Joint Stock Company «Russian concern for production of electric and thermal energy at nuclear power plants» ( Concern JSC)

ELEVENTH INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE

“SAFETY, EFFICIENCY AND ECONOMICS OF NUCLEAR POWER INDUSTRY” (MNTK-2018)

CONFERENCE PROGRAMME

Moscow, May 23–24, 2018 OVERALL SCHEDULE AND TIMING

May 23rd (1st Day) Participants registration (Conference hall lobby)...... с 0800 до 0900 Opening (Conference hall) ...... с 0900 до 0920 Plenary session (Conference hall) ...... с 0920 до 1200 Section session (the allocated rooms) ...... с 1400 до 1800 Exhibition of nuclear enterprises & organizations (Building 2 lobby) ...... с 1400 до 1800 Official dinner ...... с 1830 до 2100

May 24th (2nd Day) Section sessions, cont’d (the allocated rooms) ...... с 0900 до 1400 Exhibition of nuclear enterprises & organizations, cont’d (Building 2 lobby) ...... с 0900 до 1400 Plenary session – Summing up and Closing (Conference hall) ...... с 1430 до 1530

Timing Presentations at the plenary session: 25 to 30 min Presentations at the section sessions: 15 to 30 min including Q&A

2 CONTENTS

CONFERENCE TOPICS...... 5 PLENARY SESSION...... 10 SECTION PROGRAMMES SECTION 1. SAFE AND EFFECTIVE OPERATION OF NPPS ...... 11 1.1. Operation, maintenance and repair of NPPs with VVER, RBMK, BN and EGP-6 reactors ...... 11 1.1.1. Operation of NPPs with VVER reactors ...... 11 1.1.2. Operation of NPPs with RBMK, BN and EGP-6 reactors...... 13 1.1.3. Maintenance & repair and installation of NPP equipment ...... 15 1.2. Engineering support to NPP operations ...... 17 1.2.1. Equipment life management and nuclear power units lifetime extension ...... 17 1.2.2. Enhancement of electric equipment reliability ...... 19 1.2.3. Material science and metal inspections ...... 21 1.2.4. RW management, nuclear power units decommissioning including preparation to decommissioning ...... 22 1.2.5. SNF management...... 25 1.2.6. Fire Safety ...... 26 1.3. Radiation safety, NPP ecology, emergency preparedness ...... 29 1.3.1. Radiation safety at NPPs ...... 29 1.3.2. NPP ecology...... 31 1.3.3. Emergency preparedness at NPPs ...... 33 SECTION 2. NUCLEAR POWER DEVELOPMENT ...... 35 2.1. Key areas of advanced technological development of nuclear power . . . . . 35 2.2. Construction of new nuclear power units ...... 37 2.3. Commissioning of new nuclear power plants ...... 39 2.3.1. Nuclear power units commissioning experience ...... 39 2.3.2. Enhancement of APCS reliability and cyber-security ...... 40 SECTION 3. NUCLEAR POWER ECONOMICS AND INFORMATION TECHNOLOGIES...... 41 3.1. Nuclear power economics...... 41 3.2. Information technologies for the nuclear power...... 43

3 SECTION 4. INTERNATIONAL COOPERATION FOR NUCLEAR SAFETY...... 45 SECTION 5. HUMAN RESOURCE FOR THE NUCLEAR POWER ...... 47 5.1. Human resource for the nuclear power...... 47 5.2. Use of veterans’ experience and expertise. Tutorship...... 50 5.3. Transfer of international experience and traditions to the youth ...... 51 5.4. Young nuclear engineers and safe operation of NPPs...... 52 PLENARY SESSION / SUMMING UP AND CLOSING...... 53 Reference information ...... 54

4 CONFERENCE TOPICS

Plenary session

“The Role and Place of the Operating Organization in Implementation of Russian Nuclear Power Development Strategy”

Keynote report by Petrov A.Yu., Director General of Rosenergoatom Concern JSC

Panel discussion on «Implementation of Russian Nuclear Power Development Strategy» Facilitator: Asmolov V.G., State Corporation Panelists:

Shutikov A.V., Rosenergoatom Concern JSC

Adamov E.O., RDIPE JSC

Gulevich A.V., SSC RF IPPE

Zverev D.L., OKBM Afrikantov JSC

Konstantinov N.I., Rosenergoatom Concern JSC

Piminov V.A., EDO Gidropress JSC

SECTIONS

SECTION 1. Safe and effective operation of NPPs Chairman: Dementiev Andrey A. – Deputy Director General – Director for Production & NPP Operation, Rosenergoatom Concern JSC. 1.1. Operation, maintenance and repair of NPPs with VVER, RBMK, BN and EGP-6 reactors Chairman: Chernikov Oleg G. – First Deputy Director for Production & NPP Operation – Director of Department for NPP Operation and Nuclear Fuel Management, Rosenergoatom Concern JSC. Co-Chairman: Berkovich Vadim Ya. – Deputy Designer General, EDO Gidropress.

