PROCEEDINGS of the DISTRICT COLLECTOR, KASARAGOD (Present: Dr

Total Page:16

File Type:pdf, Size:1020Kb

PROCEEDINGS of the DISTRICT COLLECTOR, KASARAGOD (Present: Dr PROCEEDINGS OF THE DISTRICT COLLECTOR, KASARAGOD (Present: Dr. D. Sajith Babu, IAS.) Sub:- Kasaragod Development Package 2020-21- Integrated water management of Kasaragod district- Renovation of VCB at Edaneer across Mogral river in Chengala G.P - Administrative Sanction– Order issued- Reg. Read:- 1. G.O (Rt) No.392/201 3/Plg Dated: 10.10.2013 2. G.O (Rt) No. 337/2019/P&EA Dated: 25.07.2019 3. Letter No. D1-KDP/2020 Dated: 05.10.2020 of the Executive Engineer, Minor Irrigation Division, Kasaragod 4. Letter No. 431/2020/KDP/KSD Dated: 21.10.2020 of the District Collector, Kasaragod 5. Letter No. SPB/2312/2012/Agri Dated: 23.11.2020 of the Member Secretary, State Planning Board, Thiruvananthapuram 6. Minutes of the DLC meeting held on 13.01.2021 Order No. 1124/2020/KSD/KDP (572) Dated: 30.01.2021 As per the Government order read as 1st paper above, Government have constituted an Empowered Committee for the implementation of Dr. P. Prabhakaran Commission Report on Kasaragod Development Package. An amount of Rs.75.00 crore under the Head of Account 2551-60-101-97 has been earmarked during the financial year 2020-21 for implementing the projects included in the Kasaragod Development Package. As per the Government order read as 2nd paper above, a District Level Committee was constituted for granting administrative sanction for the projects below Rs. 5.00 crore under Kasaragod Development Package, based on the recommendation of State Level Empowered Committee. As per the letter read as 3rd paper above, the Executive Engineer, Minor Irrigation Division, Kasaragod furnished the D.P.R of the project “Integrated water management of Kasaragod district- Renovation of VCB at Edaneer across Mogral river in Chengala G.P” for an amount of Rs. 20.00 lakh for the year 2020-21 under Kasaragod Development Package. As per the letter read as 4th paper above, 6 project proposals for a total amount of Rs. 639.65 lakh including the above said proposal were submitted to State Planning Board for vetting and necessary approval. As per the letter 5th above, the State Planning Board approved the project and directed to submit the status report of water conservation projects sanctioned under Kasaragod Development Package and the same was submitted to State Planning Board vide this office letter No. 431/2020/KSD/KDP Dated: 19.01.2021. As per the minutes read as 6th above, the District Level Committee meeting held on 13.01.2021 reviewed the project in detail and decided to approve the project recommended by the State Planning Board. Order In the circumstances, sanction is hereby accorded for the implementation of the project “Integrated water management of Kasaragod district- Renovation of VCB at Edaneer across Mogral river in Chengala G.P” for an amount of Rs. 20.00 lakh (Rupees Twenty Lakh Only) to the Executive Engineer, Minor Irrigation Division, Kasaragod under Kasaragod Development Package for the year 2020-21. The expenditure will be met under Kasaragod Development Package from the Head of Account ‘2551-60-101-97-34-3 Other Items’ in the current year's budget for the project. The implementing officer has to execute the project by adhering the conditions stipulated below. 1. The work shall be carried out as per the D.P.R furnished and any deviation/change in the work from the estimate shall be effected only with the prior permission of the District Level Technical Committee (DLTC) as per rules in vogue. 2. Technical Sanction should be obtained from the competent authority. 3. Tender excess, if any, shall be reported to the undersigned in time before the finalization of tender. 4. Monthly progress of the work and reconciliation statement showing expenditure shall be furnished to the undersigned before 10th of every succeeding month. 5. A monitoring committee consisting of people’s representatives and officials should monitor the progress of the project. 6. The implementing officer should physically examine the work being implemented and furnish the report with all relevant details. The mandatory approvals such as permit/ sanction if required to be ensured well in advance to start the work within the stipulated time and for the speedy implementation of the project. 7. Purchase rules should be scrupulously followed for the projects where purchase of articles is required. 