Safety of Maritime Assets – Tugged by a Pandemic Coronavirus Challenges for the Shipping Sector

Total Page:16

File Type:pdf, Size:1020Kb

Safety of Maritime Assets – Tugged by a Pandemic Coronavirus Challenges for the Shipping Sector RISK BULLETIN ALLIANZ GLOBAL CORPORATE & SPECIALTY® SAFETY OF MARITIME ASSETS – TUGGED BY A PANDEMIC CORONAVIRUS CHALLENGES FOR THE SHIPPING SECTOR ALLIANZ RISK CONSULTING Image: Shutterstock INTRODUCTION The global impact of the ongoing coronavirus (Covid-19) In this document, Allianz Global Corporate & Specialty’s pandemic has led to imposition of unprecedented (AGCS)’ Allianz Risk Consulting (ARC) team highlights measures by governments. Businesses and industries some challenges that are unsettling the maritime industry across the world are in a state of abeyance. Shipping, and disrupting routine activities on board merchant being the backbone of international trade, is also severely vessels. It also lists key points to be considered for the safe impacted. The outbreak has affected almost all vessel lay-up of commercial vessels. types and has led to a number lying idle. It is reasonable to All of the recommendations are technical advisory expect that owners will be considering the option to lay-up in nature from a risk management perspective and may their assets to tide over the uncertain decline in not apply to your specific operations. Please review international trade. Ship-managers and ship-operators recommendations carefully and determine how they can are seeking solutions with minimum costs within agreed best apply to your specific needs prior to implementation. budgets. The safety of a vessel during lay-up and, its Any queries relating to insurance cover should be made reliability after subsequent reactivation, primarily depends with your local contact in underwriting and/or broker. on the strict implementation of recommended procedures and guidelines throughout the tenure of lay-up. CHALLENGES POSED BY THE COVID-19 change of grade/type of lube-oil technical advice should be sought from the equipment manufacturer and the PANDEMIC changeover procedures well planned and documented. If the maintenance interval is extended, the The indefinite restrictions on supply chains and manufacturer’s instructions should be followed and close international travel is causing multiple challenges for the monitoring of operational parameters implemented. maritime industry. While risks from the perils of the sea are Stocks held on sister ships may prove handy if vessels reduced for vessels waiting at anchorage or in lay-up, new have common ports of call. challenges have evolved which were not present in similar historical situations involving global economic slowdowns. DELAYS IN SURVEYS, INSPECTIONS AND SERVICING CREW RELIEF OF EMERGENCY EQUIPMENT Travel-restrictions due to the Covid-19 pandemic Classification societies are facing difficulties in arranging has made it very difficult to effect crew-change on vessels. attendance for scheduled surveys, which is affecting the The International Maritime Organization (IMO) has written validity of classification and statutory certification. The to all Member States, urging them to recognize all servicing of critical equipment may not take place at the seafarers as “key workers” and facilitate their travel scheduled interval as service engineers and technicians to and from the vessel. However, due to closed are unable to attend onboard. Shortage of work force and international borders there are limited workable options implementation of social distancing measures in the yards for crew repatriation and in many cases crews have is causing operational delays. continued working on board months after their normal The risk of infection may lead to reduced inspections by tour of duty is completed. These long tours of duty coupled Port State Control Inspectors, which, in turn, may lead to with worry for their families at home is causing physical unsafe practices and substandard conditions on board and mental fatigue among seafarers. going undetected. It is estimated that 75% to 96% of marine incidents can The International Association Of Classification Societies involve human error and fatigue is one of the major (IACS) has acknowledged the issues faced by ship-owners underlying causes. and permitted “force-majeure” extensions provisioned Adjustments in