5 1.1.1. Operation of NPPs with VVER reactors Chairman: Aydemirov Oleg A. – Head of Office for VVER Reactors Operation, Rosenergoatom Concern JSC. Co-Chairman: Mikhalchuk Alexander V. – Deputy Director General, VNIIAES JSC. 1.1.2. Operation of NPPs with RBMK, BN and EGP-6 reactors Chairman: Bystrikov Alexander A. – Head of Office for Channel & Fast Reactors Operation, Rosenergoatom Concern JSC. Co-Chairman: Druzhinin Vladimir E. – Head of department, VNIIAES JSC. 1.1.3. Maintenance & repair and installation of NPP equipment Chairman: Krupsky Alexander G. – Deputy Director for Production & NPP Operation – Director of Department for Plant Maintenance, Repair and Installation, Rosenergoatom Concern JSC. Co-Chairman: Chernikov Alexey A. – First Deputy Director General – Chief Engineer, Atomenergoremont JSC. 1.2. Engineering support to NPP operations Chairman: Sultanov Ramis M. – Deputy Director of Department for Engineering Support, Rosenergoatom Concern JSC. Co-Chairman: Potapov Vladimir V. – Deputy Director of the VNIIAES-SES – Director of Department for NPP Life Management, VNIIAES JSC. 1.2.1. Equipment life management and nuclear power units lifetime extension Chairmen: Berezanin Anatoly A. – chief technologist, Department for Engineering Support Rosenergoatom Concern JSC; Povarov Alexander V. – Deputy Director of Department for Production Planning, Upgrading and Lifetime Extension, Rosenergoatom Concern JSC. Co-Chairman: Potapov Vladimir V. – Deputy Director of the VNIIAES-SES - Director of Department for NPP Life Management, VNIIAES JSC. 1.2.2. Enhancement of electric equipment reliability Chairman: Prorokov Oleg A. – chief technologist, Department for Engineering Support, Rosenergoatom Concern JSC; Co-Chairman: Kononenko Alexander I. – Head, Office for Diagnostics & Testing, NIIP JSC. 1.2.3. Material science and metal inspections Chairman: Lovchev Vladimir N. – Deputy Director of Department – Head of Material Science Division, Department for Engineering Support, Rosenergoatom Concern JSC. Co-Chairman: Korneev Alexey E. – Head, division for metal physical & chemical testing SSC RF CNIITMash. 1.2.4. RW management, nuclear power units decommissioning including preparation to decommissioning Chairman: Stakhiv Mikhail R. – Deputy Director of Department – Head of division for SNF, RW management and decommission preparation, Department for Engineering Support, Rosenergoatom Concern JSC. Co-Chairperson: Safronova Natalia N. – Head of division for NPP decommissioning management, Rosenergoatom Concern JSC.

6 1.2.5. SNF management Chairman: Lobkov Yury M. – chief technologist, division for SNF, RW management and decommission preparation, Department for Engineering Support, Rosenergoatom Concern JSC. Co-Chairperson: Filippova Yulia Yu. – Deputy Head of Department for RW & SNFmanagement, VNIIAES JSC. 1.2.6. Fire Safety Chairman: Nikiforov Victor V. – Deputy Director – Head of Fire Safety Service, Technology Affiliate of Rosenergoatom Concern JSC. Co-Chairman: Aleshkov Mikhail V. – Deputy Head for Scientific Affairs, the State Firefighting Service of the EMERCOM of Russia. 1.3. Radiation safety, NPP ecology, emergency preparedness Chairman: Khlebtsevich Vladimir E. – Deputy Director for Production & NPP Operation – Director of Department for Emergency Preparedness and Radiation Protection, Rosenergoatom Concern JSC. Co-Chairman: Zhurbenko Alexander V. – Deputy Director of VVER Division, NSC Kurchatov Institute. 1.3.1. Radiation safety at NPPs Chairman: Dolzhenkov Igor – Deputy Director of Department for Emergency Preparedness and Radiation Protection, Rosenergoatom Concern JSC. Co-Chairman: Kut’kov Vladimir A. – Leading scientific researcher, NSC Kurchatov Institute. 1.3.2. NPP ecology Chairman: Pechkurov Andrey V. – chief technologist, Department for Emergency Preparedness and Radiation Protection, Rosenergoatom Concern JSC. Co-Chairperson: Plyamina Olga V. – Director, Scientific & Research Institute of Ecology. 1.3.3. Emergency preparedness at NPPs Chairman: Markov Alexander P. – Deputy Director of Department for Emergency Preparedness and Radiation Protection, Rosenergoatom Concern JSC. Co-Chairman: Kosov Alexey D. – head of division, VNIIAES JSC

SECTION 2. NUCLEAR POWER DEVELOPMENT Chairman: Bezzubtsev Valery S. – Director for Technological Development, Rosenergoatom Concern JSC; Co-Chairmen: Ponomarev-Stepnoy Nikolay N. – Scientific Advisor to Director General, Rosenergoatom Concern JSC; Davidenko Nikolay N. – Deputy Director General for Technological Development, VNIIAES JSC. 2.1. Key areas of advanced technological development of nuclear power Chairman: Bezzubtsev Valery S. – Director for Technological Development, Rosenergoatom Concern JSC. Co-Chairmen: Kornienko Konstantin A. – Head of Office for Innovative Development, Rosenergoatom Concern JSC; Bakanov Mikhail V. – Head of the “New Platform” Project Office, Rosenergoatom Concern JSC.

