Better Bart Better Bay Area Better Bart / Better Bay Area

Total Page:16

File Type:pdf, Size:1020Kb

Better Bart Better Bay Area Better Bart / Better Bay Area BETTER BART BETTER BAY AREA BETTER BART / BETTER BAY AREA 2 2 BART SYSTEM—THEN AND NOW “The decision of the people to build a 3-county Bay Area rapid transit system is one of the most courageous and promising acts in modern American municipal history…” —San Francisco Examiner, November 9, 1962 Pittsburg Center Station Antioch Station 1974 Today 3 3 MAKING A BETTER BAY AREA 4 4 BAY BRIDGE RUSH HOUR TRAFFIC *One “person” = 500 people. 2014 Caltrans and BART peak direction totals for peak hour, based on an average of non-holiday Tuesdays, Wednesdays, and Thursdays. Assumes 71% of vehicles use SOV lanes with average occupancy of 1.15 persons/car, and 29% of vehicles use HOV lanes with average occupancy of 2.65 persons/car, based on 2014 Bay Area Toll Authority data and 2012 Caltrans Bay Area Managed Lanes report. 55 5 MANAGEMENT & STEWARDSHIP Reliability is Improving Revenue Accountability is High Mean Time Between Service BART has historically had one of Disruption—Vehicle Caused the highest farebox ratios of all U.S. heavy rail 4,000 100% 3,000 80% 60% 2,000 40% 1,000 20% FAREBOX RATIO RECOVERY FAREBOX 0 0% HOURS BETWEEN DISRUPTION BETWEEN SERVICE HOURS BART WMATA NYCT Caltrain CTA MARTA Muni *National Transit Database (NTD) data, the source of these figures, excludes certain operating expenses, such as building leases, legal settlements, and Other Post Employment Benefits. 6 6 BUILDING A BETTER BART 7 7 LABOR RELATIONS 8 8 BART TO OAK AIRPORT • 3.2-mile extension from Coliseum Station to the Oakland International Airport • Automated, driverless people-mover system • Service opened November 2014 9 9 MACARTHUR TRANSIT VILLAGE OAKLAND SUCCESS STORIES • Mixed use transit-oriented development on surface parking lots at MacArthur station • Parking garage opened September 2014 • 90 Units of Affordable Housing complete • Next phase: plaza redesign & 516 units of market rate housing 10 10 19TH STREET STATION IMPROVEMENTS OAKLAND SUCCESS STORIES Multiple improvements underway: • 20th St Canopy • 17th St Alley (partnership with Oakland) • 19th Street Bike Station (partnership with Oakland) 11 11 EARTHQUAKE SAFETY $1 Billion Investment 95% of track way made earthquake safe 100% 75% 50% 25% 0% Talking Points Seismic retrofits (safety) Funding Progress: % completion on budget and timeline 1212 THE PROBLEM 1313 THE PROBLEM Aging Fleet Escalating Ridership CARS—AVERAGE YEARS IN SERVICE AVERAGE NUMBER OF WEEKDAY RIDERS 32 450,000 24 300,000 16 150,000 8 0 0 1414 NUTS & BOLTS Damaged Speed Signals = Slower Trains 1515 THE SOLUTION Continuous Reinvestment 1616 FUNDING SCENARIO $3.5B Approximately 50% Funded 1717 CAPITAL FUNDING SHORTFALL “FIX IT FIRST” BOND • POTENTIAL $3.5B BOND MEASURE TO VOTERS IN BART COUNTIES IN 2016* • POTENTIAL PROGRAMS AND PROJECTS o Upgrade or replace systems . Train