Quality Specifications for Roadway Bridges, Standardization at a European Level

Total Page:16

File Type:pdf, Size:1020Kb

Quality Specifications for Roadway Bridges, Standardization at a European Level Quality specifications for roadway bridges, standardization at a European level WG3 Technical Report Establishment of a Quality Control Plan September 2018 Impressum by boutik.pt ISBN: 978-86-7518-200-9 Editors / Authors R. Hajdin, M. Kušar, S. Mašović, P. Linneberg, J. Amado and N. Tanasić Close collaborators N. Ademović, C. Costa, M. Marić, J. Almeida, N. Galvão, S. Sein, M. Zanini and L. Pendergast GLOSSARY Observation It is a datum (i.e. piece of information) from a primary source, which may be acquired by human senses or by measuring/recording of some properties via adequate instruments. Observations can be qualitative i.e. only the absence or presence of a property is noted, or quantitative if a numerical value is coupled to the observed phenomenon by counting or measuring. The observation is a perception of human senses or data measured by instrument that is regarded as relevant within the context of the inquiry. Indicator It is something that shows what a situation is like. The “situation” depends on the context of an inquiry. The indicator can be qualitative (e.g. bad, good, etc.) or quantitative and is based on analysis of one or several ob- servations. Performance indicator (PI) Following the above definition, the “situation” is understood here as performance. The term performance indi- cator stems from economics and measures the success of an organization or of a particular activity (such as projects, programs and other initiatives) in which it engages. The application of this term to physical objects is coupled to their fitness for purpose. The performance indicator measures fitness for purpose of a physical object such as bridge or its element. Since the fitness for purpose (i.e. quality) can change over time, so does the value of a performance indicator. Maintenance interventions can also change the value of performance indicator and therefore the performance indicators of physical objects also mirror the performance of the agency responsible for their maintenance. It is obvious that bridge performance relates to safety and serviceability, but other perfor- mance criteria can be useful as well. Key performance indicators (KPIs) Generally, there is no clear distinction between PIs and KPIs. In this project, the KPIs relate to a whole bridge and are as follows: • Reliability is the probability that a bridge will be fit for purpose during its service life. It is the complement to the probability of structural failure (safety), operational failure (serviceability) or any other failure mode. • Availability is the proportion of time a bridge is open for service. It does not include failure-related service outages but the ones due to planned maintenance interventions. Alternatively, the Availability can be mea- sured as additional travel time due to an imposed traffic regime on bridge. • Safety is the situation of life and limb being protected from harm during the service life of a bridge. Loss of life and limb due to structural failure is not included by this definition (since it would overlap with the Reliability). • Economy is related to minimizing the long-term cost of maintenance activities over the service life of a bridge. Herein the user costs incurred due to detours and delays are not included. • Environment is related to minimizing the harm to environment during the service life of a bridge. Quality control plan The quality control plan specifies all activities and tools, needed to ensure quality requirements related to bridge performance aspects (e.g. safety, serviceability, etc.). It defines the extent and the interval of inspections or in- vestigations and data necessary to estimate key performance indicators and forecast their future development. Quality control plan also includes decision model that suggest maintenance action based on the forecast of key performance indicators. In this sense the quality control plan overlaps with the Strategic Asset Management Plan (SAMP) as defined in ISO 55000. Failure mode Failure modes are quasi-permanent or transient situations that violate code specifications or owner’s/ operator’s provisions. This includes but is not limited to overall bridge collapse. Some of these situations, e.g. Ultimate Limit State and Serviceability Limit State, are specified in bridge design. Due to slow (deterioration) and sudden (e.g. natural hazard) processes, damages may occur that result in additional failure modes. Finally, owners/operators may define situations (e.g. spalling, corrosion traces, etc.) that are regarded as failure modes since they might comprise public perception of safety. Vulnerable zones These are the segments and or elements of a bridge structure in which damages have the largest impact on safety and serviceability. One vulnerable zone may be related to several failure modes. Ontology A set of concepts and categories in a subject area or domain that shows their properties and the relations between them. In this report, the Entity Relationship Diagram is used to describe the ontology of the Quality control framework. Taxonomy A classification – in this case different bridge types and main girder cross-sections are classified according to construction material, static system and geometry. TABLE OF CONTENTS 1. Introduction .............................................................................................................................................8 1.1 The importance of the road infrastructure ....................................................................................................8 1.2 Growing traffic and traffic loads ......................................................................................................................9 1.3 Climate change .......................................................................................................................................................9 1.4 Decision-making for existing bridges .......................................................................................................... 10 2. Terms and concepts ............................................................................................................................. 10 2.1 Definition of quality ............................................................................................................................................. 10 2.2 Definition of quality control ............................................................................................................................ 