7 2.2. Construction of new nuclear power units Chairman: Barinov Alexander V. – Deputy Director for Designing and Licensing Activities, Capital Projects Implementation Affiliate, Rosenergoatom Concern JSC. Co-Chairman: Baryshev Alexander V. – Deputy Director of Department, Capital Projects Implementation Affiliate, Rosenergoatom Concern JSC. 2.3. Commissioning of new nuclear power plants Chairman: Katsman Alexander M. – Deputy Director for Production & NPP Operation – Director of Department for Operational Readiness of New Build, Rosenergoatom Concern JSC. 2.3.1. Nuclear power units commissioning experience Co-Chairman: Deriy Vladimir P. – Deputy Director General – Chief Engineer, Atomtechenergo JSC. 2.3.2. Enhancement of CPCS reliability and cyber-security Co-Chairman: Antipov Stanislav I. – First Deputy Director for Technical Matters, RASU JSC.

SECTION 3. NUCLEAR POWER ECONOMICS AND INFORMATION TECHNOLOGIES Chairman: Migalin Sergey A. – Deputy Director General – Director for Economy and Finances, Rosenergoatom Concern JSC. Co-Chairperson: Demidova Lyudmila N. – Director of Department for Economy and Controlling, Rosenergoatom Concern JSC. 3.1. Nuclear power economics Chairman: Migalin Sergey A. – Deputy Director General – Director for Economy and Finances, Rosenergoatom Concern JSC. Co-Chairman: Demidova Lyudmila N. – Director of Department for Economy and Controlling, Rosenergoatom Concern JSC. 3.2. Information technologies for the nuclear power Chairman: Shalnov Oleg E. – Director of Department for IT Projects Management and Integration, Rosenergoatom Concern JSC. Co-Chairman: Kirikov Anton V. – Deputy Director of IT Department, State Corporation “Rosatom”.

SECTION 4. INTERNATIONAL COOPERATION FOR NUCLEAR SAFETY Chairman: Konstantinov Nikita I. – Deputy Director General – Director for Business Development, Rosenergoatom Concern JSC. Co-Chairperson: Ivanova Nina Yu. – Head of division for International Scientific & Technical Cooperation, Rosenergoatom Concern JSC.

SECTION 5. HUMAN RESOURCE FOR THE NUCLEAR POWER Chairman: Gudin Sergey A. – Director of Department for Staff Management, Labour Management and Personal Motivation, Rosenergoatom Concern JSC. Co-Chairman: Aksinenko Sergey P. – Director of Department for Engineering Support, VNIIAES JSC.

8 5.1. Human resource for the nuclear power Chairman: Gudin Sergey A. – Director of Department for Staff Management, Labour Management and Personal Motivation, Rosenergoatom Concern JSC. Co-Chairman: Aksinenko Sergey P. – Director of Department, VNIIAES JSC. 5.2. Use of veterans’ experience and expertise. Tutorship Chairman: Markelov Nikolay I. – Deputy head for organizational matters, Executive Committee of the Interregional Nonprofit Organization for Rosenergoatom Veterans. Co-Chairman: Simagin Andrey B. – chief expert, the Interregional Nonprofit Organization for Rosenergoatom Veterans. 5.3. Transfer of international experience and traditions to the youth Chairman: Saraev Yury P. – Vice-Chairman, the International Union of Veterans of Nuclear Power Industry. Co-Chairman: Kuleshov Igor I. – chief expert, the International Union of Veterans of Nuclear Power Industry. 5.4. Young nuclear engineers and safe operation of NPPs Chairman: Kushnarev Sergey V. – Vice-President, Nuclear Society of Russia. Co-Chairman: Kirichenko Anatoly M. – First Deputy Director, WANO Moscow Center.

9 May 23rd Wednesday

0800–0900 Participants registration (VNIIAES Conference hall lobby) Chairman: Shutikov A.V. 0900–0920 Conference opening. Shutikov A.V. Welcome address from the State Corporation Rosatom. Lokshin A.M. Welcome address from Rosenergoatom Concern JSC. Petrov A.Yu. Procedural matters. Shutikov A.V. PLENARY SESSION 0920–0950 The Role and Place of the Operating Organization in Implementation of Nuclear Power Development Strategy in Russia Petrov A.Yu., Rosenergoatom Concern JSC 0945–1200 Panel discussion on Implementation of Russian Nuclear Power Development Strategy Facilitator: Asmolov V.G., State Corporation Rosatom Panelists Shutikov A.V., Rosenergoatom Concern JSC. Near-Future Plans of Rosenergoatom on Implementation of the Nuclear Power Development Strategy Adamov E.O., RDIPE JSC. The Role of Fast Reactors in Russian Nuclear Power Development Strategy Gulevich A.V., SSC RF IPPE. The Strategic Issues to Solve by Means of a Two-Component Nuclear Power System with a Single Closed Fuel Cycle, and the Role of Thermal and Fast Reactors Zverev D.L., OKBM Afrikantov JSC. Key Objectives for Improving Fast Reactor Technologies, High Temperature Gas Cooled Reactors, Low and Medium Power Sources based on Pressurized Water Reactors Konstantinov N.I., Rosenergoatom Concern JSC. Development of Rosenergoatom New Businesses Abroad: BOO, ACMM, Nuclear Infrastructure… Piminov V.A., EDO Gidropress JSC. Program for VVER Technology Enhancement and Improvement of Its Consumer Attractiveness under Conditions of a Two-Component Nuclear Power System Panelists’ presentations – up to 15 min. Discussion – up to 40 min. 1200–1230 Briefing for mass media. VNIIAES Building, 2nd floor, the OPАS room 1200–1400 Lunch 1400–1830 Section sessions 1830–2100 Official dinner