8. Government guidelines, rules and regulations, stipulated for PWD works should be strictly adhered to. 9. The work should be completed in the stipulated time period 10. A social audit board with the logo of Kasaragod Development Package should be erected before the commencement of the work with the details viz, Name of project, A.S amount, detailed specification of work, date of commencement and completion of each phase of the work. 11. A sign board carrying the inscription “KASARAGOD DEVELOPMENT PACKAGE”, Name of work, A.S amount, cost involved, year of sanction, date of commencement and completion, date of inauguration and details of implementing agency should be permanently and prominently erected at the site with the specification vide this office letter No. 1145(383)/2017-18/KDP/KSD Dated: 20.09.2019. 12. After the completion of each project, the following details viz, KASARAGOD DEVELOPMENT PACKAGE, Name of Work, A.S Amount, Year of Sanction, and Implementing Agency are to be made visible at the site, vide this office letter No. 1356/2018/KDP/KSD Dated: 25.01.2020 13. The inauguration should be arranged immediately after the completion of the work in consultation with the District Collector/ the Special Officer 14. After the completion of work, the maintenance and up keepment of the project by the user agency shall be ensured. 15. All statutory deductions of part/ final bill will be made by the Implementing Officer before effecting payment. 16. After completion of the work, the implementing officers should furnish the completion report (K.F.C Form 24), non-liability certificate, final bill, two copies of photograph of the completed project, details of transfer of asset to User Agency and future maintenance certificate, if any and utilization certificate to the undersigned on time. 17. After completing the project the balance amount if any with interest has to be remitted with required details. Sd/- District Collector Forwarded/ By order Special Officer Kasaragod Development Package To: The Executive Engineer, Minor Irrigation Division, Kasaragod Copy to: 1. The Principal Secretary to Govt. Planning and Economic Affairs, Department, Thiruvananthapuram (with C/L) 2. The Member Secretary, State Planning Board, Thiruvananthapuram (with C/L) 3. The Finance Officer, Collectorate, Kasaragod 4. The Assistant Executive Engineer, Minor Irrigation Sub Division, Kasaragod 5. The Assistant Engineer, Minor Irrigation Section, Kasaragod- 671121 6. The Assistant Engineer, KDP for Minor Irrigation 7. The President/ Secretary, Chengala Grama Panchayath 8. Stock File/ www.kasaragodpackage.com .
Recommended publications
  • Isolation and Identification of Pathogenic Bacteria in Edible Fish
    43672 Megha P U and Harikumar P S / Elixir Bio Sci. 100 (2016) 43672-43677 Available online at www.elixirpublishers.com (Elixir International Journal) Bio Sciences Elixir Bio Sci. 100 (2016) 43672-43677 Isolation and Identification of Pathogenic Bacteria in Edible Fish: A Case Study of Mogral River, Kasargod, Kerala, India Megha P U and Harikumar P S Water Quality Division, Centre for Water Resources Development and Management, Kozhikode, India. ARTICLE INFO ABSTRACT Article history: Water is one of the most valued natural resource and hence the management of its quality Received: 26 September 2016; is of special importance. In this study, an attempt was made to compare the aquatic Received in revised form: ecosystem pollution with particular reference to the upstream and downstream quality of 9 November 2016; river water. Water samples were collected from Mogral River and analysed for physico- Accepted: 18 November 2016; chemical and bacteriological parameters. Healthy fish samples from the river basin were subjected to bacteriological studies. The direct bacterial examination of the histological Keywords sections of the fish organ samples were also carried out. Further, the bacterial isolates Mogral River, were taxonomically identified with the aid of MALDI-TOF MS. The physico-chemical Water quality, parameters monitored exceeded the recommended level for surface water quality in the Fish samples, downstream segment. Results of bacteriological analysis revealed high level of faecal Bacterial isolates, pollution of the river. The isolation of enteric bacteria in fish species in the river also MALDI-TOF MS. served as an indication of faecal contamination of the water body. Comparatively, higher bacterial density was found in the liver samples of the fish collected from the downstream, than in other organs of the fish collected from the upstream segment.