work and rest hours offers effective fatigue under their procedural requirements. IACS procedural management. Incentives in cash or kind will also have requirements allow sharing of survey resources in a positive impact on the crew wellbeing. Hiring from exceptional and duly justified cases and is subject the pool of locally available seafarers may be an option to the discretion of flag administration. in some cases that can be further facilitated by If the timeline for periodic surveys or dry-dock is extended, cooperation among the crew management companies. related communications with flag-state, class and shipyards, needs to be well documented. Risks arising SPARES AND CONSUMABLES from delays in the statutory servicing of emergency equipment (e.g. fire-fighting appliances) will require Disrupted supply chains can cause delays in the implementation of additional control measures. Adequate forwarding of essential consumables and spares, like tools and special supplies may have to be locally lubricating oils, filters and hydraulic oils, necessitating the purchased to enable the vessel’s staff to carry out checks use of alternative grades/brands in some cases. Incorrect and measurements in order to maintain the reliability use of such consumables can cause performance issues of equipment. Routine jobs involving hot-work or risk and even damage to machinery in worst case scenarios. of fire can be delayed in the interest of safety. Lack of spares on board can affect maintenance programs It is also advisable to exercise caution when using for machinery. Replenishment of critical spares can take navigational equipment like a gyro compass beyond its longer than planned. prescribed service interval. Simulation drills covering Every effort should be made to source the designated scenarios like gyro failure and steering failure can ensure grade of lubricating oil. Planned maintenance programs a faster response from crew in a contingency. should continue unabated as much as possible. For any 2 BUNKER ANALYSIS LOSS PREVENTION DURING IDLING, The operation of courier services is restricted in many STORAGE AND LAY-UP regions and it may not be possible to dispatch fuel oil samples for analysis to shore-based laboratories. This in Comprehensive plans including risk assessments covering turn may lead to consumption of bunkers without proper storage and lay-up are crucial for ensuring the safety analysis and thereby increase the risk of machinery of the vessel during downtime and its subsequent return damage. to service. An unplanned lay-up can result in a prolonged recommissioning exercise that can last for months Procedures laid out in the technical manager’s safety and may even require docking. management system manual provide detailed methodology for dealing with this situation. A IDLING AND FLOATING STORAGE comprehensive risk assessment will help in mitigating the hazards and consequences arising from use of bunkers Idling and floating storage scenarios can present an without analysis. Where available, on board testing kits opportunity for carrying out maintenance of equipment are useful for carrying out preliminary checks. Pre-bunker under continuous use but due care should be taken in analysis reports can help to address the concerns assessing risk of immobilization and response times at the regarding bunker specifications meeting the International geographic location. Prolonged storage of certain cargoes Organization For Standardization quality criteria. may require special care to prevent microbial degradation The availability of local laboratories at the port of and maintain the quality specifications e.g. biofuels/ bunkering should be checked where samples can be Fatty Acid Methyl Esters (FAME). hand carried by local agents. Where feasible, supply and use of distillate fuels can be considered. KEY POINTS • Periodic steaming for short durations to preserve PILOTAGE SERVICES main and auxiliary machinery There have been reports that port authorities are adopting • Port and starboard anchors used alternatingly remote pilotage services to protect the pilots from the risk • Marine Growth Prevention System (MGPS) and of infection. Some ship masters have also voiced similar cathodic protection systems should remain active concerns for the protection of their crew when in certain and monitored cases the pilot refused to don