10 SECTION PROGRAMMES SECTION 1. SAFE AND EFFECTIVE OPERATION OF NPPS Section chairman: Dementiev A.A., Rosenergoatom Concern JSC Subsection 1.1. Operation, maintenance and repair of NPPs with VVER, RBMK, BN and EGP-6 reactors Subsection chairman: Chernikov O.G., Rosenergoatom Concern JSC. Topical area 1.1.1. Operation of NPPs with VVER reactors Chairman: Aydemirov O.A., Rosenergoatom Concern JSC. Co-Chairman: Mikhalchuk A.V., VNIIAES JSC.

Room 213 (Building 1), 2nd floor (The Crisis Center) May 23rd Wednesday 1400–1420 Session opening Activities of the Office for VVER Reactors Operation from the Nuclear Power Development Prospect Aydemirov O.A., Rosenergoatom Concern JSC 1420–1450 Sino-Russian Cooperation Model Project in the Sector of Nuclear Energy and its Follow-up Development Shen Yanfeng, Tianwan NPP 1450–1520 Aspects of Development of Failure Tolerant Fuel for Novikov V.V., VNIINM JSC 1520–1540 Coffee break. Overview of poster presentations 1540–1610 The PLAN BLOK Computer Code for Optimization of Fuel Loads at VVER-1000 Reactors with Actual Operation Modes Taken into Account Pavlovichev A.M., NRC Kurchatov Institute 1610–1640 The PLAN AES Computer Code for Scheduling Economically Efficient Operation of a Multi-Unit NPP with Actual Unit Operation Modes Taken into Account Mikhalchuk A.V., VNIIAES JSC 1640– 1710 Study of Control Algorithms for Daily Load Follow Modes for VVER- 1200 Reactors Vygovsky S.B., NRNU MEPhI 1710–1735 Implementation of Fast Neutron Fluence Monitoring to Control Exposure Related Residual Life of Equipment of VVER Reactors in Pursuance of Existing FNR Requirements Borodkin P.G., SEC NRS 1735–1800 Discussion. Section summing up

11 May 24th Thursday 0900–0925 Water Chemistry Regime for the Evaporation Cooling Towers of VVER Nuclear Power Units Krutskikh D.A., VNIIAES JSC 0925–0950 Peculiarities of Strain-Stressed States of NPP Containments at the Stages of Erection, Pre-Stressing, Commissioning Tests and Operation Medvedev V.N., Nuclear Safety Institute of the Russian Academy of Sciences 0950–1010 Simulation of Processes within the Passive Heat Removal System of VVER-1200 Steam Generators Mikhalycheva E.A., Joint Institute for Power and Nuclear Research- Sosny, Belarus 1010–1030 Results of Studies of the Oxide Film Structure at Fuel Cladding Locations with a Higher Oxydation Levels for a TVS-2M Assembly Used at Balakovo NPP Unit 4 for One Fuel Cycle Volkova I.N., NIIAR 1030–1100 Results of Studies of Leaking Fuel Rods of VVER-1000 Reactor Performed by SNC NIIAR in 2016-2017 Strozhuk A.V., NIIAR 1100–1130 Coffee break Overview of poster presentations 1130–1150 Study of Control Algorithms for Daily Load Follow Modes for VVER- 1200 Reactors Vygovsky S.B., NRNU MEPhI 1150–1210 Concerning the Optimum Water Level in Steam Generator of VVER NPPs Parchevsky V.M., NRU MPEI 1210–1235 A Method for Detection of VVER Fuel Leaks through Xe Radionuclide Activity Kalinichev P.M., SNC RF TRINITI 1235–1300 Analysis of VVER-1200 Power Unit Vibration State at Various Phases of Its Startup and the First Campaign of Commercial Operation Slepov M.T., Novovoronezh NPP 1300–1330 Coffee break 1330–1400 Discussion Voting for the best section report Section summing up

12 Topical area 1.1.2. Operation of NPPs with RBMK, BN and EGP-6 reactors Chairman: Bystrikov A.A., Rosenergoatom Concern JSC Co-Chairman: Druzhinin V.E., VNIIAES JSC Room 613 (Building 1), 6th floor May 23rd Wednesday 1400–1420 Session opening Bystrikov A.A., Rosenergoatom Concern JSC 1420–1500 Issues of RMBK-1000 Reactor Unit Life Management Slobodchikov A.V., RDIPE JSC 1500–1530 Coffee break 1530–1600 Topical Physical Tasks to Solve for Ensuring Safe Operation of RBMK-1000 Reactors Rozhdestvensky M.I., RDIPE JSC 1600–1630 Development of the Higher Accuracy Computer Code MNT-Cuda for Solving the RBMK Operational Support Tasks Ivanov I.E., VNIAES JSC 1630–1700 Experience of Neutronics Calculations Using the STEPAN-MPG Code Balygin A.A., NRC Kurchatov Institute 1700–1730 The Full-Scale 3D Code KLADKA for Temperature Field Calculations in Structural Elements of RBMK Core for Stationary, Transient and Accident Modes Babaytsev V.N., NRC Kurchatov Institute 1730–1800 Discussion Summing up