    [Show full text]
  • Problems of Salination of Land in Coastal Areas of India and Suitable Protection Measures
    Government of India Ministry of Water Resources, River Development & Ganga Rejuvenation A report on Problems of Salination of Land in Coastal Areas of India and Suitable Protection Measures Hydrological Studies Organization Central Water Commission New Delhi July, 2017 'qffif ~ "1~~ cg'il'( ~ \jf"(>f 3mft1T Narendra Kumar \jf"(>f -«mur~' ;:rcft fctq;m 3tR 1'j1n WefOT q?II cl<l 3re2iM q;a:m ~0 315 ('G),~ '1cA ~ ~ tf~q, 1{ffit tf'(Chl '( 3TR. cfi. ~. ~ ~-110066 Chairman Government of India Central Water Commission & Ex-Officio Secretary to the Govt. of India Ministry of Water Resources, River Development and Ganga Rejuvenation Room No. 315 (S), Sewa Bhawan R. K. Puram, New Delhi-110066 FOREWORD Salinity is a significant challenge and poses risks to sustainable development of Coastal regions of India. If left unmanaged, salinity has serious implications for water quality, biodiversity, agricultural productivity, supply of water for critical human needs and industry and the longevity of infrastructure. The Coastal Salinity has become a persistent problem due to ingress of the sea water inland. This is the most significant environmental and economical challenge and needs immediate attention. The coastal areas are more susceptible as these are pockets of development in the country. Most of the trade happens in the coastal areas which lead to extensive migration in the coastal areas. This led to the depletion of the coastal fresh water resources. Digging more and more deeper wells has led to the ingress of sea water into the fresh water aquifers turning them saline. The rainfall patterns, water resources, geology/hydro-geology vary from region to region along the coastal belt.
    [Show full text]
  • Kerala State Pollution Control Board
    : General: 0471- 2312910, 2318153, 2318154, 2318155 Chairman: 2318150 Member Secretary: 2318151 e-mail: [email protected] FAX: 0471 – 2318134, 2318152 web: www.keralapcb.nic.in KERALA STATE POLLUTION CONTROL BOARD Pattom P.O., Thiruvananthapuram – 695 004 PCB/HO/EE3/NGT/673/2018 Date:4.08.2020 From The Member Secretary Kerala State Pollution Control Board To The Secretary Ministry of Jal Shakti Department of water Resources, River Development and Ganga Rejuvenation Shram Shakti Bhawan Rafi Marg New Delhi-110001 Subject: Forwarding of Monthly Progress Report of June 2020 – reg. Ref: Copy of presentation made on 30.07.2020 in the 4th meeting of CMC held through Video Conferencing regarding 351 polluted river stretches based on the directions of Hon’ble NGT in the matter OA No. 673 of 2018, received through e-mail on 31.07.2020 Sir, The Monthly Progress Reports of June 2020 regarding all the 21 polluted river stretches in Kerala based on the directions of Hon’ble NGT in the matter OA No. 673 of 2018 were submitted through e-mail on 18.07.2020 to [email protected] , [email protected], [email protected], [email protected], [email protected] and [email protected]. Now in compliance with the instructions forwarded along with the copy of presentation, which was made on 30.07.2020 in the 4th meeting of CMC held under the Chairmanship of Secretary, DoWR,RD&GR, Ministry of Jal Shakti, received through e- mail on 31.07.2020, as “MPRs are submitted in 40 different files in word and excel format and State to submit one signed compiled PDF copy of MPR to NMCG,” signed compiled PDF copy of MPR is submitted herewith for kind information and necessary action.