control, traction and electrical power, mechanical, communications, fare collection o Guideways . Track, structures, grounds o Facilities . Stations, elevators, escalators * BART Bond Can’t Fund Moveable Assets (train cars) or Salaries 1818 SUMMARY OF INVESTMENTS 1919 THE ROAD AHEAD 2020 CONSEQUENCES OF INACTION 2121 CONSEQUENCES OF INACTION Freeway Delay Times with and without BART 4 3.5 3 2.5 With BART 2 (Hours) Without BART 1.5 Delay Delay 1 0.5 0 Hwy 4 I-680 to Hwy Bay Bridge I-880 I-680 W. I-580 I - 80 Pittsburg to 13 Corridor Fremont to Creek to Livermore to Hercules to 1-80 Oakland Fremont Oakland Emeryville Traffic Impact Analysis: Effects of the absence of BART service on major East Bay corridors J. Lavel, M. Cassidy, and J.C. Merrera, Oct. 2004 22 2222 YOUR PRIORITIES? FIX AND MODERNIZE INCREASE CAPACITY BART • Run more cars, increase • Repair and upgrade tracks to ridership and take additional enhance safety cars off the road • Replace old train cars to • Replace train control system improve reliability with 21st century technology to run trains more frequently • Fix and modernize stations to boost rider experience • Increase station capacity at the busiest stations to • Improve access to stations support regional business • Increase bike parking centers • Improve transit connectivity OTHER THINGS YOU WOULD LIKE BART TO DO? 2323 HELP BUILD A BETTER BART 2424 THANK YOU! 2525 BETTER BART BETTER BAY AREA.
Recommended publications
  • Transit Information Rockridge Station Oakland
    B I R C H C T Transit N Transit Information For more detailed information about BART W E service, please see the BART schedule, BART system map, and other BART information displays in this station. S Claremont Middle Stops OAK GROVE AVE K Rockridge L School San Francisco Bay Area Rapid Schedule Information e ective February 11, 2019 Fares e ective May 26, 2018 A Transit (BART) rail service connects W 79 Drop-off Station the San Francisco Peninsula with See schedules posted throughout this station, or pick These prices include a 50¢ sur- 51B Drop-off 79 Map Key Oakland, Berkeley, Fremont, up a free schedule guide at a BART information kiosk. charge per trip for using magnetic E A quick reference guide to service hours from this stripe tickets. Riders using (Leave bus here to Walnut Creek, Dublin/Pleasanton, and T transfer to 51A) other cities in the East Bay, as well as San station is shown. Clipper® can avoid this surcharge. You Are Here Francisco International Airport (SFO) and U Oakland Oakland International Airport (OAK). Departing from Rockridge Station From Rockridge to: N (stations listed in alphabetical order) 3-Minute Walk 500ft/150m Weekday Saturday Sunday I M I L E S A V E Train Destination Station One Way Round Trip Radius First Last First Last First Last Fare Information e ective January 1, 2016 12th St. Oakland City Center 2.50 5.00 M H I G H W AY 2 4 511 Real-Time Departures Antioch 5:48a 12:49a 6:19a 12:49a 8:29a 12:49a 16th St.
