PG13441 Proposed Bus Services
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Euston Resident's Assembly Report
‘Our Euston’ A report of the work of the Euston Residents’ Assembly (September - December 2018) Contents Executive Summary .................................................................................................................... 3 1 Introduction ........................................................................................................................ 6 2 Getting around Euston ..................................................................................................... 11 3 Euston’s open spaces........................................................................................................ 20 4 Best use of space .............................................................................................................. 28 5 Summary and next steps .................................................................................................. 34 valuesfirst Page 2 of 34 Executive Summary 1 Background The decision to build HS2 and the associated development means that the area around Euston is set to change dramatically with huge challenges and potentially many benefits for local people. The redevelopment of Euston Station and adjacent sites involves HS2 Ltd, Network Rail, Transport for London, Lendlease—the Department for Transport’s Master Development Partner, and the London Borough of Camden which is the planning authority. Camden council is producing a Euston Area Planning Brief, which will support the existing Euston Area Plan in guiding the development. Public consultation on the draft brief -
Temporary Changes to Bus Services for the London 2012 Olympic and Paralympic Games
Temporary changes to bus services for the London 2012 Olympic and Paralympic Games Position as of June 2012 Temporary service changes during the 2012 Games Planning the temporary changes The London bus network will remain central to the day-to-day functioning of the Capital during the 2012 Games. It will also play a role in moving Games spectators and workers. In planning the temporary changes to the network, our objectives have been to: - Maintain London’s comprehensive bus network while accommodating any temporary changes on the road network - Enhance capacity where appropriate, to meet increased demand We have considered the impacts of temporary changes to the road network needed to deliver the Games, including the Olympic Route Network (ORN) and Paralympic Route Network (PRN). The temporary changes will include measures such as restricted turns and road closures. Where these changes require bus diversions, we have tried to maintain good passenger links as far as possible. We have also compared forecasts of spectator and workforce demand with existing capacity. Road events Further temporary changes will be needed on days when Games road events take place. Details are included on a day-by-day basis in the appendix. Service alterations are subject to change if operational requirements vary during the Games. The changes, and the need to ‘check before you travel’, will be publicised to passengers well in advance of the Games using a combination of print, online and on- board electronic information. Duration Where capacity is to be enhanced, this will be for the duration of the relevant events. Most of the east London enhancements will run from the day of the Opening Ceremony to the day of the Closing Ceremony. -
London Underground Limited
Background Paper 1 Developing the Network 1 Introduction 1.1 Bus use has increased by over two-thirds since 1999, driven by sustained increases in the size and quality of the network, fares policy and underlying changes in London’s economy. The bus network is constantly evolving as London develops and the needs and aspirations of passengers and other stakeholders change. Enhancements take place not only to the service pattern but across all aspects of the service. • Capacity. The level of bus-km run has increased by around 40 per cent over the same period. Network capacity has increased by a faster rate, by around 55 per cent, with increases in average vehicle size. Additionally, much improved reliability means that more of the scheduled capacity is delivered to passengers. • Reliability. Effective bus contract management, in particular the introduction of Quality Incentive Contracts, has driven a transformation of reliability. This has been supported by bus priority and by the effects of the central London congestion charging scheme. Service control has been made more efficient and effective by iBus, TfL’s automatic vehicle location system. 4.0 3.5 3.0 2.5 2.0 1.5 Excess Wait Time (mins) 1.0 0.5 0.0 1977 1979 1981 1983 1985/86 1987/88 1989/90 1991/92 1993/94 1995/96 1997/98 1999/00 2001/02 2003/04 2005/06 2007/08 2009/10 2011/12 2013/14 Figure 1: Excess Waiting Time on high-frequency routes – since 1977 • Customer service. All bus drivers must achieve BTEC-certification in customer service and other relevant areas. -