personal protective • Planned immobilization of the vessel should equipment. Safe navigation within pilotage waters occur only with permission from local authorities depends heavily on a good master-pilot relationship and its failure has been the cause of several maritime • Care of cargo - Risks of prolonged storage. accidents in the past. Language barriers between the crew and pilot also have a detrimental effect on the LAY-UP relationship. Remote pilotage seems to offer a ready As a good practice, a comprehensive lay-up plan can be solution in providing against Covid-19, but this could also prepared and submitted to the stakeholders for their bring an enhanced risk to safe navigation of the vessel. review. Ship-owners are encouraged to use guidance Despite successful trials, the concept of remote pilotage documents and checklists provided by classification for merchant vessels is in a developmental stage with societies when preparing this plan. The lay-up plan many unknowns. Therefore, remote pilotage services may should present a clear picture
Recommended publications
  • Pier 17 Fender System Improvements Permit Application
    Pier 17 Fender System Improvements Permit Application Prepared for: South Street Seaport, LP 199 Water Street, 28th Floor New York, NY, 10036 McLaren No. 210036.00 March 2021 Prepared by: 530 Chestnut Ridge Road, Woodcliff Lake, New Jersey 07677 Tel: (201) 775-6000 Fax: (201) 746-8522 TABLE OF CONTENTS Agency Submittal Information iii Project Narrative Section I New York District Section II United States Army Corps of Engineers Joint Application for Permit Environmental Questionnaire List of Adjacent Property Owners New York State Section III Department of Environmental Conservation Short Environmental Assessment Form (SEQR) Environmental Remediation Database Forms New York State Department of State Section IV Coastal Management Program Federal Consistency Assessment Form Addendum to Federal Consistency Assessment Form New York City Section V Waterfront Revitalization Program Consistency New York City WRP Consistency Assessment Form Addendum to NYC WRP Consistency Assessment Form Flood Evaluation Worksheet Site Photos Section VI Drawings Section VII Essential Fish Habitat Worksheet Section VIII Previously Issued NYSDEC Permit Appendix A March 2021 Agency Submittal Information ii March 2021 Agency Submittal Information Attention: Regulatory Branch U.S. Army Corps of Engineers, New York District Office (USACE) 26 Federal Plaza, Room 16-406 New York, NY 10278-0090 (917) 790-8511 Attention: Regional Permit Administrator New York State Department of Environmental Conservation (NYSDEC) NYS DEC Region 2 1 Hunter’s Point Plaza 47-40 21st Street
    [Show full text]
  • Soil Sampling Kit EARTH DRILLS & AUGERS P.O
    LITTLE BEAVER SSK-1 Soil Sampling Kit EARTH DRILLS & AUGERS P.O. Box 840 Livingston, TX 77351 936-327-3121 ph * 936-327-4025 fax 1-800-227-7515 “Little Beaver How-To Series” Basic Drilling Instructions with Soil Sampling Kit DANGER: Never dig where there is a possibility of underground power lines or other hazards. Electrocution or serious bodily injury may result. Before you dig, call your local one-call agency. DANGER: Keep the machine and drilling tools away from overhead electric wires and devices. Electrocution can occur without direct contact. Failure to keep away will result in serious injury and/or death. CAUTION: Read and understand all operator’s manuals for equipment being used before operating. These “Operating Instructions” are to be used as a supplemental aid, not replacement, with the Big Beaver Operator’s Manual. Page 2 For Further Inquires Call: 1-800-227-7515 SETUP PROCEDURE: 3 Attach front legs to tower with pins. 1 Remove tower pins from stored position. Attach pul- Pivot tower up and secure ley, with rope installed, to tower. 2 with tower pins. 4 Extend back stay, pin, and 5 Extend front legs, pin, and se- 6 Be sure all chains are taut for secure with chain as described cure with chain. maximum stability. Base will in the Big Beaver Operator’s Man- be raised slightly. ual. 8 Secure the drill frame by driv- ing stakes through the holes on both sides of the frame. 7 Level the drill mast by ad- CAUTION: Be sure cat- 9 Attach torque tube and justing leveling screw, head valve is not engaged during hydraulic power source chains and/or pins for the front start-up.
