Hurricane Matthew Impacts to Jacksonville Beaches

Kevin Bodge & Steven Howard, Olsen Associates Inc. with Tom Fallin, City of Jacksonville Jason Harrah, US Army Corps of Engineers

olsen olsen olsen olsen Jacksonville Beach -- During Hurricane Matthew, October 7, 2016

olsen Duval County Shore Protection Project

Amelia Island

Nassau Sound

Ft. George Inlet

St. Johns River NAS

Tallyrand Jacksonville Atlantic Beach Neptune Beach Offshore Borrow Areas Jacksonville Beach

St. Johns County

olsen Late 1950’s/1960 Sept 1964

Jan 1965 1978

olsen 0 100 200 300 400 500 600 700 800 900 +20 Project Authorized - 1965 60’’ ELEV. 11.0 Initial Construction – 1978/80 +10 Renourished at ~5 to 6 year intervals M.H.W. 5.2 DESIGN BEACH Existing seawall 0 Emergency toe protection following 1962 Northeaster and PRE-PROJECT -10 hurricane Dora (1964)

-20 US Army Corps of Engineers Authorized Beach ProjectJacsonville District Duval County, Shore Protection Project

olsen BEACH PROFILE & FILL PERFORMANCE (Duval County)

Duval County, FL 18th St, Atlantic Beach 20 SEAWALL R-46

10

MHW 0 1974 MLW Elevation (Feet-NGVD)

-10 0 100 200 300 400 500 600 Offshore Distance (Feet)

olsen BEACH PROFILE & FILL PERFORMANCE (Duval County)

Duval County, FL 18th St, Atlantic Beach 20 SEAWALL R-46

10

1990 MHW 0 1974 MLW Elevation (Feet-NGVD)

-10 0 100 200 300 400 500 600 Offshore Distance (Feet)

olsen BEACH PROFILE & FILL PERFORMANCE (Duval County)

Duval County, FL 18th St, Atlantic Beach 20 SEAWALL R-46

10 1995 1990 MHW 0 1974 MLW Elevation (Feet-NGVD)

-10 0 100 200 300 400 500 600 Offshore Distance (Feet)

olsen BEACH PROFILE & FILL PERFORMANCE (Duval County)

Duval County, FL 18th St, Atlantic Beach 20 SEAWALL R-46 Dune Authorized Design

10 July 2012

1990 MHW 0 1974 MLW Elevation (Feet-NGVD)

-10 0 100 200 300 400 500 600 Offshore Distance (Feet)

olsen June 1970 Aug. 1978

8th Street Atlantic Beach March 2010

olsen JACKSONVILLE BEACH, 1962

olsen JACKSONVILLEJACKSONVILLE BEACH,BEACH, 20111962

olsen JACKSONVILLE BEACH Summer 1973

olsen JACKSONVILLE JACKSONVILLE BEACH BEACH February 2011 Summer 1973

olsen Post-Hurricane Matthew – October 2016

olsen 15 Pre-Storm 12th Street Atlantic Beach 10

5 seawall Mean High Water Level Post-Storm 0

-5

-100 0 100 200 300 400 500 feet

olsen 15 Pre-Storm 12th Street Atlantic Beach 10

5 seawall Mean High Water Level Post-Storm 0

-5

-100 0 100 200 300 400 500 feet

Cedar Street Neptune Beach 15 Pre-Storm 10

5 seawall Post-Storm Mean High Water 0

-5 -100 0 100 200 300 400 500 feet

olsen Alongshore Storm Erosion to Upper Beach

1939

olsen Alongshore Storm Erosion to Upper Beach

-7.1 1939 -2.3

olsen Alongshore Storm Erosion to Upper Beach

-3.0 -7.1 -8.5 1939 -2.3

olsen Alongshore Storm Erosion to Upper Beach

Average total = -10.1 cy/ft Avg total = -10.8 cy/ft (NOT renourished pre-storm) (renourished pre-storm)

-10.1 -10.8 -3.0 -7.1 -8.5 1939 -2.3

olsen 15 Dune Renourishment Pre-Storm 12th Street Atlantic Beach 10 Beach Renourishment