7. Service Specification Route: 205/N205 QC44702
7. Service Specification Route: 205/N205 QC44702 This Service Specification forms section 7 of the ITT and should be read in conjunction with the ITT document, Version 1 dated 29 September 2011. You are formally invited to tender for the provision of the bus service detailed below and in accordance with this Service Specification. Tenderers must ensure that a Compliant Tender is submitted and this will only be considered for evaluation if all parts of the Tender documents, as set out in section 11, have been received by the Corporation by the Date of Tender. The Tender must be fully completed in the required format, in accordance with the Instructions to Tenderers. A Compliant Tender must comply fully with the requirements of the Framework Agreement; adhere to the requirements of the Service Specification; and reflect the price of operating the Services with new vehicles. Terminus Points Route No. 205: Paddington, Eastbourne Terrace* to Bow Church Route No. N205 (Options 1 & 2): Paddington, Eastbourne Terrace* to Leyton High Road, Temple Mills Lane * Paddington, Westbourne Terrace from contract commencement until Summer 2016 Contract Basis Incentivised Commencement Date 30th August 2014 Vehicle Type 87 capacity, dual door, double deck buses OR New Bus for London (NBfL) (see attached letter and lease) Current Maximum Approved 10.7 metres long and 2.55 metres wide Dimensions New Vehicles Mandatory Yes Hybrid Price Required Yes Sponsored Route Partly. Route No. N205 - Extension to Leyton High Road, Temple Mills Lane funded by London Borough of Newham and the frequency increase to 3 bph to be funded by London Borough of Tower Hamlets Advertising Rights Operator Minimum Performance Standard Average Excess Wait Time - No more than 1.30 - Route No. -
Research Guide No 4: Key Dates in the History of London Transport
TfL Corporate Archives Research Guides Research Guide No 4: Key Dates in the History of London Transport The following dates and events have been extracted from London Transport Diaries and other information in the Archives. Date Event 1829 First horse drawn bus service, operated by George Shillibeer, between Paddington and the Bank, via the Angel. Bus had 22 seats, was drawn by three horses 1831 First mechanical bus. Hancock‟s steam carriage ran Stratford to London 1832 Stage Carriages Act – introduction of licences for buses 1836 First steam railway in London, from Tooley Street (London Bridge) to Deptford, opened by the London & Greenwich Railway 1838 Introduction of drivers‟ and conductors‟ licences 1840 First era of steam buses ended 1843 Opening of the Thames Tunnel, now used by the East London Line. Used only by pedestrians until the 1860's 1850 Horse buses with roof seats – the „knifeboard‟ type – started to run in London 1851 Thomas Tilling started running horse-buses from Peckham 1855 London General Omnibus Company Ltd, formed in Paris as Compagnie des Omnibus de Londres, it was reregistered as an English Company in 1858. Its object was to purchase and operate the horse buses of London, owned for the most part by small scale proprietors. Operation began in 1856 1861-1862 First horse tramways, built by George Francis Train, an American, opened in London, but were unsuccessful and soon removed. The first was along the Bayswater Road from Marble Arch to Porchester Terrace 10/01/1863 First part of the Metropolitan Railway opened, from Paddington (Bishop‟s Road) to Farringdon Street (now Farringdon). -
Rowland Bilsland Traffic Planning RB
Rowland Bilsland Traffic Planning RB Highway and Traffic Planning Consultants Traffic Planning Directors: John Rowland, B.Sc (Hons), F.I.H.T., A.M.I.C.E Stewart J. Bilsland, B.Sc (Hons), C.Eng, M.I.C.E., F.I.H.T., M.C.I.T 1A, PEMBERTON GARDENS, UPPER HOLLOWAY, LONDON, N19 5RR TRANSPORT STATEMENT SJB/AR/9033 15th June, 2010 9033tsA 2, Marsh Farm Road, Telephone: 01245 329943 South Woodham Ferrers, Facsimile: 01245 328183 Chelmsford, Essex. CM3 5WP. E-mail: [email protected] C O N T E N T S SECTION 1 - INTRODUCTION SECTION 2 - BRIEF DESCRIPTION OF SITE AND SURROUNDING HIGHWAY NETWORK SECTION 3 - EXISTING USE SECTION 4 - PROPOSED USES SECTION 5 - ACCESSIBILITY SECTION 6 - CONCLUSIONS A P P E N D I C E S APPENDIX A - LOCATION PLAN WITH BUS STOPS, STATIONS AND CROSSING FACILITES SHOWN APPENDIX B - TRICS PRINTOUTS FOR THE VARIOUS MULTI-MODAL TRIPS FOR OFFICES APPENDIX C - TRICS PRINTOUTS FOR THE VARIOUS MULTI-MODAL TRIPS FOR HOTELS APPENDIX D - TRICS PRINTOUTS FOR THE VARIOUS MULTI-MODAL TRIPS FOR RESIDENTIAL DWELLINGS APPENDIX E - PTAL CALCULATIONS APPENDIX F - EXTRACTS FROM RELEVANT BUS TIMETABLES APPENDIX G - ROUTE MAPS AND EXTRACTS FROM RELEVANT TRAIN TIMETABLES APPENDIX H - EXTRACTS FROM RELEVANT UNDERGROUND TIMETABLES 2 1.0 INTRODUCTION 1.1 Rowland Bilsland Traffic Planning Limited are instructed by Marygate Investments Limited to prepare a Transport Statement for the proposed change of use of the existing B1 Offices and Storage/Workshops on the site at 1A, Pemberton Gardens, Upper Holloway, to an Apart-Hotel and two residential dwellings. -