    [Show full text]
  • Daily Routine at Sea on American Warships in the Age of Sail Matthew Brenckle
    Daily Routine at Sea on American Warships in the Age of Sail Matthew Brenckle A publication of the USS Constitution Museum, Boston © 2019 USS Constitution Museum | usscm.org Daily Routine at Sea on American Warships in the Age of Sail Matthew Brenckle CONTENTS Introduction .............................................................1 Keeping Watch ...........................................................4 Daily Practice Drills: Sails and Weapons .....................................8 The Surgeon’s Rounds ....................................................10 Liquor Rations ..........................................................11 Dinner .................................................................12 The Marines and Afternoon Duties. .13 Supper .................................................................14 Evening Roll Call ........................................................15 Lights Out! .............................................................16 Daily Variations by Day of Week ...........................................17 Citing this publication ....................................................19 A publication of the USS Constitution Museum, Boston © 2019 USS Constitution Museum | usscm.org Introduction Samuel Johnson famously wrote, “Men go to sea, before they know the unhappiness of that way of life; and when they have come to know it, they cannot escape from it, because it is then too late to choose another profession...."1 As if to punctuate the distress which these men felt, he added, “No man will be a
    [Show full text]
  • Chapter Eighteen Standing Rigging There Are Many Methods and Techniques Which Can Be Strops with a 3.5 Mm Deadeye and 8 with a 2.5 Mm Dead- Used to Rig a Ship Model
    Eyebolt Deadeye link Deadeye strop strop 3.5 mm 2.5 mm Middle link Toe link Preventer link Chapter Eighteen Standing Rigging There are many methods and techniques which can be strops with a 3.5 mm deadeye and 8 with a 2.5 mm dead- used to rig a ship model. One method is described here. eye. Make them all at this time. Be sure to examine the plans carefully for all of the rigging Step 3 — Glue a deadeye into the strop as shown. Be details. The order in which the descriptions are written careful while positioning the deadeye so the holes are below is the same order used to rig the prototype model. aligned properly. All of the sizes for each rigging line are noted and they Step 4 — Bend the loose ends of the wire around the appear on the plans as well. To prepare for rigging the deadeye. shrouds you must first create the chain plate assemblies. Step 5 — Trim off the excess wire. You can apply a drop These assemblies are used to secure the shrouds with of glue to the top of the deadeye to permanently secure deadeyes and lanyards along the channels. All of the the wire in the groove. chain plate elements will be made using 28 gauge black wire. Each element can be made with the aid of a simple Eye bolt links (8 needed) — create a new jig with two jig. The jig is made by inserting small nails or pins into nails. The pins should be spaced 7/32” apart.
    [Show full text]
  • The Aft Course Catalogue
    AFT UNI THE AFT COURSE CATALOGUE AFT LEADERSHIP EDUCATION AND DEVELOPMENT Randi Weingarten president Lorretta Johnson secretary-treasurer Mary Cathryn Ricker executive vice president AFT Executive Council Shelvy Y. Abrams Karen GJ Lewis Mary J. Armstrong Karen E. Magee Barbara Bowen Louis Malfaro Christine Campbell Joanne M. McCall Zeph Capo John McDonald Alex Caputo-Pearl Martin Messner Donald Carlisto Daniel J. Montgomery Larry J. Carter Jr. Michael Mulgrew Kathy A. Chavez Ruby J. Newbold Melissa Cropper Candice Owley Evelyn DeJesus Andrew Pallotta Marietta A. English Joshua Pechthalt Eric Feaver Paul Pecorale Francis J. Flynn David J. Quolke David Gray Stephen Rooney David Hecker Denise Specht Jan Hochadel Wayne Spence Fedrick C. Ingram Tim Stoelb Jerry T. Jordan Ann Twomey Ted Kirsch Adam Urbanski Frederick E. Kowal Our Mission TheAmerican Federation of Teachers is a union of professionals that champions fairness; democracy; economic opportunity; and high-quality public education, healthcare and public services for our students, their families and our communities. We are committed to advancing these principles through community engagement, organizing, collective bargaining and political activism, and especially through the work our members do Copyright © American Federation of Teachers, AFL-CIO (AFT 2017). Permission is hereby granted to AFT state and local affiliates to reproduce and distribute copies of the work for nonprofit educational purposes, provided that copies are distributed at or below cost, and that the author, source, and copyright notice are included on each copy. Any distribution of such materials to third parties who are outside of the AFT or its affiliates is prohibited without first receiving the express written permission of the AFT.
