Bybanen in – an urban transformation project

Rune Herdlevær Head of lightrail department Agency for planning and building services, City of Bergen

• 279 000 residents (2017) • 465 km2 • 2 250 mm rain pr year • 90 days a year with no rain at all Agenda

• Background –concept ,goals & objectives

• The network– what’s been built and what is planned

• Success - city building an urban transformation

Bybanen i Bergen The concept

• A new visible element

• contribute to good urban development.

• the backbone of the public transit system Bybanens Brand

Bybanen brand is more than a logo, it is a promise to make "an easier everyday life". Bybanen should always be uncomplicated, accessible and predictable. Our continued work with Bybanen is intended to advance and uphold this vision. Engineering guidelines for Bybanen, part 1. 2017 Goals for Bybanen

• strengthen the urban environment

• a safe and effective means of transport Urban development objectives Bybanen will strengthen the city through: o reinforcing urban development goals o supporting environmentally sustainable development o being a visible, integrated, and identity-building element in the city o contributing to the efficient use of resources Transportation objectives Bybanen will be a safe and effective means of transport through: o safe operation in relation to other forms of traffic o predictable travel times to destinations o regular and frequent service o high priority, accessibility, and unobstructed routes o efficient movement through the city o good connections to other forms of transportation, including bus, bicycle and car o easily accessible stops o economic operation and maintenance Bybanen – accessible design

Bilder:

• På holdeplass

• Fotgjengeroverganger • Lavgulv – trille rett inn • Inne i vognene Integrated into the urban landscape Bybanen – connections to bus Back to the Agenda

• Background –concept, goals & objectives

• The network– what’s been built and what is planned

• Success - city building an urban transformation

Bybanen i Bergen Light Rail Network (2040)

Adopted by City Council in 2010:

1. Sentrum - Rådal- (phases 1+2+3)

2. Sentrum –

3. Sentrum – NHH - Åsane

Bybanen operates in a network with bus Bybanen - facts

• Light-rail: combines features og suburban rail and tram • Basis for effective and predictable land use planning

Phase 1: 9,8 km – 15 stops – 4 tunnels – open 2010

Phase 2: 3,6 km – 5 stops – 2 tunnels – open 2013

Phase 3: 6,5 km – 7 stops – 6 tunnels – 2016/17

(Total 19,9 km, of which 6,5 km tunnel. Total project costs ca. 7,8 billion NOK (€ 830 million) including workshop and depot) Facts - ridership • 2011 – 7 million • 2012 – 8 million • 2013 – 9.1 million • 2014 – 9.4 million • 2015 – 10 million (+ 6% from 2014)

• Daily ridership approx 50,000 (2017)

So – what happens now?

• Phase 4 (green line) • Phase 5 (blue line) Bybanen til Fyllingsdalen o Ca 10 km – 5 km surface – 5 km underground o 8 stops – one underground stop at Haukeland Hospital o Good service to major destination points and transformation areas o New connection between Bergen west and “Bergensdalen” o Good connections to bus and between LR lines Passenger forecast

• 2040: ca 35 000 - 39 000 passengers per day

• balance of workplaces and housing along the line, which gives a good passenger load in both directions.

BT4 Dagens situasjon 10000 BT4 Prognose middels BT4 Prognose høy 8000

6000

4000

2000

0 r l l n e n a s d n rg a n e t ie d u ta ie o n e rk e a n h s e b i g a s k e e n v n m u p e s ll k o l a r a y n d ø y r a ti te lh n r s K n s e B o å M d a ri n p N g n K le e la K a S g e d n k s u u g L a n lli H y F Møllendal Haraldsplass Haukeland hospital N3 • First underground station • Important transit destination, with ca. 12.500 employees and 1700 visits per day • 2 entrances S1 • Connections to bus system

Haukeland sykehus

Bybanen i Bergen Mindemyren

• Transformation area: from light industry to a vibrant new urban area • 800 000 m2 building area in approved zoning plan • 23 000 workplaces • 1 400 apartments

Bybanen i Bergen Fyllingsdalen • 29 000 residents • Oasen shopingcenter is focal point, 88 businesses, 3000 employees • Transformation area at Spelhaugen: planning work underway

Bybanen i Bergen Fyllingsdalen

New transit terminal

Future development Fyllingsdalen - Spelhaugen New goals for the city, the region and the nation.

