March 2021 HMS Protector Newsletter

Total Page:16

File Type:pdf, Size:1020Kb

March 2021 HMS Protector Newsletter READY FOR OST. Now that we’ve finished our refit in Middlesbrough, HMS PROTECTOR is now back in her homeport of Devonport and finishing her work-up ready for OST this March: “It’s been a long road to get here, but the ship is looking as good as new with upgraded sensors and equipment to better support our work in polar waters,” said Cdr Ballard, PROTECTOR’s second in command. “The Ship’s Company is excited to be back at sea and looking forward to a successful period of operational sea training” FOST will test our ability to respond to emergencies at sea to the limit– including complex firefighting and damage control scenarios PROTECTOR sailed south for Devonport from Teesport in February, meeting. a fellow icebreaker along the way (more on that later!). POET Maggie Edwards, one of the ships’ Weapon Engineers, is anticipating her first deployment in PROTECTOR: “After a long and intrusive refit it’s great to be back at sea! We’re looking forward to completing OST and beginning our deployment to polar waters”. HMS PROTECTOR conducting training at anchor in Plymouth Sound Credit: Defence Images UK We’ve come a long way since dry-dock! March 2021 Issue 1 A MESSAGE FROM THE CAPTAIN It’s been some time since we last produced a newsletter. The last year has been one of the most extraordinarily difficult periods for the nation in memory, and for the World beyond. Every one of us has been effected by the pandemic in ways both large and small; our thoughts and prayers are particularly with those who have lost friends and loved ones to the disease. We pay tribute also to key workers, especially those in the NHS and care sectors, who are our indispensable frontline – several of our shipmate’s have partners or spouses working there with such incredible selflessness and courage. In that context, HMS PROTECTOR’s challenges during 2020 are a small and insignificant footnote to this story. During the year, the ship has undergone significant work in partnership with our contracted provider UK Docks. The refit has taken place in Teesside and has seen the 60- ton crane refurbished, the flight deck removed and refitted to allow a stores complex to be built on the Quarter Deck, and a great number of other improvements made to the ship. These include substantial engineering and structural works, replacement of two diesel engines, addition of a 7-ton shore-power transformer, replacement of the ovens in the galley, refurbishment of all the communal mess recreation areas, the rearrangement of the holds to improve storage, and the installation of a £50,000 modular gymnasium, to name but a few. Along with re-classification as a Polar Class 5 vessel under the IMO’s recent Polar Code, together these changes will see PROTECTOR deploy in a greatly improved and fully environmentally-compliant state, and with an ability to sustain her Ship’s Company in the most austere of environments. The team here have been magnificent throughout the 10 months spent away from their Devonport base port– working in shifts and non-stop throughout 3 national lockdowns to ready the ship, despite frequent LS Ealey putting our newly-refurbished 60T hurdles and barriers. And whilst we were not able to make the crane into action at sea! 2020/21 deployment in time, I now hope to prove the success of this makeover through an intensive period of Sea Training and subsequent deployment to Polar Waters and Antarctica beyond for the 2021/22 Austral Summer. I am sincerely grateful to all of you for your support. I hope you will continue to follow our adventures, via the Navy News, the RN web page or our Twitter account, and that you will share in the pleasure we derive in ensuring the nation’s Ice Patrol Ship continues to support Britain’s interests around the globe. March 2021 Issue 1 ARCTIC ADVENTURES HMS PROTECTOR’s Ship’s Company take part in record-breaking US Coast Guard Deployment Junior Officers, Lt Jacob Stein and Lt Max Friswell have spent the last 3 months working with the US Coast Guard in their icebreaker, Polar Star, in the Arctic. They have gained valuable experience in working in polar conditions prior to PROTECTOR’s deployment later this year. Lt Stein said: “The deployment to the Arctic on the Polar Star has been a fantastic experience. The US Coast Guard are highly experienced in operating in the ice, and we have taken away a number of lessons that we will look to implement when we return to HMS PROTECTOR”. When we deploy later in the year, we look forward to hosting some US Lt’s Stein (L) and Friswell (R) with some of the Junior Coast Guard Officers in return!” Officers