World Bank Document

World Bank Document

PROCUREMENT PLAN (Textual Part) Project information: Country: Bolivia Public Disclosure Authorized Project name: Bolivia Climate Resilience - Integrated Basin Management - PPCRII P-number: P129640 Project Implementation Agencies: Unidad Coordinadora del Proyecto UCP – PPCR Fondo Nacional de Inversión Productiva y Social - FPS Date of the Procurement Plan: May 21, 2018 Period covered by this Procurement Plan: June 30, 2020 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROCUREMENT Bolivia : Bolivia Climate Resilience - Integrated Basin Management PLAN General Information Country: Bolivia Bank’s Approval Date of the Original Procurement Plan: 2018-06-12 Revised Plan Date(s): (comma delineated, leave blank if none)2021-01-26 Project ID: P129640 GPN Date: Project Name: Bolivia Climate Resilience - Integrated Basin Management Loan / Credit No: TF / 16083, TF / 11248 Executing Agency(ies):Fondo Nacional de Inversión Productiva y Social WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned C. Design and FPS OBRAS 2 / Actualizacion implementation of Solicitud de Single Stage - One 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-05- 2018-02- de Sistema de riego y Galeria TF / 16083 subprojects that improve Posterior Open - National 501,722.32 434,237.46 Firmado ofertas Envelope 24 24 29 10 15 10 23 14 26 10 Filtrante Pizorga Pocona climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 3 / Mejoramiento implementation of Solicitud de Single Stage - One 2017-04- 2017-04- 2017-04- 2017-06- 2017-05- 2017-07- 2017-05- 2017-08- 2017-06- 2018-02- Sistema de Riego Pilpina Vila TF / 16083 subprojects that improve Posterior Open - National 345,349.41 318,513.58 Firmado ofertas Envelope 24 24 29 10 15 10 22 14 09 10 Vila climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 5 / Mejoramiento implementation of Solicitud de Single Stage - One 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- Sistema de Riego Tucma Alta TF / 16083 subprojects that improve Posterior Open - National 499,997.50 389,198.31 Firmado ofertas Envelope 11 10 16 27 04 27 20 01 23 28 Tucma Centro Mizque climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 6 / Mejoramiento implementation of Solicitud de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-11- Sistema de Microriego La TF / 16083 subprojects that improve Posterior Open - National 156,896.31 137,081.73 Firmado cotizaciones Envelope 16 11 31 07 Yunga Pasorapa climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 7 / Ampliacion implementation of Solicitud de Single Stage - One 2017-03- 2017-05- 2017-06- 2017-11- sistema de riego Villa Florida TF / 16083 subprojects that improve Posterior Open - National 154,151.16 143,048.63 Firmado cotizaciones Envelope 16 11 27 07 Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 8 / Mejoramiento implementation of Solicitud de Single Stage - One 2017-04- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-06- 2017-07- 2017-06- 2018-01- Canal de riego Villa TF / 16083 subprojects that improve Posterior Open - National 263,789.22 256,953.67 Firmado ofertas Envelope 06 06 11 23 27 22 13 27 02 23 Esperanza Pojo climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 9 / Ampliacion implementation of Sistema de aduccion por Solicitud de Single Stage - One 2017-05- 2017-05- 2017-05- 2017-06- 2017-06- 2017-07- 2017-06- 2017-09- 2017-06- 2018-03- TF / 16083 subprojects that improve Posterior Open - National 340,826.52 279,301.85 Firmado tuberia Riego Subcentral la ofertas Envelope 14 14 19 30 05 30 16 03 23 02 climate resilience in the Rio Habana Pojo Grande River Basin C. Design and FPS OBRAS 10 / Ampliacion implementation of canales Terciarios sistema de Solicitud de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-11- TF / 16083 subprojects that improve Posterior Open - National 219,672.36 193,383.88 Firmado riego LahuaChama-Ayalitas cotizaciones Envelope 16 11 18 07 climate resilience in the Rio zona 3 Totora Grande River Basin C. Design and FPS OBRAS 11 / Ampliacion implementation