PROCUREMENT PLAN (Textual Part) Project information: Country:

Public Disclosure Authorized Project name: Bolivia Climate Resilience - Integrated Basin Management - PPCRII P-number: P129640 Project Implementation Agencies: Unidad Coordinadora del Proyecto UCP – PPCR Fondo Nacional de Inversión Productiva y Social - FPS Date of the Procurement Plan: May 21, 2018 Period covered by this Procurement Plan: June 30, 2020 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT Bolivia : Bolivia Climate Resilience - Integrated Basin Management PLAN General Information Country: Bolivia Bank’s Approval Date of the Original Procurement Plan: 2018-06-12 Revised Plan Date(s): (comma delineated, leave blank if none)2021-01-26 Project ID: P129640 GPN Date: Project Name: Bolivia Climate Resilience - Integrated Basin Management Loan / Credit No: TF / 16083, TF / 11248 Executing Agency(ies):Fondo Nacional de Inversión Productiva y Social

WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

C. Design and FPS OBRAS 2 / Actualizacion implementation of Solicitud de Single Stage - One 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-05- 2018-02- de Sistema de riego y Galeria TF / 16083 subprojects that improve Posterior Open - National 501,722.32 434,237.46 Firmado ofertas Envelope 24 24 29 10 15 10 23 14 26 10 Filtrante Pizorga climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 3 / Mejoramiento implementation of Solicitud de Single Stage - One 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-06- 2018-02- Sistema de Riego Pilpina Vila TF / 16083 subprojects that improve Posterior Open - National 345,349.41 318,513.58 Firmado ofertas Envelope 24 24 29 10 15 10 22 14 09 10 Vila climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 5 / Mejoramiento implementation of Solicitud de Single Stage - One 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- Sistema de Riego Tucma Alta TF / 16083 subprojects that improve Posterior Open - National 499,997.50 389,198.31 Firmado ofertas Envelope 11 10 16 27 04 27 20 01 23 28 Tucma Centro climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 6 / Mejoramiento implementation of Solicitud de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-11- Sistema de Microriego La TF / 16083 subprojects that improve Posterior Open - National 156,896.31 137,081.73 Firmado cotizaciones Envelope 16 11 31 07 Yunga climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 7 / Ampliacion implementation of Solicitud de Single Stage - One 2017-03- 2017-05- 2017-06- 2017-11- sistema de riego Villa Florida TF / 16083 subprojects that improve Posterior Open - National 154,151.16 143,048.63 Firmado cotizaciones Envelope 16 11 27 07 Pojo climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 8 / Mejoramiento implementation of Solicitud de Single Stage - One 2017-04- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-06- 2017-07- 2017-06- 2018-01- Canal de riego Villa TF / 16083 subprojects that improve Posterior Open - National 263,789.22 256,953.67 Firmado ofertas Envelope 06 06 11 23 27 22 13 27 02 23 Esperanza Pojo climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 9 / Ampliacion implementation of Sistema de aduccion por Solicitud de Single Stage - One 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- TF / 16083 subprojects that improve Posterior Open - National 340,826.52 279,301.85 Firmado tuberia Riego Subcentral la ofertas Envelope 14 14 19 30 05 30 16 03 23 02 climate resilience in the Rio Habana Pojo Grande River Basin

C. Design and FPS OBRAS 10 / Ampliacion implementation of canales Terciarios sistema de Solicitud de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 219,672.36 193,383.88 Firmado riego LahuaChama-Ayalitas cotizaciones Envelope 16 11 18 07 climate resilience in the Rio zona 3 Totora Grande River Basin

C. Design and FPS OBRAS 11 / Ampliacion implementation of Solicitud de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-11- Sistema de Riego Tecnificado TF / 16083 subprojects that improve Posterior Open - National 150,856.17 127,504.41 Firmado cotizaciones Envelope 16 11 31 07 Chijmuri Totora climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 12 / implementation of Solicitud de Single Stage - One 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 261,160.41 219,598.34 Firmado ofertas Envelope 11 10 16 27 04 27 20 01 16 28 Riego Pajcha Pata Vacas climate resilience in the Rio Grande River Basin

C. Design and implementation of FPS OBRAS 13 / AMPL. SIST. Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 376,095.98 317,830.45 Firmado DE RIEGO TIPA TIPA MIZQUE ofertas Envelope 15 15 20 01 19 31 29 05 21 03 climate resilience in the Rio

Grande River Basin

C. Design and implementation of FPS OBRAS 14 / MEJ. SIST. Solicitud de Single Stage - One 2018-06- 2018-08- 2018-07- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 115,165.75 97,191.91 Firmado RIEGO POTRERA cotizaciones Envelope 20 15 31 11 climate resilience in the Rio

Grande River Basin

C. Design and FPS OBRAS 15 / CONST. implementation of CANAL DE RIEGO Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 278,838.10 254,862.09 Firmado COMUNIDAD ESPINAL ofertas Envelope 15 15 20 01 19 31 25 05 16 03 climate resilience in the Rio PASORAPA Grande River Basin

C. Design and FPS OBRAS 16 / CONST. implementation of Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- SIST. DE RIEGO URA PIRHUA TF / 16083 subprojects that improve Posterior Open - National 341,275.74 269,586.44 Firmado ofertas Envelope 15 19 20 01 19 31 26 05 17 03 climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 17 / CONST. implementation of Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- SIST. RIEGO CHURU MAMA TF / 16083 subprojects that improve Posterior Open - National 210,167.26 166,910.43 Firmado cotizaciones Envelope 20 15 29 11 HUASI POCONA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 18 / MEJ. SIST. implementation of Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- RIEGO TECNIFICADO V. TF / 16083 subprojects that improve Posterior Open - National 147,800.25 114,349.12 Firmado cotizaciones Envelope 20 15 01 11 NUEVA Y LA MAICA TARATA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 20 / MEJ. SIST. implementation of Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- RIEGO POR ASPERCIoN TF / 16083 subprojects that improve Posterior Open - National 199,213.13 158,867.09 Firmado cotizaciones Envelope 20 15 08 11 CONDOR KOCHI climate resilience in the Rio Grande River Basin

C. Design and implementation of FPS OBRAS 21 / MEJ. SIST. Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 166,217.31 129,748.14 Firmado RIEGO CHAJRAMAYU AIQUILE cotizaciones Envelope 20 15 08 11 climate resilience in the Rio

Grande River Basin

C. Design and FPS OBRAS 22 / MEJ. SIST. implementation of Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- RIEGO SAUCEVADO TF / 16083 subprojects that improve Posterior Open - National 182,621.37 149,390.43 Firmado cotizaciones Envelope 20 15 01 11 climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 23 / MEJ. CANAL implementation of Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-09- 2019-04- DE RIEGO MAIRA KASA TF / 16083 subprojects that improve Posterior Open - National 577,595.67 492,723.03 Firmado ofertas Envelope 15 15 20 01 19 31 27 05 12 03 MIZQUE climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 24 / CONST. implementation of CANALIZACION SIST. RIEGO Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 290,630.01 279,929.63 Firmado SUPAY CALLE DIST. E ofertas Envelope 15 15 20 01 19 31 25 05 21 03 climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 1 / Mejoramiento implementation of Solicitud de Single Stage - One 4,051,443. 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- Sistema de Riego Comunidad TF / 16083 subprojects that improve Posterior Open - National 478,249.31 Firmado ofertas Envelope 01 11 13 16 27 04 27 20 01 26 28 Concepcion Aiquile climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 25 / CONST. implementation of CANAL ZONA CEMENTERIO Solicitud de Single Stage - One 3,002,335. 2019-01- 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-04- 2019-04- 2019-05- 2019-10- TF / 16083 subprojects that improve Posterior Open - National 338,863.79 Firmado FRANCISCO DEL RIVERO ofertas Envelope 12 07 31 12 23 20 25 11 29 02 26 climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 26 / MEJ. CANAL implementation of Solicitud de Single Stage - One 3,799,904. 2019-01- 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-10- DE RIEGO KANCHA WASA TF / 16083 subprojects that improve Posterior Open - National 428,183.64 Firmado ofertas Envelope 94 07 30 12 23 20 25 29 29 16 26 LARK A CLIZA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 27 / MEJ. implementation of Solicitud de Single Stage - One 2019-01- 2019-03- 2019-05- 2019-06- CANALES RIEGO DON BOSCO TF / 16083 subprojects that improve Posterior Open - National 187,966.85 144,417.07 Firmado cotizaciones Envelope 12 09 17 07 COLCAPIRHUA COLCAPIRHUA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 28 / MEJ. REG. implementation of ENCUACE HIDRICO RIO Solicitud de Single Stage - One 2019-01- 2019-03- 2019-01- 2019-02- 2019-04- 2019-03- 2019-04- 2019-04- 2019-05- 2019-09- TF / 16083 subprojects that improve Posterior Open - National 483,051.45 399,083.92 Firmado COLQUEAMAYU T 1 DIST. A ofertas Envelope 07 25 12 23 17 25 10 29 02 26 climate resilience in the Rio COLCAPIRHUA Grande River Basin

C. Design and FPS OBRAS 29 / MEJ. Y REG. implementation of ENCAUCE HIDRICO RIO Solicitud de Single Stage - One 2019-01- 2019-02- 2019-01- 2019-02- 2019-02- 2019-03- 2019-04- 2019-04- 2019-05- 2019-09- TF / 16083 subprojects that improve Posterior Open - National 483,271.72 399,083.92 Firmado COLQUEMAYU T II DIST. A ofertas Envelope 07 07 12 23 27 25 10 29 02 26 climate resilience in the Rio COLCAPIRHUA Grande River Basin

Page 1 C. Design and FPS OBRAS 30 / MEJ. SIST. implementation of Solicitud de Single Stage - One 2019-01- 2019-03- 2019-01- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-05- 2019-09- RIEGO COM. SUNCHU PAMPA TF / 16083 subprojects that improve Posterior Open - National 469,842.64 401,544.91 Firmado ofertas Envelope 07 25 12 23 17 25 15 29 29 26 POJO climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 31 / CONST. implementation of Solicitud de Single Stage - One 2019-01- 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-11- DEFENSIVOS RiO Z. TF / 16083 subprojects that improve Posterior Open - National 444,902.98 367,791.34 Firmado ofertas Envelope 07 30 12 23 20 25 29 29 15 25 CENTRAL SICAYA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 32 / CONST. implementation of Solicitud de Single Stage - One 2019-01- 2019-04- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-11- DEFENSIVOS RiO ARQUE Z. TF / 16083 subprojects that improve Posterior Open - National 449,129.06 359,322.24 Firmado ofertas Envelope 07 30 12 23 20 25 29 29 18 25 NORTE SICAYA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 33 / CONST. implementation of Solicitud de Single Stage - One 2019-01- 2019-04- 2019-01- 2019-02- 2019-05- 2019-03- 2019-06- 2019-04- 2019-07- 2019-11- DEFENSIVOS RiO ARQUE Z. TF / 16083 subprojects that improve Posterior Open - National 447,568.61 356,339.79 Firmado ofertas Envelope 07 18 12 23 09 25 14 29 10 25 SUD OESTE SICAYA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 34 / MEJ. CANAL implementation of Solicitud de Single Stage - One 2019-01- 2019-04- 2019-01- 2019-02- 2019-05- 2019-03- 2019-05- 2019-04- 2019-06- 2019-10- DE RIEGO SIVINGA AnUCHIRI TF / 16083 subprojects that improve Posterior Open - National 296,621.10 294,952.59 Firmado ofertas Envelope 07 15 12 23 06 25 27 29 26 26 DIST. RAMADAS TAPACARI climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 35 / MEJ. CANAL implementation of RIEGO PUCAVINTO AUKALARI Solicitud de Single Stage - One 2019-01- 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-10- TF / 16083 subprojects that improve Posterior Open - National 360,413.86 290,209.96 Firmado KOCHIMARCA ALTO Y BAJO ofertas Envelope 07 30 12 23 20 25 29 29 18 26 climate resilience in the Rio DIST.RAMADAS TAPACARI Grande River Basin

C. Design and FPS OBRAS 36 / AMPL. SIST. implementation of Solicitud de Single Stage - One 2019-01- 2019-02- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-11- RIEGO D III FASE 1 TF / 16083 subprojects that improve Posterior Open - National 421,657.49 280,663.10 Firmado ofertas Envelope 07 01 12 23 25 25 29 29 15 25 climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 37 / AMPL. SIST. implementation of Solicitud de Single Stage - One 2019-01- 2019-02- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-11- RIEGO D III FASE 2 TF / 16083 subprojects that improve Posterior Open - National 459,174.33 392,432.71 Firmado ofertas Envelope 07 01 12 23 25 25 29 29 15 25 TIQUIPAYA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 38 / CONST. implementation of Solicitud de Single Stage - One 2019-01- 2019-01- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-10- SIST. RIEGO TECNIFICADO TF / 16083 subprojects that improve Posterior Open - National 307,571.39 280,663.10 Firmado ofertas Envelope 07 31 12 23 25 25 29 29 16 26 MOLINOS TIQUIPAYA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 40 / CONST. implementation of Solicitud de Single Stage - One 2019-01- 2019-03- 2019-04- 2019-10- RIEGO POR ASPERCIoN UREY TF / 16083 subprojects that improve Posterior Open - National 161,539.88 130,543.09 Firmado cotizaciones Envelope 12 09 15 05 RANCHO SAN BENITO climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 41 / CONST. implementation of DEFENSIVOS MILLU MAYU Solicitud de Single Stage - One 2019-01- 2019-03- 2019-04- 2019-09- TF / 16083 subprojects that improve Posterior Open - National 141,676.09 120,377.08 Firmado ZONA SAN PEDRO BAJO cotizaciones Envelope 12 09 05 05 climate resilience in the Rio MIZQUE Grande River Basin

C. Design and implementation of FPS OBRAS 42 / AMPL. SIST. Solicitud de Single Stage - One 2019-01- 2019-02- 2019-01- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-03- 2019-12- TF / 16083 subprojects that improve Posterior Open - National 342,945.34 358,233.84 Firmado RIEGO QOLLPANI SACACA ofertas Envelope 07 01 12 23 20 25 11 29 26 25 climate resilience in the Rio

Grande River Basin

C. Design and FPS OBRAS 43 / MEJ. implementation of Solicitud de Single Stage - One 3,241,861. 2019-01- 2019-09- 2019-01- 2019-03- 2019-10- 2019-04- 2019-11- 2019-05- 2019-12- 2019-11- CANALES DE RIEGO COM. TF / 16083 subprojects that improve Posterior Open - National 319,703.37 Firmado ofertas Envelope 15 14 10 19 02 10 01 19 06 30 02 PALIZADA COMARAPA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 44 / MEJ. implementation of CANALES DE RIEGO Solicitud de Single Stage - One 32,632,272 2019-01- 2019-09- 2019-01- 2019-03- 2019-10- 2019-04- 2019-11- 2019-05- 2019-12- 2019-11- TF / 16083 subprojects that improve Posterior Open - National 447,499.99 Firmado PULQUINA ARRIBA B ofertas Envelope .71 14 10 19 02 10 01 19 06 30 02 climate resilience in the Rio COMARAPA Grande River Basin

FPS OBRAS 39 / CONST. C. Design and SIST. RIEGO NUEVO implementation of Solicitud de Single Stage - One 2,169,824. 2019-01- 2019-03- 2019-04- 2019-08- AMANECER PHUYU PHUYU TF / 16083 subprojects that improve Posterior Open - National 237,688.57 Firmado cotizaciones Envelope 19 12 09 02 06 GRANDE Y LINDE CHICO climate resilience in the Rio VACAS Grande River Basin

C. Design and FPS OBRAS 46 / MEJ. SIST. implementation of RIEGO CHALLAQUE Solicitud de Single Stage - One 2019-03- 2019-02- 2019-03- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-05- 2019-12- TF / 16083 subprojects that improve Posterior Open - National 300,370.77 242,362.58 Firmado FASE II - ofertas Envelope 01 18 06 17 12 17 25 21 16 18 climate resilience in the Rio SACABAMBA Grande River Basin

C. Design and FPS OBRAS 47 / MEJ. SIST. implementation of Solicitud de Single Stage - One 2019-03- 2019-02- 2019-03- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-05- 2019-12- RIEGO THAGO PAMPA ALIZAR TF / 16083 subprojects that improve Posterior Open - National 428,670.95 365,849.11 Firmado ofertas Envelope 01 18 06 17 12 17 25 21 28 18 MOLINOS - POJO climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 48 / CONST. implementation of REG. Y ENCAUCE HIDRICO Solicitud de Single Stage - One 40,800,560 2019-02- 2019-02- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-05- 2019-12- TF / 16083 subprojects that improve Posterior Open - National 485,998.48 Firmado RIO CHIJLLAWIRI TRAMO I ofertas Envelope .24 18 28 23 06 21 06 25 10 02 07 climate resilience in the Rio DIST. D - COLCAPIRHUA Grande River Basin

C. Design and FPS OBRAS 49 / CONST. implementation of REG. Y ENCAUCE HIDRICO Solicitud de Single Stage - One 2019-02- 2019-02- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-06- 2019-12- TF / 16083 subprojects that improve Posterior Open - National 484,244.64 401,472.48 Firmado RIO CHIJLLAWIRI TRAMO II ofertas Envelope 18 27 23 06 21 06 25 10 28 07 climate resilience in the Rio DIST. D - COLCAPIRHUA Grande River Basin

C. Design and FPS OBRAS 50 / CONST. implementation of REG. Y ENCAUCE HIDRICO Solicitud de Single Stage - One 39,525,420 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-06- 2019-12- TF / 16083 subprojects that improve Posterior Open - National 478,625.09 Firmado CANAL PAMPA MAYU TRAMO ofertas Envelope .94 01 15 06 18 06 17 28 22 07 19 climate resilience in the Rio I DIST. E - COLCAPIRHUA Grande River Basin