May 24th Thursday 0900–0930 BN-80 Reactor Assembly for Material Studies Maximtsev D.M., OKBM Afrikantov JSC 0930–1000 BN-600 and BN-800 Reactor Units Operational Support Using the Software Complex GEFEST Belov A.A., Nuclear Safety Institute of the Russian Academy of Sciences 1000–1030 The SKPF System for Subcriticality Control and Physical Measurements Fedorov V.A., NRNU MEPhI 1030–1100 Coffee break

13 1100–1130 Development, Manufacturing and Testing of a Hanger for PIK-800 Ionization Chamber. PIK-800 Implementation at Beloyarsk NPP Unit 4 Kirichenko G.PП., KPP Atompribor JSC Salyaev A.V., OKBM Afrikantov JSC 1130–1210 The Robotic System for Cutting Graphite Stacks for Restoration / Enlargement of Gaps between Core Shroud and Graphite Stack at RBMK-1000 Reactor Units Sursky P.V., Tarakanov V.Yu., Diacont JSC 1210–1250 Gap Restoration in the Core Shroud - Graphite Stack System at Kursk NPP Unit 1 by means of the Robotic System Shevtsov I.A., Prolog JSC Kurennoy E.P., Kursk NPP 1250–1320 Development of the Higher Accuracy Computer Code TRIUM800 for Calculation Support to BN-800 Reactor Operation Rozhikhin E.V., SNC RF IPPE JSC» 1320–1340 The Optimizator ZR Software. Optimization of Fuel Channel Reloading Sequence Morozov A.Yu., Smolensk NPP 1340–1400 Voting for the best section report Section summing up 1400–1430 Coffee break

14 Topical area: 1.1.3. Maintenance & repair and installation of NPP equipment Chairman: Krupsky A.G., Rosenergoatom Concern JSC Co-Chairman: Chernikov A.A, Atomenergoremont JSC Room 614 (Building 1), 6th floor May 23rd Wednesday 1400–1420 Session opening. Krupsky A.G., Rosenergoatom Concern JSC 1420–1440 The Lean Culture Projects for Power Unit Maintenance Outage Optimization: Scheduling, Implementation and Effectiveness Measuring. An Example of Power Unit Maintenance Outage Optimization at Smolensk NPP Unit 2 in 2017–2018 Aputin V.M., Smolensk NPP 1440–1500 Maintainability of Power Units under Construction Gagarin I.A., Atomenergoremont JSC 1500–1530 Coffee break 1530–1550 Performance of Repair and Modernization Works for RBMK-1000 Reactor Core Equipment Biryukov A.N., RDIPE JSC 1550–1610 Optimization of Non-Production Losses for the Works Performed in the Central Hall Leonov A.I., Kursk NPP 1610–1630 Repair of Dissimilar Welding Joints No. 23 (76,77) for Adapter Ring-to-Nozzle Welding in the PGV-4 (PGV-213) Steam Generator Using an Automatic Welding System Gaynutdinov A.R., Kola NPP 1630–1650 Restoration of RBMK-1000 Reactor Unit Elements at Leningrad NPP Godovykh P.V., Leningrad NPP 1650–1710 Up-to-Date Developments of Technology and Rigging for Plugging Heat Exchanger Tubes of PGV-1000 SG Volkov L.P., SPE “Alpha Diagnostics” 1710–1730 Development of Information Software Modules for Nuclear Power Industry Personnel Nikiforov V.N., NRNU MEPhI 1730–1750 Experimental Try-Out of a Technology for Repairing the Welding Joint No. 111 of PGV-1000M SG Using a Special Equipment Set at Novovoronezh NPP Lebedev N.V., GMZ Khimmash JSC 1750–1800 Discussion. Summing up

15 May 24th Thursday 0900–0930 Establishment of a Lean Culture Process Factory in the Area of NPP Equipment Maintenance & Repair Lyubakhin S.V., Atomenergoremont JSC 0930–1000 The POLYSOUDE Innovative Solutions for the Nuclear Industry Gutorov D.A., POLYSOUDE Representation Office 1000–1030 Alteration of Approaches to Equipment Condition-Based Maintenance and the Maintenance Cycles Entailed by the New Regulatory Requirements Voynilenko V.V., VNIAES JSC 1030–1100 Coffee break 1100–1130 New Load-Bearing Element of the Multiple Nut Runner for Tightening / Loosening the Nozzles of VVER Reactor Vessel Head Vladimirov V.I., “Norma energoatom” PJSC 1130–1200 Analysis of Application Results for the Technology of Mechanical Re-Distribution of Residual Welding-Induced Stresses in the 300- mm Diameter Austenite Pipelines Located in RMBK-1000 Reactor Unit Premises Babkin L.B., VNIAES JSC 1200–1230 Ensuring Personnel Radiation Safety during Maintenance and Repairing Works at NPPs Zanziev A.V., GMZ Khimmash JSC 1230–1300 Replacement of the Diesel Generator Crankshaft in the Conditions of an Operating NPP Fominykh A.Ya., Rostov NPP 1300–1330 Development and Production of Domestic Compounds for Cool Hardening to Use for 3rd and 4th Safety Class Equipment Repairing. The Update on Industry-wide Cooperation Progress Smirnov M.M., TVEL JSC 1330–1400 Voting for the best section report 1400–1430 Coffee break 1430–1530 Discussion Section summing up