of the Polar Star The deployment, which saw the Polar Star deploy to the High Arctic, was a record breaking achievement for the US Coast Guard. The heavy icebreaker, which spends most of its time working in the Antarctic, has broken the record for the most northerly transit of any ship in US history. It was during this deployment, that Lt Friswell “striped up”, promoting to the rank of Lieutenant RN, where he had his epaulettes presented to him by the Captain of the Polar Star, Captain Bill Woitrya. Lt Friswell is presented his epaulettes in front of the crew of the Polar Star by Captain Woitrya. The US Coast Guard Cutter Polar Star working in the ice of the Arctic. Lt’s Stein and Friswell helped to navigate the Polar COMPETITION TIME!!! Star through treacherous and challenging conditions Our new newsletter needs a name! Our affiliated schools and sea cadet units are welcome to submit their suggestions– please send them to Lt Elmore at [email protected] by 30 March 2021 March 2021 Issue 1 BREAKING THE ICE Two of the UK’s Antarctic research ships ‘broke the ice’ when HMS Protector and Sir David Attenborough met up at sea for the first time. The icebreakers – operated by the Royal Navy and the British Antarctic Survey – sailed in company in the English Channel off Start Point in Devon as both gear up for missions around the frozen continent. The Royal Research Ship (RRS) Sir David Attenborough – which the public famously wanted to call Boaty McBoatface in a national poll to pick her name – is undergoing extensive sea trials around the UK before she debuts in the Southern Hemisphere in time for the austral summer at the end of 2021. “It was great to see Captain Will Whatley and his fabulous ship Sir David Attenborough at sea off Start Point. We are looking forward to joining them in the Antarctic soon,” said Captain Michael Wood, Protector’s Commanding Officer, RRS Sir David Attenborough who chatted with his opposite number over the radio. seen from our flight deck Logistics expert Leading Hand Kasey Easson said it was “brilliant to see Sir David through the rain- we look Attenborough up close for the first time! I can’t wait until we are working with forward to working together them in the Antarctic and would love to meet the ship’s namesake one day!” in the Antarctic! Ship’s Company and contractors alike were excited to see the RRS Sir David Attenborough at sea for the first time! We look forward to many more such meetings in the future. The RRS Sir David Attenborough is the United Kingdom’s newest Icebreaker and has state of the art laboratory and research facilities. Jackspeak phrase of the Month: Follow our exploits on Twitter Important Contact Details: @HMSProtector “Port and Starboard Scran Spanners”- Naval Families Federation: 02392 Your knife and fork! Friends and family closed 654374 group- HMS Protector RNFPS: 023 9272 8777 Community March 2021 Issue 1 .
Recommended publications
  • The Naval Engineer
    THE NAVAL ENGINEER SPRING/SUMMER 2019, VOL 06, EDITION NO.2 All correspondence and contributions should be forwarded to the Editor: Welcome to the new edition of TNE! Following the successful relaunch Clare Niker last year as part of our Year of Engineering campaign, the Board has been extremely pleased to hear your feedback, which has been almost entirely Email: positive. Please keep it coming, good or bad, TNE is your journal and we [email protected] want to hear from you, especially on how to make it even better. By Mail: ‘..it’s great to see it back, and I think you’ve put together a great spread of articles’ The Editor, The Naval Engineer, Future Support and Engineering Division, ‘Particularly love the ‘Recognition’ section’ Navy Command HQ, MP4.4, Leach Building, Whale Island, ‘I must offer my congratulations on reviving this important journal with an impressive Portsmouth, Hampshire PO2 8BY mix of content and its presentation’ Contributions: ‘..what a fantastic publication that is bang up to date and packed full of really Contributions for the next edition are exciting articles’ being sought, and should be submitted Distribution of our revamped TNE has gone far and wide. It is hosted on by: the MOD Intranet, as well as the RN and UKNEST webpages. Statistics taken 31 July 2019 from the external RN web page show that there were almost 500 visits to the TNE page and people spent over a minute longer on the page than Contributions should be submitted average. This is in addition to all the units and sites that received almost electronically via the form found on 2000 hard copies, those that have requested electronic soft copies, plus The Naval Engineer intranet homepage, around 700 visitors to the internal site.