    [Show full text]
  • ACT BART S Ites by Region.Csv TB1 TB6 TB4 TB2 TB3 TB5 TB7
    Services Transit Outreach Materials Distribution Light Rail Station Maintenance and Inspection Photography—Capture Metadata and GPS Marketing Follow-Up Programs Service Locations Dallas, Los Angeles, Minneapolis/Saint Paul San Francisco/Oakland Bay Area Our Customer Service Pledge Our pledge is to organize and act with precision to provide you with excellent customer service. We will do all this with all the joy that comes with the morning sun! “I slept and dreamed that life was joy. I awoke and saw that life was service. I acted and behold, service was joy. “Tagore Email: [email protected] Website: URBANMARKETINGCHANNELS.COM Urban Marketing Channel’s services to businesses and organizations in Atlanta, Dallas, San Francisco, Oakland and the Twin Cities metro areas since 1981 have allowed us to develop a specialty client base providing marketing outreach with a focus on transit systems. Some examples of our services include: • Neighborhood demographic analysis • Tailored response and mailing lists • Community event monitoring • Transit site management of information display cases and kiosks • Transit center rider alerts • Community notification of construction and route changes • On-Site Surveys • Enhance photo and list data with geocoding • Photographic services Visit our website (www.urbanmarketingchannels.com) Contact us at [email protected] 612-239-5391 Bay Area Transit Sites (includes BART and AC Transit.) Prepared by Urban Marketing Channels ACT BART S ites by Region.csv TB1 TB6 TB4 TB2 TB3 TB5 TB7 UnSANtit
    [Show full text]
  • BART to Antioch Extension Title VI Equity Analysis & Public
    BART to Antioch Extension Title VI Equity Analysis & Public Participation Report October 2017 Prepared by the Office of Civil Rights San Francisco Bay Area Rapid Transit District Table of Contents I. BART to Antioch Title VI Equity Analysis Executive Summary 1 Section 1: Introduction 7 Section 2: Project Description 8 Section 3: Methodology 20 Section 4: Service Analysis Findings 30 Section 5: Fare Analysis Findings 39 II. Appendices Appendix A: 2017 BART to Antioch Survey Appendix B: Proposed Service Plan Appendix C: BART Ridership Project Analysis Appendix D: C-Line Vehicle Loading Analysis III. BART to Antioch Public Participation Report i ii BART to Antioch Title VI Equity Analysis and Public Participation Report Executive Summary In October 2011, staff completed a Title VI Analysis for Antioch Station (formerly known as Hillcrest Avenue Station). A Title VI/Environmental Justice analysis was conducted on the Pittsburg Center Station on March 19, 2015. Per the Federal Transit Administration (FTA) Title VI Circular (Circular) 4702.1B, Title VI Requirements and Guidelines for Federal Transit Administration Recipients (October 1, 2012), the District is required to conduct a Title VI Service and Fare Equity Analysis (Title VI Equity Analysis) for the Project's proposed service and fare plan six months prior to revenue service. Accordingly, staff completed an updated Title VI Equity Analysis for the BART to Antioch (Project) service and fare plan, which evaluates whether the Project’s proposed service and fare will have a disparate impact on minority populations or a disproportionate burden on low-income populations based on the District’s Disparate Impact and Disproportionate Burden Policy (DI/DB Policy) adopted by the Board on July 11, 2013 and FTA approved Title VI service and fare methodologies.
    [Show full text]
  • BART 2016 Factsheet
    BART 2016 Factsheet Connecting People to Opportunity BART by the Numbers For over four decades, BART has been an efficient, reliable way for families, friends, and commuters to • BART estimates ridership in FY16 safely reach their destinations. What started out as a futuristic dream in 1972 — then carrying only will average 430,000 trips on 100,000 passengers per week— has now grown to be a vital part of the regional culture and economy. weekdays and 129 million trips annually. However, as the Bay Area’s population swells, BART faces the challenge of upgrading and updating its • During peak commute hours, over nearly half century old infrastructure to meet the needs of a modern transit system. BART’s highly skilled 60,000 people ride through the and dedicated workforce is putting enormous effort into developing a plan for the future, and we are Transbay Tube in each direction. excited to work together toward a new era for BART transit. • BART’s Pittsburg/Bay Point (yellow) line carries the largest AMTRAK SAN JOAQUIN number of people. Pittsburg Center Station Antioch Station Richmond Pittsburg/Bay Point El Cerrito del Norte • Embarcadero and Montgomery North Concord/Martinez El Cerrito Plaza stations are the busiest in the Concord North Berkeley Pleasant Hill/Contra Costa Centre BART system. In FY15, over Downtown Berkeley Walnut Creek 170,000 trips were made to or Ashby Lafayette from these stations each weekday. Orinda Rockridge MacArthur TIMED TRANSFER (SOUTHBOUND) • Our top ridership day last year West Oakland 19th St/Oakland TIMED TRANSFER (NORTHBOUND) 12th St/Oakland City Center was June 19, 2015 for the SAN FRANCISCO Embarcadero Lake Merritt EAST BAY Warriors Championship Parade Montgomery St Fruitvale Powell St and A’s game —548,076 trips! Coliseum TRANSFER FOR SERVICE TO OAKLAND INTERNATIONAL AIRPORT Civic Center/UN Plaza MUNI METRO San Leandro • BART directly serves SFO and Bay Fair 16th St Mission Castro Valley Dublin/Pleasanton OAK, the nation’s 7th and 35th 24th St Mission Glen Park Oakland busiest airports.
