Groundsure Review with Full Planning
Total Page:16
File Type:pdf, Size:1020Kb
Groundsure Review with Full Planning Search Details Prepared for: GoodyBurrett LLP Matter: CC/LC/16801/1/LandRes Client address: St. Martin’s House, 63 West Stockwell Street, Essex, CO1 1HE Property: The Bridge Project, 20 Gainsborough Street, Sudbury, CO10 2EU Data Supplier: Groundsure Sovereign House, Church Street, Brighton, BN1 1UJ Date Returned: Property type: 16/07/2020 Commercial This search was compiled by the Data Supplier above and provided by InfoTrack Ltd - t: 0207 186 8090, e: [email protected]. This search is subject to terms and conditions issued by InfoTrack which can be viewed at www.infotrack.co.uk or supplied on request. This search is also subject to terms and conditions issued by the Data Supplier, available on request. InfoTrack and the Data Supplier above are registered with the Property Codes Compliance Board (PCCB) as subscribers to the Search Code. The PCCB independently monitors how registered firms maintain compliance with the Code. Visit www.propertycodes.org.uk for more information. InfoTrack UK Limited, Level 11, 91 Waterloo Road, London, SE1 8RT T: 0207 186 8090 E: [email protected] The Bridge Project, 20 Gainsborough Street, Sudbury, CO10 2EU Written by: R Marten BSc AIEMA AMIEnvSc Professional opinion Reviewed by: F Brocklehurst BSc AIEMA Contaminated Land Low: Acceptable Risk page 4 Flood Risk Negligible page 7 Consultant’s guidance and recommendations inside. © Crown copyright and database rights 2020. Ordnance Survey licence 100035207 Operational Environmental Risk Contaminated land liability Low page 4 Ground Stability Banking security Not identified Is it likely that the property will represent acceptable banking security from a contaminated land Radon perspective? Passed Yes Energy Statutory or 3rd party action Identified page 8 Is there a risk of statutory (e.g. Part 2A EPA 1990) or Transportation third party action being taken against the site? Not identified Unlikely Planning Constraints Environmental liability Identified page 10 Is there a risk that the property value may be impacted due to contaminated land liability issues? Planning Applications Unlikely 155 page 10 [email protected] Ref: IT-8901848 Your ref: IT-8901848 [email protected] Grid ref: 587143 241238 08444 159 000 Date: 16 July 2020 The Bridge Project, 20 Gainsborough Ref: IT-8901848 Street, Sudbury, CO10 2EU Your ref: IT-8901848 Grid ref: 587143 241238 Useful contacts Babergh District Council: Environment Agency National Customer http://www.babergh.gov.uk Contact Centre (NCCC): [email protected] [email protected] 01473 826 622 03708 506 506 Overview of findings and recommendations To save you time when assessing the report, we only provide maps and data tables of features within the search radius that we have identified to be of note. These relate to environmental risks that may have liability implications, affect insurance premiums, property values and/or a lender's willingness to lend. You can view the fully comprehensive library of information we have searched on page 63. Contaminated Land Groundsure has not identified any significant contaminated land issues at the site. As the site is to be redeveloped a Phase 1 Risk Assessment may be required, particularly if the redevelopment is for a highly sensitive end use (i.e. residential purposes). It is worth confirming this with the Planning Department at the Local Authority and if a Phase 1 assessment is necessary, we can undertake this work for you. For a quote, please contact Groundsure at [email protected]. This quotation would include a discount to reflect the data in the report already undertaken for the study area. As a guide, a standard Phase 1 assessment is priced at around £1245 + VAT including disbursements. Flood Risk National Planning Policy Framework (NPPF) A site-specific flood risk assessment should be provided for all development in Flood Zones 2 and 3. In Flood Zone 1, an assessment should accompany all proposals involving: sites of 1 hectare or more; land which has been identified by the Environment Agency as having critical drainage problems; land identified in a strategic flood risk assessment as being at increased flood risk in future; or land that may be subject to other sources of flooding, where its development would introduce a more vulnerable use. The NPPF states that the flood risk assessment should identify and assess the risks of all forms of flooding to and from the development and demonstrate how these flood risks will be managed so that the development remains safe throughout its lifetime, taking climate change into account. Those proposing developments should take advice from the emergency services when producing an evacuation plan for the development as part of the flood risk assessment. Contact us with any questions at: Date: 16 July 2020 [email protected] 2 08444 159 000 The Bridge Project, 20 Gainsborough Ref: IT-8901848 Street, Sudbury, CO10 2EU Your ref: IT-8901848 Grid ref: 587143 241238 Other considerations These are next steps associated with non-environmental