Village of Lake Orion Paint Creek Trail Extension

Adopted by the Lake Orion Village Council on February 23, 2015

A summary of the key findings for trail improvement and wayfinding opportunities in the Village of Lake Orion. Acknowledgements

Lake Orion Village Council • Kenneth Van Portfliet, Council President • Shauna Brown • David Churchill • Douglas Hobbs • Bradley Mathisen • Christian Mills Adopted by DDA Board: • John D. Ranville, President Pro-Tem February 10, 2015

• Darwin McClary, Village Manager Public Hearing: February 23, 2015 Village of Lake Orion DDA Board of Directors • Robert Romain, Chair Adopted by Village Council: • Robert Hollenbeck, Vice Chair February 23, 2015 • Monica Squarcia, Treasurer • Deborah Burgess, Secretary • Gene Carlson, Board Member • Don Gindhart, Board Member • Terry Hockstad, Board Member • Chris Barnett, Orion Township Representative • Ken Van Portfliet, Village of Lake Orion Council Representative Staff • Suzanne Perreault, Executive Director • Janet Hartman, Administration

Technical Assistance This assessment was prepared by Oakland County Economic Development & Community Affairs-Main Street Oakland County Program for the Lake Orion Downtown Development Authority and the Village of Lake Orion.

Oakland County Executive Office Building 2100 Pontiac Lake Road, Bldg 41 W Waterford, MI 48328 248.858.0721 [email protected]

ii | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Table of Contents

Background 1

Purpose 2

Complete Streets 4

Public Participation 7

Paint Creek Trail Extension 8

Action Plan 13

Budget Item Details 14

Downtown Destinations 20

Wayfinding Sign Locations 22

Heritage Tourism 24

Parking Downtown 26

Green Infrastructure 28

Other Recommendations 32

Funding Opportunities 36

Conclusion 37

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | iii Ov erlake Kn Manitou r oll e wo o Lake e

d

p

a L

Long Lake India nklin Wr nw Fra ig ht oo g DNR d M n i h Access 24 s u Site C y a

w Cedar Bend d t

a No Eli n r o t za o h b r

e m S t B

h h e

k r

l r

r l o i

a

a e r a

h e l P

s

Swiss w C

x n Village i

u

V l Park Church a ra H ent C n P n

r

d o

r a s

o r o r Luna

h f

k e

c x

r d

S

e A F Shadbolt n t

e a A a t l

i n Historic S rv i ie o Downtown

w p g y n F r a lin lle o Lake t Mi L Green's w P Park d Children's ai

a n Park t

o C

y

r r r e r e

B Gl k Meek's e e B nn O e Park P lle ri v Atwater o u n e Village Park Lake Orion of Lake Atwater

d

n

a

l

Orion r

o

N y

d a an Park Isl w

d n n ia a o p t m

o ra r w G

e B N

Unger Park K ing Heig hts R i

i dg

k r e c me Sum m Sum v iew

it o l B Orion c a

i t Gate Hamlin n Golden Paint Creek Trail Township o P M

e e

24 l

g Oakland a

d d

y

e l k

a r r n

r

i

a

a

a y l

e r

F

M

A r

e

gw

e iew

p V

n h rk i a S Chicago a P

Buckhorn L m Renfrew e Lake

H

Paint Creek Trail Municipal Boundary Village of Lake Orion Road Lake or River Recreation Land Holly Lake Orion Clarkston Rochester

Milford Pontiac

Distance in Miles Royal Oak

0 0.25 Oakland County

iv | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Background

The Village of Lake Orion is located in northeastern Oakland County and is known for its natural surroundings, historic architecture and abundant water resources. In the early 1870s, the tracks of the Detroit and Bay City Railway (later know as Central and then Penn Central Railroad) reached Lake Orion and offered incoming passengers from Detroit an escape from city life. This new mode of transportation also provided area merchants with a fast and direct route to ship local produce and goods to Detroit and many stops in between. In early the 1900s, the Detroit United Railway also extended a line from Detroit to Flint and had stops in Royal Oak, Troy, Clawson, Rochester, Goodison, Lake Orion, Oxford and Ortonville. This electric railway provided passengers with a way to travel between towns for both work and recreation.

To To Both railroads cease to exist today, however Flint Bay City 10.5 miles of the former Detroit and Bay City Railway right-of-way was purchased in 1983 and has been transformed into the Paint Creek Trail, Michigan's first Rails-to-Trail. The Paint Creek Trail extends from Rochester to Lake Orion and continues to provide users with a linear corridor for non-motorized transportation and recreation. The Paint Creek Trailways Commission owns and Michigan Central Railroad manages the 8.9 mile crushed limestone trail. Users can enjoy hiking, biking, cross-country skiing, horseback riding (north of Dutton Rd), fishing, wildlife viewing and nature photography. The trail also parallels and frequently crosses the Paint Creek– a high quality, cold water trout Flint Division-Detroit United Railway United Division-Detroit Flint To Detroit stream. Over the years, an effort has been made to enhance the amenities found along the trail and include many improved road/trail crossings, 1908 Plat map of the Village of Lake Orion illustrating restroom facilities, interpretive signs, parking the Detroit United Railway and Michigan Central Railroads. lots, art installations and scenic overlooks.

The Paint Creek Trailways Commission was established in 1981 through an Interlocal Agreement between the City of Rochester, City of Rochester Hills, Oakland Township, and Orion Township. Each community contributes to the annual Operating and Patrol budget and is also responsible for maintenance of the trail within their own jurisdiction. The Village of Lake Orion was added as a non-voting member in 2004 when the trail was extended up to Atwater Street.

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 1 Purpose

The Lake Orion Downtown Development Authority (DDA) and Village Officials identified the need to link the Paint Creek Trail with the historic downtown, local businesses, schools, neighborhoods, area restaurants and the Polly Ann Trail. The purpose of this analysis is to not only evaluate potential routes to extend the Paint Creek Trail, but to identify key destinations and the necessary wayfinding sign locations that will assist trail users and visitors with finding their way around the Village.

An announcement was made in December 2012 by Governor Rick Snyder for a plan to create a hiking and biking trail that would extend from Belle Isle to Wisconsin. Since then, the Paint Creek Trail has been identified as a key component in the cross-state biking trail route. The proposed trail extension and wayfinding signage will help make essential connections and bring local tourism, economic development and recreational opportunities to Downtown Lake Orion.