C. Design and FPS OBRAS 51 / CONST. implementation of REG. Y ENCAUCE HIDRICO Solicitud de Single Stage - One 26,773,260 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-07- 2019-06- 2019-11- TF / 16083 subprojects that improve Posterior Open - National 324,007.26 Firmado CANAL PAMPA MAYU TRAMO ofertas Envelope .54 01 15 06 18 06 17 03 22 17 19 climate resilience in the Rio II DIST. E - COLCAPIRHUA Grande River Basin

C. Design and FPS OBRAS 110 / MEJ. implementation of Solicitud de Single Stage - One 3,367,746. 2019-11- 2020-02- 2019-11- 2019-11- 2020-03- 2019-11- 2020-06- 2019-11- 2020-07- 2020-04- CANALES DE RIEGO DISTRITO TF / 16083 subprojects that improve Posterior Open - National 484,887.93 Firmado ofertas Envelope 88 02 19 03 18 11 19 24 27 16 25 5 - climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 111 / CONST. implementation of REG. ENC. HIDRAULICO DEL Solicitud de Single Stage - One 32,342,763 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-02- 2019-12- 2020-03- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 423,030.87 Firmado RIO PAJCHA MAYU LARATY - ofertas Envelope .13 02 22 03 27 16 28 05 06 03 04 climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 112 / MEJ. implementation of Solicitud de Single Stage - One 24,623,513 2019-11- 2020-02- 2019-11- 2019-11- 2020-03- 2019-11- 2020-06- 2019-12- 2020-07- 2020-05- OBRAS DE TOMA DISTRITO 4 TF / 16083 subprojects that improve Posterior Open - National 357,729.61 Firmado ofertas Envelope .26 02 19 03 23 11 24 24 02 27 30 - PUNATA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 113 / MEJ. implementation of Solicitud de Single Stage - One 34,471,065 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-02- 2019-12- 2020-03- 2020-06- CANAL DE RIEGO JATUN TF / 16083 subprojects that improve Posterior Open - National 413,591.06 Firmado ofertas Envelope .20 02 19 03 23 12 24 05 16 03 13 LARKa - CLIZA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 114 / MEJ. implementation of Solicitud de Single Stage - One 3,409,794. 2020-01- 2019-11- 2020-01- 2020-02- 2019-12- 2020-03- 2020-02- 2020-04- 2020-03- 2020-10- CANAL DE RIEGO CHULLPAS TF / 16083 subprojects that improve Posterior Open - National 416,071.99 Firmado ofertas Envelope 15 06 19 11 22 12 23 05 27 03 24 - CLIZA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 116 / CONST. implementation of Solicitud de Single Stage - One 3,729,434. 2019-11- 2020-02- 2019-11- 2019-11- 2020-03- 2019-11- 2020-06- 2019-12- 2020-08- 2020-05- DEFENSIVOS RIO ARQUE Z. TF / 16083 subprojects that improve Posterior Open - National 477,266.78 Firmado ofertas Envelope 44 02 19 03 23 11 24 24 02 03 30 SUD OESTE - ARQUE climate resilience in the Rio Grande River Basin

FPS OBRAS 117 / CONST. C. Design and MUROS DEFENSIVOS implementation of Solicitud de Single Stage - One 34,660,239 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-03- 2019-12- 2020-03- 2020-03- VENTILLA CONDORIRI Y TF / 16083 subprojects that improve Posterior Open - National 412,690.67 Firmado ofertas Envelope .41 02 22 03 23 16 24 05 02 06 21 CHAJWA CHAJWA - climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 118 / CONST. implementation of MUROS DEFENSIVOS Solicitud de Single Stage - One 37,491,221 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-02- 2019-12- 2020-03- 2020-03- TF / 16083 subprojects that improve Posterior Open - National 483,799.00 Firmado CALASAYA MIRO - ofertas Envelope .12 02 19 03 23 12 24 06 02 03 31 climate resilience in the Rio TACOPAYA Grande River Basin

C. Design and FPS OBRAS 119 / CONST. implementation of Solicitud de Single Stage - One 28,239,842 2019-11- 2019-12- 2019-11- 2019-11- 2020-01- 2019-11- 2020-02- 2019-12- 2020-06- 2020-03- MUROS DEFENSIVOS TF / 16083 subprojects that improve Posterior Open - National 338,531.00 Firmado ofertas Envelope .99 02 18 03 23 15 24 05 02 16 06 QOTUMAYU - TACOPAYA climate resilience in the Rio Grande River Basin

Page 2 C. Design and FPS OBRAS 120 / MEJ. SIST. implementation of RIEGO TECNIFICADO SIND. Solicitud de Single Stage - One 11,450,889 2019-11- 2019-11- 2020-07- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 148,841.58 Firmado AGRARIO CAPORAYA cotizaciones Envelope .46 03 28 17 26 climate resilience in the Rio CANCOTANI - SANTIVAÑEZ Grande River Basin

C. Design and FPS OBRAS 121 / CONST. implementation of REG. Y ENCAUCE HIDRICO Solicitud de Single Stage - One 3,531,267. 2020-01- 2020-02- 2020-01- 2020-01- 2020-03- 2020-01- 2020-06- 2020-02- 2020-08- 2020-07- TF / 16083 subprojects that improve Posterior Open - National 458,669.53 Firmado RIO ANGELAMAYU DIST. A - ofertas Envelope 00 06 19 07 27 11 28 26 05 17 04 climate resilience in the Rio COLCAPIRHUA Grande River Basin

C. Design and FPS OBRAS 122 / CONST. implementation of Solicitud de Single Stage - One 32,283,629 2019-11- 2019-12- 2019-11- 2019-11- 2020-01- 2019-11- 2020-03- 2019-12- 2020-06- 2020-03- OBRAS HIDRAULICAS RIO TF / 16083 subprojects that improve Posterior Open - National 385,792.80 Firmado ofertas Envelope .46 02 13 03 23 06 24 05 02 10 31 ROCHA - climate resilience in the Rio Grande River Basin

FPS OBRAS 123 / CONST. C. Design and OBRAS HIDRAULICAS implementation of Solicitud de Single Stage - One En 2019-11- 2019-01- 2019-11- 2019-11- 2019-11- 2019-12- 2020-03- REGULACION Y TF / 16083 subprojects that improve Posterior Open - National 473,940.56 0.00 ofertas Envelope ejecución 02 14 03 23 24 02 31 ENCAUZAMIENTO RIO climate resilience in the Rio LINDERO - TIQUIPAYA Grande River Basin

C. Design and FPS OBRAS 124 / MEJ. implementation of SISTEMA DE RIEGO EN LA Solicitud de Single Stage - One 25,236,324 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-01- 2019-12- 2020-03- 2020-06- TF / 16083 subprojects that improve Posterior Open - National 301,620.09 Firmado COMUNIDAD DE KURI ALTO - ofertas Envelope .29 02 19 03 23 12 24 31 15 02 12 climate resilience in the Rio MIZQUE Grande River Basin

C. Design and FPS OBRAS 125 / MEJ. SIST. implementation of Solicitud de Single Stage - One 29,514,132 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-02- 2019-12- 2020-03- 2020-05- DE RIEGO EN LA COMUNIDAD TF / 16083 subprojects that improve Posterior Open - National 374,731.66 Firmado ofertas Envelope .47 02 19 03 23 12 24 05 02 02 30 DE KURI CENTRO - MIZQUE climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 128 / MEJ. SIST. implementation of Solicitud de Single Stage - One 10,189,545 2019-11- 2019-12- 2020-06- 2019-12- RIEGO CHAUPI MOLINO - TF / 16083 subprojects that improve Posterior Open - National 125,212.56 Firmado cotizaciones Envelope .38 03 04 05 19 climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 129 / CONST. implementation of SIST. DE RIEGO POR Solicitud de Single Stage - One 13,608,459 2019-11- 2019-11- 2020-03- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 171,816.61 Firmado ASPERSION OTB SAN MIGUEL cotizaciones Envelope .01 03 28 03 26 climate resilience in the Rio D-7 - Grande River Basin

C. Design and FPS OBRAS 130 / MEJ. implementation of CANAL SISTEMA DE RIEGO Solicitud de Single Stage - One 28,154,957 2019-11- 2020-02- 2019-11- 2019-11- 2020-03- 2019-11- 2020-06- 2019-12- 2020-08- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 335,129.10 Firmado SULTI KASA PATA - SAN ofertas Envelope .54 02 19 03 23 11 24 24 02 03 30 climate resilience in the Rio BENITO Grande River Basin

C. Design and FPS OBRAS 131 / MEJ. SIST. implementation of Solicitud de Single Stage - One 5,526,003. 2019-11- 2019-11- 2020-02- 2020-03- DE RIEGO TECNIFICADO TF / 16083 subprojects that improve Posterior Open - National 69,107.00 Firmado cotizaciones Envelope 68 03 28 14 27 TUNAS MAYU - TARATA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 132 / MEJ. SIST. implementation of RIEGO TECNIFICADO CHIMPA Solicitud de Single Stage - One 3,200,745. 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-01- 2019-12- 2020-03- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 371,076.00 Firmado RANCHO YANA KOCHI - SAN ofertas Envelope 64 02 19 03 23 12 24 31 02 06 30 climate resilience in the Rio BENITO Grande River Basin

C. Design and FPS OBRAS 133 / MEJ. implementation of SISTEMA DE RIEGO Solicitud de Single Stage - One 12,839,084 2019-11- 2019-11- 2020-02- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 161,813.81 Firmado TECNIFICADO PAJCHA SAN cotizaciones Envelope .80 03 28 14 26 climate resilience in the Rio MIGUEL - TARATA Grande River Basin

C. Design and FPS OBRAS 134 / MEJ. SIST. implementation of Solicitud de Single Stage - One 41,960,832 2019-11- 2019-12- 2019-11- 2019-11- 2020-01- 2019-11- 2020-03- 2019-12- 2020-06- 2020-04- DE RIEGO CUENCA RIO LA TF / 16083 subprojects that improve Posterior Open - National 467,684.67 Firmado ofertas Envelope .19 02 13 03 23 06 24 05 02 04 20 LLAVE - VINTO climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 135 / MEJ. SIST. implementation of Solicitud de Single Stage - One 10,876,303 2019-11- 2019-11- 2020-06- 2020-03- DE RIEGO TINTI MOKo D-4 - TF / 16083 subprojects that improve Posterior Open - National 147,010.00 Firmado cotizaciones Envelope .08 03 28 17 27 TIQUIPAYA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 136 / CONST. implementation of Solicitud de Single Stage - One 34,936,465 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-01- 2019-12- 2020-03- 2020-05- SIST. DE RIEGO ALFALFA TF / 16083 subprojects that improve Posterior Open - National 390,616.78 Firmado ofertas Envelope .48 02 22 03 23 16 24 31 02 02 20 COTANI - climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 137 / MEJ. SIST. implementation of Solicitud de Single Stage - One 37,746,602 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-01- 2019-12- 2020-03- 2020-05- DE RIEGO PIRIGALLO B - TF / 16083 subprojects that improve Posterior Open - National 454,867.60 Firmado ofertas Envelope .00 02 22 03 23 16 24 31 02 02 20 CAPINOTA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 138 / CONST. implementation of Solicitud de Single Stage - One 8,646,146. 2019-11- 2019-11- 2020-03- 2020-04- SIST. DE RIEGO TECNIFICADO TF / 16083 subprojects that improve Posterior Open - National 120,732.67 Firmado cotizaciones Envelope 86 03 28 06 26 CATACHILLA - ARANI climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 139 / MEJ. SIST. implementation of Solicitud de Single Stage - One 13,237,949 2019-11- 2019-11- 2020-03- 2020-04- DE RIEGO COMUNIDAD TF / 16083 subprojects that improve Posterior Open - National 171,919.19 Firmado cotizaciones Envelope .97 03 28 06 26 CONDORIRI - TAPACARI climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 140 / CONST. implementation of SIST. RIEGO TECNIFICADO Solicitud de Single Stage - One 10,585,005 2019-11- 2019-12- 2020-03- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 126,958.11 Firmado COMUNIDAD PHUYU PHUYU cotizaciones Envelope .77 03 04 06 02 climate resilience in the Rio CHICO - ARANI Grande River Basin

C. Design and FPS OBRAS 141 / AMPL. implementation of REVESTIMIENTO CANALES DE Solicitud de Single Stage - One 33,418,852 2019-11- 2020-03- 2019-11- 2019-11- 2020-03- 2019-11- 2020-09- 2019-12- 2020-09- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 415,592.85 Firmado RIEGO VILLA CARMEN - ofertas Envelope .18 02 05 03 23 26 24 04 02 17 30 climate resilience in the Rio ARANI Grande River Basin

C. Design and FPS OBRAS 142 / CONST. implementation of REVESTIMIENTO CANALES DE Solicitud de Single Stage - One 32,225,439 2019-11- 2020-03- 2019-11- 2019-11- 2020-03- 2019-11- 2020-09- 2019-12- 2020-09- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 393,587.81 Firmado RIEGO GERMAN TARDIO - ofertas Envelope .30 02 05 03 23 26 24 04 31 17 29 climate resilience in the Rio ARANI Grande River Basin

C. Design and FPS OBRAS 145 / CONST. implementation of OBRAS DE PROTECCIÓN DE Solicitud de Single Stage - One 29,413,957 2019-11- 2019-12- 2019-11- 2019-11- 2020-01- 2019-11- 2020-03- 2019-12- 2020-06- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 396,405.47 Firmado RIBERAS OTB AYACUCHO RIO ofertas Envelope .24 02 13 03 27 06 28 05 06 15 04 climate resilience in the Rio KHORA - VINTO Grande River Basin

C. Design and FPS OBRAS 147 / CONST. implementation of OBRAS DE PROTECCION DE Solicitud de Single Stage - One 29,478,330 2019-11- 2019-12- 2019-11- 2019-11- 2020-01- 2019-11- 2020-03- 2019-11- 2020-06- 2020-03- TF / 16083 subprojects that improve Posterior Open - National 415,396.31 Firmado RIBERAS OTB CENTRAL RIO ofertas Envelope .01 02 13 03 23 15 24 05 30 17 29 climate resilience in the Rio CHULLA - VINTO Grande River Basin

C. Design and FPS OBRAS 149 / MEJ. SIST. implementation of Solicitud de Single Stage - One 4,846,978. 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-02- 2019-12- 2020-03- 2020-04- DE RIEGO J. KANAUT - TF / 16083 subprojects that improve Posterior Open - National 573,268.00 Firmado ofertas Envelope 05 02 19 03 23 12 24 06 02 02 30 COLCAPIRHUA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 150 / MEJ. implementation of SISTEMA DE RIEGO EN LA Solicitud de Single Stage - One 45,775,685 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-02- 2019-12- 2020-03- 2020-06- TF / 16083 subprojects that improve Posterior Open - National 576,971.00 Firmado COMUNIDAD DE KURI BAJO - ofertas Envelope .29 02 19 03 23 12 24 05 02 09 29 climate resilience in the Rio MIZQUE Grande River Basin

C. Design and FPS OBRAS 95 / implementation of Solicitud de Single Stage - One 2019-08- 2019-09- 2020-02- MEJORAMIENTO SISTEMA DE TF / 16083 subprojects that improve Posterior Open - National 182,600.58 0.00 Cancelado cotizaciones Envelope 04 29 26 RIEGO CONDORIRI climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 89 / implementation of Solicitud de Single Stage - One 2019-08- 2019-09- 2020-01- MEJORAMIENTO SISTEMA DE TF / 16083 subprojects that improve Posterior Open - National 160,955.31 0.00 Cancelado cotizaciones Envelope 04 29 27 RIEGO TINTI MOKO D-4 climate resilience in the Rio Grande River Basin

FPS OBRAS 90 / CONSTRUCCION MURO C. Design and DEFENSIVO DE HORMIGON implementation of Solicitud de Single Stage - One 2019-08- 2019-09- 2020-01- CICLOPEO Y RECUPERACION TF / 16083 subprojects that improve Posterior Open - National 247,056.59 0.00 Cancelado cotizaciones Envelope 04 29 27 DE SUELOS AGRICOLAS climate resilience in the Rio COMUNIDAD LONDO Grande River Basin POQUERA

C. Design and FPS OBRAS 93 / implementation of CONSTRUCCION SISTEMA DE Solicitud de Single Stage - One 2019-08- 2019-09- 2020-02- TF / 16083 subprojects that improve Posterior Open - National 100,705.66 0.00 Cancelado RIEGO TECNIFICADO cotizaciones Envelope 04 29 26 climate resilience in the Rio CATACHILLA Grande River Basin

Page 3 FPS OBRAS 86 / C. Design and MEJORAMIENTO SISTEMA DE implementation of Solicitud de Single Stage - One 2019-08- 2019-09- 2019-10- RIEGO TECNIFICADO TF / 16083 subprojects that improve Posterior Open - National 145,240.67 0.00 Cancelado cotizaciones Envelope 04 29 11 SINDICATO AGRARIO VILLA climate resilience in the Rio FATIMA Grande River Basin

C. Design and FPS OBRAS 78 / CONST. implementation of MEJORAMIENTO SISTEMA DE Solicitud de Single Stage - One 2019-08- 2019-09- 2020-02- TF / 16083 subprojects that improve Posterior Open - National 185,461.13 0.00 Cancelado RIEGO TECNIFICADO PAJCHA cotizaciones Envelope 04 29 26 climate resilience in the Rio SAN MIGUEL - TARATA Grande River Basin

FPS OBRAS 57 / C. Design and MEJORAMIENTO SIFON implementation of Solicitud de Single Stage - One 2019-08- 2019-09- 2020-03- INVERTIDO OBRA TF / 16083 subprojects that improve Posterior Open - National 35,813.83 0.00 Cancelado cotizaciones Envelope 04 29 27 COMPLEMENTARIA PANTEON climate resilience in the Rio PAMPA (SICAYA) Grande River Basin