10 3. Quality of road bridges ........................................................................................................................ 11 3.1 Design and construction – acceptance criteria ..........................................................................................11 3.2 Inspection and monitoring ................................................................................................................................11 3.3. Operation and maintenance ............................................................................................................................11 3.4 Key Performance Indicators for existing bridges ....................................................................................12 4. Damage processes ............................................................................................................................... 14 4.1 Gradual observable and non-observable Damage Processes ............................................................ 14 4.2 Sudden events – natural hazards .................................................................................................................. 16 5. Performance indicators and observations ....................................................................................... 17 5.1 Conceptual remarks .............................................................................................................................................17 5.2 Damage Processes and Observations ..........................................................................................................17 6. Performance assessment ................................................................................................................... 20 6.1 Current practice and its deficits .................................................................................................................... 20 6.2 Safety and serviceability of an undamaged structure ...........................................................................21 6.3 Reliability ................................................................................................................................................................22 6.4 Impact of observations - change from undamaged structure ..........................................................23 7. Quality Control framework .................................................................................................................27 7.1 General explanation of the Entity Relationship Diagram ......................................................................27 7.2 Vulnerable zones ................................................................................................................................................. 28 7.2.1 Conceptual weaknesses ................................................................................................................................28 7.2.2 Vulnerable zones related to the superstructure ................................................................................28
Recommended publications
  • Arched Bridges Lily Beyer University of New Hampshire - Main Campus
    University of New Hampshire University of New Hampshire Scholars' Repository Honors Theses and Capstones Student Scholarship Spring 2012 Arched Bridges Lily Beyer University of New Hampshire - Main Campus Follow this and additional works at: https://scholars.unh.edu/honors Part of the Civil and Environmental Engineering Commons Recommended Citation Beyer, Lily, "Arched Bridges" (2012). Honors Theses and Capstones. 33. https://scholars.unh.edu/honors/33 This Senior Honors Thesis is brought to you for free and open access by the Student Scholarship at University of New Hampshire Scholars' Repository. It has been accepted for inclusion in Honors Theses and Capstones by an authorized administrator of University of New Hampshire Scholars' Repository. For more information, please contact [email protected]. UNIVERSITY OF NEW HAMPSHIRE CIVIL ENGINEERING Arched Bridges History and Analysis Lily Beyer 5/4/2012 An exploration of arched bridges design, construction, and analysis through history; with a case study of the Chesterfield Brattleboro Bridge. UNH Civil Engineering Arched Bridges Lily Beyer Contents Contents ..................................................................................................................................... i List of Figures ........................................................................................................................... ii Introduction ............................................................................................................................... 1 Chapter I: History
    [Show full text]
  • CS 467 Risk Management and Structural Assessment of Concrete Deck Hinge Structures
    Design Manual for Roads and Bridges Highway Structures & Bridges Inspection & Assessment CS 467 Risk management and structural assessment of concrete deck hinge structures (formerly BA 93/09) Revision 1 Summary The use of this document enables the safety and serviceability of concrete hinge deck structures to be assessed and managed, allowing to manage risks and maintain a safe and operational network. Application by Overseeing Organisations Any specific requirements for Overseeing Organisations alternative or supplementary to those given in this document are given in National Application Annexes to this document. Feedback and Enquiries Users of this document are encouraged to raise any enquiries and/or provide feedback on the content and usage of this document to the dedicated Highways England team. The email address for all enquiries and feedback is: [email protected] This is a controlled document. CS 467 Revision 1 Contents Contents Release notes 3 Foreword 4 Publishing information . 4 Contractual and legal considerations . 4 Introduction 5 Background . 5 Assumptions made in the preparation of this document . 5 Abbreviations and symbols 6 Terms and definitions 7 1. Scope 8 Aspects covered . 8 Implementation . 8 Use of GG 101 . 8 2. Risk management process and prioritisation 9 Risk management report . 11 Initial review . 11 Risk assessment for structural assessment . 11 Structural review . 12 Structural assessment . 12 Risk assessment for management . 12 Management plan . 12 Prioritisation of deck hinge structures . 12 3. Initial review 13 4. Risk assessment for structural assessment 14 Risk assessment . 14 Primary risks . 14 Condition risk . 15 Structural risk . 15 Secondary risks . 15 Consequential risk . 16 Vulnerable details risk .
