signature of concerned field authority of NHAI/PWD/BRO]

JILNVEVNS OO608T OOT 608T £g l¢ yNVE T aX) =3 (a) axy =) (a) (v)

4einsieg =| ‘ONS (sy)u nowy (Q4Abs/sy)ul azey| (aA)eety CaA)UIPIM | (‘2HAYAsuaT

INIT NOISSINSNVUL II-V IGWVHE YANVIS-YAWITY 3/0 AX S92 (NOISHOd LNO dO01) 40 O11 LaSHS NOILVINITVO |

o'v60SE T6'v8S C68TOL 8°8E 608T £9 £2 aajyasuasry | T (o9xs}=9 | (ztxXoTa=4| (a%9)=3 (a) (axv)=9 (g) (v) bsoosz)eusia (su) (syyquow s ad Jad/o00z6=a1ey sejromed bons Ul 227 1EOL| nuuoy sed sy (‘sy)jun owy 10 Jad sy (aA)eeay |(“I)UAPIM|(aN ) Yasue} siedA BAlj1 04 (@uArbs/sy)ul sey

INIT NOISSIWISNVUL H- VIGWH@ YINVIS-YSIATY 9/0 AX S92 (NOISYOd LNO dOO7) 40 O1N

L1339HSNOLLVINI1V5 so-aunxauuy