FPS OBRAS 53 / C. Design and MEJORAMIENTO SISTEMA DE implementation of Solicitud de Single Stage - One 2019-08- 2019-09- 2020-03- RIEGO LINDE- TF / 16083 subprojects that improve Posterior Open - National 236,690.42 0.00 Cancelado cotizaciones Envelope 04 29 27 KANARRANCHO D-6 climate resilience in the Rio (TIQUIPAYA) Grande River Basin

FPS OBRAS 79 / C. Design and MEJORAMIENTO SISTEMA DE implementation of Solicitud de Single Stage - One 2019-08- 2019-09- 2020-03- REIGO TECNIFICADO TF / 16083 subprojects that improve Posterior Open - National 169,753.44 0.00 Cancelado cotizaciones Envelope 04 29 27 SINDICATO AGRARIO climate resilience in the Rio CAPORAYA CANCOTANI Grande River Basin

C. Design and FPS OBRAS 73 / CONST. implementation of SISTEMA DE RIEGO POR Solicitud de Single Stage - One 2019-08- 2019-09- 2020-02- TF / 16083 subprojects that improve Posterior Open - National 180,407.45 0.00 Cancelado ASPERSION OTB SAN MIGUEL cotizaciones Envelope 04 29 26 climate resilience in the Rio D-7 Grande River Basin

C. Design and implementation of FPS OBRAS 76 / CONST. Solicitud de Single Stage - One 2019-08- 2019-09- 2019-11- TF / 16083 subprojects that improve Posterior Open - National 108,437.35 0.00 Cancelado SISTEMA DE RIEGO TOTORAL cotizaciones Envelope 04 29 28 climate resilience in the Rio

Grande River Basin

C. Design and FPS OBRAS 88 / implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- MEJORAMIENTO SISTEMA DE TF / 16083 subprojects that improve Posterior Open - National 499,247.60 0.00 Cancelado ofertas Envelope 30 04 15 15 19 17 RIEGO J.KANAUT climate resilience in the Rio Grande River Basin

FPS OBRAS 94 / C. Design and MEJORAMIENTO DEL SISTEMA implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-11- DE MICRORIEGO TF / 16083 subprojects that improve Posterior Open - National 499,874.71 0.00 Cancelado ofertas Envelope 30 04 15 15 19 13 SUPRACOMUNAL CABRERA - climate resilience in the Rio MOLLINI B Grande River Basin

C. Design and implementation of FPS OBRAS 91 / SISTEMA DE Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-07- TF / 16083 subprojects that improve Posterior Open - National 455,136.45 0.00 Cancelado RIEGO ALFALFA - COTANI ofertas Envelope 30 04 15 15 19 26 climate resilience in the Rio

Grande River Basin

C. Design and FPS OBRAS 92 / implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-07- MEJORAMIENTO SISTEMA DE TF / 16083 subprojects that improve Posterior Open - National 495,257.41 0.00 Cancelado ofertas Envelope 30 04 15 15 19 26 RIEGO PIRIGALLO B climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 71 / implementation of MEJORAMIENTO DE SISTEMA Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-06- TF / 16083 subprojects that improve Posterior Open - National 433,468.19 0.00 Cancelado DE RIEGO COMUNIDAD DE ofertas Envelope 30 04 15 15 19 16 climate resilience in the Rio KURI BAJO Grande River Basin

C. Design and FPS OBRAS 69 / implementation of MEJORAMIENTO DE SISTEMA Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-06- TF / 16083 subprojects that improve Posterior Open - National 387,334.45 0.00 Cancelado DE RIEGO COMUNIDAD DE ofertas Envelope 30 04 15 15 19 30 climate resilience in the Rio KURI ALTO Grande River Basin

C. Design and FPS OBRAS 84 / implementation of CONSTRUCCION Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 11248 subprojects that improve Posterior Open - National 499,883.72 0.00 Cancelado MEJORAMIENTO CANAL DE ofertas Envelope 30 04 15 15 19 17 climate resilience in the Rio RIEGO OPA LARKA Grande River Basin

C. Design and FPS OBRAS 74 / CONST. implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- SISTEMA DE RIEGO SULTI TF / 16083 subprojects that improve Posterior Open - National 371,458.15 0.00 Cancelado ofertas Envelope 30 04 15 15 19 17 KASAPATA climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 85 / implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- MEJORAMIENTO SISTEMA DE TF / 16083 subprojects that improve Posterior Open - National 499,930.96 0.00 Cancelado ofertas Envelope 30 04 15 15 19 17 RIEGO CUENCA RIO LA LLAVE climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 82 / implementation of REENCAUZAMIENTO Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 499,996.91 0.00 Cancelado HIDRAULICO DEL RIO CLIZA ofertas Envelope 30 04 15 15 19 02 climate resilience in the Rio COMUNIDAD DE HUALLPERO Grande River Basin

FPS OBRAS 83 / C. Design and REENCAUZAMIENTO implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- HIDRAULICO DEL RIO CLIZA TF / 16083 subprojects that improve Posterior Open - National 489,856.50 0.00 Cancelado ofertas Envelope 30 04 15 15 19 02 COMUNIDAD MOSOJ climate resilience in the Rio RANCHO B Grande River Basin

C. Design and FPS OBRAS 81 / implementation of CONSTRUCCION Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 469,293.54 0.00 Cancelado MEJORAMIENTO CANAL DE ofertas Envelope 30 04 15 15 19 17 climate resilience in the Rio RIEGO COMPUERTA Grande River Basin

C. Design and FPS OBRAS 72 / CONST. implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-06- SISTEMA DE RIEGO POR TF / 11248 subprojects that improve Posterior Open - National 471,522.89 0.00 Cancelado ofertas Envelope 30 04 15 15 19 16 ASPERSION OTB FALSURI D-7 climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 55 / CONST. implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- MEJORAMIENTO CANAL DE TF / 16083 subprojects that improve Posterior Open - National 579,889.50 0.00 Cancelado ofertas Envelope 30 04 15 15 19 17 RIEGO JATUN LARKA (CLIZA) climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 54 / implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- RECONSTRUCCION OBRAS DE TF / 16083 subprojects that improve Posterior Open - National 392,563.07 0.00 Cancelado ofertas Envelope 30 04 15 15 19 17 TOMA DISTRITO - 4 climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 70 / implementation of MEJORAMIENTO DE SISTEMA Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-08- TF / 16083 subprojects that improve Posterior Open - National 309,704.67 0.00 Cancelado DE RIEGO COMUNIDAD DE ofertas Envelope 30 04 15 15 19 20 climate resilience in the Rio KURI CENTRO Grande River Basin

FPS OBRAS 59 / C. Design and CONSTRUCCION MUROS implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-03- DEFENSIVOS VENTILLA TF / 16083 subprojects that improve Posterior Open - National 495,902.07 0.00 Cancelado ofertas Envelope 30 04 15 15 19 08 CONDORIRI Y CHAJWA climate resilience in the Rio CHAJWA Grande River Basin

C. Design and FPS OBRAS 80 / implementation of CONSTRUCCION TOMA Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 351,653.53 0.00 Cancelado SISTEMA MICRORIEGO SAN ofertas Envelope 30 04 15 15 19 17 climate resilience in the Rio ANTONIO Grande River Basin

C. Design and FPS OBRAS 66 / implementation of REGULACION Y ENCAUCE Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 512,922.86 0.00 Cancelado HIDRICO RIO CHIJLLAWIRI ofertas Envelope 30 04 15 15 19 17 climate resilience in the Rio TRAMO III DISTRITO D Grande River Basin

C. Design and FPS OBRAS 77 / CONST. implementation of MEJORAMIENTO SISTEMA DE Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 421,033.16 0.00 Cancelado RIEGO TECNIFICADO CHIMPA ofertas Envelope 30 04 15 15 19 17 climate resilience in the Rio RANCHO YANA KOCHI Grande River Basin

C. Design and FPS OBRAS 68 / implementation of REGULACION Y ENCAUCE Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 507,565.16 0.00 Cancelado HIDRICO RIO CHIJLLAWIRI ofertas Envelope 30 04 15 15 19 17 climate resilience in the Rio TRAMO FINAL DISTRITO E Grande River Basin

FPS OBRAS 65 / C. Design and MEJORAMIENTO DE OBRA DE implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TOMA CAPTACION DEL TF / 16083 subprojects that improve Posterior Open - National 499,895.33 0.00 Cancelado ofertas Envelope 30 04 15 15 19 17 SISTEMA DE RIEGO PLAYA climate resilience in the Rio ANCHA TARIZA Grande River Basin

C. Design and FPS OBRAS 56 / implementation of MEJORAMIENTO SISTEMA DE Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-08- TF / 16083 subprojects that improve Posterior Open - National 327,825.38 0.00 Cancelado RIEGO TECNIFICADO RODEO ofertas Envelope 30 04 15 15 19 15 climate resilience in the Rio CHICO ZONA 2 (TOTORA) Grande River Basin

Page 4 C. Design and FPS OBRAS 67 / implementation of REGULACION Y ENCAICE Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 522,141.11 0.00 Cancelado HIDRICO RIO CHIJLLAWIRI ofertas Envelope 30 04 15 15 19 17 climate resilience in the Rio TRAMO IV DISTRITO D Grande River Basin

C. Design and FPS OBRAS 62 / implementation of REGULACION Y ENCAUCE Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 461,610.06 0.00 Cancelado HIDRICO RIO ANGELAMAYU ofertas Envelope 30 04 15 15 19 17 climate resilience in the Rio DISTRITO A (COLCAPIRHUA) Grande River Basin

FPS OBRAS 64 / CONSTRUCCION DE OBRAS C. Design and HIDRAULICAS PARA LA implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2019-12- REGULACION Y EL TF / 16083 subprojects that improve Posterior Open - National 500,000.00 0.00 Cancelado ofertas Envelope 30 04 15 15 19 01 ENCAUZAMIENTO climate resilience in the Rio HIDRAULICO EN EL CAUCE Grande River Basin PRINCIPAL DEL RIO LINDERO

FPS OBRAS 60 / C. Design and CONSTRUCCION MUROS implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-05- DEFENSIVOS DE PROTECCION TF / 16083 subprojects that improve Posterior Open - National 494,457.25 0.00 Cancelado ofertas Envelope 30 04 15 15 19 17 Y RECUPERACION DE climate resilience in the Rio TIERRAS CALASAYA, MIRO Grande River Basin

C. Design and FPS OBRAS 75 / CONST. implementation of MEJORAMIENTO SISTEMA DE Solicitud de Single Stage - One 2019-08- 2019-09- 2019-12- TF / 16083 subprojects that improve Posterior Open - National 95,080.07 0.00 Cancelado RIEGO TECNIFICADO TUNAS cotizaciones Envelope 04 29 28 climate resilience in the Rio MAYU - TARATA Grande River Basin

C. Design and FPS OBRAS 58 / implementation of Solicitud de Single Stage - Two 2019-07- 2019-08- 2019-09- 2019-11- 2020-01- 2020-06- CONSTRUCCION DEFENSIVOS TF / 11248 subprojects that improve Posterior Open - National 499,942.58 0.00 Cancelado ofertas Envelope 30 04 15 28 02 30 RIO ARQUE ZONA SUD OESTE climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 52 / implementation of Solicitud de Single Stage - One 2019-07- 2019-08- 2019-09- 2019-10- 2019-11- 2020-04- MEJORAMIENTO DE CANAL TF / 16083 subprojects that improve Posterior Open - National 571,255.51 0.00 Cancelado ofertas Envelope 30 04 15 15 19 17 DE RIEGO DISTRITO - 5 climate resilience in the Rio Grande River Basin

FPS OBRAS 148 / CONST. C. Design and OBRAS DE PROTECCIÓN DE implementation of Solicitud de Single Stage - One En 2019-11- 2019-12- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- RIBERAS OTB NUESTRA TF / 16083 subprojects that improve Posterior Open - National 405,295.54 0.00 ofertas Envelope ejecución 02 13 03 23 24 04 02 SEÑORA DEL ROSARIO RIO climate resilience in the Rio KHORA - VINTO Grande River Basin

C. Design and FPS OBRAS 146 / CONST. implementation of OBRAS DE PROTECCION DE Solicitud de Single Stage - One 31,125,588 2019-11- 2019-12- 2019-11- 2019-11- 2020-01- 2019-11- 2020-03- 2019-12- 2020-06- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 417,269.97 Firmado RIBERAS OTB JUAN VARGAS ofertas Envelope .78 02 13 03 23 06 24 05 02 18 30 climate resilience in the Rio RIO CHULLA - VINTO Grande River Basin

C. Design and FPS OBRAS 126 / CONST. implementation of SIST. DE RIEGO POR Solicitud de Single Stage - One 40,114,117 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-11- 2020-01- 2019-12- 2020-03- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 439,890.24 Firmado ASPERSION OTB FALSURI D-7 ofertas Envelope .39 02 27 03 23 20 24 31 02 02 30 climate resilience in the Rio - QUILLACOLLO Grande River Basin

C. Design and implementation of FPS OBRAS 144 / MEJ. SIST. Solicitud de Single Stage - One 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 340,040.04 0.00 Cancelado RIEGO - POCONA ofertas Envelope 02 03 23 24 02 30 climate resilience in the Rio

Grande River Basin

C. Design and FPS OBRAS 19 / CONST. implementation of Solicitud de Single Stage - One 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2020-01- CANAL DE RIEGO V. CARMEN TF / 16083 subprojects that improve Posterior Open - National 830,000.27 0.00 Cancelado ofertas Envelope 04 09 20 22 26 21 ARANI D-1 ARANI climate resilience in the Rio Grande River Basin

C. Design and FPS OBRAS 45 / CONST. implementation of SIST. MICRORIEGO Solicitud de Single Stage - One 2019-02- 2019-04- 2019-10- TF / 16083 subprojects that improve Posterior Open - National 262,407.49 0.00 Cancelado PRESURIZADO COMUNIDAD cotizaciones Envelope 23 20 17 climate resilience in the Rio DEL SUR - TOLATA Grande River Basin

C. Design and FPS OBRAS 127 / CONST. implementation of SIST. MICRORIEGO Solicitud de Single Stage - One 2019-11- 2019-09- 2019-11- 2019-11- 2019-09- 2019-11- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Open - National 262,407.50 0.00 Cancelado PRESURIZADO COMUNIDAD ofertas Envelope 02 04 03 23 26 24 02 30 climate resilience in the Rio DEL SUR - TOLATA Grande River Basin

C. Design and implementation of FPS OBRAS 143 / MEJ. SIST. Solicitud de Single Stage - One 2019-11- 2019-11- 2020-04- TF / 16083 subprojects that improve Posterior Open - National 238,085.75 0.00 Cancelado RIEGO TICANI - cotizaciones Envelope 03 28 26 climate resilience in the Rio

Grande River Basin

C. Design and FPS OBRAS 115 / MEJ. SIST. implementation of Solicitud de Single Stage - One 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-06- RIEGO TECNIFICADO RODEO TF / 16083 subprojects that improve Posterior Open - National 282,454.48 0.00 Cancelado ofertas Envelope 02 03 23 24 31 28 CHICO ZONA 2 - TOTORA climate resilience in the Rio Grande River Basin

GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

C. Design and FPS CF 1 / AUDITORiA implementation of Selección basada 2018-04- 2018-05- 2018-06- 2018-04- 2018-07- 2018-05- 2018-08- 2018-05- 2018-09- 2018-05- 2018-10- 2018-06- 2019-04- 2018-06- FINANCIERA DEL PROGRAMA TF / 16083 subprojects that improve Posterior Open - National 13,000.00 12,934.88 Finalizado 2018-04-20 en el menor costo 13 11 24 20 22 14 21 21 25 24 30 14 28 28 GESTIoN 2017 climate resilience in the Rio Grande River Basin

BO-FPS-91703-CS-LCS / AUDITORÍA FINANCIERA DEL PROGRAMA PILOTO SOBRE RESILENCIA CLIMATICA PPCR C. Design and FINANCIADO PARCIALMENTE implementation of Selección basada 2019-02- 2019-03- 2019-04- 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2019-08- 2019-06- 2019-10- POR EL CONVENIO DE TF / 16083 subprojects that improve Posterior Open - National 49,000.00 14,457.45 Firmado 2019-02-11 en el menor costo 15 04 17 23 15 07 14 07 19 23 23 07 22 CREDITO TF 16083 POR LOS climate resilience in the Rio COMPONENTES EJECUTADOS Grande River Basin POR EL FPS POR LAS GESTIONES 2018,2019 Y 2020 CIERRE

BO-FPS-152358-CS-CQS / “AUDITORÍA DEL PROGRAMA C. Design and PILOTO SOBRE RESILIENCIA implementation of Selección basada 2020-01- 2020-01- 2020-02- 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- CLIMÁTICA (RESILIENCIA TF / 16083 subprojects that improve Posterior Open - National 34,000.00 0.00 Cancelado 2020-01-10 en el menor costo 17 31 24 23 28 02 06 16 CLIMÁTICA EN BOLIVIA- climate resilience in the Rio PROYECTO DE MANEJO Grande River Basin INTEGRADO DE CUENCAS)

BO-FPS-159502-CS-QCBS / AUDITORIA DEL PROGRAMA C. Design and PILOTO SOBRE RESCILIENCIA implementation of CLIMATICA (RESCILIENCIA Selección basada 2020-02- 2020-03- 2020-04- 2020-02- 2020-05- 2020-06- 2020-07- 2020-08- 2020-10- TF / 16083 subprojects that improve Posterior Open - National 34,000.00 0.00 En ejecución 2020-02-14 CLIMATICA EN BOLIVIA - en calidad y costo 21 06 19 21 17 16 21 25 04 climate resilience in the Rio MANEJO INTEGRADO DE Grande River Basin CUENCAS GESTIONES 2019- 2020-CIERRE)

INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

C. Design and FPS CI 1 / SUPERVISIoN implementation of TeCNICA Mejoramiento 2017-03- 2017-05- 2017-03- 2017-05- 2017-05- 2017-06- 2017-05- 2017-12- TF / 16083 subprojects that improve Posterior Individual Open 16,732.16 16,611.09 Firmado 2017-03-13 Sistema de Riego Comunidad 13 01 13 22 09 26 09 23 climate resilience in the Rio Concepcion Aiquile Grande River Basin

C. Design and FPS CI 2 / ASISTENCIA implementation of TeCNICA Mejoramiento 2017-05- 2017-07- 2017-05- 2017-08- 2017-06- 2017-09- 2017-06- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-05-29 Sistema de Riego Comunidad 29 17 29 07 30 11 30 10 climate resilience in the Rio Concepcion Aiquile Grande River Basin

Page 5 C. Design and FPS CI 3 / SUPERVISIoN ATI implementation of Mejoramiento Sistema de 2017-05- 2017-07- 2017-05- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-05-22 Riego Comunidad 22 10 22 31 23 04 23 03 climate resilience in the Rio Concepcion Aiquile Grande River Basin

C. Design and FPS CI 7 / SUPERVISIoN implementation of TeCNICA CMejoramiento 2017-03- 2017-05- 2017-03- 2017-05- 2017-05- 2017-06- 2017-05- 2017-12- TF / 16083 subprojects that improve Posterior Individual Open 18,746.36 18,610.71 Firmado 2017-03-13 Sistema de Riego Tucma Alta 13 01 13 22 10 26 10 23 climate resilience in the Rio Tucma Centro Mizque Grande River Basin

C. Design and FPS CI 8 / ASISTENCIA implementation of TeCNICA Mejoramiento 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-07- 2017-04- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 16,982.51 16,859.62 Firmado 2017-03-27 Sistema de Riego Tucma Alta 27 15 27 05 27 10 27 06 climate resilience in the Rio Tucma Centro Mizque Grande River Basin

C. Design and FPS CI 9 / SUPERVISIoN ATI implementation of Mejoramiento Sistema de 2017-03- 2017-05- 2017-03- 2017-06- 2017-05- 2017-07- 2017-05- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 16,982.51 16,859.62 Firmado 2017-03-31 Riego Tucma Alta Tucma 31 19 31 09 10 14 10 10 climate resilience in the Rio Centro Mizque Grande River Basin

C. Design and FPS CI 10 / SUPERVISIoN implementation of TeCNICA Mejoramiento 2017-04- 2017-06- 2017-04- 2017-07- 2017-05- 2017-08- 2017-05- 2018-02- TF / 16083 subprojects that improve Posterior Individual Open 16,732.16 16,611.09 Firmado 2017-04-24 Sistema de Microriego La 24 12 24 03 22 07 22 03 climate resilience in the Rio Yunga Pasorapa Grande River Basin

C. Design and FPS CI 11 / ASISTENCIA implementation of TeCNICA Mejoramiento 2017-03- 2017-05- 2017-03- 2017-06- 2017-05- 2017-07- 2017-05- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-03-27 Sistema de Microriego La 27 15 27 05 04 10 04 06 climate resilience in the Rio Yunga Pasorapa Grande River Basin

C. Design and FPS CI 12 / SUPERVISIoN ATI implementation of Mejoramiento Sistema de 2017-05- 2017-07- 2017-05- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-05-22 Microriego La Yunga 22 10 22 31 22 04 22 03 climate resilience in the Rio Pasorapa Grande River Basin

C. Design and FPS CI 13 / SUPERVISIoN implementation of TeCNICA Actualizacion de 2017-03- 2017-07- 2017-03- 2017-07- 2017-05- 2017-09- 2017-05- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 16,732.16 16,611.09 Firmado 2017-05-22 Sistema de riego y Galeria 13 10 28 31 03 04 03 03 climate resilience in the Rio Filtrante Pizorga Pocona Grande River Basin

C. Design and FPS CI 14 / ASISTENCIA implementation of TeCNICA Actualizacion de 2017-06- 2017-08- 2017-06- 2017-08- 2017-07- 2017-10- 2017-07- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-06-19 Sistema de riego y Galeria 19 07 19 28 18 02 18 31 climate resilience in the Rio Filtrante Pizorga Pocona Grande River Basin

C. Design and FPS CI 15 / SUPERVISIoN ATI implementation of Actualizacion de Sistema de 2017-05- 2017-07- 2017-05- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 15,274.44 15,163.91 Firmado 2017-05-22 riego y Galeria Filtrante 22 10 22 31 29 04 29 03 climate resilience in the Rio Pizorga Pocona Grande River Basin

C. Design and FPS CI 16 / SUPERVISIoN implementation of 2017-03- 2017-08- 2017-03- 2017-09- 2017-05- 2017-10- 2017-05- 2018-04- TeCNICA Ampliacion sistema TF / 16083 subprojects that improve Posterior Individual Open 7,580.17 7,525.33 Firmado 2017-07-11 31 29 31 19 10 24 10 22 de riego Villa Florida Pojo climate resilience in the Rio Grande River Basin

C. Design and FPS CI 17 / ASISTENCIA implementation of 2017-06- 2017-08- 2017-06- 2017-08- 2017-07- 2017-10- 2017-07- 2018-03- TeCNICA Ampliacion sistema TF / 16083 subprojects that improve Posterior Individual Open 6,851.31 6,801.74 Firmado 2017-06-19 19 07 19 28 17 02 17 31 de riego Villa Florida Pojo climate resilience in the Rio Grande River Basin

C. Design and FPS CI 18 / SUPERVISIoN ATI implementation of 2017-07- 2017-08- 2017-07- 2017-09- 2017-08- 2017-10- 2017-08- 2018-04- Ampliacion sistema de riego TF / 16083 subprojects that improve Posterior Individual Open 6,851.31 6,801.74 Firmado 2017-07-11 11 29 11 19 17 24 18 22 Villa Florida Pojo climate resilience in the Rio Grande River Basin

C. Design and FPS CI 19 / SUPERVISIoN implementation of TeCNICA Mejoramiento 2017-04- 2017-08- 2017-04- 2017-08- 2017-05- 2017-10- 2017-05- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 12,973.76 12,879.88 Firmado 2017-06-19 Canal de riego Villa 24 07 24 28 23 02 23 31 climate resilience in the Rio Esperanza Pojo Grande River Basin

C. Design and FPS CI 20 / ASISTENCIA implementation of TeCNICA Mejoramiento 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-07- 2017-04- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 11,577.42 Firmado 2017-03-27 Canal de riego Villa 27 15 27 05 27 10 27 06 climate resilience in the Rio Esperanza Pojo Grande River Basin

C. Design and FPS CI 21 / SUPERVISIoN ATI implementation of 2017-06- 2017-08- 2017-06- 2017-08- 2017-07- 2017-10- 2017-07- 2018-03- Mejoramiento Canal de riego TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 11,577.42 Firmado 2017-06-19 19 07 19 28 18 02 18 31 Villa Esperanza Pojo climate resilience in the Rio Grande River Basin

FPS CI 22 / SUPERVISIoN C. Design and TeCNICA Ampliacion Sistema implementation of 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-07- 2017-04- 2018-01- de aduccion por tuberia TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 15,918.96 Firmado 2017-03-31 13 19 13 09 25 14 25 10 Riego Subcentral la Habana climate resilience in the Rio Pojo Grande River Basin

FPS CI 23 / ASISTENCIA C. Design and TeCNICA Ampliacion Sistema implementation of 2017-03- 2017-05- 2017-03- 2017-06- 2017-05- 2017-07- 2017-05- 2018-01- de aduccion por tuberia TF / 16083 subprojects that improve Posterior Individual Open 13,994.17 13,892.91 Firmado 2017-03-27 27 15 27 05 05 10 05 06 Riego Subcentral la Habana climate resilience in the Rio Pojo Grande River Basin

C. Design and FPS CI 24 / SUPERVISIoN ATI implementation of Ampliacion Sistema de 2017-03- 2017-05- 2017-03- 2017-06- 2017-05- 2017-07- 2017-05- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 13,994.17 13,892.91 Rescindido 2017-03-31 aduccion por tuberia Riego 31 19 31 09 12 14 12 10 climate resilience in the Rio Subcentral la Habana Pojo Grande River Basin

FPS CI 25 / SUPERVISIoN C. Design and TeCNICA Ampliacion canales implementation of 2017-03- 2017-08- 2017-03- 2017-08- 2017-04- 2017-10- 2017-04- 2018-03- Terciarios sistema de riego TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2017-06-19 13 07 13 28 25 02 25 31 LahuaChama-Ayalitas zona 3 climate resilience in the Rio Totora Grande River Basin

FPS CI 26 / ASISTENCIA C. Design and TeCNICA Ampliacion canales implementation of 2017-06- 2017-08- 2017-06- 2017-08- 2017-07- 2017-10- 2017-07- 2018-03- Terciarios sistema de riego TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 8,683.07 Firmado 2017-06-19 19 07 19 28 14 02 14 31 LahuaChama-Ayalitas zona 3 climate resilience in the Rio Totora Grande River Basin

FPS CI 27 / SUPERVISIoN ATI C. Design and Ampliacion canales implementation of 2017-06- 2017-08- 2017-06- 2017-08- 2017-07- 2017-10- 2017-07- 2018-03- Terciarios sistema de riego TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 8,683.07 Firmado 2017-06-19 19 07 19 28 13 02 13 31 LahuaChama-Ayalitas zona 3 climate resilience in the Rio Totora Grande River Basin

C. Design and FPS CI 28 / SUPERVISIoN implementation of TeCNICA Ampliacion Sistema 2017-03- 2017-08- 2017-03- 2017-08- 2017-05- 2017-10- 2017-05- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2017-06-19 de Riego Tecnificado 13 07 13 28 12 02 12 31 climate resilience in the Rio Chijmuri Totora Grande River Basin

C. Design and FPS CI 29 / ASISTENCIA implementation of TeCNICA Ampliacion Sistema 2017-03- 2017-05- 2017-03- 2017-06- 2017-05- 2017-07- 2017-05- 2018-01- 2018-08- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Finalizado 2017-03-27 de Riego Tecnificado 27 15 27 05 04 10 04 06 01 climate resilience in the Rio Chijmuri Totora Grande River Basin

C. Design and FPS CI 30 / SUPERVISIoN ATI implementation of 2017-06- 2017-08- 2017-06- 2017-08- 2017-07- 2017-09- 2017-07- 2018-03- Ampliacion Sistema de Riego TF / 16083 subprojects that improve Posterior Individual Open 9,475.22 9,406.66 Firmado 2017-06-16 19 04 19 25 19 29 19 28 Tecnificado Chijmuri Totora climate resilience in the Rio Grande River Basin

C. Design and FPS CI 31 / SUPERVISIoN implementation of TeCNICA Mejoramiento 2017-03- 2017-07- 2017-03- 2017-07- 2017-05- 2017-09- 2017-05- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2017-05-22 Sistema de Riego Pajcha Pata 13 10 13 31 09 04 09 03 climate resilience in the Rio Vacas Grande River Basin

C. Design and FPS CI 32 / ASISTENCIA implementation of TeCNICA Mejoramiento 2017-03- 2017-05- 2017-03- 2017-06- 2017-06- 2017-07- 2017-06- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 12,390.67 12,301.01 Firmado 2017-03-27 Sistema de Riego Pajcha Pata 27 15 27 05 14 10 14 06 climate resilience in the Rio Vacas Grande River Basin

C. Design and FPS CI 33 / SUPERVISIoN ATI implementation of 2017-05- 2017-07- 2017-05- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 11,577.42 Firmado 2017-05-22 22 10 22 31 22 04 22 03 Riego Pajcha Pata Vacas climate resilience in the Rio Grande River Basin

C. Design and FPS CI 34 / SUPERVISIoN implementation of TeCNICA Mejoramiento 2017-03- 2017-07- 2017-03- 2017-07- 2017-04- 2017-09- 2017-04- 2018-03- TF / 16083 subprojects that improve Posterior Individual Open 17,201.17 17,076.70 Firmado 2017-05-22 Sistema de Riego Pilpina Vila 13 10 13 31 25 04 25 03 climate resilience in the Rio Vila Grande River Basin

C. Design and FPS CI 35 / ASISTENCIA implementation of TeCNICA Mejoramiento 2017-03- 2017-05- 2017-03- 2017-06- 2017-04- 2017-07- 2017-04- 2018-01- TF / 16083 subprojects that improve Posterior Individual Open 15,262.39 15,151.95 Firmado 2017-03-27 Sistema de Riego Pilpina Vila 27 15 27 05 27 10 27 06 climate resilience in the Rio Vila Grande River Basin

Page 6 C. Design and FPS CI 36 / SUPERVISIoN ATI implementation of 2017-05- 2017-07- 2017-05- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Individual Open 15,262.39 15,151.95 Firmado 2017-05-22 22 10 22 31 20 04 20 03 Riego Pilpina climate resilience in the Rio Grande River Basin

C. Design and FPS CI 37 / SUPERVISIoN implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA AMPL. SIST. DE TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2018-06-20 15 08 15 29 23 03 23 01 RIEGO TIPA TIPA MIZQUE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 38 / SUPERVISIoN implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-20 15 08 15 29 23 03 23 01 POTRERA TIRAQUE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 39 / SUPERVISIoN implementation of TeCNICA CONST. CANAL DE 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 15,918.96 Firmado 2018-06-20 RIEGO COMUNIDAD ESPINAL 15 08 15 29 23 03 23 01 climate resilience in the Rio PASORAPA Grande River Basin

C. Design and FPS CI 40 / SUPERVISIoN implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-08- 2018-10- 2018-08- 2019-04- TeCNICA CONST. SIST. DE TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 14,471.78 Firmado 2018-06-20 20 08 20 29 20 03 20 01 RIEGO URA PIRHUA AIQUILE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 41 / SUPERVISIoN implementation of TeCNICA CONST. SIST. RIEGO 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 13,848.40 13,748.19 Firmado 2018-06-20 CHURU MAMA HUASI 15 08 15 29 24 03 24 01 climate resilience in the Rio POCONA Grande River Basin

C. Design and FPS CI 42 / SUPERVISIoN implementation of TeCNICA MEJ. SIST. RIEGO 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,130.25 Firmado 2018-06-20 TECNIFICADO V. NUEVA Y LA 15 08 15 29 26 03 26 01 climate resilience in the Rio MAICA TARATA Grande River Basin

C. Design and FPS CI 44 / SUPERVISIoN implementation of TeCNICA MEJ. SIST. RIEGO 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-20 POR ASPERCIoN CONDOR 15 08 15 29 24 03 24 01 climate resilience in the Rio KOCHI TACACHI Grande River Basin

C. Design and FPS CI 45 / SUPERVISIoN implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 14,471.78 Firmado 2018-06-20 15 08 15 29 27 03 27 01 CHAJRAMAYU AIQUILE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 46 / SUPERVISIoN implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 9,037.90 8,972.50 Firmado 2018-06-20 15 08 15 29 26 03 26 01 SAUCEVADO OMEREQUE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 47 / SUPERVISIoN implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA MEJ. CANAL DE TF / 16083 subprojects that improve Posterior Individual Open 26,239.07 26,049.20 Firmado 2018-06-20 15 08 15 29 30 03 30 01 RIEGO MAIRA KASA MIZQUE climate resilience in the Rio Grande River Basin

FPS CI 48 / SUPERVISIoN C. Design and TeCNICA CONST. implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- CANALIZACION SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 11,422.30 11,339.65 Firmado 2018-06-20 15 08 15 29 24 03 24 01 SUPAY CALLE DIST. E climate resilience in the Rio COLCAPIRHUA Grande River Basin

C. Design and FPS CI 49 / ASISTENCIA implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA AMPL. SIST. DE TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 15 10 15 31 26 05 26 03 RIEGO TIPA TIPA MIZQUE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 50 / ASISTENCIA implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 15 10 15 31 23 05 23 03 POTRERA TIRAQUE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 51 / ASISTENCIA implementation of TeCNICA CONST. CANAL DE 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2018-06-22 RIEGO COMUNIDAD ESPINAL 15 10 15 31 31 05 31 03 climate resilience in the Rio PASORAPA Grande River Basin

C. Design and FPS CI 52 / ASISTENCIA implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA CONST. SIST. DE TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 20 10 20 31 23 05 23 03 RIEGO URA PIRHUA AIQUILE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 53 / ASISTENCIA implementation of TeCNICA CONST. SIST. RIEGO 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 CHURU MAMA HUASI 15 10 15 31 30 05 30 03 climate resilience in the Rio POCONA Grande River Basin

C. Design and FPS CI 54 / ASISTENCIA implementation of TeCNICA MEJ. SIST. RIEGO 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,130.25 Firmado 2018-06-22 TECNIFICADO V. NUEVA Y LA 15 10 15 31 31 05 31 03 climate resilience in the Rio MAICA TARATA Grande River Basin

C. Design and FPS CI 56 / ASISTENCIA implementation of TeCNICA MEJ. SIST. RIEGO 2018-06- 2018-08- 2018-06- 2018-08- 2018-08- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,130.25 Firmado 2018-06-22 POR ASPERCIoN CONDOR 15 10 15 31 07 05 07 03 climate resilience in the Rio KOCHI TACACHI Grande River Basin