    [Show full text]
  • Northumberland Strait Crossing: Design Development of Precast Prestressed Bridge Structure
    PRECAST CONCRETE SOLVES 100-YEAR-OLD PROBLEM Northumberland Strait Crossing: Design Development of Precast Prestressed Bridge Structure The authors describe the design development process of the $840 million (Canadian dollars) Northumberland Strait Crossing Project from conceptual design in 1987 to the final project design. The 13 km (8 mile) long bridge links Prince Edward Island with New Brunswick and mainland Canada. The current design is based on main bridge spans of 250 m (820 ft) to minimize the number of piers and foundations in the Strait. Each span consists of a continuous precast, prestressed concrete variable depth double cantilever girder Barry Lester, P.Eng. with a length of 190 m (623 ft) and a drop-in segment of 60 m President (197 ft). The design took into consideration unusually heavy SLG Stanley Consultants Inc. vehicle loads, high wind loads, seismic factors, very high Calgary, Alberta icepack forces and possible ship collisions. Precast concrete Canada production began in the summer of 1994 and the main spans will be erected beginning in September 1995. The project is scheduled for completion in the summer of 1997. he Northumberland Strait gotiating the Terms of Confederation, Crossing Project (NSCP) is a the Federal Government of Canada T 13 km (8 mile) long bridge (see promised to promote efficient commu­ Fig. 1), with associated approach nication between the island and the roads and shoreside facilities, joining mainland, a promise that has been ful­ Prince Edward Island to New filled by the payment of annual subsi­ Brunswick and mainland Canada (see dies to support the island ferry service Fig.
    [Show full text]
  • Arched Bridges
    University of New Hampshire University of New Hampshire Scholars' Repository Honors Theses and Capstones Student Scholarship Spring 2012 Arched Bridges Lily Beyer University of New Hampshire - Main Campus Follow this and additional works at: https://scholars.unh.edu/honors Part of the Civil and Environmental Engineering Commons Recommended Citation Beyer, Lily, "Arched Bridges" (2012). Honors Theses and Capstones. 33. https://scholars.unh.edu/honors/33 This Senior Honors Thesis is brought to you for free and open access by the Student Scholarship at University of New Hampshire Scholars' Repository. It has been accepted for inclusion in Honors Theses and Capstones by an authorized administrator of University of New Hampshire Scholars' Repository. For more information, please contact [email protected]. UNIVERSITY OF NEW HAMPSHIRE CIVIL ENGINEERING Arched Bridges History and Analysis Lily Beyer 5/4/2012 An exploration of arched bridges design, construction, and analysis through history; with a case study of the Chesterfield Brattleboro Bridge. UNH Civil Engineering Arched Bridges Lily Beyer Contents Contents ..................................................................................................................................... i List of Figures ........................................................................................................................... ii Introduction ............................................................................................................................... 1 Chapter
    [Show full text]
  • A Survey on Cyclic Response of Unbonded Posttensioned Precast Pier with Ductile Fiber- Reinforced Concrete
    ISSN (Online): 2319-8753 ISSN (Print) : 2347-6710 International Journal of Innovative Research in Science, Engineering and Technology (A High Impact Factor, Monthly, Peer Reviewed Journal) Visit: www.ijirset.com Vol. 7, Issue 1, January 2018 A Survey on Cyclic Response of Unbonded Posttensioned Precast Pier with Ductile Fiber- Reinforced Concrete Vaibhav Dadarao Shinde, Prof. V.S. Thorat M.Tech Student. (Civil-Structural), G.H.Raisoni College of Engineering and Management, Pune, Maharashtra, India Assistant Professor, G.H.Raisoni College of Engineering and Management, Pune, Maharashtra, India ABSTRACT: A precast segmental concrete bridge pier system is being investigated for use in seismic regions. The proposed system uses unbonded posttensioning (UBPT) to join the precast segments and has the option of using a ductile fiber-reinforced cement-based composite (DRFCC) in the precast segments at potential plastic hinging regions. The UBPT is expected to cause minimal residual displacements and a low amount of hysteretic energy dissipation. The DFRCC material is expected to add hysteretic energy dissipation and damage tolerance to the system. Small-scale experiments on cantilever columns using the proposed system were conducted. The two main variables were the material used in the plastic hinging region segment and the depth at which that segment was embedded in the column foundation. It was found that using DFRCC allowed the system to dissipate more hysteretic energy than traditional concrete up to drift levels of 3–6%. Furthermore, DFRCC maintained its integrity better than reinforced concrete under high cyclic tensile compressive loads. The embedment depth of the bottom segment affected the extent of microcracking and hysteretic energy dissipation in the DFRCC.