    [Show full text]
  • 1. Introduction
    1. INTRODUCTION 1.1. History Kasaragod, the northernmost district of Kerala, is endowed with rich natural resources and is noted for its majestic forts, ravishing rivers, hills, green valleys and beautiful beaches. The rich and varied cultural heritage of the district is portrayed through spectacular presentations of Theyyam, Yakshagana, Poorakkali, Kolkali and Mappilappattu. Seven languages are prevalent in Kasaragod. Malayalam is the administrative language. Other languages are Kannada, Tulu, Konkani, Marati, Urdu and Beary.Prior to State reorganization, Kasaragod was part of the South Kanara district.Kasaragod became a part of Malabar district following the reorganization of States and formation of unified Kerala State. Later, Kasaragod Taluk of Malabar district was bifurcated in to Kasaragod and Hosdurg Taluks and integrated with the then newly formed Cannanore district. Kasaragod became part of Kerala following the re-organization of states and formation of Kerala in 1st November 1956.The district was Kasaragod Taluk in Kannur District.The formation of Kasaragod district was a long felt ambition of the people.It is with the intention of bestowing maximum attention on the development of backward area, Kasaragod district was formed on 24th May,1984 as per GO (MS)No.520/84/RD, Dated 19.05.1984 by taking Kasaragod and Hosdurg taluks from the then Kannur district.The name Kasaragod is said to be derived from the word Kasaragod which means Nuxvemied Forest(Kanjirakuttam). 1.2. Physiography Kasaragod is bounded on the north and the east by Dakshina Kannada and Coorg districts of Karnataka State, on the south by Kannur district and on the west by the Lakshadweep Sea.
    [Show full text]
  • Annual Report 2013-'2014
    ANNUAL REPORT 2013-’2014 National Centre for Earth Science Studies (ESSO, Ministry of Earth Sciences, Govt. of India) Akkulam, Thiruvananthapuram-695011, India Chief Editor Dr. N. P. Kurian Editorial Board Dr. D. Padmalal Dr. L. Sheela Nair Dr. D. S. Suresh Babu Secretarial Assistance Mr. D. Sreekanth Pai Mrs. S. R. Reeja Raj Mrs. R. P. Rejani Contents From the Director’s Desk ........................................................................................................................................................... v NCESS: Retrospect and Prospect ............................................................................................................................................. vi 1. Crustal Processes 1.1 Palaeoproterozoic palaeomagnetism with special reference to the mafic dykes in the Archaean craton around the Cuddapah basin ............................................................................................................................................. 1 1.2 Mafic volcanic flows/sills in the Gwalior, Bijawar and Cuddapah Basins ....................................................... 2 1.3 Archeaomagnetism ......................................................................................................................................... 3 1.4 Major and trace element geochemistry and Sr-Nd isotope study of the charnockites from Southern Granulite Terrain .........................................................................................................................................................
    [Show full text]
  • Water Quality
    WATER QUALITY Type Frequency Sampling Sampling STNCode Name of Monitoring Station Water Name Of Wate rBody MonAgency Of Weather Date Time Body Monitorin 17 02:11:17 11:20 R.Periyar Near Aluva- Eloor River Periyar River Kerala S.P.C.B. Monthly Clear 18 03:11:17 11:45 R.Periyar At Kalady River Periyar River Kerala S.P.C.B. Monthly Clear 20 08:11:17 10:02 Chaliyar At Koolimadu River Chaliyar River Kerala S.P.C.B. Monthly Clear 21 08:11:17 10:45 Chaliyar At Chungapilli River Chaliyar River Kerala S.P.C.B. Monthly Clear 42 03:11:17 9:10 Kallada At Perumthottam Kadavu River Kallada River Kerala S.P.C.B. Monthly Clear 43 02:11:17 10:45 Muvattupuzha At Vettikattumukku River Muvattupuzha River Kerala S.P.C.B. Monthly Clear 1154 03:11:17 12:45 Chalakudy At Pulickal Kadavu River Chalakudy River Kerala S.P.C.B. Monthly Clear 1155 04:11:17 10:00 Karamana At Moonnattumukku River Karamana River Kerala S.P.C.B. Monthly Clear 1156 04:11:17 7:30 Pamba At Chengannur River Pamba River Kerala S.P.C.B. Monthly Clear 1207 13:11:17 11:45 Kabani At Muthankara River Kabani River Kerala S.P.C.B. Monthly Clear 1208 03:11:17 12:30 Bhavani At Elachivazhi River Bhavani River Kerala S.P.C.B. Monthly Clear 1338 03:11:17 10:45 Periyar At SDP Aluva River Periyar River Kerala S.P.C.B. Monthly Clear 1339 18:11:17 10:10 Meenachil At Kidangoor River Meenachil River Kerala S.P.C.B.