It should be noted that an effort has been made to meet criteria and recommendations that are consistent with the Americans with Disabilities Act (ADA), American Association of State Highway and Transportation Officials (AASHTO) and the Michigan Manual on Uniform Traffic Control Devices (MMUTCD). During the design phase, official standards should be revisited as requirements may have been modified or updated. These standards may apply to the following: • Trail surface type • Trail width • Warning and regulatory signs • Road crossings • Shared lane pavement markings • Typeface on wayfinding signs • Sign placement and height

2 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | KEWEENAW

HOUGHTON

ONTONAGON

BARAGA Grand Marais

North Country Trail Depot Park Marquette North Country Trail * 549 Miles 549 Miles Trailhead GOGEBIC Ironwood MARQUETTE LUCE US-2 Bike Route 325 Miles CHIPPEWA ALGER SCHOOLCRAFT IRON US-2 Bike Route 325 Miles MACKINAC DICKINSON DELTA

St. Ignace Mackinac Island Iron Mountain 7.9 Miles Escanaba Mackinaw City

EMMET MENOMINEE North Central State Trail 63 Miles Petoskey CHEBOYGAN Legend North Country Trail PRESQUE ISLE 600 Miles Biking Trail CHARLEVOIX OTSEGO MONTMORENCY ALPENA Existing Trail ANTRIM Grayling to Gaylord Bike Path 26 Miles Approved for Construction LEELANAU CRAWFORD OSCODA Grayling Area Community ALCONA Pathway 2.7 Miles County Iosco County Non-motorized Proposed Trail GRAND KALKASKA BENZIE Road River Pathway 29 Miles TRAVERSE Roscommon to F-28 Grayling 16 Miles 29.7 Miles Oscoda Community Trail MISSAUKEE OGEMAW 1.9 Miles West Branch To IOSCO Sunrise Side Pathway Hiking Trail 10.1 Miles MANISTEE WEXFORD Roscommon 25 Miles Consumers ROSCOMMON Energy MDOT M-55 ROW Powerline Existing Trail North Country Trail 4.5 Miles 10 Miles Omer to East Tawas on US-23 600 Miles 32.6 Miles GLADWIN ARENAC Temporary Connector CLARE Lake State MASON LAKE OSCEOLA Railroad HURON Corridor Possible Hiking or Biking 17 Miles Lake State RR to Bay City Fraser Township Trail 4.2 Miles State Recreation Area 1.9 Miles Bangor 6.4 Miles Existing Trail Lake State Railroad Corridor Easement 6.4 Miles OCEANA BAY Bay City Riverwalk 2.2 Miles MECOSTA ISABELLA MIDLAND Bay City Riverwalk to Harger Rail Trail 6 Miles Harger Rail Trail 19.2 Miles TUSCOLA MONTCALM GRATIOT SAGINAW Cass River Greenway to Highways NEWAYGO Millington 7.8 Miles Harger Rail Trail to Dehmel Rd 5.9 Miles Frankenmuth Southern Links Trailway 10.3 Miles Lakes and Rivers MUSKEGON Dehmel Rd to Frankenmuth 1.8 Miles SANILAC Cass River Greenway to GENESEE Columbiaville to Genesee Frankenmuth 9.7 Miles Recreation Area 15.6 Miles Flint CLINTON SHIAWASSEE Cities ST CLAIR KENT Genesee Recreation Area to Perry LAPEER Village of OTTAWA Street Path Ending 13.7 Miles Paint Creek Trail Lowell 8.1 Miles North Country Trail Perry Street Path to Polly Ann Lake Orion County Boundary IONIA Connectors 16.9 Miles 600 Miles Polly Ann Trail & Connectors 12.4 Miles MACOMB OAKLAND State Park Boundary LIVINGSTON EATON INGHAM Trail ALLEGAN BARRY 1.8 Miles State Land Lakeland Trail Clinton River Trail to Connor 22.5 Miles Creek Greenway 24 Miles

Detroit Connor Creek Greenway 9.4 Miles Jackson to Lakeland * Federal Land Trail 10.5 Miles Border WAYNE .8 Miles To Belle Isle 5 JACKSON VAN BUREN KALAMAZOO Border CALHOUN Trail Detroit Riverwalk 4.3 Miles 44.3 Miles WASHTENAW Albion to Concord Elizabeth Park to Rouge River 12.3 Miles 17.5 Miles Falling Metro Parks Waters Bike Path Grosse Isle Option Trail 12. 3 Miles 9.5 Miles BERRIEN CASS ST JOSEPH BRANCH 15.7 Miles LENAWEE MONROE HILLSDALE Metro Parks Bike Path to Elizabeth Park 12 Miles

June 11, 2014 Resource Assessment Section Forest Resources Division Michigan Department of Natural Resources

Proposed Governor's Showcase Trail • Belle Isle to Wisconsin • In December 2012, Governor Rick Snyder announced his plan for a hiking and biking trail extending from Belle Isle to Wisconsin. This announcement came as an outline to help the state become more environmentally friendly and energy-efficient. The Paint Creek Trail has been identified as a key component in the cross state biking trail. The proposed trail extension and wayfinding signage will help make essential connections and bring local tourism, economic development and recreational opportunities to Downtown Lake Orion.

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 3 Complete Streets

Lake Orion has jurisdiction over the streets and sidewalks in public right-of-way within the Village, with the exception of M-24, which is maintained by the Michigan Department of Transportation. The Department of Public Works is responsible for the maintenance and upkeep of these transportation corridors. Fortunately, the low traffic volumes, low speeds and low crash rates on the roads within the Village provide ideal facilities for Complete Streets considerations. Complete Streets are roadways planned, designed and constructed to accommodate safe access for all users. The Village Council passed a Complete Streets Resolution on September 12, 2011.

Complete Streets allow pedestrians, cyclists, equestrians, motorists, and public transit riders of all ages and abilities to safely move along and across roadways. Elements of Complete Streets may include sidewalks, crosswalks, signage, bike lanes, shared lane markings or wide shoulders. The Village requires the construction of sidewalks for certain types of new development within the Village. Creating these linkages will help provide safe routes to school, promote active and healthy lifestyles and accommodate a variety of users.

A bike lane is the portion of a roadway which has been designated by pavement markings and signage for the preferential or exclusive use of bicyclists.

Sharrows or shared lane markings can be found in locations where there is insufficient width to provide A complete street is defined as a a designated bike lane. The marking roadway that is planned, designed and also alerts road users to the lateral constructed to provide appropriate position bicyclists are likely to occupy access to all legal users in a manner that within the traveled way, therefore promotes safe and efficient movement encouraging safer passing practices. of people and goods whether by car, Cyclist should ride down the center of truck, transit, assistive device, foot, or the arrows when possible. bicycle. For more information, please visit: www.michigancompletestreets.org Complete Streets Bike Lanes Sharrows

4 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Winter Maintenance

Along with incorporating Complete Streets principles, winter maintenance is an essential part of any non- motorized network. According to the Code of Ordinances of the Village of Lake Orion:

A. Owners, occupants and persons in control of any property shall be responsible for keeping all sidewalks adjoining the property clear of snow and ice as provided in this section. Ice shall be cleared by removal or application of sufficient quantities of deicing material or sand.

B. Failure to remove snow or ice from a sidewalk for a period of 24 consecutive hours is a violation of this chapter.

C. On sidewalks in the downtown area, accumulations of two or more inches of snow that falls and ice that forms, between the hours of 9:00 a.m. and 9:00 p.m., shall be removed immediately, with any snow that accumulates or ice that forms after 9:00 p.m. to be removed by 9:00 a.m. of the following day, with failure to comply with these requirements being a violation of this chapter.