    [Show full text]
  • JACKLINE RACHEL FRANCIOSI SKROCK.Pdf
    UNIVERSIDADE FEDERAL DO PARANÁ JACKLINE RACHEL FRANCIOSI SKROCK A DIVERSIDADE GENÉTICA DE HLA-E E AS NEOPLASIAS INTRAEPITELIAIS CERVICAIS CURITIBA 2019 JACKLINE RACHEL FRANCIOSI SKROCK A DIVERSIDADE GENÉTICA DE HLA-E E AS NEOPLASIAS INTRAEPITELIAIS CERVICAIS Dissertação apresentada ao curso de Pós- Graduação em Tocoginecologia, Setor de Ciências da Saúde, Universidade Federal do Paraná, como requisito parcial à obtenção do título de Mestre em Tocoginecologia. Orientadora: Prof.ª Dr.ª Maria da Graça Bicalho Coorientador: Prof. Dr. Newton Sérgio de Carvalho CURITIBA 2019 TERMO DE APROVAÇÃO Dedico a Deus, essencial em minha vida. AGRADECIMENTOS Aos meus filhos, pela capacidade de acreditarem em mim, compartilhando alegrias e dores, com vocês, nas pausas entre um parágrafo e outro de produção, melhora tudo o que tenho produzido na vida. A presença de vocês, significa a certeza de que não estou sozinha nesta caminhada. Ao grande amigo João, por todo o incentivo, por me mostrar o valor da minha fé. Aos professores do programa de Tocoginecologia em especial ao Prof. Dr. Newton, grande mestre, obrigado, suas palavras foram muito importantes para minha vida acadêmica. Sem deixar de mencionar a Prof.ª Dr.ª Maria da Graça Bicalho, pela paciência, incentivo e suporte, o que tornou possível a conclusão deste trabalho. Ao Vinicius, do PGTOCO, gentileza incomparável. À minha amiga Dr.ª Renate, que de uma forma especial e carinhosa, me deu força. À minha amiga Cinthia, pelo apoio constante. Aos colegas, Geórgia e Samuel do Laboratório LIGH, o conhecimento compartilhado engrandeceu este trabalho. Frequentemente é necessário ter mais coragem para ousar fazer certo do que temer fazer errado.
    [Show full text]
  • Farmer Relationship in Dairy Value Chains an Assessment Study in Borabu and Kiambu Districts, Kenya
    Strategies to improve firm- farmer relationship in dairy value chains An assessment study in Borabu and Kiambu Districts, Kenya By DOMINIC SIMBE ONG’ARO SUPERVISOR VHL: MARCO VERSCHUUR Wageningen, September, 2012 Research Project submitted to Van Hall Larenstein University of Applied Sciences In partial fulfilment of the requirements for the awards of Master degree in Agricultural Production Chain Management specializing in Livestock Chains By Dominic Simbe September 2012. University of Applied Science part of Wageningen University, The Netherlands © Copyright Dominic Simbe. 2012. All rights reserved. i ACKNOWLEDGEMENT This thesis is written as a partial fulfilment for the degree of Master in Agricultural Production Chain Management with specialization in Livestock Chains. I convey my gratitude to the Royal Dutch Government for providing me the Nuffic scholarship and the Kenyan Government for granting me permission to pursue this master degree at Van Hall Larenstein University of Applied Sciences, part of Wageningen University and Research Centre. First of all, I would like to thank my supervisor, Marco Verschuur who doubles as my course coordinator for his dedicated guidance and supervision. His highly valued advice, positive criticism and invaluable motivation during my thesis write up encouraged me through. I would also like to express my appreciation to my the WUR-CDI/ APF team of Ted Schrader, Annemarrie Groot Kormelinck and Inger Jansen and Cees van Rij of Agriterra Kenya for their support during the support I received during my thesis. My other sincere gratitude goes to all the lecturers at the Van Hall Larenstein University of Applied Sciences for the competencies they built in me during the course.