    [Show full text]
  • BAS Science Summaries 2018-2019 Antarctic Field Season
    BAS Science Summaries 2018-2019 Antarctic field season BAS Science Summaries 2018-2019 Antarctic field season Introduction This booklet contains the project summaries of field, station and ship-based science that the British Antarctic Survey (BAS) is supporting during the forthcoming 2018/19 Antarctic field season. I think it demonstrates once again the breadth and scale of the science that BAS undertakes and supports. For more detailed information about individual projects please contact the Principal Investigators. There is no doubt that 2018/19 is another challenging field season, and it’s one in which the key focus is on the West Antarctic Ice Sheet (WAIS) and how this has changed in the past, and may change in the future. Three projects, all logistically big in their scale, are BEAMISH, Thwaites and WACSWAIN. They will advance our understanding of the fragility and complexity of the WAIS and how the ice sheets are responding to environmental change, and contributing to global sea-level rise. Please note that only the PIs and field personnel have been listed in this document. PIs appear in capitals and in brackets if they are not present on site, and Field Guides are indicated with an asterisk. Non-BAS personnel are shown in blue. A full list of non-BAS personnel and their affiliated organisations is shown in the Appendix. My thanks to the authors for their contributions, to MAGIC for the field sites map, and to Elaine Fitzcharles and Ali Massey for collating all the material together. Thanks also to members of the Communications Team for the editing and production of this handy summary.
    [Show full text]
  • Coronation Review of the Fleet
    CORONATION REVIEW OF THE FLEET. While every care has been taken in the preparation of this show, accuracy cannot be guaranteed. CLICK TO CONTINUE, APPLIES TO ALL SLIDES Acknowledgement: Much of the information for this presentation was gathered from various internet websites and publications from the era. The naming of the ships came from a chart provided by Bill Brimson. The chart was published at the Admiralty 22nd May 1953, under the Superintendence of Vice-Admiral A. Day, C.B. C.B.E. D.S.O. Hydroggrapher Cover of the Official Programme The programme was published under the authority of Commander-in-Chief, Portsmouth. PROGRAMME FOR THE DAY 8 a.m. Ships dress over-all. 5.10 p.m. HMS Surprise anchors at the head of line E. Morning Her Majesty The Queen receives the Board of ( approximately) Admiralty and certain Senior Officers on board 5.35 p.m. The flypast by Naval Aircraft takes place. HMS Surprise. Her Majesty Queen Elizabeth The Queen 1 p.m. Her Majesty the Queen holds a luncheon party Mother, and some other members of the Royal on board HMS Surprise. Family disembark to return to London. 2.35 p.m. Her Majesty Queen Elizabeth, 6.30 p.m. Her Majesty The Queen holds a Sherry Party on Her Royal Highness Princess Margaret and board HMS Surprise. other members of the Royal Family arrive by 8.30 p.m. Her Majesty The Queens dines on board train and embark in HMS Surprise. HMS Vanguard. 3 p.m. Preceded by Trinity House vessel Patricia and 10.30 p.m.
    [Show full text]
  • Introduction Into Maritime and the Royal Navy Booklet
    STEM ACTIVITY BOOK The Royal Navy The Royal Navy is made up of a number of vessels, including the following: A Type 45 Destroyer Queen Elizabeth-class aircraft carriers designed for a huge range of tasks, from hunting down are the biggest warships ever pirates to defending the Fleet from air attack built for the Royal Navy The Astute-class submarines The HMS Protector are the largest, most advanced and most powerful attack a ship used to explore areas such as the Antarctic submarines ever operated by the Royal Navy Copyright © 2020, Raytheon UK. All rights reserved. 3 STEM ACTIVITY BOOK Learn about: How magnetism works in compasses Make your own Compass The magnetic compass is an ancient navigational tool used to indicate north, south, east and west. It’s composed of a magnetised needle that aligns itself with the earth’s magnetic field to point north. In the Navy they use different navigational tools and systems to precisely track a ship’s position and course across the ocean. If you find yourself lost without a compass, you can easily make your own using a piece of magnetised metal and a bowl of water. You will need: 4. Carefully thread the needle through the paper circle twice, but not all the - Ferromagnet way through, so that the needle lays - Needle/Safety Pin flat on the paper. - Paper 5. Carefully place the paper and needle - Bowl of Water on the surface of the water. Both - Scissors ends of the needle should be above - Adult Supervision the floating paper circle. 6. Watch it slowly rotate and then stop.