D. Upon a violation of a requirement of this section, in addition to and without regard to whether the violation is pursued as provided in § 92.32, the Village Manager may cause all snow and ice to be cleared and removed from the sidewalk, at the expense of all persons responsible, with payment of the village's actual and administrative costs and expenses incurred in doing so to be a joint and several debt to the village by all of the persons responsible, which shall be paid in full within 30 days of the village's billing to those persons, and which shall be secured by a lien on the property adjoining the sidewalk from the time the snow and/or ice is cleared and removed by the village.

(Ord. 8.01, passed 10-11-71; Am. Ord. 8.04, passed 2-12-07)

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 5 Complete Streets Resolution

WHEREAS, the term "Complete Streets" describes a comprehensive integrated transportation network with infrastructure and design that allows safe and convenient travel along and across streets for all users, including pedestrians, bicyclists, motor vehicle drivers, public transportation riders and drivers, and people of all ages and abilities, including children, youth, families, older adults, and individuals with disabilities; and

WHEREAS, Increasing active transportation (e.g., walking, bicycling and using public transportation) offers the potential for improved public health, economic development, a cleaner environment, reduced transportation costs, enhanced community connections, social equity, and more livable communities: and

WHEREAS, A Complete Street is safe, comfortable, and convenient for travel by automobile, foot, bicycle, and transit regardless of age or ability; and

WHEREAS, The Michigan legislature has passed Complete Streets legislation that requires the Michigan Department of Transportation and local governments to consider all users in transportation related projects; and

WHEREAS, the Michigan Planning Enabling Act has been amended, requiring that all transportation improvements identified in a plan are appropriate to the context of the community and as applicable, considers all legal users of the public right of way; and

WHEREAS, Complete Streets support economic growth and community stability by providing accessible and efficient connections between home, school, work, recreation and retail destinations by improving the pedestrian and vehicular environments throughout communities; and

WHEREAS, Complete Streets enhance safe walking and bicycling options for school-age children, in recognition of the objectives of the national Safe Routes to School program; and

WHEREAS, the Village of lake Orion recognizes the importance of street infrastructure and modifications such as sidewalks, crosswalks, shared use paths, bicycle lanes, signage, narrow vehicle lanes and accessible curb ramps, that enable safe, convenient, and comfortable travel for all users; therefore

BE IT RESOLVED, that the Village of Lake Orion supports the future development of master plan amendments for multi-modal and non-motorized transportation plan and a Complete Streets ordinance that support ease of use and safety for all users of transportation systems within the Village of Lake Orion,

BE IT FURTHER RESOLVED, that the Village of Lake Orion, to the extent feasible, should include Complete Streets design considerations and practices as a routine part of municipal infrastructure planning and implementation, and approach transportation projects and programs as an opportunity to improve public and private streets and the transportation network for all users, working in coordination with other departments, agencies, and jurisdictions.

Motion to Adopt By Council Member Toth; Seconded by Council Member Stumkat and adopted. AYES: 6; NAYS: O; ABSENT: 1. Resolution passed on September 12, 2011.

6 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Public Participation

A number of opportunities and methods to gain public input for the Paint Creek Trail extension route and wayfinding sign locations were considered. The first of which was a public workshop that was held on August 6, 2014 at the Orion Art Center in order to solicit input on the trail extension through the Village, identify key destinations, existing challenges/hazards and other potential improvements. A brief presentation on the history of the trail, current conditions through the Village, a questionnaire and a number of related maps and posters were on display. In addition to the public, various stakeholders from the following organizations were invited to participate at the workshop: DDA members, Village staff, elected officials, Stakeholder input session Police, Fire, Parks & Recreation and trail councils.

An online trail user survey was also publicized to residents, visitors, business owners and trail users. This survey was specifically designed so that stakeholders had an opportunity to answer multiple choice and open-ended questions related to current conditions and future trail extension improvements. A total of 173 surveys were completed from July-September 2014. Comments and input from the workshop sessions and the surveys were taken into consideration for the recommendations made in the evaluation.

Further, Village residents and the public were given the opportunity to familiarize themselves with the potential routes during a guided walk. Participants evaluated several potential trail route options and observed conditions like slope, vegetation, right-of-way ownership, roadway conditions and connectivity to destinations. A number of potential areas of concern were identified during the walk that were not apparent in discussions or identified on maps with aerial photos. Participants then reconvened at the Orion Art Center to discuss existing conditions and refine route options and other necessary improvements. Guided walk to evaluate potential trail route options

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 7 Paint Creek Trail Extension

In September 2008, an analysis was done in Oakland County to study the major gaps in the regional trail system. The Paint Creek to Polly Ann Trail Gap Analysis resulted in four potential connectors. Each of the proposed routes would provide trail users with variety of amenities, create diverse user experiences, limit certain user groups and vary in accessibility. Providing multiple connector routes between regional trails will help to improve the non-motorized transportation options for the communities that they pass through. It should be noted that all of the proposed connectors should be explored and are considered important to the overall County Trail Network.

From 2008 Oakland County Trails Master Plan Gap Analysis

Purple Route – Approximate Length: 6.00 mi This route would traverse to the south, within and/or near Bald Mountain State Recreation Area, along Kern Road, Clear Creek Drive and utilize the existing safety path along Waldon Road.

Yellow Route – Approximate Length: 4.33 mi This route utilizes existing safety path from the Paint Creek Trail to Glanworth, M-24, along Clarkston Road, Pine Tree Road, Heights, and Joslyn Roads.

Blue Route – Approximate Length: 3.65 mi This route would traverse from the Paint Creek Trail, north along M-24 to Drahner Road and connect into the Polly Ann Trail.

Green Route – Approximate Length: 6.81 This route would traverse to the north from the Paint Creek Trail, along Orion Road and Clarkston Road, within Marshview Park, along Bald Mountain State Recreation Area utilizing Stoney Creek, Harmon and Predmore Roads, to Lake George Road.

For the purposes of this analysis, the portion in Lake Orion of the Blue Route identified in the Oakland County Trails Master Plan-Paint Creek Trail to Polly Ann Trail Gap Analysis will be the main focus. Within the Village, four main routes were studied and discussed with stakeholders. Maps of the four routes and preliminary observations can be found on the following pages.