    [Show full text]
  • Kerala State Pollution Control Board
    : General: 0471- 2312910, 2318153, 2318154, 2318155 Chairman: 2318150 Member Secretary: 2318151 e-mail: [email protected] FAX: 0471 – 2318134, 2318152 web: www.keralapcb.nic.in KERALA STATE POLLUTION CONTROL BOARD Pattom P.O., Thiruvananthapuram – 695 004 PCB/HO/EE3/NGT/673/2018 Date: 20.11.2020 From The Member Secretary To The Secretary, Ministry of Jal Shakti, Department of water Resources, River Development and Ganga Rejuvenation, Shram Shakti Bhawan, Rafi Marg, New Delhi-110001. Subject: Forwarding of Monthly Progress Report of October, 2020 – reg. Ref: Order of the Hon’ble NGT in the matter OA No. 673 of 2018 Sir, The signed compiled PDF copy of Monthly Progress Report of October, 2020 in the new format is submitted herewith for kind information and necessary action. The revised dossier regarding sewage and effluent from industries will be submitted at the earliest. Yours faithfully, Member Secretary Copy to: 1. Principal Secretary, Environment Department (Chairperson, RRC) 2. O/o the Chief Secretary’s Environment Monitoring Cell 3. CPCB, Delhi and Bangalore E-mail: [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected], [email protected] [email protected], GreenState KERALA <[email protected]>, Industries Directorate <[email protected]>, Chief Engineer Irrigation and Administration <[email protected]>, Chief Engineer
    [Show full text]
  • History of Kerala PDF.Pdf
    UNIVERSITY OF CALICUT SCHOOL OF DISTANCE EDUCATION FIRST SEMESTER M.A. HISTORY PAPER-II HISTORYHISTORY OFOF KERALAKERALA -I-I (2008 Admission onwards) Prepared by Dr.N.PADMANABHAN Reader P.G.Department of History 2 C.A.S.College, Madayi P.O.Payangadi-RS-670358 Dt.Kannur-Kerala. PART- I GEOGRAPHY AND HISTORY CHAPTERS CONTENTS PAGES I IMPORTANCE OF LOCATION IN PENINSULAR INDIA 07-06 II LANDSCAPE AND SOIL TYPES 14- 42 III THE WESTERN GHATS 43-47 IV RIVER SYSTEMS AND BACKWATERS 48-72 V CHANGING ROLES OF THE ARABIAN SEA 73-77 PART-II SOURCES AND HISTORICAL WRITINGS CHAPTERS CONTENTS PAGES 1 LEGENDS AND PERCEPTIONS 79-131 II SEARCHES FOR PRIMARY SOURCES 132-149 III TRADITIONAL WRITING OF DIFFERENT TYPES 150-163 IV NEW WRITING 164-194 V EMERGING AREAS 195-208 3 PART ± I GEOGRAPHY AND HISTORY Kerala has been through the ages an integral part of the Indian sub- continent.Its history is part of the general history of India and its culture is one of the major streams that have enriched the composite culture of the country. At the same time Kerala has had the distinction of bring an independent geographical and political entity from very early days. Its unique geographical position and peculiar physical features have invested Kerala with a distinct individuality.The land of Kerala comprises the narrow coastal strip bounded by the Western Ghats on the east and the Arabian Sea on the west in the southern part of the Indian Peninsula.Paradoxical as it might seem, this geographical position has helped to ensure, to some extent, its political and cultural isolation from the rest of the country and also facilitated its extensive and active contacts with the countries of the outside world.