    [Show full text]
  • Concrete Research Council
    AGENDA CONCRETE RESEARCH COUNCIL 2008 Spring Meeting ACI Convention Tuesday, April 1, 2008 Hyatt Regency Century Plaza Hotel Brentwood Room Los Angeles, California 11:30 a.m. to 1:00 p.m. 1.0 APPROVAL OF MINUTES AND AGENDA 1.1 Call to Order 1.2 Approval of Minutes of CRC 2007 Fall Meeting Council is asked to approve the minutes of the meeting held in Puerto Rico on October 16, 2007. 1.3 Approval of Agenda Any items not printed in this agenda will be announced. 1.4 Announcements Chair will make any announcements to the Council. 2.0 MEMBERSHIP - Exhibit A Note that this information is consistent with the ACI Membership Database. Make necessary corrections and forward them to ACI and the CRC Secretary. 3.0 EXECUTIVE COMMITTEE 3.1 ACI Foundation Structure 3.2 Executive Committee Membership 4.0 STATUS OF RESEARCH PROJECTS AND PROPOSALS - Exhibit B Research Coordinator Nanni to make presentation 4.1 CRC Research Projects CRC Project #26 De-Icing Salt Scaling (Jolin, awarded 8/01) CRC Project #37 CFRP Bridge (Grace, awarded 2/05) – Project complete, paper submitted as final report. CRC Project #40 Formwork SCC (Gardner, awarded 4/06) CRC Project #41 Surface Preparations (Bissonnette, awarded 1/07) CRC Project #43 Concrete Modulus (Popovics, awarded 7/06) CRC Project #45 LW Creep/Slip (Hays and Zollo, awarded 7/07) CRC Project #48 Leakage Control (Kianoush, awarded 4/07) 4.2 CRC Research Proposals CRC Proposal #52 by Pantelides (Review Chair – Jirsa) – Chair will update review progress CRC Proposal #50 by Sezen (Review Chair – Murray) – Chair will lead discussion of the review, followed by a ballot to determine funding 4.3 Grant Proposal Guide Proposal Guide updated and posted to ACI website 5.0 CURRENT FINANCIAL STATUS – Exhibit C Secretary will make presentation.
    [Show full text]
  • 2010 51 Pages 8.8 MB
    Illustrations Key: Six of the more interesting articles in this public- cation year (six illustrations at right) were: • Lunar Industrial Seed 3b- • Alternative sites for Analog Research (abandoned dry mine galleries, quarries, hangars • Eartly road network on Mars • Apollo 13 Essays: “Human Exploration is worth the risk” • The importance of hallways on outposts and settlements • Getting past the Macims of Peenemunde Other Articles of note include: • A Page from the Luna City Yellow Pages • Basalt Fibers industry • Lunar Base Preconstruction • L1 Gateway to the Moon • Platinum MOON (Book Review) • Peter’s Shielding Blog • Pendeulum of views on ancient Mars • Mars Analog Stations • “Thermal Wadis” on the Moon • Expanding on the Google Lunar X-prize technology opportunities • Basalt as the linchpin of lunar industry • More than one settlement - role of trade • Research and Development for the International Lunar Research Park • Is Bigelow tackling only half the challenge of TransHab? • Kalam , NSS, and Space Solar Power challenge • “in this Decade” win the race, lose the war • Fresh look at the Spacesuit Concept • Lunar Cold Traps key to outer solar system • L1 Gateway, 2 • Calcium Reduction for processing moonduat • Mining Asteroids on the Moon • An Asteroid Mission that makes sense • An Avatar Moonbase? • Lavatubes: from skylights to Settlements • Sweet Spot in farside’s Mare Ingenii • Lunarcrete: a concept from two decades ago Read and enjoy! 1 Zubrin: “Earth is to Moon and Mars as Europe is to Greenland and North America” So says Mars Society founder Robert Zubrin in Defining the Lunar Industrial Seed: a recent release. Let’s get real! Earth is to Moon and By Dave Dietzler [email protected] Mars as Europe is to Iceland and Antarctica.