8 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Village of Lake Orion

Oakland County Trails Master Plan • Paint Creek Trail to Polly Ann Trail Gap Analysis •

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 9 Route A Route B

Approximate Length: 1.36 miles Approximate Length: 1.49 miles

Challenges: Challenges: • Work with landowners to acquire • Route is three blocks away from Historic easements Downtown • Route requires pedestrians to cross • Many gaps in the sidewalk system-poor multiple residential driveways pedestrian facilities • Stop signs at almost every intersection • Route requires pedestrians to cross multiple residential driveways Opportunities: • Route is located along Village streets with Opportunities: low speeds and low traffic volumes • Route passes Atwater Park

• Routes uses a combination of on-road • Route is located along Village streets with shared lane markings for cyclists and low speeds and low traffic volumes sidewalks for pedestrians

• Route is one block off of Broadway (Historic Downtown) and passes by the new Village Offices & Police Station

Long Lake Long Lake

L L

a a p F p F e r e r e an e an r k r k lin Wright lin Wright

n n

l l

o o

c c

n n

i i

L L y Cedar Bend y Cedar Bend

a a

w w

t t

d d

n n

E a E a o l l o iz o iz o

a r a r m b b m

e B e B

e e

r t r t r

h h r

i i

a a

a a

h h

l l

s s

C C

n n

i i

l l

V V

l l Church e Church e

w w

x x

u u

a a

n n

H H

P r P r

d d r a r a

rk o rk o

o o

h h

f f

c c

x x

S S A Shadbolt A Shadbolt

e e

c c

n n

e e Fl r Fl r int o int o

l l

F F

r r

y y

e er e er e e Lake t ill Lake t ill r M r M

a a

l l

a a a w a w

l O l O

S S

d d

C r C r a a io io

y o o P n P n a r a

i r i nt nt

C e C

r B r Lake Orion B r ay Lake Orion r ay e d P e d ek ari ek ari y M M Glen r Glen n r n

e Cass P Cass

Atwater Atwater

d d

n n

a a

l l

r r

o o

N N y

y James James a

a Evergreen Evergreen

w w

Paint Creek Trail d

d d d Paint Creek Trail a

P an a P lan l o

ark I s o C ark I s C r

r on n on n B B n n v o v o a e t ia e t i r p r p s w ram s w ram e e G e e G

A N A N

l l g g

e e

n n e s e s Height Height

10 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Route C Route D

Approximate Length: 1.18 miles Approximate Length: 0.76 miles

Challenges: Challenges: • On-street parking and narrow road lane • Route is located next to M-24 with high widths for on-road cycling facilities traffic volumes and higher speeds • Narrow sidewalk along the east side of • Narrow sidewalk along the east side of M-24 M-24 • High traffic volumes on M-24 and • Route requires pedestrians to cross Broadway multiple commercial driveways • Route requires pedestrians to cross Opportunities: multiple residential driveways • Dam at Lake Orion/Paint Creek is visible Opportunities: • Traffic signals at located at major • Route passes through Historic Downtown intersections to assist pedestrian road • Signalized intersection at Atwater & M-24 crossings • Avoid a number of commercial driveways • Route follows historic Michigan Central on M-24 Railroad right-of-way

Long Lake Long Lake

L L

a a p F p F e r e r e an e an r k r k lin Wright lin Wright

n n

l l

o o

c c

n n

i i

L L y Cedar Bend y Cedar Bend

a a

w w

t t

d d

n n

E a E a o l o l iz o iz o

a r a r m b m b

e B e B

e e

r t r t r

h r h

i i

a a

a a

h h

l l

s s

C C

n n

i i

l l

V V

l l Church e Church e

w w

x x

u u

a a

n n

H H

P r P r

d d r r a a

rk o rk o

o o

h h

f f

c c

x x

S S A A Shadbolt Shadbolt

e e

c c

n n

e e Fl r Fl r int o int o

l l

F F

r r

y y

e er e er e e Lake t ill Lake t ill r M r M

a a

l l

a a a w a w

l O l O

S S

d d

C r C r a

io a io o P n o P n ain ain

t C t C

r B r Lake Orion Lake Orion B G re day re day ek ari ek ari y M y M len r Gle r r n n n r

e e Cass P Cass P

Atwater Atwater

d d

n n

a a

l l

r r

o o

N N y

James y James a

Evergreen a Evergreen w

w Paint Creek Trail d

d Paint Creek Trail d d a

P lan P an a o l

ark I s C ark I s o C r

on n r on n B n B n v o a v o e t i e t ia r p r p s w ram s w ram e e G e e G

A N A N

l l g g

e e

n n e s e s Height Height

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 11 After reviewing comments from stakeholders and the user survey, Route A has become the preferred option. This route would extend the Paint Creek Trail north from its current terminus, across Atwater Street along the eastern boundary of Lake Orion Lumber. The trail would continue over the Paint Creek using the existing park pathway and bridge in Meek's Park to Anderson Street. Using a combination of sidewalks for pedestrians and on-road shared lane markings for cyclists, the route will extend north along Anderson Street and west on Elizabeth Street to M-24.

This route is ideal for promoting the historic downtown and local tourism destinations. Through pedestrian wayfinding signage, nearby destinations can be called out while being mindful of the small-town character of the Village. The local attractions include: • Downtown • Historic Sites • Farmer's Market • Meek's Park • Children's Park • Anderson Street Trailhead • Village Offices & Police Station • Church Street Trailhead View of Anderson Street • Restaurants & Businesses

Potential Lumber Yard linkage Bridge over Paint Creek View of Elizabeth Street near M-24

12 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Action Plan

Throughout the evaluation process, the comments provided by the public, community stakeholder input and trail user feedback have been considered. The following priorities have been identified for this project:

Action Item 1: Extend the Paint Creek Trail through Lake Orion by providing a safe, accessible and user friendly route for the residents and visitors to the Village.

• Design non-motorized facilities to meet ADA and Universal Design guidelines • Support the principles of Complete Streets within the Village • Provide improvements and facilities that will enhance and be consistent with the small town character of the Village

Action Item 2: Create a unified signage program in the Village of Lake Orion and help visitors locate key destinations.

• Work with Village Officials and other stakeholders to identify key trail access points and trailhead parking areas

• Develop appropriate wayfinding signage to/from the trail into the historic downtown, Village parks, M-24 and trailheads

Ensure that regulatory signs conform to the Michigan Manual of Uniform Traffic Control Devices and ADA standards

Action Item 3: Provide non-motorized opportunities that support local tourism initiatives and healthy and active lifestyles.

• Construct non-motorized facilities and install related amenities at Village parks and designated trailheads that will support and enhance the Governor's Showcase Trail • Participate in trail related events that promote health and wellness • Create consistent looking maps, marketing materials, online resources and visitor's guide to promote Lake Orion and the Paint Creek Trail

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 13 Budget Item Details

The scope items being proposed are in compliance with the Michigan Manual on Uniform Traffic Control Devices (MMUTCD). The proposed amenities are all located within public property and road rights-of-way. Details of each scope item can be found on the following pages. Further refinement of scope items and cost estimates will be needed from a qualified engineer prior to seeking grant funds.

Although the project needs to competitively bid out the scope items, it is the intent to use local sign fabricators and contractors to complete the project. By using local businesses for this project, it helps strengthen the local and state economy.