    [Show full text]
  • Hon'ble NGT in the Matter of OA No. 673/2018 Dated 06.12.2019
    National Mission for Clean Ganga Format for Submission of Monthly Progress Report by States/ UTs (Hon’ble NGT in the matter of OA No. 673/2018 dated 06.12.2019) Sl. Activity to be Timeline Submission of Progress by State/UT-Compliance Status No. monitored 1. Ensure 100% 31.03.2021 Total Sewage Generation in Kerala: 3759.28 MLD treatment of Total Sewage Treatment capacity in the state: 124.04 MLD sewage at least Total septage treatment capacity in the state: 0.2 MLD in situ Gap in Sewage Treatment in the state: 3635.24 MLD remediation Total Sewage Treatment in the state out of installed capacity: 55.04 MLD No. of functional STPs in the state: 7 No. of functional septage treatment plants in the state: 2 *The entire sewage generated in the state is treated by septic tank - soak pit system or STP. Individual septic tank - soak pit systems are provided for households and small establishments. Individual STPs are provided for establishments such as flats, hotels, hospitals, etc. There is no open defecation in the state. Details of existing STPs/Septage treatment plants in the State: Sl. City/Town STP location Status STP No. Installed capacity 1 Thiruvananthapur Common Sewage Operational 107 MLD am Treatment Plant, Muttathara, Trivandrum Maintained by Kerala Water Authority 2 Pathanamthitta Seasonally 5 MLD Sewage Treatment Plan Operated during at Sannidhanam (5MLD) festival season Maintained by Travancore Devaswom Board Sewage Treatment Plan Seasonally 3.5 MLD at Pamba (3.5 MLD) Operated during Maintained by Travancore festival season Devaswom
    [Show full text]
  • Mrp Non Rec 2
    UNIVERSITY GRANTS COMMISSION SOUTH WESTERN REGIONAL OFFICE BANGALORE MINOR RESEARCH PROJECT- Not Recommended DISCIPLINE COLLEGE NAME AND ADDRESS Zoology/Sericulture/Aquaculture/Environmental Science JYOTHI NIVAS DEGREE COLLEGE, KABA021 HOSUR ROAD, KORAMANGALA BANGALORE - 560 095 ROMRP-SWRO-ZOOL-2015-16-50304 Anthropogenic induced shifts in Honeybee populations in urban habitats: Analysis and approaches to conserve bees MAHARANI'S SCIENCE COLLEGE KABA027 FOR WOMEN, PALACE ROAD BANGALORE - 560 001 ROMRP-SWRO-AGRI-2015-16-24998 Understanding the host RNA interference infested Silkworm`s (Bombyx mori)immunity by Uzi fly- Exorista sorbillans MOUNT CARMEL COLLEGE, 58, KABA028 PALACE ROAD, VASANTH NAGAR BANGALORE - 560 052 ROMRP-SWRO-LIFE-2015-16-92455 Exploration- identification- isolation and characterisation of Sericinolytic bacteria present in the waste water from the raw silk reeling/degumming units of Ramnagara/Bangalore. ROMRP-SWRO-ENVI-2015-16-41304 Decolourization of textile dyes using spent mycelium substrate of novel edible mushroom Hypsizygus ulmarius MAHARANI LAKSHMI AMMANI KABA029 COLLEGE FOR WOMEN, SCIENCE P.O., MALLESHWARAM BANGALORE - 560 012 ROMRP-SWRO-ZOOL-2015-16-83472 Propolis and its contituents- Emerging Adjuvant therapy for Cancer MES COLLEGE OF ARTS, SCIENCE KABA031 AND COMMERCE, MALLESHWARAM BANGALORE - 560 003 DISCIPLINE COLLEGE NAME AND ADDRESS ROMRP-SWRO-ZOOL-2015-16-84978 Extraction of silver nanoparticles from plant source and studying its uv blocker property by using zebrafish as a model organism ROMRP-SWRO-ZOOL-2015-16-81128 Checklist of spiders (Arachnida: Araneae) THE NATIONAL COLLEGE, KABA034 BASAVANAGUDI BANGALORE - 560 004 ROMRP-SWRO-ZOOL-2015-16-66676 ASSESSMENT OF GROUND WATER QUALITY OF BANGALORE NORTH RBANM FIRST GRADE COLLEGE, KABA039 12,ANNASWAMY MUDALIAR ROAD, ULSOOR BANGALORE - 560 042 ROMRP-SWRO-ENVI-2015-16-49371 Protection and Management of Lake Eco System in Urban Areas - A Case study of Ulsoor Lake ST.