Consultation on Proposed Changes to Bus Routes 7 and 10
Consultation on proposed changes to bus routes 7 and 10 Consultation report March 2016 1 Consultation on proposed changes to bus routes 7 and 10 Consultation Report March 2016 Contents 1 Introduction ..................................................................................................................... 1 2 The consultation ............................................................................................................. 1 3 Responses from members of the public ......................................................................... 3 4 Responses from statutory bodies and other stakeholders .............................................. 8 Appendix A - Copy of the consultation materials ................................................................. 10 Appendix B – All issues raised for Questions 5 & 6 (relating to the Tottenham Court Road and Holborn area bus route proposals) ..................................................................... 15 Appendix C – All issues raised for Question 12, relating to the quality of the proposal ....... 18 Appendix D – List of stakeholders consulted ....................................................................... 19 1 1 Introduction We recently consulted stakeholders and the public about a proposal to introduce changes to bus services in the Tottenham Court Road and Holborn area. The consultation ran for six weeks from 3 November to 15 December 2015. The areas around Tottenham Court Road and Holborn are currently experiencing disruption because of our work to upgrade -
Central London Bus Services Consultation – Updated Supporting Material
Appendix 2 Central London Bus Services Consultation – Updated Supporting Material October 2018 Page | 1 Central London Bus Services Consultation - Supporting Material Contents 1. Introduction ................................................................................................................ 3 2. Methodology and findings .......................................................................................... 3 3. Re-shaping the bus network ...................................................................................... 4 4. Why we reviewed central London .............................................................................. 5 Changes by route .................................................................................................................. 6 5. Tottenham Court Road - routes 14 (24 hour) and 134 (24 hour) ................................ 6 6. Kings Road to Shaftesbury Avenue corridor - routes 9 and N9 .................................. 7 7. Kings Road to Shaftesbury Avenue corridor - Routes 11, 19, 22 and 311 ................. 7 8. Whitehall and Westminster Bridge - Routes 3 and 53 ................................................ 9 9. Waterloo to Fleet Street - Routes 4, 76, 172 and 341 .............................................. 10 10. Euston Road - Routes 59 and 476 ........................................................................... 11 11. Marylebone Road - Routes 205 and N205 ............................................................... 12 12. Kingsway - Route 171 ............................................................................................. -
521 Waterloo - Cannon Street - London Bridge RED ARROW
521.qxd 21/8/03 4:17 pm Page 1 521 Waterloo - Cannon Street - London Bridge RED ARROW Mondays to Fridays (not peak hours) terloo Station „ Ê t. Paul’s Station „ Wa Aldwych Holborn StationHigh „ Holborn Holborn Circus S Mansion House StationCannon „Street StationLondon „ Bridge Ê • • • • • • • • • Station „ Ê BUS PASS ZONE 1 Mondays to Fridays Waterloo Station „ Ê 0643 0647 1000 1008 Then 1538 1548 1908 Aldwych Then about every 1013 about 1543 Then about every Holborn Station „ 0647 0651 3 minutes until 1006 1016 every 1546 1553 4 minutes until 1912 Holborn Circus 0652 0656 1013 1023 10 1553 1600 1917 St. Paul’s Station „ 0654 0658 1016 1026 mins 1556 1603 1919 Cannon Street Station „ Ê --- 0703 Then about every 1023 1033 until 1603 1610 Then about every 1924 London Bridge Station „ Ê --- 0708 6 minutes until 1028 1038 1608 1615 8 minutes until 1930 No service on Saturdays, Sundays or Public Holidays We do all we can to run the services shown but circumstances beyond our Operated by London General control mean that we may not always succeed. Special services run during the Christmas and New Year Holiday, with no buses on Christmas Day. for London Buses If you have any comments regarding this service, London Travel Information please write to Customer Service Centre, London Buses, 172 Buckingham Palace Road, 5.6.02 020 7222 1234 24 hours London SW1W 9TN. Telephone 020 7918 4300. T4130O 521.qxd 21/8/03 4:17 pm Page 2 521 London Bridge - Cannon Street - Waterloo RED ARROW Mondays to Fridays terloo t. -