    [Show full text]
  • Royal Navy Ice Patrol Ship Coated with Ecospeed Royal Navy Ice Patrol Ship Coated with Ecospeed
    Royal Navy Ice Patrol Ship coated with Ecospeed Royal Navy Ice Patrol Ship coated with Ecospeed t the end of May, the Royal Navy Ice Patrol Ship HMS Protector was coated with Ecospeed at the AA&P Tyne Ltd. Shipyard in Tyne and Wear, United Kingdom. The vessel is deployed on operations for 330 days a year, mostly in the Antarctic region. It is therefore essen- tial that her underwater hull is protected against the harsh icy conditions she is faced with. The number one consideration in a hull coating for ice-going vessels and icebreakers is the ability of the coating to protect the hull in the harshest marine environment there is. Ecospeed demonstrates excellent attachment to the hull and successful resistance to extremely icy conditions. Ecospeed has proven its ability to withstand the harshest winter conditions on numerous occasions. For over seven years a number of vessels coated with Ecospeed have been sailing as far as both the North and the South Pole. These vessels’ underwater hulls frequently have to endure the impact of large pieces of floating dry ice. Despite this none of these vessels have required more than just a few touchups during their drydock visits. HMS Protector HMS Protector is a Royal Navy Ice Patrol Ship built in Norway in 2001. The vessel was designed for long Antarctic On the 2nd December 2013, HMS Protector conducted a base inspection on the Ukrainian Vernadsky Research Base. The base was renamed Faraday Station in August 1977 in honour of British scientist Michael Faraday until Ukraine took over the operation of expeditions and for supporting subsea work.
    [Show full text]
  • UK National Report to NIOHC 2009
    UNITED KINGDOM NATIONAL REPORT 11TH HYDROGRAPHIC COMMISSION ON ANTARTICA (HCA) MEETING HOBART, TASMANIA, AUSTRALIA 5th – 7th October 2011 This report supplements the UK Generic National Report, posted on the UKHO website (www.ukho.gov.uk/AboutUs/Documents/UK-Generic-National-Report-2010.pdf), and describes UK’s activities of direct relevance to the HCA region. www.ukho.gov.uk Page intentionally left blank Page 2 of 14 Version 2.0 (16 September 2011) 1. UNITED KINGDOM HYDROGRAPHIC OFFICE (UKHO) UK Delivery of Hydrographic Services 1.1 The UK delivery of hydrographic services is described in the UK Generic National Report. However, it is worth highlighting the close liaison which exists between UK’s hydrographic office (UKHO) and UK’s maritime administration (MCA) in providing a co-ordinated approach to hydrographic and maritime safety representation both nationally and internationally. UKHO Governance and Targets 1.2 This is described in the UK Generic National Report to the IHO, see (www.ukho.gov.uk/AboutUs/Documents/UK-Generic-National-Report-2010.pdf), UKHO Organisation 1.3 Details of the UKHO’s organization are provided in the UK Generic National Report (section 1) together with general contact details. Specific contact details relevant to the HCA region are included at the end of this report. Production Systems 1.4 This is described in the UK Generic National Report to IHO. Cooperation and Partnerships 1.5 The UK is committed to the bilateral arrangements which it has developed in cooperation with other international government hydrographic authorities, covering a range of topics, including the use of copyright data, and also promotes other forms of co-operation between the participants, helping to enhance international maritime safety and protection of the environment.