16 Subsection 1.2. Engineering support to NPP operations Chairman: Sultanov R.M., Rosenergoatom Concern JSC Co-Chairman: Potapov V.V., VNIIAES JSC Topical area: 1.2.1. Equipment life management and nuclear power units lifetime extension Chairmen: Berezanin A.A., Povarov A.V., Rosenergoatom Concern JSC; Co-chairman: Loginov A.M., VNIIAES JSC

Room 612 (Building 1), 6th floor May 23rd Wednesday 1400–1410 Session opening Sultanov R.M., Rosenergoatom Concern JSC 1410–1440 Progress in Monitoring and Diagnostics at NPPs Gloth G., Framatome GmbH 1440–1500 Results of Works on Development of Lifetime Management Programs for Equipment & Pipelines. The Challenges of Justification and Determination of Residual Life Parameters for E&P Potapov V.V., VNIIAES JSC 1500–1515 The Outcomes of Unit 5 Life Extension Activities and Outstanding Works at the Unit 6 of Kozloduy NPP Ovedensky Ts., Kozloduy NPP, Bulgaria 1515–1530 Frequency-Resonance Reflectometry: New Opportunities for Detection of Defects in Cables Belousov S.V., NIIP JSC 1530–1630 Coffee break

1630–1655 Optimization and Development of the Thermal Equipment Diagnostics Systems to Meet Requirements of Life Management Programmes Pavelko V.I., SEC Diaprom JSC 1655–1715 Methodology for Lifetime Management of Reactor Installations of VVER Type Bogachev A.V., EDO Gidropress JSC 1715–1730 Application of Supercomputers and CFD Software for Resolution of Pending Issues in Nuclear Power Industry Sveshnikov D.N., OKBM Afrikantov JSC 1730–1800 Discussion Summing up

17 May 24th Thursday 0900–0920 Lifetime Extension of the Existing Nuclear Power Units of Rosenergoatom Concern JSC Gilev V.A., Rosenergoatom Concern JSC 0920–0940 Lifetime Extension of Nuclear Power Units with VVER-1000 Reactors Schekotov A.V., Balakovo NPP 0940–1000 Modernization and Lifetime Extension of Nuclear Power Unit 2 of Metzamor NPP (Armenia) Sevikyan G.A., “Armenian NPP” CJSC 1000–1020 Application of Acoustoelasticity Method for Ensuring Long-Term Service Life of NPP Engineering Elements Antonov M.I., St.-Petersburg Polytechnic University n.a. Peter the Great 1020–1040 Results of Activities on Development of Life Management Programs for Thermomechanical Equipment and Civil Structures of Buildings and Facilities Loginov A.M., Ilyin V.A., VNIIAES JSC 1040–1100 Use of Residual Life Test Results for Electric and I&C Components for Determination of Limit States and Residual Life Parameters Zvonarev A.V., EREC JSC 1100–1120 Ways to Ensure Structural Integrity of the NPP Process Systems Elements Arzhaev A.A., NPO DIAPROK LLC 1120–1200 Discussion Section summing up 1200–1300 Coffee break

18 Topical area: 1.2.2. Enhancement of electric equipment reliability Chairman: Prorokov O.A, Rosenergoatom Concern JSC Co-Chairman: Kononenko A.I., NIIP JSC

Room 319 (the Module building, 3rd floor) May 23rd Wednesday 1400–1420 Session opening Sultanov R.M., Rosenergoatom Concern JSC Prorokov O.A, Rosenergoatom Concern JSC 1420–1450 Enhancement of Electric Equipment of the Existing NPPs Prorokov O.A, Rosenergoatom Concern JSC 1450–1510 Assessment of Electric Insulation Conditions Using Relaxation Isothermal Current Measurement Results Kononenko A.I., NIIP JSC 1510–1530 Implementation of Measures Aimed at Limitation of Short Circuit Current Levels in 330-kV Grid Boytsov M.A., Leningrad NPP 1530–1610 Coffee break 1610–1630 Comprehensive Diagnostics of NPP Electric Equipment. The Status and Prospects of Electric Equipment Engineering Diagnostics Activities Organization at NPPs Using Portable and Stationary Systems. Aksenov Yu.P., DIAKS JSC 1630–1650 Advanced Methods and Means for DC Electric Resistance Measurement of Power Transformer Windings Ekaterinina O.N., “SDB of Electric Instrument Engineering” JSC 1650–1710 Operation and Modernization of Generation Equipment for NPP Reliability Increasing and Lifetime Extension Zheleznyak V.N., “Power Machinery” PJSC, “Elektrosila” Plant 1710–1730 Prospects of Implementation of the Systems for Monitoring and Engineering Diagnostics of Electric Machines Zavidey V.I., RFNC-VNIITF 1730–1800 Discussion Summing up