Proposed Scope Items DDA Scope Item Comments Boundary Continental Crosswalk Yes Across Atwater Commons & Atwater Street Detectable Warning Strip Yes 10' Sidewalk Extension Yes To Atwater Street Bike/Ped Warning Sign & Hardware Yes Atwater Street W11-15 20' wide easement or acquisition Yes East edge of Lumber Yard 10' wide multi-use trail & 2' shoulders Yes Surface TBD Fence/Railing Yes Along Lumber Yard Property Sharrow-Shared Lane Markings Yes Anderson St & Elizabeth St Sharrow-Shared Lane Markings No Anderson St & Elizabeth St Standard Crosswalk Markings Yes Anderson St & Elizabeth St Standard Crosswalk Markings No Anderson St & Elizabeth St Trail Wayfinding Sign & Hardware Yes Anderson St & Elizabeth St Trail Wayfinding Sign & Hardware No Anderson St & Elizabeth St Bike Fix-it Station (Optional) Yes Trailhead & Downtown Trailhead Kiosk (Optional) Yes Anderson Street Trailhead Contingency Mobilization Landscape Restoration Soil Erosion Control Professional Fees Maintaining Traffic Permits Prevailing Wage

14 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | L

a

p

e

e

r Cedar Bend

y

a

w

d **230' Missing r d

o E a f li o Sidewalk ** z n x ab r B o A e th t • Create transition g

r

n

i

a

h

between h road

s

s

a

n

and sidewalki Village

W

V Offices & Police Church Station

M 24 A • Sharrows

n

d • Standard Crosswalks

r Jackson

e

w • Trail Wayfinding Jackson s • Detectable Warning Strips

Shadbolt

e

b Sh N adb e olt o e r B t h F Historic S lint Downtown

r n h

e

r o o

e s

e r

r t

p

e e

a

a

l d

L

Lake S n

e

r A

a

l C • Property Easement Darlin g • Surface Trail • Fence/Railing Lake Orion P a • Trail Wayfinding rk eek t Cr Pain Glenn

• Detectable Warning Strips • Sidewalk Extension Cass Proposed Trailhead Parking • Continental Crosswalks Lake or River Road • W11-15 Warning Signs

Proposed Paint Creek Trail y Extension a Atwater

DDA District Boundary w

d

a o

Distance in Feet r B 0 450 Park Green

Proposed Paint Creek Trail Extension Village of Lake Orion

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 15 Pavement Markings Quantity varies Estimated Price $TBD total Pavement markings provide guidance and information to trail users. Shared lane markings or sharrows assist bicyclists with lateral positioning in lanes that are too narrow for a motor vehicle and a bicycle to travel side by side within the same traffic lane, alert Definition road users of the lateral location bicyclists are likely to occupy within the traveled way, encourage safe passing of bicyclists by motorists and reduce the incidence of wrong- way bicycling. Pavement markings will be used at all trail/road intersections and where the trail may Location change direction. Universal * Detectable warning strips are required at all hazardous vehicular areas to comply Access Design with ADA guidelines Considerations * Contrasting color treatments for maximum visibility Crime Prevention * Applied directly to asphalt or concrete surface Measures Environmentally friendly/ * Constructed using long lasting materials Innovative Technology

Shared Lane Marking (Sharrow) Detectable Warning Strip & Continental Crosswalk Markings

16 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Regulatory & Wayfinding Signs Quantity varies Estimated Price $TBD total Regulatory signs are intended to alert trail users or drivers on what they should do Definition (or not do) under a given set of circumstances. Wayfinding signs provide directional information to trail users for nearby destinations. Location Regulatory signs will be located at all trail/road intersections. Universal * Located on accessible route Access Design * Contrasting color treatments for maximum visibility Considerations Crime * Constructed using hidden fasteners Prevention * Fixed in place Measures Environmentally friendly/ * Constructed using long lasting materials Innovative * Retroreflective material Technology

Bike/Ped Warning Sign

To Paint Creek Trail

Urban Trail Marker (design needs further refinement)

Trail Wayfinding Sign

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 17 Information Kiosk Quantity 1 Estimated Price $TBD total Information kiosks provide a place to post trail maps, advertise trail related and community events, post Definition rules and regulations as well as other information to be communicated to trail users. Information may be changed seasonally. Information kiosks are to be placed at high-use locations Location along the trail, such as staging areas, downtown gateways and other trail access points.

Dimensions W-75” x H-60” Example of Information Kiosk Universal * Located on accessible route Access Design * Contrasting color treatments for maximum visibility Considerations * Interpretive information panels in a variety of formats * Constructed using hidden fasteners Crime * Fixed in place Prevention * Interpretive exhibits to be fabricated using scratch Measures resistant material, spray paint is also removable, ink is non-fading * Constructed using long lasting materials Environmentally * QR Code to get additional information friendly/ * May include weather resistant bulletin board to Innovative display event information or other trail related Technology information

18 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Bike Fix-It Station Quantity 2 Estimated Price $TBD total A Bike Fix-It Station includes all the tools necessary to perform basic repairs and maintenance, from changing a flat to adjusting brakes. The tools and air pump are Definition securely attached to the stand with stainless steel cables and tamper-proof fasteners. Hanging the bike from the hanger arms allows the pedals and wheels to spin freely while making adjustments. Bike Fix-It Stations should be located at a trailhead or in Location the Downtown. Dimensions W-20” x H-59”

Universal * Located on accessible route Example of Bike Fix-It Station Access Design * Contrasting color treatments for maximum visibility Considerations * Height meets ADA requirements Crime * Constructed using hidden fasteners Prevention * Fixed in place Measures * Stainless steel cables are tamper proof Environmentally friendly/ * Constructed using long lasting materials Innovative Technology

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 19 Downtown Destinations

For well over a century, the Village of Lake Orion has been known as a destination for city dwellers looking for an escape to a resort community on the lake. After reviewing the comments from the surveys and public workshop, the following key points of interest were identified and should be considered on wayfinding signage: • DNR Lake Access Site • Lake Orion Schools Admin Building • Village Offices & Police Department • Blanche Sims Elementary School • Lake Orion DDA Office • Historic Downtown • Green's Village Park • Children's Park • Orion Township Fire Station #1 • Orion Art Center & Farmer's Market • Meek's Park • Atwater Park • Paint Creek Trail

Recommendations • Identify each of the major destinations with a monument sign • Verify that existing and potential wayfinding signs direct visitors to correct destinations

20 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities |

a

n

u

r L n

a

e

n i

l p C l a i r e m o n

t o

l i

i r

O m

a

M

r

n r o h c S G

d n a l r o ek N re C t

in

a

e

y r r e

P P k

D a

To Rochester via Rochester To Trail Paint Creek e c n e r o l L F

g

n

o t

L n

o

L t w l l e w x u a H n e i N

l n Paint Creek Trail

r n

d F

Village of e

e n Lake Orion

l t Village of Lake Orion of Lake Village n o t g n i h s a

e W a

G e

h

t

B

t

w

a

r

r

t r

a

G

e

o

A

d r e t a l

S n w m

K

e

e n

C

m

a

d

l l M

I

u

o A n d

e r s o

n G S

J

G

h y

a

w

d c

a

o r

r H B r

o a d w a y B C B r o a d w a u y E M 24

h F

C

t

l r e e p a L h

o a

e h d b

k n

t a

a a e d

l h t

b B r n

S

d

h a G

e a

z l

v i g s O i l

O r E I

k

W

r r a h s n i V k n a

i r

l a P

k B l P o c k

n i

a

r e

To Oxford & Oxford To Polly Trail Ann via M-24

F k

M

24

a

L L a p

e

e r

A x f o r d t i

m

m

u

S

n

o c n t P a i 0.2 o i r Key Destinations Key O e or e Sh k h a rt L o N Distance in Miles 0

d Facility Educational Park BoundaryDDA Extension Trail Proposed Lake or River Road o

o

e

t e n Park

u w i u Unger

o v

o

e n p e

t g l i n l k

a o e A L n a i B a L d

M n I

Park

Swiss Swiss k Village Village r a P

g

n

i

h s

s

u C g t

d l

in

o a h

o r K

lw t g

l i n

o e e

n C

H K

w ie rv a i

DNR Lake Access Site DNR Lake Access Building Lake Orion Schools Admin Department Offices & Police Village F Blanche Sims Elementary School Office Lake Orion DDA Historic Downtown Village Green's Park Park Children's #1 Station Fire Township Orion Market Orion Art& Farmer's Center Meek's Park Park Atwater Trail Paint Creek Orion Wayfinding Analysis Wayfinding Township I J L F E C B K A G H D M To Polly Polly To via Trail Ann Indianwood