    [Show full text]
  • The Bulletin MAJOR CHANGES COMING to the Published by the Electric Railroaders’ GRAND CENTRAL SUBWAY STATION COMPLEX Association, Inc
    ERA BULLETIN — MAY, 2018 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 61, No. 5 May, 2018 The Bulletin MAJOR CHANGES COMING TO THE Published by the Electric Railroaders’ GRAND CENTRAL SUBWAY STATION COMPLEX Association, Inc. P.O. Box 3323 by Subutay Musluoglu Grand Central Station New York, NY 10163 (Photographs by the author) For general inquiries, (Continued from March, 2018 issue) or Bulletin submissions, contact us at In the March, 2018 Bulletin, I described Two of them provided access to the mezza- [email protected] the first round of capacity upgrades and as- nine level of the 42nd Street Shuttle. One was or on our website at erausa.org/contact sociated improvements that have been com- 317 Madison Avenue, which occupied the pleted at the Grand Central subway station southeast corner of the block and actually Editorial Staff: complex. It had been my intention to contin- had its main entrance on E. 42nd Street (this Jeffrey Erlitz ue by specifically focusing on the creation of author worked in the building from 2004-5), Editor-in-Chief new stairways and the reconstruction of the and within its lobby there was a stairway existing stairways between the mezzanine down to the subway. Next door to the east Ronald Yee nd Tri-State News and and the platforms of the Lexington Avenue was 51 E. 42 Street, which featured an off- Commuter Rail Editor Line. However, the situation in the station sidewalk entrance within its front façade. has been very fluid lately, with an unusually These two entrances were essentially one Alexander Ivanoff North American and fast pace of work resulting in stairways open- unit, since both stairways joined together on World News Editor ing and closing on short notice.
    [Show full text]
  • 2015 Station Profiles
    2015 BART Station Profile Study Station Profiles – Non-Home Origins STATION PROFILES – NON-HOME ORIGINS This section contains a summary sheet for selected BART stations, based on data from customers who travel to the station from non-home origins, like work, school, etc. The selected stations listed below have a sample size of at least 200 non-home origin trips: • 12th St. / Oakland City Center • Glen Park • 16th St. Mission • Hayward • 19th St. / Oakland • Lake Merritt • 24th St. Mission • MacArthur • Ashby • Millbrae • Balboa Park • Montgomery St. • Civic Center / UN Plaza • North Berkeley • Coliseum • Oakland International Airport (OAK) • Concord • Powell St. • Daly City • Rockridge • Downtown Berkeley • San Bruno • Dublin / Pleasanton • San Francisco International Airport (SFO) • Embarcadero • San Leandro • Fremont • Walnut Creek • Fruitvale • West Dublin / Pleasanton Maps for these stations are contained in separate PDF files at www.bart.gov/stationprofile. The maps depict non-home origin points of customers who use each station, and the points are color coded by mode of access. The points are weighted to reflect average weekday ridership at the station. For example, an origin point with a weight of seven will appear on the map as seven points, scattered around the actual point of origin. Note that the number of trips may appear underrepresented in cases where multiple trips originate at the same location. The following summary sheets contain basic information about each station’s weekday non-home origin trips, such as: • absolute number of entries and estimated non-home origin entries • access mode share • trip origin types • customer demographics. Additionally, the total number of car and bicycle parking spaces at each station are included for context.