19 May 24th Thursday 0900–0910 Session resumption. Opening remarks Prorokov O.A, Rosenergoatom Concern JSC 0910–0930 Introduction of Computerized Diagnostic Monitoring of HV Equipment for NPP Operational Reliability Enhancement Mudrik A.A., CAMLIN Ltd 0930–0950 Turbine Generators Vibroacoustic Diagnostics and Monitoring Nazolin A.L., SEC “Resource” CJSC 0950–1010 Enhancement of Reliability of Uninterruptible Power Supply to Electric Equipment at NPP Facilities in Emergency Operation Modes Aleshkin A.A., “AK Booster” CJSC 1010–1040 Innovative Electric Equipment to Ensure Safe and Efficient Operation of Nuclear Power Plants Kovalev V.D., “Elektrozavod” JSC 1040–1120 Coffee break

1120–1140 In-situ Power Transformers Testing for Elevated Voltage Levels Gorbunov A., “Smart Energo” CJSC 1140–1200 Approaches to Interpretation of Frequency Parameter Measurements for Assessment of Conditions of Power Transformer Windings at Reactors. The Current Status and Prospects of Introduction of the Systems for Monitoring and Engineering Diagnostics of High-Power electric Machines and Apparatuses Volkov A.Yu., “VEI the branch of FSUE “RFNC-VNIITF” 1200–1230 A System for Comprehensive On-line Monitoring of Transformer Equipment Gorokhov N.B., “Pergam-Engineering” JSC 1230–1430 Discussion Section summing up Coffee break

20 Topical area: 1.2.3. Material science and metal inspections Chairman: Lovchev V.N., Rosenergoatom Concern JSC Co-Chairman: Korneev A.E., SSC RF CNIITMash

3rd floor, left side (Building 2) May 23rd Wednesday 1400–1420 Session opening Lovchev V.N., Rosenergoatom Concern JSC 1420–1445 Developments of Standards of allowable wall thickness for Model programs of NPP in-service inspection with different types of reactor installations. Problematic issues in predicting the ECW rate and in evaluating the measurement uncertainty Kuzmin D.A., VNIIAES JSC 1445–1510 Development of Innovative Materials for Application in Advanced VVER Reactor Unit Designs Margolin B.Z., NRC Kurchatov Institute, CRISM “Prometey” 1510–1530 Results and Prospects in Development of Works in Resolving Challenges of Erosion-Corrosion of Equipment and Pipelines at NPP Units Tomarov G.V., Geotherm-M LLC 1530–1630 Coffee break

1630–1655 Methods and Technologies to Improve Informativeness of Automatic Ultrasonic Inspection of Thick-Wall Welded Joints at Nuclear Power Plants Tikhonov D.S., NPC ECHO+ LLC 1655–1730 Application of Acoustic Emission Monitoring Technology to Detect Cracks in Metal Structures Barat V.A., Energosvyazinvest LLC 1730–1800 Discussion Section summing up

May 24th Thursday 0900–930 Activities on Experimental Study of Actual Material Properties of VVER Reactor Unit after 45 Years of Operation at Novovoronezh NPP Unit 3 Varovin A.Ya., NRC Kurchatov Institute – CRISM “Prometey”

21 0930–1000 Identification of Actual Metal Properties of Reactor Vessels Using the Results of Studies of the Metal Specimen Cut from the Reactor Vessel Walls Erak D.Yu., NRC Kurchatov Institute 1000–1030 Studies of Material Properties of Samples of Defective Heat Exchanging Tubes and Metal of the Steam Generator Casing from Novovoronezh NPP Unit 3 after 45 Years of Operation Kazansev A.G., NPO CNIITMASH JSC 1030–1130 Coffee break 1130–1200 A System for Classification of Equipment Assemblies and Inspection Zones Based on the MOiT ISI Information System Tyurin A.V.., “SPE Sigma IT” LLC 1200–1230 Metodological Approaches to Treatment and Analysis of Inspection Results from MOiT ISI Information System for NPPs Alexandrov A.E., “SPE Sigma IT” LLC 1230–1300 Discussion Section summing up Coffee break

Topical area: 1.2.4. RW management, nuclear power units decommissioning including preparation to decommissioning Chairman: Stakhiv M.R., Rosenergoatom Concern JSC Co-Chairperson: Safronova N.N., Rosenergoatom Concern JSC

Building 2, 3rd floor, center May 23rd Wednesday 1400–1410 Session opening Stakhiv M.R., Rosenergoatom Concern JSC 1410–1430 Solving the Tasks of NPP Units Decommissioning Safronova N.N., Rosenergoatom Concern JSC 1430–1450 Graphite Cl-36 Inventory, Recent Efficient Developments Poncet B., EDF Group 1450–1510 French Graphite Gas Reactors Dismantling Programme Dorier C., EDF Group