C. Design and FPS CI 57 / ASISTENCIA implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-08- 2018-10- 2018-08- 2019-04- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 15 10 15 31 07 05 07 03 CHAJRAMAYU AIQUILE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 58 / ASISTENCIA implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 6,997.08 6,946.45 Firmado 2018-06-22 15 10 15 31 23 05 23 03 SAUCEVADO OMEREQUE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 59 / ASISTENCIA implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TeCNICA MEJ. CANAL DE TF / 16083 subprojects that improve Posterior Individual Open 21,865.89 21,707.67 Firmado 2018-06-22 15 10 15 31 26 05 26 03 RIEGO MAIRA KASA MIZQUE climate resilience in the Rio Grande River Basin

FPS CI 60 / ASISTENCIA C. Design and TeCNICA CONST. implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-08- 2018-10- 2018-08- 2019-04- CANALIZACION SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 9,511.66 9,442.84 Firmado 2018-06-22 15 10 15 31 15 05 15 03 SUPAY CALLE DIST. E climate resilience in the Rio COLCAPIRHUA Grande River Basin

C. Design and FPS CI 65 / SUPERVISIoN ATI implementation of MEJ. SIST. RIEGO POR 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,235.89 Firmado 2018-06-22 ASPERCIoN CONDOR KOCHI 15 10 15 31 27 05 27 03 climate resilience in the Rio TACACHI Grande River Basin

C. Design and FPS CI 66 / SUPERVISIoN ATI implementation of CONST. CANALIZACIÓN SIST. 2018-06- 2018-08- 2018-06- 2018-08- 2018-08- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,295.22 Firmado 2018-06-22 RIEGO SUPAY CALLE DIST. E 15 10 15 31 07 05 07 03 climate resilience in the Rio COLCAPIRHUA Grande River Basin

C. Design and FPS CI 64 / SUPERVISIoN ATI implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- MEJ. SIST. RIEGO SAUCEVADO TF / 16083 subprojects that improve Posterior Individual Open 3,498.54 8,972.50 Firmado 2018-06-22 15 10 15 31 26 05 26 03 OMEREQUE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 63 / SUPERVISIoN ATI implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- CONST. SIST. RIEGO CHURU TF / 16083 subprojects that improve Posterior Individual Open 10,058.30 13,748.19 Firmado 2018-06-22 15 10 15 31 24 05 13 03 MAMA HUASI POCONA climate resilience in the Rio Grande River Basin

C. Design and BO-FPS-67251-CS-INDV / implementation of SUPERVISION ATI MEJ. SIST. 2018-06- 2018-08- 2018-06- 2018-08- 2018-08- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,235.89 Firmado 2018-06-22 RIEGO TECNIFICADO V. 15 10 15 31 08 05 08 03 climate resilience in the Rio NUEVA Y LA MAICA TARATA Grande River Basin

C. Design and BO-FPS-67255-CS-INDV / implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-07- 2018-10- 2018-07- 2019-04- SUPERVISION ATI AMPL. SIST. TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,235.89 Firmado 2018-06-22 15 10 15 31 27 05 27 03 RIEGO TIPA TIPA MIZQUE climate resilience in the Rio Grande River Basin

C. Design and BO-FPS-67256-CS-INDV / implementation of 2018-10- 2018-08- 2018-10- 2018-08- 2018-11- 2018-10- 2018-11- 2019-04- SUPERVISION ATI MEJ. CANAL TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2018-06-22 05 10 05 31 12 05 12 03 RIEGO MAIRA KASA MIZQUE climate resilience in the Rio Grande River Basin

Page 7 C. Design and FPS CI 62 / SUPERVISIoN ATI implementation of 2018-06- 2018-08- 2018-06- 2018-08- 2018-06- 2018-10- 2019-04- CONST. SIST. RIEGO URA TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 Cancelado 2018-06-22 20 10 20 31 15 05 03 PIRHUA AIQUILE climate resilience in the Rio Grande River Basin

C. Design and BO-FPS-67258-CS-INDV / implementation of 2018-08- 2018-08- 2018-10- 2019-04- SUPERVISION ATI MEJ. SIST. TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 Cancelado 2018-06-22 10 31 05 03 RIEGO CHAJRAMAYU AIQUILE climate resilience in the Rio Grande River Basin

C. Design and BO-FPS-67249-CS-INDV / implementation of 2018-08- 2018-08- 2018-10- 2019-04- SUPERVISIÓN ATI MEJ. SIST. TF / 16083 subprojects that improve Posterior Individual Open 5,830.90 0.00 Cancelado 2018-06-22 10 31 05 03 RIEGO POTRERA TIRAQUE climate resilience in the Rio Grande River Basin

C. Design and FPS CI 61 / SUPERVISIoN ATI implementation of CONST. CANAL DE RIEGO 2018-08- 2018-08- 2018-10- 2019-04- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 Cancelado 2018-06-22 COMUNIDAD ESPINAL 10 31 05 03 climate resilience in the Rio PASORAPA Grande River Basin

C. Design and FPS CI 72 / SUPERVISIoN implementation of TeCNICA MEJ. CANAL DE 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2020-01- TF / 16083 subprojects that improve Posterior Individual Open 19,825.07 19,681.62 Firmado 2019-01-07 RIEGO KANCHA WASA LARK 13 25 29 18 11 22 25 17 climate resilience in the Rio A CLIZA Grande River Basin

C. Design and FPS CI 75 / SUPERVISIoN implementation of TeCNICA MEJ. CANALES 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 9,475.22 9,406.66 Firmado 2019-01-07 RIEGO DON BOSCO 13 25 29 18 09 22 29 18 climate resilience in the Rio COLCAPIRHUA COLCAPIRHUA Grande River Basin

C. Design and FPS CI 77 / SUPERVISIoN implementation of TeCNICA MEJ. REG. ENCUACE 2019-04- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-05- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 26,239.07 26,105.87 Firmado 2019-01-07 HIDRICO RIO COLQUEAMAYU 10 25 26 18 07 22 21 18 climate resilience in the Rio T 1 DIST. A COLCAPIRHUA Grande River Basin

FPS CI 78 / SUPERVISIoN C. Design and TeCNICA MEJ. Y REG. implementation of 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-10- ENCAUCE HIDRICO RIO TF / 16083 subprojects that improve Posterior Individual Open 26,239.07 26,049.20 Firmado 2019-01-07 13 25 29 18 10 22 30 19 COLQUEMAYU T II DIST. A climate resilience in the Rio COLCAPIRHUA Grande River Basin

C. Design and FPS CI 80 / SUPERVISIoN implementation of 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-12- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 15,918.96 Firmado 2019-01-07 13 25 29 18 09 22 23 18 COM. SUNCHU PAMPA POJO climate resilience in the Rio Grande River Basin

C. Design and FPS CI 82 / SUPERVISIoN implementation of TeCNICA CONST. 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2019-01-07 DEFENSIVOS RiO ARQUE Z. 13 25 29 18 10 22 17 16 climate resilience in the Rio CENTRAL SICAYA Grande River Basin

C. Design and FPS CI 83 / SUPERVISIoN implementation of TeCNICA CONST. 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,052.94 Firmado 2019-01-07 DEFENSIVOS RiO ARQUE Z. 13 25 29 18 10 22 25 16 climate resilience in the Rio NORTE SICAYA Grande River Basin

C. Design and FPS CI 84 / SUPERVISIoN implementation of TeCNICA CONST. 2019-04- 2019-02- 2019-05- 2019-03- 2019-05- 2019-04- 2019-05- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,052.94 Firmado 2019-01-07 DEFENSIVOS RiO ARQUE Z. 18 25 06 18 10 22 30 16 climate resilience in the Rio SUD OESTE SICAYA Grande River Basin

C. Design and FPS CI 86 / SUPERVISIoN implementation of TeCNICA MEJ. CANAL DE 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 14,503.26 Firmado 2019-01-07 RIEGO SIVINGA AnUCHIRI 13 25 29 18 10 22 23 18 climate resilience in the Rio DIST. RAMADAS TAPACARI Grande River Basin

FPS CI 89 / SUPERVISIoN C. Design and TeCNICA MEJ. CANAL RIEGO implementation of 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2020-01- PUCAVINTO AUKALARI TF / 16083 subprojects that improve Posterior Individual Open 16,399.42 16,316.17 Firmado 2019-01-07 13 25 29 18 10 22 23 17 KOCHIMARCA ALTO Y BAJO climate resilience in the Rio DIST. RAMADAS TAPACARI Grande River Basin

C. Design and FPS CI 92 / SUPERVISIoN implementation of 2019-03- 2019-02- 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2020-02- TeCNICA AMPL. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 18,950.44 18,854.24 Firmado 2019-01-07 13 25 13 18 29 22 23 16 D III FASE 1 TIQUIPAYA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 94 / SUPERVISIoN ATI implementation of 2019-09- 2019-02- 2019-10- 2019-03- 2019-11- 2019-04- 2019-11- 2020-02- AMPL. SIST. RIEGO D III FASE TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 8,701.96 Firmado 2019-01-07 25 25 14 18 05 22 26 16 2 TIQUIPAYA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 95 / SUPERVISIoN implementation of 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2020-02- TeCNICA AMPL. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 15,918.96 Firmado 2019-01-07 13 25 29 18 10 22 25 16 D III FASE 2 TIQUIPAYA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 98 / SUPERVISIoN implementation of 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2020-02- TeCNICA AMPL. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 16,034.99 15,953.59 Firmado 2019-01-07 13 25 13 18 11 22 25 16 D III FASE 2 TIQUIPAYA climate resilience in the Rio Grande River Basin

FPS CI 101 / SUPERVISIoN C. Design and TeCNICA CONST. SIST. RIEGO implementation of 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2019-12- NUEVO AMANECER PHUYU TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 11,602.61 Firmado 2019-01-07 13 25 29 18 11 22 23 18 PHUYU GRANDE Y LINDE climate resilience in the Rio CHICO VACAS Grande River Basin

C. Design and FPS CI 104 / SUPERVISIoN implementation of TeCNICA CONST. RIEGO POR 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 10,932.94 10,853.84 Firmado 2019-01-07 ASPERCIoN UREY RANCHO 13 25 29 18 09 22 23 16 climate resilience in the Rio SAN BENITO Grande River Basin

FPS CI 106 / SUPERVISIoN C. Design and TeCNICA CONST. implementation of 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2020-01- DEFENSIVOS MILLU MAYU TF / 16083 subprojects that improve Posterior Individual Open 23,932.36 14,358.23 Firmado 2019-01-07 13 25 29 18 10 22 02 17 ZONA SAN PEDRO BAJO climate resilience in the Rio MIZQUE Grande River Basin

C. Design and FPS CI 107 / SUPERVISIoN implementation of 2019-03- 2019-02- 2019-04- 2019-03- 2019-04- 2019-04- 2019-04- 2019-12- TeCNICA AMPL. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 17,525.83 19,162.00 Firmado 2019-01-07 29 25 15 18 18 22 23 18 QOLLPANI SACACA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 110 / SUPERVISIoN implementation of TeCNICA MEJ. CANALES DE 2019-09- 2019-03- 2019-10- 2019-03- 2019-10- 2019-04- 2019-11- 2020-01- TF / 16083 subprojects that improve Posterior Individual Open 16,525.55 22,480.06 Firmado 2019-01-14 RIEGO COM. PALIZADA 19 04 04 25 25 29 28 24 climate resilience in the Rio COMARAPA Grande River Basin

C. Design and FPS CI 113 / SUPERVISIoN implementation of TeCNICA MEJ. CANALES DE 2019-09- 2019-03- 2019-10- 2019-03- 2019-10- 2019-04- 2019-11- 2020-01- TF / 16083 subprojects that improve Posterior Individual Open 20,000.00 22,480.06 Firmado 2019-01-14 RIEGO PULQUINA ARRIBA B 19 04 04 25 25 29 28 24 climate resilience in the Rio COMARAPA Grande River Basin

FPS CI 85 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA MEJ. 2019-04- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-05- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,152.28 Firmado 2019-01-07 CANAL DE RIEGO SIVINGA 15 25 29 18 06 22 17 18 climate resilience in the Rio AnUCHIRI DIST. RAMADAS Grande River Basin TAPACARI

FPS CI 74 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-11- 2019-02- 2019-12- 2019-03- 2020-01- 2019-04- 2020-03- 2019-10- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 5,830.90 5,801.31 Firmado 2019-01-07 27 25 20 18 14 22 09 19 CANALES RIEGO DON BOSCO climate resilience in the Rio COLCAPIRHUA COLCAPIRHUA Grande River Basin

FPS CI 88 / SUPERVISIoN AL ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA MEJ. implementation of 2019-10- 2019-02- 2019-10- 2019-03- 2019-11- 2019-04- 2019-12- 2020-01- CANAL RIEGO PUCAVINTO TF / 16083 subprojects that improve Posterior Individual Open 9,475.22 9,427.12 Firmado 2019-01-07 09 25 25 18 20 22 12 17 AUKALARI KOCHIMARCA climate resilience in the Rio ALTO Y BAJO DIST. RAMADAS Grande River Basin TAPACARI

FPS CI 91 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-11- 2019-02- 2019-12- 2019-03- 2020-01- 2019-04- 2020-03- 2020-02- ASISTENCIA TeCNICA AMPL. TF / 16083 subprojects that improve Posterior Individual Open 9,329.45 9,282.09 Firmado 2019-01-07 27 25 20 18 14 22 10 16 SIST. RIEGO D III FASE 1 climate resilience in the Rio TIQUIPAYA Grande River Basin

FPS CI 103 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-10- 2019-02- 2019-10- 2019-03- 2019-11- 2019-04- 2019-12- 2019-10- ASISTENCIA TeCNICA CONST. TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 8,701.96 Firmado 2019-01-07 09 25 25 18 20 22 12 19 RIEGO POR ASPERCIoN UREY climate resilience in the Rio RANCHO SAN BENITO Grande River Basin

Page 8 FPS CI 79 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-04- 2019-02- 2019-04- 2019-03- 2019-05- 2019-04- 2019-05- 2019-12- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,122.92 Firmado 2019-01-07 13 25 29 18 03 22 24 18 SIST. RIEGO COM. SUNCHU climate resilience in the Rio PAMPA POJO Grande River Basin

FPS CI 109 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-06- 2019-02- 2019-07- 2019-03- 2019-07- 2019-04- 2019-07- 2020-03- ASISTENCIA TeCNICA AMPL. TF / 16083 subprojects that improve Posterior Individual Open 7,571.16 11,497.17 Firmado 2019-01-07 17 25 03 18 15 22 24 17 SIST. RIEGO QOLLPANI climate resilience in the Rio SACACA Grande River Basin

FPS CI 115 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-10- 2019-03- 2019-10- 2019-03- 2019-10- 2019-04- 2019-11- 2020-01- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 15,000.00 14,503.26 Firmado 2019-01-14 08 04 24 25 31 29 28 24 CANALES DE RIEGO climate resilience in the Rio PULQUINA ARRIBA B Grande River Basin COMARAPA

FPS CI 112 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-10- 2019-03- 2019-10- 2019-03- 2019-10- 2019-04- 2019-11- 2020-01- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 10,807.71 14,503.26 Firmado 2019-01-14 08 04 24 25 31 29 19 24 CANALES DE RIEGO COM. climate resilience in the Rio PALIZADA COMARAPA Grande River Basin

BO-FPS-107109-CS-INDV / C. Design and SUPERVISIoN TeCNICA MEJ. implementation of 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- 2019-05- 2020-03- SIST. RIEGO CHALLAQUE TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 10,152.28 Firmado 2019-03-20 15 08 29 29 06 03 29 29 SACABAMBA FASE II climate resilience in the Rio SACABAMBA Grande River Basin

BO-FPS-107116-CS-INDV / C. Design and SUPERVISIoN TeCNICA implementation of 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- 2019-05- 2020-03- CONST. REG. Y ENCAUCE TF / 16083 subprojects that improve Posterior Individual Open 23,323.62 23,205.22 Firmado 2019-03-20 10 08 26 29 08 03 28 29 HiDRICO RiO CHIJLLAWIRI climate resilience in the Rio TRAMO II DISTR. D Grande River Basin (COLCAPIRHUA)

BO-FPS-107118-CS-INDV / C. Design and SUPERVISIoN TeCNICA implementation of 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- 2019-05- 2020-03- CONST. REG. Y ENCAUCE TF / 16083 subprojects that improve Posterior Individual Open 23,323.62 23,205.22 Firmado 2019-03-20 10 08 26 29 10 03 28 29 HiDRICO RiO CHIJLLAWIRI climate resilience in the Rio TRAMO I DISTR. D Grande River Basin (COLCAPIRHUA)VVVV

BO-FPS-107119-CS-INDV / C. Design and SUPERVISION TECNICA implementation of 2019-09- 2019-05- 2019-09- 2019-05- 2000-08- 2019-07- 2020-03- CONST. SIST. MICRORIEGO TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,034.03 En ejecución 2019-03-20 04 08 26 29 28 03 29 PRESURIZADO COMUNIDAD climate resilience in the Rio DEL SUR (TOLATA) Grande River Basin

BO-FPS-107127-CS-INDV / C. Design and ACOMPAnAMIENTO Y implementation of 2019-09- 2019-05- 2019-10- 2019-05- 2019-12- 2019-07- 2019-12- 2020-03- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,052.94 Firmado 2019-03-20 25 08 14 29 04 03 26 29 SIST. RIEGO THAGO PAMPA - climate resilience in the Rio ALIZAR MOLINOS POJO Grande River Basin

BO-FPS-107128-CS-INDV / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA MEJ. 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- 2019-06- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 13,848.40 13,778.10 Firmado 2019-03-20 SIST. RIEGO CHALLAQUE 08 08 24 29 09 03 17 29 climate resilience in the Rio SACABAMBA FASE II Grande River Basin SACABAMBA

BO-FPS-107131-CS-INDV / C. Design and SUPERVISIoN implementation of ACOMPAnAMIENTO Y 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- 2019-05- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,152.28 Firmado 2019-03-20 ASISTENCIA TeCNICA MEJ. 15 08 29 29 06 03 17 29 climate resilience in the Rio SIST. RIEGO THAGO PAMPA - Grande River Basin ALIZAR MOLINOS POJO