search returns on matters of energy and transport infrastructure, mobile masts, and planning constraints. Energy Wind Existing or proposed wind installations have been identified within 10km. Next steps for consideration: use the details given in the report to find out more about the potential impacts on the property contact the operating company and the relevant Local Authority for further information visit the area in order to more accurately assess the impact this wind development would have on the property Solar Existing or proposed solar installations have been identified within 5km of the property. Next steps for consideration: use the details given in the report to find out more about the potential impacts on the property by contacting the operating company and/or Local Authority visit the area in order to more accurately assess the impact this solar farm would have on the property Projects One or more nationally significant energy infrastructure projects has been identified within 5km of the property. Next steps for consideration: visit the National Infrastructure Planning website at https://infrastructure.planninginspectorate.gov.uk/projects/, where further details on nationally significant infrastructure projects, including environmental impact assessments, can be found Planning constraints Visual and cultural designations The property lies within 250m of a visually or culturally protected site or area. Next steps for consideration: seek further guidance from the local planning department on any likely restrictions if considering any property development Contact us with any questions at: Date: 16 July 2020 [email protected] 3 08444 159 000 The Bridge Project, 20 Gainsborough Ref: IT-8901848 Street, Sudbury, CO10 2EU Your ref: IT-8901848 Grid ref: 587143 241238 Consultant's assessment Environmental searches are designed to ensure that significant hazards and risks associated with this property are identified and considered alongside the investment in or purchase of a property. Please see page 2 for further advice. Contaminated Land The Contaminated Land assessment has been completed Past Land Use Low by a qualified environmental consultant and includes a Waste and Landfill Low manual review of our extensive collection of high Current and Recent Industrial Low detailed Ordnance Survey maps and environmental data. Operational environmental Low Please see page 14 for details of the identified issues. risk Current and proposed land use Current land use Groundsure has not been advised by the client (or their advisers) of the current use of the property. Groundsure has therefore made a best judgement based on the available information that the property is likely to be used for commercial purposes. The site has been identified to comprise a building in the north east, three minor units in the north west and two buildings in the south west. The remainder of the plot consists of hardstanding. Proposed land use Groundsure has been advised that the property will be redeveloped for residential purposes. Site location The site lies within a mixed residential and commercial area of Sudbury, Suffolk. Surrounding area North: Gainsborough Street with commercial and residential premises beyond. South: An access road with a commercial building beyond. East: Residential dwellings with gardens. West: Commercial premises and a church. Historical land use On-site The site history, based on a review of Groundsure's high detailed historical mapping, is as follows: 1884 - The site had been developed prior to this date and comprised a building in the north east and adjoining buildings in the north and centre, with a minor unit in the north west and two glasshouses in the south west. Contact us with any questions at: Date: 16 July 2020 [email protected] 4 08444 159 000 The Bridge Project, 20 Gainsborough Ref: IT-8901848 Street, Sudbury, CO10 2EU Your ref: IT-8901848 Grid ref: 587143 241238 1884 - 1925 - No significant changes were observed. 1926 - The glasshouses and the building in the centre had been cleared. Four units were observed across the southern half of the site. 1926 - 1938 - No significant changes were observed. 1955 - The units had undergone further reconfigurations by this time and an additional unit was noted in the centre. 1955 - 1973 - No significant changes were observed. 1976 - The unit in the centre had been cleared and the site had been reconfigured to comprise two buildings in the north east and north west and two units and an open-sided structure in the south west. 1976 - 1989 - No significant changes were observed. 1990 - The open-sided structure had been removed. 2006 - (Aerial Photography) A minor unit was noted in the west, bringing the site into its current format. Surrounding area No potentially contaminative land uses have been identified in proximity to the study site. Environmental permits and register entries No Environmental Permits of concern have been identified on site or in proximity to the property. No entries on the Local Authority's Contaminated Land Register have been identified within 250m of the site.