of Solicitud de Single Stage - One 2017-03- 2017-05- 2017-05- 2017-11- Sistema de Riego Tecnificado TF / 16083 subprojects that improve Posterior Open - National 150,856.17 127,504.41 Firmado cotizaciones Envelope 16 11 31 07 Chijmuri Totora climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 12 / implementation of Solicitud de Single Stage - One 2017-03- 2017-03- 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-07- 2017-05- 2017-12- Mejoramiento Sistema de TF / 16083 subprojects that improve Posterior Open - National 261,160.41 219,598.34 Firmado ofertas Envelope 11 10 16 27 04 27 20 01 16 28 Riego Pajcha Pata Vacas climate resilience in the Rio Grande River Basin C. Design and implementation of FPS OBRAS 13 / AMPL. SIST. Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 376,095.98 317,830.45 Firmado DE RIEGO TIPA TIPA MIZQUE ofertas Envelope 15 15 20 01 19 31 29 05 21 03 climate resilience in the Rio Grande River Basin C. Design and implementation of FPS OBRAS 14 / MEJ. SIST. Solicitud de Single Stage - One 2018-06- 2018-08- 2018-07- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 115,165.75 97,191.91 Firmado RIEGO POTRERA TIRAQUE cotizaciones Envelope 20 15 31 11 climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 15 / CONST. implementation of CANAL DE RIEGO Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 278,838.10 254,862.09 Firmado COMUNIDAD ESPINAL ofertas Envelope 15 15 20 01 19 31 25 05 16 03 climate resilience in the Rio PASORAPA Grande River Basin C. Design and FPS OBRAS 16 / CONST. implementation of Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- SIST. DE RIEGO URA PIRHUA TF / 16083 subprojects that improve Posterior Open - National 341,275.74 269,586.44 Firmado ofertas Envelope 15 19 20 01 19 31 26 05 17 03 AIQUILE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 17 / CONST. implementation of Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- SIST. RIEGO CHURU MAMA TF / 16083 subprojects that improve Posterior Open - National 210,167.26 166,910.43 Firmado cotizaciones Envelope 20 15 29 11 HUASI POCONA climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 18 / MEJ. SIST. implementation of Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- RIEGO TECNIFICADO V. TF / 16083 subprojects that improve Posterior Open - National 147,800.25 114,349.12 Firmado cotizaciones Envelope 20 15 01 11 NUEVA Y LA MAICA TARATA climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 20 / MEJ. SIST. implementation of Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- RIEGO POR ASPERCIoN TF / 16083 subprojects that improve Posterior Open - National 199,213.13 158,867.09 Firmado cotizaciones Envelope 20 15 08 11 CONDOR KOCHI TACACHI climate resilience in the Rio Grande River Basin C. Design and implementation of FPS OBRAS 21 / MEJ. SIST. Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- TF / 16083 subprojects that improve Posterior Open - National 166,217.31 129,748.14 Firmado RIEGO CHAJRAMAYU AIQUILE cotizaciones Envelope 20 15 08 11 climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 22 / MEJ. SIST. implementation of Solicitud de Single Stage - One 2018-06- 2018-08- 2018-08- 2019-02- RIEGO SAUCEVADO TF / 16083 subprojects that improve Posterior Open - National 182,621.37 149,390.43 Firmado cotizaciones Envelope 20 15 01 11 OMEREQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 23 / MEJ. CANAL implementation of Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-09- 2019-04- DE RIEGO MAIRA KASA TF / 16083 subprojects that improve Posterior Open - National 577,595.67 492,723.03 Firmado ofertas Envelope 15 15 20 01 19 31 27 05 12 03 MIZQUE climate resilience in the Rio Grande River Basin C. Design and FPS OBRAS 24 / CONST. implementation of CANALIZACION SIST. RIEGO Solicitud de Single Stage - One 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- 2018-08- 2018-07- 2018-10- 2018-08- 2019-04- TF / 16083 subprojects that improve Posterior Open - National 290,630.01 279,929.63 Firmado SUPAY CALLE DIST.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us