    [Show full text]
  • EMMA Official Statement
    NEW ISSUE – BOOK ENTRY ONLY RATINGS: Moody’s (2020 Bonds): Aaa Long Term Standard & Poor’s (2020C-1 Bonds): AAA Short Term Standard & Poor’s (2020C-2 Bonds): A-1+ See “Ratings” herein. In the opinion of Orrick, Herrington & Sutcliffe LLP, Bond Counsel to the District, based upon an analysis of existing laws, regulations, rulings and court decisions, and assuming, among other matters, the accuracy of certain representations and compliance with certain covenants, interest on the 2020C-1 Bonds is excluded from gross income for federal income tax purposes under Section 103 of the Internal Revenue Code of 1986. In the further opinion of Bond Counsel, interest on the 2020C-1 Bonds is not a specific preference item for purposes of the federal alternative minimum tax. Bond Counsel is also of the opinion that interest on the 2020 Bonds is exempt from State of California personal income taxes. Bond Counsel further observes that interest on the 2020C-2 Bonds is not excluded from gross income for federal income tax purposes under Section 103 of the Code. Bond Counsel expresses no opinion regarding any other tax consequences related to the ownership or disposition of, or the amount, accrual or receipt of interest on, the 2020 Bonds. See “TAX MATTERS.” $700,000,000 SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT GENERAL OBLIGATION BONDS $625,005,000 $74,995,000 (ELECTION OF 2016), (ELECTION OF 2016), 2020 SERIES C-1 2020 SERIES C-2 (FEDERALLY TAXABLE) (GREEN BONDS) (GREEN BONDS) Dated: Date of Delivery Due: As shown on inside cover The San Francisco Bay Area Rapid Transit District General Obligation Bonds (Election of 2016), 2020 Series C-1 (Green Bonds) (the “2020C-1 Bonds”) and 2020 Series C-2 (Federally Taxable) (Green Bonds) (the “2020C-2 Bonds” and, together with the 2020C-1 Bonds, the “2020 Bonds”) are being issued to finance specific acquisition, construction and improvement projects for District facilities approved by the voters and to pay the costs of issuance of the 2020 Bonds.
    [Show full text]
  • Bart at Twenty: Land Use and Development Impacts
    ffional Development BART@20: Land Use and Development Impacts Robert Cervero with research assistance by Carlos Castellanos, Wicaksono Sarosa, and Kenneth Rich July 1995 University of California at Berkeley - 1 BART@20: Land Use and Development Impacts Robert Cervero with Research Assistance by Carlos Castellanos, Wicaksono Sarosa, and Kenneth Rich This paper was produced with support provided by the U.S. Department of Transportation and the California State Department of Transportation (Caltrans) through the University of California Transportation Center. University of California at Berkeley Institute of Urban and Regional Development Table of Contents ONE: BART at 20: An Analysis of Land Use Impacts 1 1. INTRODUCTION 1 TWO: Research Approach and Data Sources 3 THREE: Employment and Population Changes in BART and Non-BART Areas 6 3.1. Population Changes 6 3.2. Employment Changes 3.3. Population Densities 15 3.4. Employment Densities 15 3.5. Summary 20 FOUR: Land Use Changes Over Time and by Corridor 21 4.1. General Land-Use Trends 23 4.2. Pre-BART versus Post-BART 25 4.3. Early versus Later BART 30 4.4. Trends in Non-Residential Densities 33 4.4. Summary 37 FIVE: Land-Use Changes by Station Classes 38 5.1. Grouping Variables 38 5.2. Classification 38 5.3. Station Classes 41 5.4. Trends in Residential and Non-Residential Growth Among Station Classes 44 5.5. Percent Growth in Early- versus Later-BART Years Among Station Classes 46 5.6. Trends in Non-Residential Densities Among Station Classes 46 SLX: Matched-Pair Comparisons of Land-Use Changes near BART Stations Versus Freeway Interchanges 51 6.1.