    [Show full text]
  • Tomahawk and Astute – a 21St Century Firepower Display
    Dec 11 Issue 43 desthe magazine for defenceider equipment and support Tomahawk and Astute – a 21st century firepower display Virtual warfare in focus See inside Warrior Wildcat Daring packs Support takes Mapping out upgrade goes to sea a punch on a new look the future FEATURES 6 24 Warfare staff go to war The Royal Navy has unveiled its new Maritime Composite Training System to a fanfare of trumpets and applause, marking the most radical change to its training for more than 40 years. 26 It’s the Army’s PlayStation generation Members of the British Army's PlayStation generation head to Helmand Province on the latest Operation Herrick deployment having honed their soldiering skills in virtual combat 28 Kestrel reaches full flight Project Kestrel – Information Systems and Services' reliable backbone communications network – is now complete, guaranteeing increased capacity and improved quality of communications in Afghanistan 2011 30 Defence Secretary praises ‘dedicated people’ New Defence Secretary Philip Hammond has praised 'the cover image most dedicated people in the public service' as he outlined A Tomahawk land attack missile is pictured being his vision for defence in his first public speech since fired byHMS Astute during her latest set of trials. The succeeding Dr Liam Fox missile, one of two fired on the trial, demonstrated complex evasive manoeuvres during flight and hit its designated target on a missile range DECEMBER desider NEWS Assistant Head, Public Relations: Ralph Dunn - 9352 30257 or 0117 9130257 5 Warrior in £1 billion
    [Show full text]
  • Plymouth Eligibility and Application Form for WAC Pilot: Plymouth
    Wrap Around Childcare (WAC) Plymouth Eligibility and Application form for WAC pilot: Plymouth. Personal data recorded on this form is collected for processing purposes in line with the General Data Protection Regulations (GDPR), Article 6(1)(e); Data Protection Act (DPA) 2018. Further details of how the Ministry of Defence processes your personal data can be found at: MOD privacy notice (www) Processing of this data is necessary for application screening and funding approval where applicable. Please note that by completing this form you are consenting to the information contained within it to be used to process your application for Wrap Around Childcare, (WAC). This means that details will be shared with those members of staff who are required to check your eligibility status including your local HR Personnel, (this could also include APC OH in Glasgow and Operational Commitments Establishment (OCE)), the Childcare Support Team and potentially HMRC. The application data will be stored on a secure system, or in the case of a hard copy, (paper), submission the application will be scanned and stored on a secure system with the original being shredded. Due to the requirement to reconfirm eligibility at the three month point then this application data will be retained for as long as you take part in the WAC. The application data will be used to provide statistical data on the uptake of the WAC which will be shared within the MOD and potentially with partner organisations but any data used in this way would not contain personal information other than where required by HMRC.
    [Show full text]
  • General Recommendations from the Joint Inspections
    General Recommendations from the Joint Inspections Undertaken by Argentina and Chile under Article VII of the Antarctic Treaty and Article 14 of the Environmental Protocol INDEX Introduction 1 Acknowledgements 3 Preliminary considerations 3 General comments / recommendations 3 Inspection Report Johann Gregor Mendel Station (Czech Republic) 7 Inspection Report Rothera Station (United Kingdom) 18 Annex 41 Introduction Between January and February 2017, a multidisciplinary team of observers from Argentina and Chile conducted the inspection of foreign Antarctic stations, pursuant to the provisions of Article VII of the Antarctic Treaty and Article 14 of the Environmental Protocol. On January 20th, the team of observers inspected Johann Gregor Mendel Station, managed by the Masaryk University of the Czech Republic, and on February 24th, Rothera Station, managed by the British Antarctic Survey (BAS) of the United Kingdom. For this purpose, each Party's governments appointed five observers, and notified the other Consultative Parties in compliance with article VII of the Treaty, as well as the Antarctic Treaty Secretariat as per Decision 7 (2013) The designated observers were: For Argentina: Min. Máximo Gowland (Antarctic Foreign Policy - Ministry of Foreign Affairs) Mg. Rodolfo Sánchez (Instituto Antártico Argentino– Min. of Foreign Affairs) • Lic. Hernán Mazón(Dirección Nacional del Antártico–Min. of Foreign Affairs) • Sec. Juan Ignacio Herrero (Antarctic Foreign Policy Ministry of Foreign Affairs) • Vcom. Gabriel Fernando Maldonado (Ministry of Defence) • • For Chile: Amb. Francisco Berguño (Ministry of Foreign Affairs) Sec. Macarena Quezada (Ministry of Foreign Affairs) • Mg. Verónica Vallejos (Instituto Antártico Chileno, Ministry of Foreign Affairs) • Mg. Juan Francisco Pizarro (Ministry of the Environment) • Crl. (R) Mg.