BO-FPS-107132-CS-INDV / SUPERVISIoN C. Design and ACOMPAnAMIENTO Y implementation of 2019-04- 2019-05- 2019-04- 2019-05- 2019-05- 2019-07- 2019-05- 2020-03- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,130.25 Firmado 2019-03-20 14 08 29 29 03 03 29 29 SIST. RIEGO CHALLAQUE climate resilience in the Rio SACABAMBA FASE II Grande River Basin SACABAMBA

FPS CI 102 / ASISTENCIA C. Design and TeCNICA CONST. SIST. RIEGO implementation of 2019-02- 2019-03- 2019-04- 2019-12- NUEVO AMANECER PHUYU TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 0.00 Cancelado 2019-01-07 25 18 22 18 PHUYU GRANDE Y LINDE climate resilience in the Rio CHICO VACAS Grande River Basin

FPS CI 100 / SUPERVISIoN C. Design and ATI CONST. SIST. RIEGO implementation of 2019-02- 2019-03- 2019-04- 2019-12- NUEVO AMANECER PHUYU TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 Cancelado 2019-01-07 25 18 22 18 PHUYU GRANDE Y LINDE climate resilience in the Rio CHICO VACAS Grande River Basin

FPS CI 102-2 / ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA CONST. implementation of 2019-09- 2019-05- 2019-10- 2019-06- 2019-11- 2019-07- 2019-11- 2020-03- SIST. RIEGO NUEVO TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,137.58 Firmado 2019-03-27 25 15 14 05 28 10 26 06 AMANECER PHUYU PHUYU climate resilience in the Rio GRANDE Y LINDE CHICO Grande River Basin VACAS

FPS CI 100-2 / SUPERVISION AL ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA CONST. implementation of 2019-04- 2019-05- 2019-04- 2019-06- 2019-05- 2019-07- 2019-05- 2020-03- SIST. RIEGO NUEVO TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,241.13 Firmado 2019-03-27 15 15 29 05 07 10 21 06 AMANECER PHUYU PHUYU climate resilience in the Rio GRANDE Y LINDE CHICO Grande River Basin VACAS

C. Design and FPS CI 105 / ASISTENCIA implementation of TeCNICA CONST. RIEGO POR 2019-02- 2019-03- 2019-04- 2020-02- TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 0.00 Cancelado 2019-01-07 ASPERCIoN UREY RANCHO 25 18 22 16 climate resilience in the Rio SAN BENITO Grande River Basin

C. Design and FPS CI 108 / ASISTENCIA implementation of 2019-02- 2019-03- 2019-04- 2020-03- TeCNICA AMPL. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,515.50 0.00 Cancelado 2019-01-07 25 18 22 17 QOLLPANI SACACA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 111 / ASISTENCIA implementation of TeCNICA MEJ. CANALES DE 2019-03- 2019-03- 2019-04- 2020-01- TF / 16083 subprojects that improve Posterior Individual Open 13,220.44 0.00 Cancelado 2019-01-14 RIEGO COM. PALIZADA 04 25 29 24 climate resilience in the Rio COMARAPA Grande River Basin

C. Design and FPS CI 114 / ASISTENCIA implementation of TeCNICA MEJ. CANALES DE 2019-03- 2019-03- 2019-04- 2020-01- TF / 16083 subprojects that improve Posterior Individual Open 17,500.00 0.00 Cancelado 2019-01-14 RIEGO PULQUINA ARRIBA B 04 25 29 24 climate resilience in the Rio COMARAPA Grande River Basin

C. Design and FPS CI 55 / ASISTENCIA implementation of TeCNICA CONST. CANAL DE 2019-02- 2019-03- 2019-04- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 Cancelado 2019-01-04 RIEGO V. CARMEN ARANI D- 22 15 19 13 climate resilience in the Rio 1 ARANI Grande River Basin

C. Design and FPS CI 73 / ASISTENCIA implementation of TeCNICA MEJ. CANAL DE 2019-02- 2019-03- 2019-04- 2020-01- TF / 16083 subprojects that improve Posterior Individual Open 17,842.57 0.00 Cancelado 2019-01-07 RIEGO KANCHA WASA LARK 25 18 22 17 climate resilience in the Rio A CLIZA Grande River Basin

C. Design and FPS CI 76 / ASISTENCIA implementation of TeCNICA MEJ. CANALES 2019-02- 2019-03- 2019-04- 2019-10- TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 0.00 Cancelado 2019-01-07 RIEGO DON BOSCO 25 18 22 19 climate resilience in the Rio COLCAPIRHUA COLCAPIRHUA Grande River Basin

C. Design and FPS CI 81 / ASISTENCIA implementation of 2019-02- 2019-03- 2019-04- 2019-12- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 Cancelado 2019-01-07 25 18 22 18 COM. SUNCHU PAMPA POJO climate resilience in the Rio Grande River Basin

C. Design and FPS CI 87 / ASISTENCIA implementation of TeCNICA MEJ. CANAL DE 2019-02- 2019-03- 2019-04- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 11,734.69 0.00 Cancelado 2019-01-07 RIEGO SIVINGA AnUCHIRI 25 18 22 18 climate resilience in the Rio DIST. RAMADAS TAPACARI Grande River Basin

FPS CI 90 / ASISTENCIA C. Design and TeCNICA MEJ. CANAL RIEGO implementation of 2019-02- 2019-03- 2019-04- 2020-01- PUCAVINTO AUKALARI TF / 16083 subprojects that improve Posterior Individual Open 13,192.42 0.00 Cancelado 2019-01-07 25 18 22 17 KOCHIMARCA ALTO Y BAJO climate resilience in the Rio DIST. RAMADAS TAPACARI Grande River Basin

C. Design and FPS CI 93 / ASISTENCIA implementation of 2019-02- 2019-03- 2019-04- 2020-02- TeCNICA AMPL. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 14,067.06 0.00 Cancelado 2019-01-07 25 18 22 16 D III FASE 1 TIQUIPAYA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 99 / ASISTENCIA implementation of 2019-02- 2019-03- 2019-04- 2020-02- TeCNICA AMPL. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,386.30 0.00 Cancelado 2019-01-07 25 18 22 16 D III FASE 2 TIQUIPAYA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 96 / ASISTENCIA implementation of 2019-02- 2019-03- 2019-04- 2020-02- TeCNICA AMPL. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 Cancelado 2019-01-07 25 18 22 16 D III FASE 2 TIQUIPAYA climate resilience in the Rio Grande River Basin

Page 9 FPS CI 105 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-11- 2019-05- 2019-12- 2019-06- 2020-03- 2019-07- 2020-06- 2020-05- ASISTENCIA TeCNICA CONST. TF / 16083 subprojects that improve Posterior Individual Open 10,204.08 10,137.58 Firmado 2019-03-29 27 17 20 07 11 12 10 07 RIEGO POR ASPERCIoN UREY climate resilience in the Rio RANCHO - SAN BENITO Grande River Basin

FPS CI 108 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-06- 2019-05- 2019-06- 2019-06- 2019-07- 2019-07- 2019-07- 2020-06- ASISTENCIA TeCNICA AMPL. TF / 16083 subprojects that improve Posterior Individual Open 10,515.50 19,134.25 Firmado 2019-03-29 04 17 24 07 01 12 09 06 SIST. RIEGO QOLLPANI climate resilience in the Rio SACACA - C. VILLA SACACA Grande River Basin

FPS CI 111 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-10- 2019-05- 2019-10- 2019-06- 2019-10- 2019-07- 2019-11- 2020-04- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 13,220.44 23,895.73 Firmado 2019-03-29 08 17 24 07 31 12 28 07 CANALES DE RIEGO COM. climate resilience in the Rio PALIZADA - COMARAPA Grande River Basin

FPS CI 114 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-10- 2019-05- 2019-10- 2019-06- 2019-10- 2019-07- 2019-11- 2020-04- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 17,500.00 23,895.73 Firmado 2019-03-29 08 17 24 07 31 12 28 07 CANALES DE RIEGO climate resilience in the Rio PULQUINA ARRIBA B - Grande River Basin COMARAPA

FPS CI 73 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-09- 2019-05- 2019-06- 2019-07- 2020-04- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 17,842.57 0.00 Bajo Revision 2019-03-29 06 17 07 12 07 CANAL DE RIEGO KANCHA climate resilience in the Rio WASA LARKA - CLIZA Grande River Basin

FPS CI 76 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA MEJ. 2019-10- 2019-05- 2019-10- 2019-06- 2019-11- 2019-07- 2019-12- 2020-01- TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 8,689.36 Firmado 2019-03-29 CANALES RIEGO COM. DON 09 17 25 07 19 12 03 08 climate resilience in the Rio BOSCO-COLCAPIRHUA - Grande River Basin COLCAPIRHUA

FPS CI 81 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-04- 2019-05- 2019-04- 2019-06- 2019-05- 2019-07- 2019-05- 2020-03- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 13,024.60 Firmado 2019-03-29 08 17 24 07 06 12 21 08 SIST. RIEGO COM. SUNCHU climate resilience in the Rio PAMPA - POJO Grande River Basin

FPS CI 90 - 2 / ACOMPAnAMIENTO Y C. Design and ASISTENCIA TeCNICA MEJ. implementation of 2020-02- 2019-05- 2020-03- 2019-06- 2020-06- 2019-07- 2020-07- 2020-04- CANAL RIEGO PUCAVINTO- TF / 16083 subprojects that improve Posterior Individual Open 13,192.42 13,182.81 Firmado 2019-03-29 19 17 12 07 23 12 27 07 AUKALARI-KOCHIMARCA climate resilience in the Rio ALTO Y BAJO DIST. RAMADAS Grande River Basin - TAPACARI

FPS CI 93 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-10- 2019-05- 2019-10- 2019-06- 2019-11- 2019-07- 2019-12- 2020-05- ASISTENCIA TeCNICA AMPL. TF / 16083 subprojects that improve Posterior Individual Open 14,067.06 13,975.38 Firmado 2019-03-29 09 17 25 07 19 12 03 07 SIST. RIEGO D-III FASE 1 - climate resilience in the Rio TIQUIPAYA Grande River Basin

FPS CI 96 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-10- 2019-05- 2019-10- 2019-06- 2019-11- 2019-07- 2019-12- 2020-05- ASISTENCIA TeCNICA AMPL. TF / 16083 subprojects that improve Posterior Individual Open 13,199.53 13,034.03 Firmado 2019-03-29 09 17 25 07 19 12 04 07 SIST. RIEGO D-III FASE-2 - climate resilience in the Rio TIQUIPAYA Grande River Basin

FPS CI 116 / SUPERVISION C. Design and TECNICA CONST. REG. Y implementation of 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2020-03- ENCAUCE HIDRICO CANAL TF / 16083 subprojects that improve Posterior Individual Open 23,323.62 23,171.61 Firmado 2019-04-01 15 20 02 10 15 15 22 11 PAMPA MAYU TRAMO I DIST. climate resilience in the Rio E - COLCAPIRHUA Grande River Basin

FPS CI 117 / SUPERVISION C. Design and TECNICA CONST. REG. Y implementation of 2019-04- 2019-05- 2019-05- 2019-06- 2019-05- 2019-07- 2019-05- 2020-02- ENCAUCE HIDRICO CANAL TF / 16083 subprojects that improve Posterior Individual Open 17,492.71 17,378.71 Firmado 2019-04-01 15 20 02 10 15 15 28 10 PAMPA MAYU TRAMO II DIST. climate resilience in the Rio E - COLCAPIRHUA Grande River Basin

FPS CI 87 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA MEJ. 2019-09- 2019-05- 2019-10- 2019-06- 2019-11- 2019-07- 2019-12- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 11,734.69 11,658.22 Firmado 2019-03-29 CANAL DE RIEGO SIVINGA, 25 17 14 07 08 12 03 08 climate resilience in the Rio AnUCHIRI DIST. RAMADAS - Grande River Basin TAPACARI

C. Design and BO-FPS-107108-CS-INDV / implementation of SUPERVISiON TeCNICA MEJ. 2019-03- 2019-05- 2019-03- 2019-05- 2019-04- 2019-07- 2019-05- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 16,034.98 15,930.48 Firmado 2019-03-20 SIST. RIEGO THAGO PAMPA - 13 08 29 29 09 03 02 29 climate resilience in the Rio ALIZAR MOLINOS POJO Grande River Basin

BO-FPS-89890-CS-INDV / C. Design and SUPERVISION ATI RIEGO implementation of 2019-01- 2019-02- 2019-03- 2019-09- CHURU MAMA HUASI TF / 16083 subprojects that improve Posterior Individual Open 15,843.02 0.00 Cancelado 2018-12-10 28 18 25 21 POCONA - RIEGO POTRERA climate resilience in the Rio TIRAQUE Grande River Basin

C. Design and BO-FPS-89122-CS-INDV / implementation of SUPERVISIoN ATI RIEGO 2019-02- 2019-03- 2019-04- 2019-10- TF / 16083 subprojects that improve Posterior Individual Open 14,534.80 0.00 Cancelado 2019-01-07 CHAJRAMAYU AIQUILE - 25 18 22 19 climate resilience in the Rio RIEGO URA PIRHUA AIQUILE Grande River Basin

FPS CI 97 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-09- 2019-02- 2019-10- 2019-03- 2019-11- 2019-04- 2019-11- 2020-02- ASISTENCIA TeCNICA AMPL. TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 8,727.27 Firmado 2019-01-07 25 25 14 18 04 22 26 16 SIST. RIEGO D III FASE 2 climate resilience in the Rio TIQUIPAYA Grande River Basin

FPS CI 70 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-11- 2019-02- 2019-12- 2019-03- 2020-01- 2019-04- 2020-03- 2020-01- ASISTENCIA TeCNICA CONST. TF / 16083 subprojects that improve Posterior Individual Open 6,122.45 6,082.55 Firmado 2019-01-07 27 25 20 18 13 22 09 17 CANAL ZONA CEMENTERIO climate resilience in the Rio FRANCISCO DEL RIVERO Grande River Basin CLIZA

FPS CI 71 / SUPERVISIoN AL C. Design and ACOMPAnAMIENTO Y implementation of 2019-11- 2019-02- 2019-12- 2019-03- 2020-01- 2019-04- 2020-03- 2020-01- ASISTENCIA TeCNICA MEJ. TF / 16083 subprojects that improve Posterior Individual Open 6,705.53 6,661.84 Firmado 2019-01-07 27 25 20 18 13 22 09 17 CANAL DE RIEGO KANCHA climate resilience in the Rio WASA LARK A CLIZA Grande River Basin

BO-FPS-141846-CS-INDV / C. Design and SUPERVISIoN AL implementation of ACOMPAnAMIENTO Y 2019-11- 2019-11- 2019-12- 2019-11- 2020-01- 2019-12- 2020-03- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 7,725.95 7,675.60 Firmado 2019-10-21 ASISTENCIA TeCNICA CONST 27 16 20 23 13 01 09 29 climate resilience in the Rio SIST RIEGO TECNIFICADO Grande River Basin MOLINOS - TIQUIPAYA

BO-FPS-141848-CS-INDV / C. Design and SUPERVISIoN TeCNICA implementation of 2019-03- 2019-11- 2019-03- 2019-12- 2019-04- 2019-12- 2019-05- 2020-06- CONST SIST RIEGO TF / 16083 subprojects that improve Posterior Individual Open 16,034.98 15,930.48 Firmado 2019-10-21 13 16 29 07 09 15 02 12 TECNIFICADO MOLINOS - climate resilience in the Rio TIQUIPAYA Grande River Basin

BO-FPS-141849-CS-INDV / C. Design and ACOMPAnAMIENTO Y implementation of 2019-04- 2019-11- 2019-04- 2019-11- 2019-05- 2019-12- 2019-05- 2020-06- ASISTENCIA TeCNICA CONST TF / 16083 subprojects that improve Posterior Individual Open 10,386.29 10,318.61 Firmado 2019-10-21 08 16 24 23 03 28 21 26 SIST RIEGO TECNIFICADO climate resilience in the Rio MOLINOS - TIQUIPAYA Grande River Basin

BO-FPS-141850-CS-INDV / C. Design and SUPERVISIoN TeCNICA implementation of 2019-03- 2019-11- 2019-03- 2019-11- 2019-04- 2019-12- 2019-05- 2020-05- CONST. CANAL ZONA TF / 16083 subprojects that improve Posterior Individual Open 15,743.44 15,640.84 Firmado 2019-10-21 13 16 29 23 16 01 02 29 CEMENTERIO FRANCISCO DEL climate resilience in the Rio RIVERO (CLIZA) Grande River Basin

C. Design and FPS CI 150 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2019-12- 2020-07- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 11,370.26 11,328.98 Firmado 2019-11-16 CANALES DE RIEGO DISTRITO 19 09 12 16 23 24 27 22 climate resilience in the Rio 5 - PUNATA Grande River Basin

C. Design and FPS CI 151 / SUPERVISIoN implementation of 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2019-12- 2020-07- 2020-05- TeCNICA MEJ. CANALES DE TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 15,228.43 Firmado 2019-11-16 19 09 12 16 19 24 20 22 RIEGO DISTRITO 5 - PUNATA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 153 / SUPERVISIoN implementation of TeCNICA CONST. REG. ENC. 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-06- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 15,206.37 Firmado 2019-11-18 HIDRAULICO DEL RIO PAJCHA 14 11 30 18 17 26 23 24 climate resilience in the Rio MAYU LARATY - SACABA Grande River Basin

C. Design and FPS CI 154 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2019-12- 2020-08- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 11,370.26 11,345.45 Firmado 2019-11-18 OBRAS DE TOMA DISTRITO 4 19 11 13 18 23 26 03 23 climate resilience in the Rio - PUNATA Grande River Basin