    [Show full text]
  • Oakland Transit Village Is Rising City Planners and BART Officials Pin Renewal and Ridership Hopes on New Development
    HOT LOT | EAST BAY Oakland Transit Village Is Rising City planners and BART officials pin renewal and ridership hopes on new development. By Sasha Vasilyuk he area surrounding Oakland’s MacArthur BART station, while located near the major intersection of Highway 24 and Interstate 580, has not been Ta model of urban glory. Te neighborhood currently features a below street- grade parking lot, a small strip mall, a surgery center, a church and single-family homes. But developers of the new MacArthur BART transit village hope the $370 mil- lion, 7.76-acre project will do much to change the area’s look. Te new community is to include affordable and market-rate housing, retail, a parking garage and a child care center. Fingers are crossed that the development expands upon the success of the nearby Temescal district. “Te Temescal-area retailers are already expanding on their own, but there is a dead area now on Telegraph [Avenue] where there is a lot of vacancy, and we are hoping that that stretch will be helped,” said Kathy Kleinbaum, project manager at the city’s redevelopment agency. “You put 624 housing units and a major desti- nation—the BART station—and we think those people are going to shop in the Temescal district.” This page First to be constructed is the 480-car garage that will replace BART’s surface Top Left: Future MacArthur transit village parking lot. Te site’s main developer, affordable housing giant Bridge Housing, will MENDORF Top Right: Current MacArthur BART station E ZI Bottom Left: Telegraph Avenue then build 108 affordable housing units starting this fall, with an expected comple- AD tion date of 2014.
    [Show full text]
  • NNN Leased Strip Center, Value-Add Potential
    NNN Leased Strip Center, Value-Add Potential 3105 Railroad Ave Mary Alam, MBA Joshua Ballesteros Pittsburg, CA 94565 Senior Vice President Investment Advisor O: 415.358.2111 O: 415.480.0214 M: 415.297.5586 M: 209.518.9025 [email protected] [email protected] CalDRE #01927340 CalDRE #02010271 OFFERING MEMORANDUM Table Of Contents Table of Contents 3 Section 1 Property Information 6 Section 2 Location Information 14 Section 3 Financial Analysis 18 Section 4 Sale Comparables 25 Section 5 Rent Comparables 34 Section 6 Demographics Section 1 THE OFFERING 1 Property Description Property Overview NAI Northern California is pleased to present for sale this well located strip center with 10 retail units and NNN leases. The property benefits from its strategic location in an emerging retail corridor just 0.7 miles from the Pittsburg Bart station and the California Delta Highway-4. Railroad Avenue enjoys close to a 20,000 vehicles per day traffic count which further adds to the visibility of this retail property and its success. This busy retail corridor includes, among others, the Atlantic Plaza Shopping Center, which features a wide variety of vendors such as FoodsCo, CVS, Goodwill, McDonald's, USPS, Little Caesar's, Mountain Mike's, Jackson Hewitt Tax and more Location Overview The subject is located on busy Railroad Avenue in Pittsburg, minutes from the Pittsburg Bart Station and busy Highway 4. It enjoys strong demographics of approximately 150,000 people within a five mile radius with an average household income of approximately $82,000 per year. Population growth within five miles has been phenomenal at nearly 12% between 2010 and 2018 and projected to be close to 6% in the next five years.