• No further growth in car traffic

That means • All further growth has to be taken with PT, bicycle and walking

• Starting from 2017 Planning for bicycle together with Bybanen Planning for bicycle together with Bybanen • Bike route from downtown to Kronstad via Kronstad tunnel

• New local and «express» routes in Mindemyren

• Long tunnel through Løvstakken

• Fyllingsdalen – connections to neighbourhood centre, transit hub, new and existing development areas Bybanen i Bergen Tunnel through Løvstakken. • Combined function emergency exit tunnel for Bybanen - cycling/pedestrian tunnel

• High potential for cycle traffic. Will result in Fyllingsdalen – Bergensdalen being within Løvstakktunnelen a normal cycling distance. 3000m 10min 36min • Attractive for recreation and pedestrians (experience from Lyon). More traffic = improved safety. Bybanen to Fyllingsdalen -Construction costs

Anticipated costs: ca 7,6 MRD kr (€ 760 000 000)

• Highest cost elements are tunnels, underground station at Haukeland filling in Store Lungegårdsvannet and depot at Spelhaugen

Included in cost estimate: • Everything necessary to build and operate Bybanen • Pedestrian and cycling facilities along the entire line • Replacement of parkland along Store Lungegårdsvannet • Complete cross-section of Kanalveien in Mindemyren, including new drainage works (canal) • Required moving/replacing of underground infrastructure • Urban open spaces along the line Bybanen to Fyllingsdalen: Zoning plan approved by Bergen City Council (21. June 2017)

Detail design work underway (Bybanen utbygging)

Construction 2018 -2021/22

Opening ?

Film Bybanen to Åsane – phase 5

• Ca 14 km

• 12-13 stops

• Parallel bicycle route

? Bybane langs – batteridrift mulig

Bybanen i Bergen – Trasevurderinger sentrum til Åsane Area plan Bergen West

? Agenda

• Background –concept, goals & objectives

• The network– what’s been built and what is planned

• Success - city building an urban transformation

Bybanen i Bergen Bybanen connects the centres Planning for revitalization and densification of centre areas Bybanen connects the city Planning of the Bybanen contributes to the transformation and densification of the hubs Upgrading streets and urban spaces Kaigaten 2005 2010 Nygård Marineholmen Education, research, business College in Bergen 6000 students, 600 staff, 51 000 m2 Kronstadparken

Housing, office and retail - circa 350 housing units, 3500 jobs. Paradis Paradis, zoning plan for ca. 1000 new apartments, + offices and retail Can this be more than a shopping centre?? Lagunen End station from 2013-2016, new retail, culture, housing, office development Sandslivegen, Bybanen phase 3 Investment in development along the line (phase 1) around 20 times the investment for Bybanen Other experiences… Property prices rice along the track Travel survey (RVU) Bergen 2013 changes in travel mode between , Årstad, og

2008 2013 Travel survey (RVU) Bergen 2013 changes in travel mode between Bergenhus, Årstad, Fana og Ytrebygda Number of trips with PT per capita per year Summary Bybanen contributes to: • increased density in designated centre areas • a more accessible city • a more robust transit system • to changes in travel mode and patterns • a more enjoyable travel experience Bybanen is an urban transformation project “The city changes right in front of our eyes.”

Not as a result of the physical work, but the city gets a whole new identity.

A city with a light rail is another city. Once - we designed the light rail

Now the light rail design us.

Thank you for your attention!