C. Design and FPS CI 155 / SUPERVISIoN implementation of 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2019-12- 2020-07- 2020-06- TeCNICA MEJ. OBRAS DE TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 15,272.73 Firmado 2019-11-16 19 09 12 16 19 24 27 21 TOMA DISTRITO 4 - PUNATA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 157 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 18,586.00 18,438.18 Firmado 2019-11-18 CANAL DE RIEGO JATUN 20 11 05 18 05 26 05 23 climate resilience in the Rio LARKa - CLIZA Grande River Basin

Page 10 C. Design and FPS CI 158 / SUPERVISIoN implementation of 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-06- 2020-06- TeCNICA MEJ. CANAL DE TF / 16083 subprojects that improve Posterior Individual Open 20,641.40 20,492.04 Firmado 2019-11-18 14 11 30 18 16 26 23 23 RIEGO JATUN LARKa - CLIZA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 159 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTO 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 18,586.00 18,518.52 Firmado 2019-11-16 MEJ. CANAL DE RIEGO JATUN 23 09 10 16 09 24 03 21 climate resilience in the Rio LARKa - CLIZA Grande River Basin

C. Design and FPS CI 160 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 18,671.14 18,522.63 Firmado 2019-11-18 CANAL DE RIEGO CHULLPAS 20 11 05 18 03 26 10 23 climate resilience in the Rio - CLIZA Grande River Basin

C. Design and FPS CI 161 / SUPERVISIoN implementation of 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-07- 2020-06- TeCNICA MEJ. CANAL DE TF / 16083 subprojects that improve Posterior Individual Open 20,745.77 20,610.57 Firmado 2019-11-18 14 11 31 18 13 26 27 23 RIEGO CHULLPAS - CLIZA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 162 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTO 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 18,671.14 18,603.34 Firmado 2019-11-18 MEJ. CANAL DE RIEGO 23 11 10 18 12 26 03 23 climate resilience in the Rio CHULLPAS - CLIZA Grande River Basin

C. Design and FPS CI 166 / SUPERVISIoN implementation of TeCNICA CONST. 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2019-12- 2020-07- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 12,682.21 12,617.84 Firmado 2019-11-16 DEFENSIVOS RIO ARQUE Z. 19 09 12 16 19 24 20 21 climate resilience in the Rio SUD OESTE - ARQUE Grande River Basin

FPS CI 167 / SUPERVISIoN C. Design and TeCNICA CONST. MUROS implementation of 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-06- 2020-04- DEFENSIVOS VENTILLA TF / 16083 subprojects that improve Posterior Individual Open 8,253.81 820,002.30 Firmado 2019-11-16 14 09 31 16 20 24 23 12 CONDORIRI Y CHAJWA climate resilience in the Rio CHAJWA - TACOPAYA Grande River Basin

C. Design and FPS CI 168 / SUPERVISIoN implementation of TeCNICA CONST. MUROS 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-07- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 9,675.98 959,902.10 Firmado 2019-11-18 DEFENSIVOS CALASAYA MIRO 14 11 30 18 17 26 20 24 climate resilience in the Rio - TACOPAYA Grande River Basin

C. Design and FPS CI 169 / SUPERVISIoN implementation of TeCNICA CONST. MUROS 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-06- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 6,770.61 671,676.65 Firmado 2019-11-18 DEFENSIVOS QOTUMAYU - 14 11 30 18 05 26 23 30 climate resilience in the Rio TACOPAYA Grande River Basin

FPS CI 170 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO MEJ. implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-05- SIST. RIEGO TECNIFICADO TF / 16083 subprojects that improve Posterior Individual Open 11,078.71 11,006.52 Firmado 2019-11-16 20 09 05 16 03 24 05 22 SIND. AGRARIO CAPORAYA climate resilience in the Rio CANCOTANI - SANTIVAÑEZ Grande River Basin

FPS CI 171 / SUPERVISIoN C. Design and TeCNICA MEJ. SIST. RIEGO implementation of 2020-01- 2020-02- 2020-01- 2020-03- 2020-03- 2020-04- 2020-06- 2020-05- TECNIFICADO SIND. TF / 16083 subprojects that improve Posterior Individual Open 12,390.67 12,327.77 Firmado 2020-01-06 14 24 31 16 11 20 23 17 AGRARIO CAPORAYA climate resilience in the Rio CANCOTANI - SANTIVAÑEZ Grande River Basin

FPS CI 172 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-05- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 8,701.96 Firmado 2019-11-18 23 11 10 18 12 26 03 24 TECNIFICADO SIND. climate resilience in the Rio AGRARIO CAPORAYA Grande River Basin CANCOTANI - SANTIVAÑEZ

FPS CI 173 / SUPERVISIoN C. Design and TeCNICA CONST. REG. Y implementation of 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-07- 2020-06- ENCAUCE HIDRICO RIO TF / 16083 subprojects that improve Posterior Individual Open 17,492.71 17,353.58 Firmado 2019-11-16 14 09 14 16 21 24 20 21 ANGELAMAYU DIST. A - climate resilience in the Rio COLCAPIRHUA Grande River Basin

C. Design and FPS CI 174 / SUPERVISIoN implementation of TeCNICA CONST. OBRAS 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-06- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 10,893.25 Firmado 2019-11-16 HIDRAULICAS RIO ROCHA - 14 09 30 16 20 24 16 22 climate resilience in the Rio VINTO Grande River Basin

FPS CI 175 / SUPERVISIoN C. Design and TeCNICA CONST. OBRAS implementation of 2020-07- 2019-12- 2020-07- 2019-12- 2020-08- 2019-12- 2020-08- 2020-04- HIDRAULICAS REGULACION Y TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 11,602.61 Firmado 2019-11-16 06 09 27 16 05 24 12 22 ENCAUZAMIENTO RIO climate resilience in the Rio LINDERO - TIQUIPAYA Grande River Basin

FPS CI 176 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO MEJ. implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-06- SISTEMA DE RIEGO EN LA TF / 16083 subprojects that improve Posterior Individual Open 15,072.89 14,953.00 Firmado 2019-11-18 20 11 05 18 05 26 12 23 COMUNIDAD DE KURI ALTO - climate resilience in the Rio MIZQUE Grande River Basin

C. Design and FPS CI 177 / SUPERVISIoN implementation of TeCNICA MEJ. SISTEMA DE 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-06- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 16,588.92 16,480.81 Firmado 2019-11-18 RIEGO EN LA COMUNIDAD DE 14 11 30 18 13 26 23 23 climate resilience in the Rio KURI ALTO - MIZQUE Grande River Basin

FPS CI 178 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2020-01- 2020-08- 2020-07- MEJ. SISTEMA DE RIEGO EN TF / 16083 subprojects that improve Posterior Individual Open 15,072.89 15,018.16 Firmado 2019-11-16 23 09 10 16 10 07 03 05 LA COMUNIDAD DE KURI climate resilience in the Rio ALTO - MIZQUE Grande River Basin

FPS CI 179 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO MEJ. implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-06- SIST. DE RIEGO EN LA TF / 16083 subprojects that improve Posterior Individual Open 18,294.46 18,148.95 Firmado 2019-11-16 20 09 05 16 03 24 05 21 COMUNIDAD DE KURI climate resilience in the Rio CENTRO - MIZQUE Grande River Basin

C. Design and FPS CI 180 / SUPERVISIoN implementation of TeCNICA MEJ. SIST. DE RIEGO 2020-01- 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 18,680.76 0.00 Bajo Revision 2019-11-16 EN LA COMUNIDAD DE KURI 14 09 16 24 22 climate resilience in the Rio CENTRO - MIZQUE Grande River Basin

FPS CI 181 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-06- MEJ. SIST. DE RIEGO EN LA TF / 16083 subprojects that improve Posterior Individual Open 18,294.46 20,275.16 Firmado 2019-11-18 23 11 10 18 10 26 17 23 COMUNIDAD DE KURI climate resilience in the Rio CENTRO - MIZQUE Grande River Basin

FPS CI 182 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-05- CONST. SIST. DE RIEGO POR TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 10,167.03 Firmado 2019-11-16 20 09 05 16 03 24 05 22 ASPERSION OTB FALSURI D-7 climate resilience in the Rio - QUILLACOLLO Grande River Basin

C. Design and FPS CI 183 / SUPERVISIoN implementation of TeCNICA CONST. SIST. DE 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 12,244.90 9,117.22 Firmado 2019-11-18 RIEGO POR ASPERSION OTB 23 11 10 18 10 26 03 24 climate resilience in the Rio FALSURI D-7 - QUILLACOLLO Grande River Basin

FPS CI 184 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-05- CONST. SIST. DE RIEGO POR TF / 16083 subprojects that improve Posterior Individual Open 9,183.67 9,150.33 Firmado 2019-11-16 23 09 10 16 09 24 03 22 ASPERSION OTB FALSURI D-7 climate resilience in the Rio - QUILLACOLLO Grande River Basin

C. Design and FPS CI 188 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 8,714.60 Firmado 2019-11-16 SIST. RIEGO CHAUPI MOLINO 20 09 05 16 03 24 12 22 climate resilience in the Rio - ANZALDO Grande River Basin

C. Design and FPS CI 189 / SUPERVISIoN implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-08- 2019-12- 2020-10- 2020-05- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 8,701.96 Firmado 2019-11-18 23 11 10 18 12 26 01 24 CHAUPI MOLINO - ANZALDO climate resilience in the Rio Grande River Basin

C. Design and FPS CI 190 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTO 2020-01- 2019-12- 2020-02- 2019-12- 2020-09- 2019-12- 2020-10- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 8,714.60 Firmado 2019-11-18 MEJ. SIST. RIEGO CHAUPI 23 11 10 18 16 26 01 24 climate resilience in the Rio MOLINO - ANZALDO Grande River Basin

FPS CI 191 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO implementation of 2020-07- 2019-12- 2020-07- 2019-12- 2020-08- 2019-12- 2020-09- 2020-05- CONST. SIST. DE RIEGO POR TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 6,535.95 Firmado 2019-11-16 06 09 28 16 18 24 08 22 ASPERSION OTB SAN MIGUEL climate resilience in the Rio D-7 - QUILLACOLLO Grande River Basin

FPS CI 192 / SUPERVISIoN C. Design and TeCNICA CONST. SIST. DE implementation of 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-06- 2020-05- RIEGO POR ASPERSION OTB TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 8,714.60 Firmado 2019-11-16 14 09 30 16 13 24 23 22 SAN MIGUEL D-7 - climate resilience in the Rio QUILLACOLLO Grande River Basin

FPS CI 193 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-08- 2019-12- 2020-09- 2020-05- CONST. SIST. DE RIEGO POR TF / 16083 subprojects that improve Posterior Individual Open 6,559.76 6,517.02 Firmado 2019-11-18 23 11 10 18 18 26 08 24 ASPERSION OTB SAN MIGUEL climate resilience in the Rio D-7 - QUILLACOLLO Grande River Basin

Page 11 FPS CI 194 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO MEJ. implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-06- CANAL SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 12,390.67 12,345.68 Firmado 2019-11-16 20 09 05 16 03 24 05 21 SULTI KASA PATA - SAN climate resilience in the Rio BENITO Grande River Basin

C. Design and FPS CI 195 / SUPERVISIoN implementation of TeCNICA MEJ. CANAL 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 8,701.96 Firmado 2019-11-18 SISTEMA DE RIEGO SULTI 23 11 10 18 12 26 17 23 climate resilience in the Rio KASA PATA - SAN BENITO Grande River Basin

FPS CI 196 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-06- MEJ. CANAL SISTEMA DE TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 8,701.96 Firmado 2019-11-18 23 11 10 18 12 26 17 23 RIEGO SULTI KASA PATA - climate resilience in the Rio SAN BENITO Grande River Basin

C. Design and FPS CI 197 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-06- 2019-12- 2020-07- 2019-12- 2020-08- 2019-12- 2020-09- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 8,309.04 8,278.87 Firmado 2019-11-16 SIST. DE RIEGO TECNIFICADO 10 09 28 16 18 24 08 22 climate resilience in the Rio TUNAS MAYU - TARATA Grande River Basin

C. Design and FPS CI 198 / SUPERVISIoN implementation of TeCNICA MEJ. SIST. DE RIEGO 2020-01- 2019-12- 2020-01- 2019-12- 2020-06- 2019-12- 2020-06- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 10,495.63 10,457.52 Firmado 2019-11-16 TECNIFICADO TUNAS MAYU 14 09 30 16 02 24 23 22 climate resilience in the Rio - TARATA Grande River Basin

FPS CI 199 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-04- MEJ. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 6,297.38 6,265.41 Firmado 2019-11-16 23 09 10 16 09 24 03 22 TECNIFICADO TUNAS MAYU climate resilience in the Rio - TARATA Grande River Basin

FPS CI 200 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO MEJ. implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-05- SIST. RIEGO TECNIFICADO TF / 16083 subprojects that improve Posterior Individual Open 12,390.67 12,345.68 Firmado 2019-11-16 20 09 05 16 03 24 12 22 CHIMPA RANCHO YANA climate resilience in the Rio KOCHI - SAN BENITO Grande River Basin

FPS CI 201 / SUPERVISIoN C. Design and TeCNICA MEJ. SIST. RIEGO implementation of 2020-01- 2019-12- 2020-01- 2019-12- 2020-06- 2019-12- 2020-06- 2020-05- TECNIFICADO CHIMPA TF / 16083 subprojects that improve Posterior Individual Open 15,306.12 15,272.73 Firmado 2019-11-18 14 11 30 18 03 26 23 24 RANCHO YANA KOCHI - SAN climate resilience in the Rio BENITO Grande River Basin

FPS CI 202 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-05- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 8,701.96 Firmado 2019-11-16 23 09 10 16 09 24 03 22 TECNIFICADO CHIMPA climate resilience in the Rio RANCHO YANA KOCHI - SAN Grande River Basin BENITO

FPS CI 203 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO MEJ. implementation of 2020-01- 2019-12- 2020-07- 2019-12- 2020-08- 2019-12- 2020-09- 2020-05- SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 10,152.28 Firmado 2019-11-16 20 09 27 16 18 24 08 22 TECNIFICADO PAJCHA SAN climate resilience in the Rio MIGUEL - TARATA Grande River Basin

C. Design and FPS CI 204 / SUPERVISIoN implementation of TeCNICA MEJ. SISTEMA DE 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-05- TF / 11248 subprojects that improve Posterior Individual Open 13,119.54 0.00 En ejecución 2019-11-16 RIEGO TECNIFICADO PAJCHA 14 09 30 16 18 24 22 climate resilience in the Rio SAN MIGUEL - TARATA Grande River Basin

FPS CI 205 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-05- MEJ. SISTEMA DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 7,871.72 7,843.14 Firmado 2019-11-18 23 11 10 18 12 26 03 24 TECNIFICADO PAJCHA SAN climate resilience in the Rio MIGUEL - TARATA Grande River Basin

C. Design and FPS CI 206 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-01- 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 11,370.26 0.00 En ejecución 2019-11-18 SIST. DE RIEGO CUENCA RIO 20 11 12 20 08 climate resilience in the Rio LA LLAVE - VINTO Grande River Basin

C. Design and FPS CI 207 / SUPERVISIoN implementation of TeCNICA MEJ. SIST. DE RIEGO 2020-01- 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 En ejecución 2019-11-16 CUENCA RIO LA LLAVE - 14 09 16 24 12 climate resilience in the Rio VINTO Grande River Basin

C. Design and FPS CI 208 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTO 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-09- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 7,725.95 7,686.73 Firmado 2019-11-16 MEJ. SIST. DE RIEGO CUENCA 23 09 23 16 05 24 25 12 climate resilience in the Rio RIO LA LLAVE - VINTO Grande River Basin

C. Design and FPS CI 209 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-07- 2019-12- 2019-12- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 9,475.21 0.00 En ejecución 2019-11-18 SIST. DE RIEGO TINTI MOKo 06 11 18 26 24 climate resilience in the Rio D-4 - TIQUIPAYA Grande River Basin

C. Design and FPS CI 210 / SUPERVISIoN implementation of TeCNICA MEJ. SIST. DE RIEGO 2020-01- 2019-12- 2019-12- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 En ejecución 2019-11-16 TINTI MOKo D-4 - 14 09 16 24 22 climate resilience in the Rio TIQUIPAYA Grande River Basin

C. Design and FPS CI 211 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTO 2020-01- 2019-12- 2019-12- 2019-12- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 6,122.45 0.00 En ejecución 2019-11-18 MEJ. SIST. DE RIEGO TINTI 23 11 18 26 24 climate resilience in the Rio MOKo D-4 - TIQUIPAYA Grande River Basin

FPS CI 212 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-06- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 11,585.81 Firmado 2019-11-18 20 11 05 18 03 26 05 13 ALFALFA COTANI - climate resilience in the Rio CAPINOTA Grande River Basin

C. Design and FPS CI 213 / SUPERVISIoN implementation of TeCNICA CONST. SIST. DE 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 17,492.71 10,137.58 Firmado 2019-11-16 RIEGO ALFALFA COTANI - 23 09 10 16 12 24 03 11 climate resilience in the Rio CAPINOTA Grande River Basin

FPS CI 214 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2019-12- 2019-12- 2020-06- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 0.00 En ejecución 2019-11-18 23 11 18 26 13 ALFALFA COTANI - climate resilience in the Rio CAPINOTA Grande River Basin

C. Design and FPS CI 215 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 13,848.40 13,738.25 En ejecución 2019-11-18 SIST. DE RIEGO PIRIGALLO B 20 11 05 18 03 26 13 climate resilience in the Rio - CAPINOTA Grande River Basin