Euston Station and Approach
LONDON-WEST MIDLANDS ENVIRONMENTAL STATEMENT ENVIRONMENTAL MIDLANDS LONDON-WEST | Vol 2 Vol LONDON- | Community Forum Area report Area Forum Community WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA1 | Euston - Station and Approach | CFA1 | Euston - Station and Approach Approach Station and - Euston November 2013 VOL VOL VOL ES 3.2.1.1 2 2 2 London- WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA1 | Euston - Station and Approach November 2013 ES 3.2.1.1 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited, Eland House, Bressenden Place, London SW1E 5DU Details of how to obtain further copies are available from HS2 Ltd. Telephone: 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Euston – Station and Approach/No 1 | Contents -
Lotno Description Hammer 1 London County
LotNo Description Hammer 1 London County Council Tramways fold-out LEAFLET ''How to Get There by Electric Car''£48 detailing cheap return fares to University Colleges, Polytechnics etc with list of service numbers & routes. Pencilled date 8/13 on cover believed correct. Two small fold-tears and some age-spotting. [1] 2 Early 1900s PUNCH TICKETS from the New London & Suburban Omnibus Co's Surbiton-Molesey£35 service (2) and the London Motor Omnibus Co's (Vanguard Services) Tufnell Park-Barnes service, the latter with trace of a stamp hinge on reverse. [3] 3 London Underground postcard MAP from 1908 printed by Waterlow & Sons Ltd. AccordingRes to ''No Need to Ask'', published by Capital Transport, this was the first use of the UndergrounD 'logo'. These postcards were available to advertisers and this one promotes Farrow's Bank on the reverse. It is unused, postcard-wise, and in good condition with a knock to the top-left corner and a little ageing on the reverse. [1] 4 1929 London Underground double-royal POSTER ''See them in London's Country - Travel£160 by Underground'' by Dorothy Mullock (1888-1973) featuring colourful and detailed illustrations of wild flowers. Printed by Adams Bros & Shardlow with print-code 7 1500 1-1-29. Some edge-scuffs, small tears at top and bottom edges, corner pin-holes and minor age-spotting in a couple of places but generally a good example. Unmounted. [1] 5 WW2 large card air-raid shelter TICKET for Holborn (Kingsway) Underground Station dated£50 April 1944 and issued by the ARP Controller for the Metropolitan Borough of Holborn. -
Central London Bus Services Consultation – Updated Supporting Material
Central London Bus Services Consultation – Updated Supporting Material October 2018 Page | 1 Central London Bus Services Consultation - Supporting Material Contents 1. Introduction ................................................................................................................ 3 2. Methodology and findings .......................................................................................... 3 3. Re-shaping the bus network ...................................................................................... 4 4. Why we reviewed central London .............................................................................. 5 Changes by route .................................................................................................................. 6 5. Tottenham Court Road - routes 14 (24 hour) and 134 (24 hour) ................................ 6 6. Kings Road to Shaftesbury Avenue corridor - routes 9 and N9 .................................. 7 7. Kings Road to Shaftesbury Avenue corridor - Routes 11, 19, 22 and 311 ................. 7 8. Whitehall and Westminster Bridge - Routes 3 and 53 ................................................ 9 9. Waterloo to Fleet Street - Routes 4, 76, 172 and 341 .............................................. 10 10. Euston Road - Routes 59 and 476 ........................................................................... 11 11. Marylebone Road - Routes 205 and N205 ............................................................... 12 12. Kingsway - Route 171 .............................................................................................