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 21 Wayfinding Sign Locations

Creating a system of wayfinding signs around the Village will assist visitors and trail users with locating area attractions, off-trail amenities, special points of interest and public parking areas. It is necessary to carefully locate wayfinding signs at major decision points where motorists and pedestrians may need to change direction in order to locate a destination. The overall design, content, consistency, colors, typeface size and materials should be thought Examples of wayfinding signage for Lake Orion through to create a positive visitor experience.

Recommendations • Use contrasting colors and symbols that are easy to read from a distance and complement the downtown and residential areas • Consider adding distances to amenities in addition to directional arrows • When possible, mount new signs to existing light poles to reduce the number of obstacles along heavily traveled pedestrian pathways and remove old unnecessary or duplicate signage • Conduct a sign asset inventory for gateway signs, park signs and monument signs at Village owned properties and in addition to proposed wayfinding signs, create a full signage plan and guidelines • Ensure the Village branding and typeface on signs are consistent and ADA compliant; signs should be upgraded to the new style when possible • Evaluate potential obstructions and lighting conditions; it may be ideal to up-light gateway signs and monument signs as a safety feature and increase readability at night • Review Village sign ordinance and work with local businesses to reduce sign clutter that is unsightly, and distracting along major thoroughfares to maintain a consistent streetscape and viewshed

Existing park monument sign Existing wayfinding sign Existing gateway sign along M-24

22 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities |

a

n

u

r L n

a

e

n i

l p C l a i r e m o n

t o

l i

i r

O m

a

M

r

n r o h c S G

d n a l r o G N ek re C t

in

a

e

y r r e

P P k

a

To Rochester via Rochester To Trail Paint Creek e c n e r o l L F

g

n

o t

n

o

L t w l l e w x u a H n r e i N l n Paint Creek Trail

Orion

n

e t

d F

Village Village of Lake of Lake

e n

l a Village of Lake Orion of Lake Village n o t g n i h s a e W

G e

h

t

B

t

w t

a

r

r

r

a

G

e

o

A

h

d r

e t a l

c S

n w m

r

e

e n T

u

C

m

a d

h

l

l u

C

T o A n d

e r s o

n G S

T

G

T

y W

W

a

w d

a

o

r B r o a d w a y B B r o a d w a y G M 24 W W

t

l r e e p a L h

o a

e h d b

k n

t a

a a e d

l h

t b r n

S

d

h a

e a W

z l

v i g s O i l

O r E I

k

W

r r a h s n i V k n a

i r

l a P

k B l P o c k

n i

a

r e

To Oxford & Oxford To Polly Trail Ann via M-24

F k T

M

24

a

L L

a p

e

e

r G A x f o r d t i

m

m

u

S

n

o Decision Points c n t P a i i o r O e or e Sh k h a rt L o N

d o

o

e

t e

n

u w i u

o v

o

e n p e

t g l i n l k

a o e n L a i B a L d

M n

I

k r a P

g

n

i

h s

s

u

C g t

d l n

0.2 i

o a h

o r K

lw t g

l i n

o e e

n C

H K

w

e Distance in Miles vi ir Fa 0 Pedestrian/Cyclist Pedestrian/Cyclist Decision Point Decision Point Driver Lake or River Road Main Thoroughfare Sign Gateway Proposed Sign Wayfinding Proposed Marker Trail Proposed Orion T G Wayfinding Analysis Wayfinding W Township To Polly Polly To via Trail Ann Indianwood

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 23 Heritage Tourism

The history of an area can be subtly reflected in architectural styles, road names, land parcel shapes and building orientation. Since the late 1800s, Lake Orion has been known as a resort community and for many years relied on seasonal visitors and local trade to support the local economy. As transportation routes and modes have improved and the population has grown and dispersed around Southeastern Michigan, the Village has been able to maintain much of its small town charm.

In addition to the abundant water resources and parks in the Village, a well distributed collection of local and state historic sites exist in the area. In 2006, a nationally recognized historic district was created in and around the downtown. At the time of the Historic District application, it was estimated that the Village had 217 contributing historic structures. A prime opportunity exists in this area to promote and market the numerous historic and natural resources. The National Trust for Historic Preservation defines heritage tourism as “traveling to experience the places, artifacts and activities that authentically represent the stories and people of the past,” and heritage tourism can include cultural, historic and natural resources. Many buildings in the downtown have retained architectural details and historic appearance.

Recommendations • Tell the story and celebrate the past. Create a system of interpretive signs located at significant buildings or sites around the Village. • Create a map and walking route of important sites • Preserve and rehabilitate historically significant resources • Explore the possibility of a boutique hotel or bed and breakfast in the area that would be accommodating to trail users • Create a marketing campaign to market heritage tourism in the area • Seek Pure Michigan Trail and Trail Town designation

24 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | )"

)"

)"

)"

)"

y a w d a

o

r

" B

r e abeth e Eliz

p

n

a

o

L

t

g

n

i

" h

s

a

 W Church

 n "

o

s r

" e d

" n A

l

" l

e

w

Jackson Jackson x

u

a

H y a

w " d DDA a Office "

o "

" r  B Shadbolt F o r " m e r F Shad l bolt in t D iv " is  io n -D Historic e Flint Downtown Flint )" tr ke o " a i F L t o U r r m n )" e

i e e n

te r " o d M p 

s R a i r a c L il h e w i g d a a r y n n

e n A  t

C o

a e t n l Front g t S r a n M i l " R h

24 a s

i a l r o a W d

P a Historic District rk State Registered Site Local Historic Place k ree Former Railroad Building Lake Orion int C Glenn Pa Lake or River Road

)" Distance in Feet

s

s

0 a 300

C

Historic Resources Village of Lake Orion

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 25 Parking Downtown

Public parking is an essential component of any successful downtown district. Lake Orion has a mix of on-street parking and dedicated public parking lots. For the most part, on-street spaces are limited to two hours and the public lots are posted as 23 hour parking. The private lot on the southeast corner of Shadbolt and Broadway restricts public parking Monday-Friday from 6 a.m.-6 p.m.