    [Show full text]
  • Dear Mr Zacchi, Release of Information Thank You for Your
    Navy Command FOI Section Navy Command Headquarters MP 1-4, Leach Building Whale Island PORTSMOUTH PO2 8BY FOI2021/03678 E-mail: [email protected] Mr J Zacchi [email protected] 27 April 2021 Dear Mr Zacchi, Release of Information Thank you for your correspondence of 1 April 2021, in which you requested the following information: ‘Could you provide a list of the vessels of the Royal Navy and Royal Fleet Auxiliary with their current home ports (as of 1 March 2021). With regard to my request, can I also ask if the Overseas Patrol Squadron is the same as the Coastal Forces Squadron? If not, could you advise when this squadron was formed, and which overhead command do both these squadrons sit under?’ Your enquiry has been considered to be a request for information in accordance with the Freedom of Information (FOI) Act 2000. A search has been completed within the Ministry of Defence (MOD) and I can confirm that information in scope of your request is held. The information relating to part one of your request is at Annex A to this letter. With regard to part two of your request, Overseas Patrol Squadron (OPS) and Coastal Forces Squadron (CFS) are separate squadrons. Both squadrons are under the command of Commander Surface Flotilla (COMSURFLOT). OPS used to be called the Fishery Protection Squadron. They control the fishery protection Offshore Patrol Vessels Batch One, they also control the Forward Deployed Units around the world such as the Falkland and Caribbean supporting British dependant territories. CFS used to be called First Patrol Boat Squadron.
    [Show full text]
  • Deaths of FIDS and BAS Staff Inside Antarctica
    British Antarctic Survey Archives Service Deaths of FIDS/BAS Staff in the Antarctic Last updated 7 July 2016 Joanna Rae, BAS Archives Service See also list of those who died in service outside Antarctica. FIDS/BAS employees – who died whilst serving at an Antarctic Base/Station The British Antarctic Survey (BAS) cares for the graves and memorials in the Antarctic of those listed below. Photographs of most of these are available from BAS Archives Service (contact [email protected]). This information also appears on the BAS Club website http://www.antarctica.ac.uk/basclub/ and the British Antarctic Monument Trust website http://www.antarctic-monument.org/ (which also has photographs and memories from relatives and friends of those who died) 1948 Oliver Burd and Michael C Green, 9 Nov 1948, Hope Bay Killed in hut fire. Graves in the vicinity of the original hut. Commemorative place names: Cape Bird & Cape Green, Trinity Peninsula. Eric Platt, 10 Nov 1948, Admiralty Bay Heart attack. Grave marked by cross in vicinity of base. Commemorative place name: Platt Cliffs, King George Island. 1953 Arthur H Farrant, 17 Nov 1953, Deception Island Suicide. Grave in whalers’ cemetery. Cross was probably washed away or buried by the mud slide caused by the 1969 volcanic eruption. 1956 Ronald G Napier, 24 Mar 1956, Admiralty Bay Drowned when dinghy overturned. Memorial (cross in vicinity of base) (body not recovered). Commemorative place name: Napier Rock, King George Island. 1958 Stanley E Black, David Statham and Geoffrey Stride, 27 May 1958, Horseshoe Island Lost when sea ice broke up during depot laying trip to Dion Islands.
    [Show full text]
  • MARS Fleet Tanker Contract Signed ANNOUNCEMENT to SPEND £452M on FOUR NEW RFA TANKERS
    Gunline 1-3_Layout 1 02/05/2012 17:37 Page 1 RFA Fort Victoria Falkland Supports Causes More Islands Ice Patrol Disruption Commemorated p3 p4 p11 GunlineGunline – The First Point of Contact | Protecting our Nation’s Interests | Spring 2012 | www.rfa.mod.uk BMT Defence Services/ DefenceImaging.com - ©BMT Defence Services MARS Fleet Tanker Contract Signed ANNOUNCEMENT TO SPEND £452M ON FOUR NEW RFA TANKERS The RFA has great reason to celebrate after At the event senior staff from DSME, who the fantastic news in late February when the travelled from South Korea to the Filton site, MoD announced that they were to sign a signed the MARS Tanker contract with multi million pound contract to purchase a Defence Equipment and Support (DE&S). They new generation of tankers weighing in at an were joined by members of the Royal Fleet impressive 37,000 tonnes each. This is a clear Auxiliary and UK ship designer BMT Defence indication of the government’s commitment Services, who will work with DSME on the to the RFA and recognises the value of our programme. support to the Royal Navy and will significantly increase our capabilities and Commodore Bill Walworth, Head of the demonstrates that we continue to have a RFA, said: strong future in support of the naval service. “This is fantastic news and we are delighted After many months of negotiating, the RFA will operate these world class vessels. Minister for Defence Equipment Support and These fleet replenishment tankers will be Technology, Peter Luff, announced that flexible ships, able to operate with the Royal Daewoo Shipbuilding and Marine Engineering Navy and Armed Forces in conflict, and are (DSME) is the Government’s preferred bidder designed to allow for upgrades and emerging for the deal.
    [Show full text]