    [Show full text]
  • Demography Details of Kerala (2011 Census)
    GENERAL INFORMATION Kasaragod district came into existence on 24th May 1984. District is bound in the East by Kodagu and Dashkin Kannada districts of Karnataka State, in the West by the Lakshadweep Sea, in the North by Manglore taluk and Dashkin Kannada district of Karnataka and in the South by Kannur district of Kerala. Kasaragod covers an area of 199077 ha. consisting 6 blocks, 3 municipalities and 4 taluks. Lying at the Northern tip of Kerala, district lies between 12002’35” to 12047’38” North latitudes and between 74051’54” to 75025’59” East longitude. Based on physiographic features district falls under three sub micro regions namely Cannanore coast; Kasaragod table land; Peringom muttannur undulating upland. Diversity of physical features results in corresponding diversity of climate in this district. Forest is classified as Southern tropical moist deciduous, Western tropical wet evergreen and semi evergreen and covers an area of 119.73 Sq.km. Kasaragod covers sandy, sandy loam, laterite and hill or forest soil. Mineral reserves are not abundantly rich except china clay and bauxite. Nine rivers are flow through this district. Agriculture plays a vital role in the district with a total cropped area of 151871 ha. District contributes major part of tobacco, arecanut and cashew nut etc. coastal area extends 70 km consisting 18 fishing villages. District holds immense potential for animal husbandry and related dairy development activities. Animal husbandry activities are the major subsidiary occupation of the district and total live stock population was 1.34 lakh during 2010-11. Besides the conventional sources for irrigation like tanks, wells, private canals district has lot of minor irrigation schemes.
    [Show full text]
  • Water Quality May 2019
    WATER QUALITY MAY 2019 Frequency stationcod SamplingT TypeofWa NameofMonit SamplingDate NameofMonitoringStation NameOfWaterBody OfMonitor Weather e ime terBody oringAgency ingStation 17 03.05.2019 09:40 R.Periyar Near Aluva- Eloor River Periyar River Kerala S.P.C.B. Monthly Clear 18 07.05.2019 11:50 R.Periyar At Kalady River Periyar River Kerala S.P.C.B. Monthly Clear 20 0.360173611 9:45 Chaliyar At Koolimadu River Chaliyar River Kerala S.P.C.B. Monthly Clear 21 0.360173611 10:35 Chaliyar At Chungapilli River Chaliyar River Kerala S.P.C.B. Monthly Clear 42 0.193506944 9:30 Kallada At Perumthottam Kadavu River Kallada River Kerala S.P.C.B. Monthly Clear 43 09.05.2019 10:40 Muvattupuzha At Vettikattumukku River Muvattupuzha River Kerala S.P.C.B. Monthly Clear 1154 07.05.2019 12:30 Chalakudy At Pulickal Kadavu River Chalakudy River Kerala S.P.C.B. Monthly Clear 1155 0.776840278 8:30 Karamana At Moonnattumukku River Karamana River Kerala S.P.C.B. Monthly Clear 1156 04.05.2019 7:30 Pamba At Chengannur River Pamba River Kerala S.P.C.B. Monthly Clear 1207 03.05.2019 11:25 Kabani At Muthankara River Kabani River Kerala S.P.C.B. Monthly Clear 1208 0.193506944 12:00 Bhavani At Elachivazhi River Bhavani River Kerala S.P.C.B. Monthly Clear 1338 07.05.2019 10:30 Periyar At SDP Aluva River Periyar River Kerala S.P.C.B. Monthly Clear 1339 14.05.2019 10:45 Meenachil At Kidangoor River Meenachil River Kerala S.P.C.B.
    [Show full text]