    [Show full text]
  • Globalization in Transition: the Future of Trade and Value Chains
    GLOBALIZATION IN TRANSITION: THE FUTURE OF TRADE AND VALUE CHAINS JANUARY 2019 AboutSince itsMGI founding in 1990, the McKinsey Global Institute (MGI) has sought to develop a deeper understanding of the evolving global economy. As the business and economics research arm of McKinsey & Company, MGI aims to provide leaders in the commercial, public, and social sectors with the facts and insights on which to base management and policy decisions. MGI research combines the disciplines of economics and management, employing the analytical tools of economics with the insights of business leaders. Our “micro-to-macro” methodology examines microeconomic industry trends to better understand the broad macroeconomic forces affecting business strategy and public policy. MGI’s in-depth reports have covered more than 20 countries and 30 industries. Current research focuses on six themes: productivity and growth, natural resources, labor markets, the evolution of global financial markets, the economic impact of technology and innovation, and urbanization. Recent reports have assessed the digital economy, the impact of AI and automation on employment, income inequality, the productivity puzzle, the economic benefits of tackling gender inequality, a new era of global competition, Chinese innovation, and digital and financial globalization. MGI is led by three McKinsey & Company senior partners: Jacques Bughin, Jonathan Woetzel, and James Manyika, who also serves as the chairman of MGI. Michael Chui, Susan Lund, Anu Madgavkar, Jan Mischke, Sree Ramaswamy, and Jaana Remes are MGI partners, and Mekala Krishnan and Jeongmin Seong are MGI senior fellows. Project teams are led by the MGI partners and a group of senior fellows, and include consultants from McKinsey offices around the world.
    [Show full text]
  • The History of the Tall Ship Regina Maris
    Linfield University DigitalCommons@Linfield Linfield Alumni Book Gallery Linfield Alumni Collections 2019 Dreamers before the Mast: The History of the Tall Ship Regina Maris John Kerr Follow this and additional works at: https://digitalcommons.linfield.edu/lca_alumni_books Part of the Cultural History Commons, and the United States History Commons Recommended Citation Kerr, John, "Dreamers before the Mast: The History of the Tall Ship Regina Maris" (2019). Linfield Alumni Book Gallery. 1. https://digitalcommons.linfield.edu/lca_alumni_books/1 This Book is protected by copyright and/or related rights. It is brought to you for free via open access, courtesy of DigitalCommons@Linfield, with permission from the rights-holder(s). Your use of this Book must comply with the Terms of Use for material posted in DigitalCommons@Linfield, or with other stated terms (such as a Creative Commons license) indicated in the record and/or on the work itself. For more information, or if you have questions about permitted uses, please contact [email protected]. Dreamers Before the Mast, The History of the Tall Ship Regina Maris By John Kerr Carol Lew Simons, Contributing Editor Cover photo by Shep Root Third Edition This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by-nc- nd/4.0/. 1 PREFACE AND A TRIBUTE TO REGINA Steven Katona Somehow wood, steel, cable, rope, and scores of other inanimate materials and parts create a living thing when they are fastened together to make a ship. I have often wondered why ships have souls but cars, trucks, and skyscrapers don’t.