    [Show full text]
  • Western Bridge Engineers' Seminar
    Western Bridge INNOVATIVE SOLUTIONS Engineers’ THAT STAND THE TEST OF TIME Seminar Portland Marriott Downtown Waterfront Portland, Oregon Seminar managed by: Photo courtesy of TriMet K1 KEYNOTE SESSION Overview of the OR-18 Newberg – Dundee Bypass Project landslides along the alignment and the Willamette River and Matthew Stucker • Oregon Department of Transportation additional historic landslides on both sides of the Chehalem Robert Goodrich • OBEC Consulting Engineering Creek. These landslides necessitated construction of two large Tony Snyder • Oregon Department of Transportation tieback and secant pile retaining walls beneath the bypass bridge Scott Schlechter • GRI that crosses the creek. Highway structures include ten bridges, two retaining walls The purpose of the OR18: Newberg-Dundee Bypass Project and various sign structures. Three bridges originally planned (NDBP) is to improve mobility and safety for highway traffi c through south Newberg were combined into a single half mile through Newberg and Dundee and to relieve congestion by long, 16-span structure to eliminate settlement concerns from reducing truck and passenger vehicle traffi c on OR99W. ODOT large embankments. A 3500-foot long noise wall along the east Region 2 led a multi-disciplined team of professionals from ODOT embankment and extending almost 2000 feet onto the east end and area engineering fi rms, working together to complete the of the bridge, incorporated 28 unique architectural formliner planning, permitting, design and construction of this major project. patterns depicting hills and trees. The bridge design team was The overall NDBP is being developed through multiple projects challenged to repurpose surplus PCPS Bulb-T girders that the that accommodate schedule, funding and construction bonding Agency had available from another project that was halted.
    [Show full text]
  • Report 2009/109 Pacific Earthquake Engineering Research Center College of Engineering University of California, Berkeley December 2009
    PACIFIC EARTHQUAKE ENGINEERING RESEARCH CENTER PACIFIC EARTHQUAKE ENGINEERING Simulation and Performance-Based Earthquake Engineering Assessment of Self-Centering Post-Tensioned Concrete Bridge Systems Won K. Lee and Sarah L. Billington Stanford University PEER 2009/109 DECEMBER 2009 Simulation and Performance-Based Earthquake Engineering Assessment of Self-Centering Post-Tensioned Concrete Bridge Systems Won K. Lee Department of Civil and Environmental Engineering Stanford University Sarah L. Billington Department of Civil and Environmental Engineering Stanford University PEER Report 2009/109 Pacific Earthquake Engineering Research Center College of Engineering University of California, Berkeley December 2009 ABSTRACT The focus of this research is on conducting a performance-based earthquake engineering assessment of self-centering bridge columns for structural concrete bridges. Standard highway bridges in highly seismic regions are typically designed for columns to undergo large inelastic deformations during severe earthquakes, which can result in residual displacements. These residual displacements are a measure of post-earthquake functionality in bridges, and can determine whether a bridge remains usable following an earthquake. To mitigate the effects of residual displacements, a number of self-centering systems for bridge columns using unbonded post-tensioned (UBPT) reinforcing steel are proposed and investigated. The research reported herein had three objectives: (1) to assess and develop simulation methods and models that can
    [Show full text]
  • Creep and Cracking of Concrete Hinges: Insight from Centric and Eccentric Compression Experiments
    Materials and Structures (2017) 50:244 https://doi.org/10.1617/s11527-017-1112-9 ORIGINAL ARTICLE Creep and cracking of concrete hinges: insight from centric and eccentric compression experiments Thomas Schlappal . Michael Schweigler . Susanne Gmainer . Martin Peyerl . Bernhard Pichler Received: 9 March 2017 / Accepted: 4 November 2017 / Published online: 22 November 2017 Ó The Author(s) 2017. This article is an open access publication Abstract Existing design guidelines for concrete construction, it is concluded (i) that realistic simula- hinges consider bending-induced tensile cracking, but tion of variable loads requires consideration of the the structural behavior is oversimplified to be time- here-studied time-dependent behavior and (ii) that independent. This is the motivation to study creep and permanent compressive normal forces shall be limited bending-induced tensile cracking of initially mono- by 45% of the ultimate load carrying capacity, in order lithic concrete hinges systematically. Material tests on to avoid damage of concrete hinges under sustained plain concrete specimens and structural tests on loading. marginally reinforced concrete hinges are performed. The experiments characterize material and structural Keywords Integral bridge construction Á creep under centric compression as well as bending- Mechanized tunneling Á Segmented tunnel lining Á induced tensile cracking and the interaction between Tensile cracking of concrete Á Digital image creep and cracking of concrete hinges. As for the latter correlation two aims, three nominally identical concrete hinges are subjected to short-term and to longer-term eccen- tric compression tests. Obtained material and struc- tural creep functions referring to centric compression 1 Introduction are found to be very similar.