C. Design and FPS CI 216 / SUPERVISIoN implementation of 2020-01- 2019-12- 2019-12- 2019-12- 2020-06- TeCNICA MEJ. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 19,825.07 0.00 En ejecución 2019-11-18 14 11 18 26 13 PIRIGALLO B - CAPINOTA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 217 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTO 2020-01- 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 0.00 En ejecución 2019-11-18 MEJ. SIST. DE RIEGO 23 11 18 26 13 climate resilience in the Rio PIRIGALLO B - CAPINOTA Grande River Basin

FPS CI 218 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO implementation of 2020-06- 2019-12- 2019-12- 2019-12- 2020-05- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 8,017.49 0.00 En ejecución 2019-11-18 10 11 18 26 24 TECNIFICADO CATACHILLA - climate resilience in the Rio ARANI Grande River Basin

C. Design and FPS CI 219 / SUPERVISIoN implementation of TeCNICA CONST. SIST. DE 2020-01- 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 10,204.09 0.00 En ejecución 2019-11-16 RIEGO TECNIFICADO 14 09 16 24 22 climate resilience in the Rio CATACHILLA - ARANI Grande River Basin

FPS CI 220 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2019-12- 2019-12- 2020-05- CONST. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 6,559.76 0.00 En ejecución 2019-11-16 23 09 16 24 22 TECNIFICADO CATACHILLA - climate resilience in the Rio ARANI Grande River Basin

C. Design and FPS CI 221 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2020-01- 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 En ejecución 2019-11-16 SIST. DE RIEGO COMUNIDAD 20 09 16 24 22 climate resilience in the Rio CONDORIRI - TAPACARI Grande River Basin

FPS CI 223 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-05- MEJ. SIST. DE RIEGO TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 8,714.60 Firmado 2019-11-18 23 11 10 18 10 26 03 24 COMUNIDAD CONDORIRI - climate resilience in the Rio TAPACARI Grande River Basin

FPS CI 224 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO implementation of 2020-07- 2019-12- 2020-07- 2019-12- 2020-08- 2019-12- 2020-09- 2020-05- CONST. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 6,122.45 5,499.28 Firmado 2019-11-18 06 11 28 18 19 26 08 08 TECNIFICADO COMUNIDAD climate resilience in the Rio PHUYU PHUYU CHICO - Grande River Basin ARANI

Page 12 FPS CI 225 / SUPERVISIoN C. Design and TeCNICA CONST. SIST. RIEGO implementation of 2020-01- 2020-02- 2020-01- 2020-03- 2020-03- 2020-04- 2020-06- 2020-10- TECNIFICADO COMUNIDAD TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,235.89 Firmado 2020-01-06 14 24 30 16 11 20 23 17 PHUYU PHUYU CHICO - climate resilience in the Rio ARANI Grande River Basin

FPS CI 226 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-07- 2019-12- 2019-12- 2019-12- 2020-04- CONST. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 5,539.36 0.00 En ejecución 2019-11-16 06 09 16 24 22 TECNIFICADO COMUNIDAD climate resilience in the Rio PHUYU PHUYU CHICO - Grande River Basin ARANI

FPS CI 227 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO AMPL. implementation of 2020-03- 2019-12- 2020-06- 2019-12- 2020-07- 2019-12- 2020-08- 2020-05- REVESTIMIENTO CANALES DE TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 8,739.99 Firmado 2019-11-16 05 09 26 16 13 24 03 22 RIEGO VILLA CARMEN - climate resilience in the Rio ARANI Grande River Basin

FPS CI 228 / SUPERVISIoN C. Design and TeCNICA AMPL. implementation of 2020-03- 2019-12- 2019-12- 2019-12- 2020-05- REVESTIMIENTO CANALES DE TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 En ejecución 2019-11-16 05 09 16 24 22 RIEGO VILLA CARMEN - climate resilience in the Rio ARANI Grande River Basin

FPS CI 229 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-03- 2019-12- 2019-12- 2019-12- 2020-05- AMPL. REVESTIMIENTO TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 En ejecución 2019-11-16 05 09 16 24 22 CANALES DE RIEGO VILLA climate resilience in the Rio CARMEN - ARANI Grande River Basin

FPS CI 230 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO implementation of 2020-03- 2019-12- 2019-12- 2019-12- 2020-05- CONST. REVESTIMIENTO TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 En ejecución 2019-11-18 05 11 18 26 24 CANALES DE RIEGO GERMAN climate resilience in the Rio TARDIO - ARANI Grande River Basin

FPS CI 231 / SUPERVISIoN C. Design and TeCNICA CONST. implementation of 2020-03- 2019-12- 2019-12- 2019-12- 2020-04- REVESTIMIENTO CANALES DE TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 En ejecución 2019-11-16 05 09 16 24 22 RIEGO GERMAN TARDIO - climate resilience in the Rio ARANI Grande River Basin

FPS CI 232 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-03- 2019-12- 2020-03- 2019-12- 2020-08- 2019-12- 2020-09- 2020-05- CONST. REVESTIMIENTO TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 7,220.22 Firmado 2019-11-16 05 09 26 16 18 24 08 22 CANALES DE RIEGO GERMAN climate resilience in the Rio TARDIO - ARANI Grande River Basin

FPS CI 239 / SUPERVISIoN C. Design and TeCNICA CONST. OBRAS DE implementation of 2020-01- 2019-12- 2020-01- 2019-12- 2020-06- 2019-12- 2020-06- 2020-04- PROTECCIÓN DE RIBERAS TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 10,893.25 Firmado 2019-11-18 14 11 31 18 02 26 23 24 OTB AYACUCHO RIO KHORA climate resilience in the Rio - VINTO Grande River Basin

FPS CI 240 / SUPERVISIoN C. Design and TeCNICA CONST. OBRAS DE implementation of 2020-01- 2019-12- 2019-12- 2019-12- 2020-05- PROTECCION DE RIBERAS TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 En ejecución 2019-11-16 14 09 16 24 22 OTB JUAN VARGAS RIO climate resilience in the Rio CHULLA - VINTO Grande River Basin

FPS CI 241 / SUPERVISIoN C. Design and TeCNICA CONST. OBRAS DE implementation of 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2020-01- 2020-06- 2020-06- PROTECCION DE RIBERAS TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 10,877.45 Firmado 2019-11-18 14 11 30 18 20 09 23 07 OTB CENTRAL RIO CHULLA - climate resilience in the Rio VINTO Grande River Basin

FPS CI 242 / SUPERVISIoN C. Design and TeCNICA CONST. OBRAS DE implementation of 2020-01- 2019-12- 2020-01- 2019-12- 2020-06- 2019-12- 2020-06- 2020-04- PROTECCIÓN DE RIBERAS TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 10,893.25 Firmado 2019-11-16 14 09 30 16 02 24 23 22 OTB NUESTRA SEÑORA DEL climate resilience in the Rio ROSARIO RIO KHORA - Grande River Basin VINTO

FPS CI 243 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO MEJ. implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-06- 2019-12- 2020-08- 2020-06- SISTEMA DE RIEGO EN LA TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 20,245.84 Firmado 2019-11-16 23 09 05 16 16 24 18 21 COMUNIDAD DE KURI BAJO - climate resilience in the Rio MIZQUE Grande River Basin

C. Design and FPS CI 244 / SUPERVISIoN implementation of TeCNICA MEJ. SISTEMA DE 2020-01- 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 25,510.20 0.00 En ejecución 2019-11-18 RIEGO EN LA COMUNIDAD DE 14 11 18 26 23 climate resilience in the Rio KURI BAJO - MIZQUE Grande River Basin

FPS CI 245 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2019-12- 2019-12- 2020-06- MEJ. SISTEMA DE RIEGO EN TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 En ejecución 2019-11-16 23 09 16 24 21 LA COMUNIDAD DE KURI climate resilience in the Rio BAJO - MIZQUE Grande River Basin

FPS CI 246 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2020-06- MEJORAMIENTO SISTEMA DE TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 13,052.94 Firmado 2019-11-18 20 11 05 18 03 26 05 23 RIEGO J.KANAUT - climate resilience in the Rio COLCAPIRHUA Grande River Basin

C. Design and FPS CI 247 / SUPERVISIoN implementation of TeCNICA MEJORAMIENTO 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-07- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 25,510.20 17,353.58 Firmado 2019-11-16 SISTEMA DE RIEGO J.KANAUT 14 09 30 16 17 24 20 21 climate resilience in the Rio - COLCAPIRHUA Grande River Basin

FPS CI 248 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2020-01- 2019-12- 2019-12- 2019-12- 2020-06- MEJORAMIENTO SISTEMA DE TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 En ejecución 2019-11-16 23 09 16 24 21 RIEGO J.KANAUT - climate resilience in the Rio COLCAPIRHUA Grande River Basin

FPS CD 1 / CAPACITACION Y ASISTENCIA TECNICA PARA C. Design and LA GESTION DEL TRAMITE DE implementation of Selección directa 2019-12- 2019-11- 2019-12- 2020-02- CAPACIDAD DE TF / 16083 subprojects that improve Posterior Direct 5,484.00 0.00 Cancelado 2019-11-18 de consultores 13 24 13 06 ENDEUDAMIENTO climate resilience in the Rio REFERENCIAL PARA Grande River Basin CONTRAPARTES LOCALES

FPS CD 1A / CAPACITACION C. Design and PARA LA GESTION DEL implementation of TRAMITE DE CAPACIDAD DE Selección directa 2020-01- 2020-01- 2020-02- 2020-03- TF / 16083 subprojects that improve Posterior Direct 5,484.00 0.00 En ejecución 2020-01-22 ENDEUDAMIENTO de consultores 21 25 03 24 climate resilience in the Rio REFERENCIAL PARA Grande River Basin CONTRAPARTES LOCALES

C. Design and FPS CI 152 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTO 2020-02- 2020-04- 2020-03- 2020-04- 2020-06- 2020-04- 2020-07- 2020-09- TF / 16083 subprojects that improve Posterior Individual Open 9,475.22 15,195.37 Firmado 2020-03-12 MEJ. CANALES DE RIEGO 19 04 12 11 19 19 20 16 climate resilience in the Rio DISTRITO 5 - PUNATA Grande River Basin

C. Design and FPS CI 222 / SUPERVISIoN implementation of TeCNICA MEJ. SIST. DE RIEGO 2020-01- 2019-12- 2020-01- 2019-12- 2020-03- 2019-12- 2020-08- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 13,052.94 Firmado 2019-11-16 COMUNIDAD CONDORIRI - 14 09 30 16 20 24 17 22 climate resilience in the Rio TAPACARI Grande River Basin

C. Design and FPS CI 43 / SUPERVISIoN implementation of TeCNICA CONST. CANAL DE 2019-02- 2019-03- 2019-04- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 23,323.62 0.00 Cancelado 2019-01-04 RIEGO V. CARMEN ARANI D- 22 15 19 13 climate resilience in the Rio 1 ARANI Grande River Basin

BO-FPS-67259-CS-INDV / C. Design and SUPERVISIoN AL implementation of ACOMPAnAMIENTO Y 2019-02- 2019-03- 2019-04- 2020-04- TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 Cancelado 2019-01-04 ASISTENCIA TeCNICA CONST. 22 15 19 13 climate resilience in the Rio CANAL DE RIEGO V. CARMEN Grande River Basin ARANI D-1 ARANI

FPS CI 55 - 2 / C. Design and ACOMPAnAMIENTO Y implementation of 2019-05- 2019-06- 2019-07- 2020-07- ASISTENCIA TeCNICA CONST. TF / 16083 subprojects that improve Posterior Individual Open 20,408.16 0.00 Cancelado 2019-03-29 17 07 12 06 CANAL DE RIEGO V. CARMEN climate resilience in the Rio ARANI D-1 - ARANI Grande River Basin

BO-FPS-107135-CS-INDV / SUPERVISIoN C. Design and ACOMPAnAMIENTO Y implementation of 2019-05- 2019-05- 2019-07- 2020-03- ASISTENCIA TeCNICA CONST. TF / 16083 subprojects that improve Posterior Individual Open 8,746.36 0.00 Cancelado 2019-03-20 08 29 03 29 SIST. MICRORIEGO climate resilience in the Rio PRESURIZADO COMUNIDAD Grande River Basin DEL SUR TOLATA

BO-FPS-107130-CS-INDV / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA CONST. 2019-05- 2019-05- 2019-07- 2020-03- TF / 16083 subprojects that improve Posterior Individual Open 11,661.80 0.00 Cancelado 2019-03-20 SIST. MICRORIEGO 08 29 03 29 climate resilience in the Rio PRESURIZADO COMUNIDAD Grande River Basin DEL SUR TOLATA

C. Design and FPS CI 233 / ASIST. TECNICA implementation of 2019-12- 2019-12- 2019-12- 2020-05- Y ACOMPAÑAMIENTO MEJ. TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 Cancelado 2019-11-18 11 18 26 24 SIST. RIEGO TICANI - ALALAY climate resilience in the Rio Grande River Basin

C. Design and FPS CI 234 / SUPERVISIoN implementation of 2020-04- 2020-04- 2020-04- 2020-09- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 Cancelado 2020-03-12 04 11 19 16 TICANI - ALALAY climate resilience in the Rio Grande River Basin

Page 13 C. Design and FPS CI 235 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTO 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 Cancelado 2019-11-16 MEJ. SIST. RIEGO TICANI - 09 16 24 22 climate resilience in the Rio ALALAY Grande River Basin

C. Design and FPS CI 236 / ASIST. TECNICA implementation of Y ACOMPAÑAMIENTO MEJ. 2019-12- 2019-12- 2019-12- 2020-05- TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 Cancelado 2019-11-18 SIST. RIEGO COCAPATA - 11 18 26 24 climate resilience in the Rio POCONA Grande River Basin

C. Design and FPS CI 237 / SUPERVISIoN implementation of 2019-12- 2019-12- 2019-12- 2020-05- TeCNICA MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 0.00 Cancelado 2019-11-18 11 18 26 24 COCAPATA - POCONA climate resilience in the Rio Grande River Basin

C. Design and FPS CI 238 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTOMEJ. 2020-01- 2020-01- 2020-01- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 Cancelado 2019-11-16 SIST. RIEGO COCAPATA - 07 14 22 20 climate resilience in the Rio POCONA Grande River Basin

BO-FPS-89123-CS-INDV / C. Design and SUPERVISIoN ATI RIEGO implementation of 2019-02- 2019-03- 2019-04- 2019-10- COMUNIDAD ESPINAL TF / 16083 subprojects that improve Posterior Individual Open 12,209.30 0.00 Cancelado 2019-01-07 25 18 22 19 PASORAPA - RIEGO climate resilience in the Rio SAUCEVADO OMEREQUE Grande River Basin

FPS CI 186 / SUPERVISIoN C. Design and TeCNICA CONST. SIST. implementation of 2019-09- 2019-12- 2019-09- 2019-12- 2019-12- 2020-06- MICRORIEGO PRESURIZADO TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 Cancelado 2019-11-18 04 11 26 18 26 23 COMUNIDAD DEL SUR - climate resilience in the Rio TOLATA Grande River Basin

FPS CI 163 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO MEJ. implementation of 2019-12- 2019-12- 2019-12- 2020-06- SIST. RIEGO TECNIFICADO TF / 16083 subprojects that improve Posterior Individual Open 13,119.54 0.00 Cancelado 2019-11-16 09 16 24 21 RODEO CHICO ZONA 2 - climate resilience in the Rio TOTORA Grande River Basin

C. Design and FPS CI 164 / SUPERVISIoN implementation of TeCNICA MEJ. SIST. RIEGO 2019-12- 2019-12- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 14,577.26 0.00 Cancelado 2019-11-18 TECNIFICADO RODEO CHICO 11 18 26 23 climate resilience in the Rio ZONA 2 - TOTORA Grande River Basin

FPS CI 165 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2019-12- 2019-12- 2019-12- 2020-06- MEJ. SIST. RIEGO TF / 16083 subprojects that improve Posterior Individual Open 10,932.95 0.00 Cancelado 2019-11-18 11 18 26 23 TECNIFICADO RODEO CHICO climate resilience in the Rio ZONA 2 - TOTORA Grande River Basin

C. Design and FPS CI 156 / SUPERVISIoN implementation of AT Y ACOMPAÑAMIENTO 2020-02- 2019-12- 2020-03- 2019-12- 2020-06- 2019-12- 2020-06- TF / 16083 subprojects that improve Posterior Individual Open 7,288.63 0.00 Cancelado 2019-11-18 MEJ. OBRAS DE TOMA 19 11 12 18 24 26 23 climate resilience in the Rio DISTRITO 4 - PUNATA Grande River Basin

FPS CI 185 / ASIST. TECNICA C. Design and Y ACOMPAÑAMIENTO implementation of 2019-12- 2019-12- 2019-12- 2020-06- CONST. SIST. MICRORIEGO TF / 16083 subprojects that improve Posterior Individual Open 11,661.81 0.00 Cancelado 2019-11-18 11 18 26 23 PRESURIZADO COMUNIDAD climate resilience in the Rio DEL SUR - TOLATA Grande River Basin

FPS CI 187 / SUPERVISIoN C. Design and AT Y ACOMPAÑAMIENTO implementation of 2019-12- 2019-12- 2019-12- 2020-06- CONST. SIST. MICRORIEGO TF / 16083 subprojects that improve Posterior Individual Open 8,746.35 0.00 Cancelado 2019-11-18 11 18 26 23 PRESURIZADO COMUNIDAD climate resilience in the Rio DEL SUR - TOLATA Grande River Basin

BO-FPS-141851-CS-INDV / C. Design and ACOMPAnAMIENTO Y implementation of ASISTENCIA TeCNICA CONST. Ejecución 2019-12- 2019-12- 2019-12- 2019-12- TF / 16083 subprojects that improve Posterior Individual Open 13,119.53 0.00 2019-12-06 CANAL ZONA CEMENTERIO pendiente 08 08 10 16 climate resilience in the Rio FRANCISCO DEL RIVERO Grande River Basin (CLIZA)

Page 14