    [Show full text]
  • SAILING Physical Literacy Check List
    SAILING Physical Literacy Check List Do I have a clear plan for the program? Am I modelling movement vocabulary effectively? Are my words age and sport appropriate? Are my activities developmentally appropriate? Am I meeting the needs of participants with varying abilities? Are my progressions clear and relevant? SAILING Have I planned a Get To Know You (GTKY) activity so the kids can meet new people (each time)? Physical Literacy* Are there re-entry tasks to avoid elimination? Camp Levels Crew (on Getaway) • Skipper • First Mate and Sailing Warm up and cool down activities have a Fundamental Movement Skills (FMS) purpose and Sailing provides the following help improve their skills Equipment physical benefits: Is there a skill/activity planned for those waiting on the side (when there is one-on-one or Brava • Getaway • Sails • Paddles • PFD Bytes • Helmets • Tow Ropes • Bailer small group instruction)? • Improves cardiovascular fitness Is there exposure to a variety of activities and Fundamental Movement Skills (FMS)? Fundamental Movement Skills • Increases muscle strength - (FMS) Does the environment allow for maximum participation and practice time? particularly in the back, arms, Body Management Skills: Is there enough equipment for everyone? Rolling • Stopping • Bending • Twisting shoulders and chest, from moving Landing • Stretching • Climbing • Balance Are the wait times short with few line-ups? the sail/rudder for steering Locomotor Skills: Am I motivating the kids to achieve personal bests or learn new things? Crawling
    [Show full text]
  • Starbuck Perry]
    Library of Congress [Starbuck Perry] Tales - Anecdote [11/14?] [6500?] FOLKLORE NEW YORK Forms to be Filled out for Each Interview FORM A Circumstances of Interview STATE New York NAME OF WORKER William Wood ADDRESS 7012 67th Place, Glendale, L.I. DATE November 14, 1938 SUBJECT Starbuck Perry, Hard-boiled Mate 1. Date and time of interview Oct. 31, '38, 1 P.M.; Nov. 1, '38, 11 a.m.; Nov. 2, '38, 11 a.m.; Nov. 3, '38, 11 a.m. 2. Place of interview The Sailors' Snug Harbor, Staten Island, N.Y. 3. Name and address of informant Henry Perry, The Sailors' Snug Harbor, Staten Island, L.I., N.Y. 4. Name and address of person, if any, who put you in touch with informant. Captain W. F. Flynn, Governor, Sailors' Snug Harbor. 5. Name and address of person, if any, accompanying you None [Starbuck Perry] http://www.loc.gov/resource/wpalh2.26040133 Library of Congress 6. Description of room, house, surroundings, etc. The interviews took place in an anteroom of Hospital Ward 2; on the hospital balcony; and at the bedside of Mr. Perry. The anteroom is unfurnished, except with chains in which sit a few of the inmates of the ward who are able to take recreation without assistance. A door leads to the balcony, which overlooks the beautiful grounds. 2 The Sailors' Snug Harbor, a home for aged and disabled mariners, stands on the north shore of Staten Island, New York. It is situated on the banks of the Kill Von Kull, a narrow channel connecting Newark Bay with the Upper Bay of New York Harbor.
    [Show full text]
  • 271 Subpart 113.37—Shaft Speed and Thrust Indicators
    Coast Guard, DHS § 113.37–5 (3) Has a means to reduce the audible the case of a transmitter, the acknowl- signal from 100 percent to not less than edgment of an order. The audible signal 50 percent. device must not be dependent upon any [CGD 74–125A, 47 FR 15272, Apr. 8, 1982, as source of power for operation other amended by CGD 94–108, 61 FR 28290, June 4, than that of the movement of the 1996] transmitter or indicator handle. § 113.35–7 Electric engine order tele- [CGD 74–125A, 47 FR 15272, Apr. 8, 1982, as graph systems; operations. amended by CGD 94–108, 61 FR 28290, June 4, 1996] (a) Where two or more transmitters, located on or on top of, or on the wings § 113.35–13 Mechanical engine order of, the navigating bridge operate a telegraph systems; operation. common indicator in the engineroom, If more than one transmitter oper- the transmitters must: ates a common indicator in the (1) Operate in synchronism as re- engineroom, all the transmitters must quired in paragraph (b) of this section; be mechanically interlocked and oper- or ate in synchronism. A failure of the (2) Operate under the control of a transmission wire or chain at any transmitter transfer control in accord- transmitter must not interrupt or dis- ance with paragraph (c) of this section. able any other transmitter. (b) All transmitter handles and pointers must operate in synchronism. § 113.35–15 Mechanical engine order Where the transmitters are mechani- telegraph systems; application. cally interlocked to effect synchronous operation, the requirements of § 113.35– If a mechanical engine order tele- 13 must be met.
    [Show full text]