Recommendations • Number or name the public parking lots to assist visitors with locating them • Create a Visitor's Guide and highlight public parking areas, on-street parking, handicap parking locations and bicycle racks

• Add public parking lots2009 to Editiononline mapping services Page 89

• In addition to the existing 1.trailhead NO PARKING parking ANY just TIME east (R7-1); of 383 S Broadway, consider designating the lot on the southwest corner of Anderson 2. NO andPARKING Front X:XX Street AM forTO X:XXuse as PM a trailheadFigure and adding 2B-24. theParking following and Standing amenities: (R7-2, R7-2a); Signs and Plaques (R7 Series) (Sheet 2 of 2) °° Information Kiosk with 3. NO map PARKING of surrounding EXCEPT SUNDAYS area AND HOLIDAYS (R7-3); °° Restroom facilities 4. NO STANDING ANY TIME (R7-4); °° Bike fix-it station 5. XX HOUR PARKING X:XX AM – X:XX PM (R7-5); °° Bike racks 6. NO PARKING LOADING ZONE (R7-6); 7. NO PARKING BUS STOP (R7-7, R7-107, °° Benches R7-107a); °° Trash and recycle receptacles 8. RESERVED PARKING for persons with disabilities (R7-8); • Reduce the number of 9.regulatory VAN ACCESSIBLE signs (R7-8P);in the Village. 10. Pay Station (R7-20); For example, the MMUTCD 11. Pay recommends Parking (R7-21, R7-21a,To minimize R7-22); the 12. Parking Permitted number of parking signs, blanketX:XX AMregulations TO X:XX PMthat (R7-23); apply to a given district may, if legal, 13.be Parkingposted Permitted at district boundary lines. XX HOUR(S) XX AM – XX PM (R7-23a); (Section 2B.47.09) 14. XX HR PARKING X:XX AM TO X:XX PM R7-200 R7-200a (R7-108); • Conduct a sign asset inventory 15. NO PARKING in the Village.ANYTIME/XX Ensure HOUR that sign height, orientation andPARKING content X:XX are AM consistent– X:XX PM and Parking Plaque Standard Orientation (R7-200, R7-200a); from MMUTCD Section 2B.47 OR compliant with MMUTCD 16. and TOW-AWAY Code ZONEof Ordinances (R7-201P, R7-201aP); of the Village of Lake Orion. 17. THIS SIDE OF SIGN (R7-202P); 18. EMERGENCY SNOW ROUTE NO PARKING IF OVER XX INCHES (R7-203); R7-201P R7-201aP R7-202P 19. NO PARKING ON PAVEMENT (R8-1); 20. NO PARKING EXCEPT ON SHOULDER (R8-2); 21. No Parking (R8-3, R8-3a); 22. EXCEPT SUNDAYS AND HOLIDAYS (R8- 3bP); 23. ON PAVEMENT (R8-3cP); 24. ON BRIDGE (R8-3dP); 25. ON TRACKS (R8-3eP); 26. EXCEPT ON SHOULDER (R8-3fP); 27. LOADING ZONE (R8-3gP); 28. X:XX AM TO X:XX PM (R8-3hP); 29. EMERGENCY PARKING ONLY (R8-4); R7-203 Compliant on-street parking signs 30. NO STOPPINGNon-compliant ON PAVEMENT parking (R8-5); signs Non-compliant parking signs 31. NO STOPPING EXCEPT ON SHOULDER (R8-6); and 32. EMERGENCY STOPPING ONLY (R8-7). 26 Section 2B.47 Design of Parking, | Village Standing, of Lake and Orion Stopping | Wayfinding Signs & Trail Extension Opportunities | Support: 01 Discussions of parking signs and parking regulations in this Section apply not only to parking, but also to standing and stopping. Standard: 02 The legend on parking signs shall state applicable regulations. Parking signs (see Figures 2B-24 and 2B-25) shall comply with the standards of shape, color, and location.

December 2009 Sect. 2B.46 to 2B.47 y a w d a

o

r

B

r e 39 abeth e Eliz spaces p

n

a

o

L

t

g

n

Lake Orion i

Schools h 52 Village 5 s spaces Admin Offices 19 a spaces Building W & Police 6

Department Church

y

n

a

o

s

w

r

d

e

a

d

n

o

r A

l

l B

e

w

Jackson Jackson x

u

a

H

DDA Office Shadbolt 14 16 34 spaces spaces spaces Shadbolt

Historic Flint Downtown Flint ke La r 27 e spaces

e

p

a

L M 41

24 spaces r

e n

t

o

a

t Front l

g

Green's S 9

n

Park i

h n s

a

o

s r W

68 e

spaces d

n A

P a Children's Restricted Public Parking rk Park 23 Hour Public Parking 2 Hour Public Parking reek Meek's Lake Orion t C Park Bicycle Parkingn Pain Glen Lake or River Road

Distance in Feet

s

s

a

0 C 300

Downtown Public Parking Village of Lake Orion

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 27 Green Infrastructure

In 2009, a Green Infrastructure Vision was developed for Oakland County in order to identify areas in the landscape that are in need of local protection and link the remaining valuable ecological lands. These lands include large natural areas, important wildlife habitats, wetlands, riparian corridors, and areas that reflect key elements of Oakland County’s biological diversity.

This locally driven initiative gathered input from a wide variety of stakeholders. In 2005, key stakeholders from Lake Orion and Orion Township participated in one of many work sessions focusing on natural resource connectivity. The area surrounding the Paint Creek has been identified as a key recreational link in the County Vision.

What is Green Infrastructure? Green infrastructure is the interconnected network of open spaces, natural areas, and waterways. This network supports native species, maintains natural ecological processes, sustains air and water resources and contributes to health and quality of life. It also focuses on conservation values and the services provided by natural systems in concert with, instead of in opposition to, land development.

Benefits of Green Infrastructure Green infrastructure provides a mechanism to identify and blend environmental and economic factors creating a multitude of social, economic, cultural and environmental benefits. • Provides a sense of place and a unique identity • Decreases cost of public infrastructure (i.e. stormwater management & water treatment systems) • Increases both active and passive recreational opportunities • Increases property values • Helps preserve the unique quality of life • Maintains the naturally functioning ecosystems • Helps to attract new businesses and well qualified workers

Components of a Green Infrastructure Network • Hubs: Hubs anchor the network and provide an origin or destination for wildlife. Hubs range in size from large conservation areas to smaller parks and preserves. Hubs provide habitat for native wildlife and help maintain natural ecological processes. • Sites: Smaller ecological landscape features that can serve as a point of origin or destination or include less extensive ecological important areas. • Links: The connections that hold the network together and enable it to function. Links facilitate movement from one hub to another.