    [Show full text]
  • NCHRP014 Final Report.Pdf
    IDEA PROJECT FINAL REPORT Contract NCHRP-94-IDO 1 4 IDEA Program Transportation Research Board National Research Council March 1997 UNRETNFORCED, CENTRALLY PRESTRESSED COLI]MNS AI\D PILES Prepared by: D.V. Reddy, Florida Atlantic University Boca Raton, Florida Paul Csagoly Consultant Clearwater, Florida INNOVATIONS DESERVING EXPLORATORY ANALYSIS (IDEA) PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) This NCHRP-IDEA investigation was completed as part of the National Cooperative Highway Research Program (NCHRP). The NCHRP-IDEA program is one of the four IDEA programs managed by the Transportation Research Board (TRB) to foster innovations in highway and intermodal surface transportation systems. The other three IDEA program areas are Transit-IDEA, which focuses on products and results for transit practice, in support of the Transit Cooperative Research Program (TCRP), Safety-IDEA, which focuses on motor carrier safety practice, in support of the Federal Motor Carrier Safety Administration and Federal Railroad Administration, and High Speed Rail-IDEA (HSR), which focuses on products and results for high speed rail practice, in support of the Federal Railroad Administration. The four IDEA program areas are integrated to promote the development and testing of nontraditional and innovative concepts, methods, and technologies for surface transportation systems. For information on the IDEA Program contact IDEA Program, Transportation Research Board, 500 5th Street, N.W., Washington, D.C. 20001 (phone: 202/334-1461, fax: 202/334-3471, http://www.nationalacademies.org/trb/idea) The project that is the subject of this contractor-authored report was a part of the Innovations Deserving Exploratory Analysis (IDEA) Programs, which are managed by the Transportation Research Board (TRB) with the approval of the Governing Board of the National Research Council.
    [Show full text]
  • Life Cycle Assessment of Maillart's Bridges
    Politecnico di Torino École polytechnique fédérale de Lausanne Master Course in Civil Engineering Master Thesis: Life Cycle Assessment of Maillart’s Bridges Giulia Pirro Professors: Supervisor: C. Fivet and C. De Wolf R. Ceravolo Academic Year 2018/2019 Life Cycle Assessment of Maillart’s Bridges Giulia Pirro 1 Master Thesis, 2019 Life Cycle Assessment of Maillart’s Bridges Abstract Robert Maillart’s contribution to the community of civil engineers and, most of all, his crucial role in the evolution of the structural art are undeniable. He was able to merge not only mechanical efficiency with innovative solutions but also aesthetic expression as a real artist, always balancing his choices with limited resources both in terms of construction materials and costs. Following these three key parameters he succeeded in producing structures which can be considered a very good combination of structural performance and sustainability. The actual goal is to understand to what extent Maillart’s bridges are indeed sustainable in addition to be efficient and elegant. That is why performing a Life Cycle Assessment (LCA) of his bridges is a valid quantitative confirmation of his achievements. The followed procedure is, thus, based on the computation of construction materials volumes. Starting from the original drawings [1], elaborating them as 3D model, the contribution of concrete and steel is computed. Then, the volume of masonry is also calculated and, where present, the timber for the scaffolding. The goal is to compute the Global Warming Potential (GWP) of each bridge, to normalise them per deck area and to be able to compare them according to different strategies.
    [Show full text]