    [Show full text]
  • Measure RR Small Business Outreach
    Measure RR Small Business Outreach VTA River Oaks Campus Thursday, November 9, 2017 Agenda DBE Program - Small Business Elements • Measure RR Background • Measure RR Upcoming Projects • How to do business with BART • Economic Opportunity Programs • Resources • Q&A 2 Measure RR Background • $3.5B Measure RR Bond passed in 2016 to improve BART’s aging transit infrastructure: . Repair and replace critical safety infrastructure . Relieve passenger crowding, reduce traffic congestion, expand opportunities to safely access stations 3 Measure RR Upcoming Projects Program FY18* FY19* Total* Renew Track $45.9 $47.3 $93.2 Renew Power Infrastructure $85.2 $117.2 $202.4 Repair Tunnels & Structures $19.1 $25.6 $44.7 Renew Mechanical $7.0 $5.5 $12.5 Replace Train Control/Increase Capacity $5.2 $3.0 $8.2 Renew Stations $4.6 $13.6 $18.2 Expand Safe Access to Stations $14.0 $23.0 $37.0 Design/Engineer to Relieve Crowding $9.1 $14.9 $24.0 Total $190.1 $250.1 $440.2 * In millions. Represents a portion of the total project cost (RR funds only) 4 Upcoming Procurement/Construction Contract Awards Advertisement Substantial Est. Contract Project Date Completion Value ($ millions) RENEW TRACK Rail Procurement*** - 15CQ-200 FY18 – Qtr 1 FY23 – Qtr 3 $18 M03 Track Construction – 15CQ-100 FY18 – Qtr 1 FY19 – Qtr 1 $4.1 M03 Track Material FY18 – Qtr 1 FY19 – Qtr 2 $1 Rail Procurement (Frogs) – 6M3378A FY18 – Qtr 1 FY19 – Qtr 2 $0.2 A15 Portal Grout Project (DFS) FY18 – Qtr 1 FY19 – Qtr 3 $0.8 C55 Material Procurement FY18 – Qtr 2 FY19 – Qtr 3 $1.1 Wheel Rail Interface Optimize FY18 – Qtr 2 FY20 – Qtr 3 $4.9 System Joint Elimination FY18 – Qtr 2 TBD $5 C35 Interlocking Track Construction FY18 – Qtr 2 FY20 – Qtr 3 $13 Yard Track Replacement Construction FY19 – Qtr 2 TBD $200 Renew Track Sub-Total $248.1 *** Project funded by RR and other funding sources 5 UpcomingUpcoming Procurement/Construction Procurement/Construction ContractContract Awards Awards Advertisement Substantial Est.
    [Show full text]
  • Netsci Transportation Information
    The Transportation Information for NetSci 2014 1. SFO to Clark Kerr and Claremont Airport Shuttles from San Francisco International Airport to Clark Kerr and Claremont Hotel Airport shuttles provide door-to-door service. The price is $34 for one person and 15 for additional person. The total occupancy of the shuttle is for 7 people. Reservations are recommended. Bay Porter Express 1-877-467-1800 (Bay Area toll free) • 1-415-467-1800 (outside Bay Area) East Bay Transportation 1-877-526-0304, 1-510-526-0304 Airport Commuter 1-888-876-1777 Taxi Taxi fare to Berkeley will be approximately $78 from the San Francisco airport. http://www.veteranstaxicab.com/ BART (Bay Area Rapid Transit) BART is the Bay Area's subway system. The campus is closest to the Downtown Berkeley station on the Richmond line and to the Rockridge station on the Pittsburg/Bay Point line. There is no direct connection to downtown Berkeley from San Francisco on Sundays and evenings. At those times, take the Pittsburg/Bay Point train and transfer to a Richmond train at the 12th Street (Oakland) station (traveling to San Francisco at those times, transfer at MacArthur station). Monday - Friday, 4 a.m. to midnight* Saturday, 6:00 a.m. to midnight* Sunday, 8:00 a.m. to midnight* *In many cases, BART service extends past midnight. Individual station closing times are coordinated with the schedule for the last train, beginning at around midnight. BART trains typically run every 15 minutes on weekdays and every 20 minutes on evenings, weekends and holidays. For exact times, check the following website.
    [Show full text]