28 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities |

d R

B

s a t

r a r

o R C d S S tanton Rd Indian Lake Rd MANITOU

d LAKE

R

n i

w LON d G L

l AKE a

B d Rd

Indianwoo N

W Flint St Village Or io n of Lake R LAKE d ORION Orion Odanah St Heights Rd

d

R

HEATHER K

n

e

y

LAKE l r

s n

o

R

J

d W Clarkston Rd E Clarkston Rd WALTERS Clarkston Rd LAKE

Casemer Rd S

E Orion

s

t

o

n Township LAKE

R SIXTEEN d UV24 d R

n r VO e ORHEIS LAKE K W Greenshield Rd hield Rd E Greens

Waldon Rd

Maybee Rd

W Silverbell Rd E Silverbell Rd

d

R

JUDAH LAKE

n d

i R

w s

d d Judah R l d g

R

a

n

r i

B

h d

S

o d i

R G

Brown Rd Dutton Rd ¨¦§75 N Lak e Ang elus R LAKE OAKLAND d Harmon Rd

Road Hub OrionOriion TTownshipownshiip Green Infrastructure Municipal Boundary Site Green IInffrasttructture Lake or River Link Green infrastructure is the interconnected network L. Brooks Patterson, County Executive ofH igopenhway spaces, naturalHu bareas, and waterways. This Environmental Stewardship Program Planning & Economic Development Services network supports native species, maintains natural Major Road Site **The information provided herewith has been compiled from recorded deeds, Map Created on October 13, 2014 plats, tax mapsDistance, surveys an din o thMileser public records. It is not a legally recorded ecological processes, sustains air and water resources map or survey and is not intended to be used as one. Users should consult Municipal Boundary Link Miles the information sources mentioned above when questions arise.** ± 0 1 and contributes to health and quality0 0.25 of0.5 life.0.75 1

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 29 30 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 31 Other Recommendations

• Remove benches, trash receptacles and other obstacles from multi-use pathways and install a minimum of 3 feet from the edge of the pathway. Consider adding a concrete pad below benches with additional space to accommodate a wheelchair or stroller.

• Reinstall picnic table bench seats (90o from existing location) to accommodate a wheelchair or stroller.

• Work with utility company to adjust guy-wires to allow for a 8' minimum overhead clearance on pathways and install appropriate plastic covers to protect trail users.

Compliant example

32 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | • Work with private property owners and local businesses to remove landscaping and trees that obstruct or block the clear zone at sidewalk/driveway crossings.

• Inspect and replace sections of concrete sidewalk that are in poor condition.

• Install ADA compliant curb ramps and detectable warning strips at hazardous vehicular areas.

Compliant example

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 33 • Work with MDOT and explore the potential of relocating the guardrail along M-24 closer to the curb to create a burrier between the road and the sidewalk. Also consider creating a vegetated median from Broadway north to Flint Street that will act as traffic calming and install a pedestrian refuge island.

Example from Dixie Highway in Waterford

• Work with Village Officials and Parks & Recreation staff to consider adding equestrian amenities at Meek's Park such as a water trough and horse picket lines.

• Enhance existing Paint Creek Trail information kiosk at the south end of the Village to welcome trail users and provide wayfinding sign to amenities, shopping and restaurants in the Downtown and along M-24.

34 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | • Work with DPW and Village Police to modify existing Traffic Control Orders along Anderson and Elizabeth Streets to reduce the number of stop signs. Cyclists and motorists share many of the same rights and responsibilities while traveling on a roadway-especially obeying traffic signals and signs. With the current configuration, a cyclist will need to stop 6 times along the proposed trail extension route. Another consideration might be to enact a law in the Village similar to the Idaho Stop, which allows cyclists to treat a stop sign as a yield sign and a red light as a stop sign.

• Work with local business owners to create a trail user incentive program such as bring in your bike helmet and receive free shipping or special discounts on items.

• Enhance and promote the Paint Creek through the Village. This is Southeast Michigan's premier coldwater trout stream. Reducing stormwater runoff, streambank stabilization and increasing tree canopy along the creek's edge will help to improve water quality.

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 35 Funding Opportunities

There are a number of grant opportunities that exist for non-motorized transportation and outdoor recreation enhancements. The Village of Lake Orion may qualify for grants from the following sources:

• Transportation Alternatives Program Grant The Transportation Alternatives Program (TAP) is a competitive grant program that funds projects such as multi-use paths, streetscapes, and historic preservation of transportation facilities that enhance Michigan's intermodal transportation system and provide safe alternative transportation options. The Michigan Department of Transportation and Southeast Michigan Council of Governments each have access to federal transportation funds to support place-based economic development by offering transportation choices, promoting walkability and improving quality of life. A minimum 20% local match is required for proposed projects and applications are accepted on an on-going basis online. www.michigan.gov/mdot or www.semcog.org/TAPCall.aspx

• Michigan Natural Resources Trust Fund The Michigan Department of Natural Resources oversees funds from the sale of oil, gas and mineral leases and royalties from their extraction on state lands. These funds are then granted back to qualifying agencies to acquire and develop lands for public recreation or for protection of land for its environmental importance or scenic beauty. A minimum 25% local match is required in addition to an updated 5-Year Parks & Recreation Master Plan. Online grant applications are due April 1st each year. www.michigan.gov/dnr

• Michigan Recreation Passport Grant The Michigan Department of Natural Resources oversees funds from the sale of the Recreation Passport which replaces the resident Motor Vehicle Permit for state park entrance. A portion of the revenues are then granted back to qualifying agencies for development projects. The program is focused on renovating and improving existing parks, but the development of new parks is eligible. www.michigan.gov/dnr

• Community Development Block Grant Funds Community Development Block Grant funds are provided to communities from the U.S. Department of Housing and Urban Development for a range of eligible activities that benefit low and moderate income citizens and/or promote community and economic development. As long as projects meet eligibility criteria funds could be used for non-motorized trail projects like sidewalk improvements. www.hud.gov

• Four County Community Foundation Grant Funds Grant applications through the Four County Community Foundation Grant are accepted throughout the year and will fund a variety of community related projects for non-profits, public schools and governmental agencies. www.4ccf.org

36 | Village of Lake Orion | Wayfinding & Trail Extension Opportunities | Conclusion

The Village of Lake Orion has done an excellent job preserving the small town character and historic roots from which it was built on. With some refinement of some key features and promotional materials, the Downtown can continue to grow and improve services and amenities to visitors and residents alike. Expansion of the Paint Creek Trail and proper wayfinding signage through the Village will also provide an improved user experience, a safe route to the Downtown and close another gap with connecting to the Polly Ann Trail.

The Governor's Showcase Trail will also expand the reaches of promoting non-motorized recreation and transportation in and around the state of Michigan. Exposing trail users to unique trails, special places and connecting downtowns are only a few benefits that this cross-state trail has to offer. The Lake Orion DDA should evaluate the existing services and amenities related to trails and cultural tourism and strive to expand missing business types.

Maintaining a strong downtown will ensure continued economic development potential, sustain property values and provide the opportunity for an improved quality of life for area residents. The small town charm, abundant natural resources and preservation of historic features continue to attract new businesses and out of town visitors. The proposed trail extension and wayfinding opportunities will help improve the overall experience and awareness of the special places that Lake Orion has to offer.

| Village of Lake Orion | Wayfinding & Trail Extension Opportunities | 37