5 seawall Mean High Water Level Post-Storm 0

-5

-100 0 100 200 300 400 500 feet

Dune Renourishment Cedar Street Neptune Beach 15 Pre-Storm 10 Beach Renourishment 5 seawall Post-Storm Mean High Water 0

-5 -100 0 100 200 300 400 500 feet

olsen POST-HURRICANE MATTHEW SITUATION

• 700,000 cubic yards of ongoing 2016 beach renourishment, of which the southern 7000-ft was completed pre-storm

• +80,000 cy storm erosion to renourishment template

• +208,000 cubic yards of dune erosion

• Corps of Engineers authorized only for beach renourishment

• City must contribute funds for dune renourishment

• Beach renourishment advances ~500 feet per day 15 Dune Renourishment Pre-Storm 10 Beach Renourishment

5 seawall Mean High Water Level Post-Storm 0

-5

-100 0 100 200 300 400 500 feet

Dune Renourishment

15 Pre-Storm 10 Beach Renourishment 5 seawall Post-Storm Mean High Water 0

-5 -100 0 100 200 300 400 500 feet

olsen Dune Repair Design

Dune Elevation +15.5 +14.5 +14.5

Dune Toe Location

olsen Dune Repair Design

Dune Slope

2.5 1

Pre-Storm Profiles

olsen Dune Repair Design

Slope up/down to intersect

+14.5 or +15.5

2.5 1 +8.2 SPP Berm Fill

CONSTRUCTION BASELINE CONSTRUCTION DISTANCE TO TOE

DUNE PAYMENT = ALL VOLUME PLACED ABOVE +8.2’

olsen Dune Repair Design

Flat crest +14.5 or +15.5

2.5 1 +8.2 SPP Berm Fill

CONSTRUCTION BASELINE CONSTRUCTION DISTANCE TO TOE

DUNE PAYMENT = ALL VOLUME PLACED ABOVE +8.2’

olsen Dune Repair Design

35 ft +14.5 or +15.5

2.5 1 +8.2 SPP Berm Fill

CONSTRUCTION BASELINE CONSTRUCTION DISTANCE TO TOE

DUNE PAYMENT = ALL VOLUME PLACED ABOVE +8.2’

olsen EXAMPLE OF DUNE REPAIR TEMPLATE FROM PLANS

Dune Template Pre‐Storm (5/2016)

Beach Fill Template

Post‐Storm (10/2016)

Dune Template Pre‐Storm (5/2016)

Beach Fill Template

Post‐Storm (10/2016) 2016 Project Renourishment

• Federal = 61.6% $9.2M

• State of Florida = 18.0% $2.7M $14.9 M

• City of Jacksonville = 20.4% $3.0M

• City of Jacksonville Dune = 100% +$7.5M

olsen Hurricane Matthew Response (Oct-Nov 2016)

Sun Mon Tue Wed Thu Fri Sat Oct 2345678 Construction since 20 Sept, 2016 Storm Hurricane Demobilize Matthew Southern 7500-ft completed 9101112131415 Inspect Beach Dune Initiate Beach; Survey data Beach Survey completed Renourish Repair Plan Consult Meeting resumes Drafted with GLDD 16 17 18 19 20 21 22 City Brief Mayor, Governor, USACE HQ re: need for legislation prompt action entered 23 24Meetings 25 2626 2 27 28 29 and City Corps modifies approves construction $7.5M contract

30 31 Nov 1City funds 2 Dune 3 4 5 provided to repairs Corps begin

olsen Dune Reconstruction (Neptune Beach) olsen olsen Dune Vegetation out for bid, for 200,000 cubic yards of post-dune reconstruction sand and ~600,000 sea (Example illustration) oat plants to restore the dune erosion along the 7-mile project area from north Atlantic Beach to south Jacksonville Beach.

olsen BEACH & DUNE REPAIR PLAN

Hanna Park

Dune & beach fill – May 2017: 1.5 miles

Atlantic Beach

Neptune Beach Dune and beach fill – completed: 2 miles

PIER Jacksonville Dune fill & add’l beach fill – July 2017: 3 miles Beach