22 1510–1530 Concerning the Issue of Development of Irradiated Graphite and SNF Management Technologies for Decommissioning of Nuclear Power Plants with RBMK-1000 Reactors Kalyutik A.A., St.-Petersburg State Polytechnic University 1530–1600 Coffee break 1600–1620 Reuse of Materials During Decommissioning of NPP Reactor Units Ermoshin F.E., RDIPE JSC 1620–1640 Mobile Modular Complex Facilities and Equipment for RW Conditioning Gorbunova O.A., FSUE “RosRAO” 1640–1700 Practical Experience of RW Acceptance for Disposal Cherkesov A.E., ODPB FSUE “NO RAO” 1700–1720 Priority areas for the optimization of radioactive waste management Samoilov А.А., Nuclear Safety Institute of the Russian Academy of Science 1720–1740 Modern Approaches to Reprocessing and Conditioning Facilities for Newly Built NPPs Adamovich D.V., NIKIMT-Atomstroy JSC 1740–1800 Construction of Radioactive Waste Reprocessing Facility at Kursk NPP Zerkal D.G., WANO-MC representative at Kursk NPP

May 24th Thursday 0900–0910 Opening remarks Stakhiv M.R., Rosenergoatom Concern JSC 0910–0930 Modernization of Spent Ion Exchanging Resin Dryer Design at Balakovo NPP Kozhevnikova E.K., Balakovo NPP 0930–0950 RW Conditioning at Novovoronezh NPP. Challenges and Ways of Its Resolution. Process Monitoring in Course of Conditioning. Bulka S.K., Novovoronezh NPP 0950–1010 Options of Evaporator Sludge Reprocessing for Beloyarsk NPP Savkin A.E., FSUE “Radon” 1010–1030 The Rearent-Sorption Aftertreatment of Evaporator Sludge Solutions with a Higher Salt Content to Remove Radionuclides Ivanenko V.I., Institute of Chemistry and Technology of Rare Elements and Mineral Raw Materials / Kola Science Center of the RAS 1030–1100 Coffee break

23 1100–1120 Selection of Treatment Strategy for Liquid RW Generated at Rosenergoatom NPPs Sharov D.A., VNIIAES JSC 1120–1140 Facilities for RW Characterization and Exemption from Regulatory Control Kryuchkova L.M., SPE “Radico” 1140–1200 The Experience of Establishment of a Complex Facility for SRW Reprocessing at a NPP. RW Conditioning Technology Problems and Their Solutions Zinin A.V., “NIKIMT-Atomstroy” JSC 1200–1220 SRW Plasma Reprocessing Complex Facility at EDCD Affiliate of Rosenergoatom Concern JSC Kadyrov A.V., Novovoronezh NPP 1220–1240 The Digital Decommissioning Software & Hardware System: an Innovative Approach to Decommissioning of Nuclear Power Facilities Tikhonovsky V.L., Neolant CJSC 1240–1300 Comprehensive Examination of Leningrad NPP Unit 1 Aimed at Obtaining License on Operation of the Unit Shut Down for Decommissioning Kuznetsov A.N., Leningrad NPP 1300–1320 Issues of Efficient Use of NZK Type Casks for Disposal of Radioactive Waste Sobko A.A., RAOPROEKT JSC 1320–1340 Packages for RW Radchenko M.V., “ECNC” JSC 1340–1400 Discussion Section summing up 1400–1430 Coffee break 1430–1530 Voting for the best section report

24 Topical area: 1.2.5. SNF management Chairman: Lobkov Yu.M., Rosenergoatom Concern JSC Co-Chairperson: Filippova Yu.Yu., VNIIAES JSC

Building 2, 2nd floor, room No. 210 May 23rd Wednesday 1400–1415 Session opening Lobkov Yu.M., Rosenergoatom Concern JSC 1415–1450 Specification for Transfer of Spent Nuclear Fuel from Wet to Dry Storage at Smolensk NPP Antonenko V.M., Smolensk NPP 1450–1530 Substantiation of Opportunity for Transport and Storage in Dry Storage Facility HOT-2 of FSUE MChC of Spent Nuclear Fuel from RBMK-1000 reactors with its Prior Holding for 10 Years Minimum Lukashevich A.A., FSUE Mining and Chemical Combine 1530–1600 Coffee break

1600–1635 Measurement of Nuclear Fuel Burnup at Kalinin NPP and GKhK Combine with Application of MKS Series Installations Nikolaev S.A., NRC RF IPPE, Obninsk 1635–1710 Subcriticality Measurements in Spent Fuel Storage Pool at VVER- 1000 with Application of the SKP-HOT System Chernov V.A., NRC RF IPPE, Obninsk 1710–1800 Discussion. Summing up

May 24th Thursday 0900–0910 Session resumption Lobkov Yu.M., Rosenergoatom Concern JSC 0910–0940 Phase, Element and Radionuclide Analysis of Corrosion Products and Depositions in Cask Tubes of K-17U Assemblies Golosov O.A., Institute of Reactor Materials JSC 0940–1010 Experience of Operation of Russian Cast Iron Casks TUK-141O and TUK-153 at VVER-1000 NPPs Zubkov A.A., ICYaK JSC 1010–1040 Inclusion of the 14th Series Transport Package Sets into the Handling Operation Pattern of FSUE “PA ” Savinov V.A., FSUE “PA Mayak” 1040–1110 Coffee break

25 1110–1135 Experience Gained with Reprocessing of Leaking SNF from RBMK- 1000 at FSUE “PA Mayak” Belinsky L.L., FSUE “PA Mayak” 1135–1200 SNF Reprocessing as a Key Factor of Closing the Nuclear Fuel Cycle Sheremetyev A.V., FSUE “PA Mayak” 1200–1400 Discussion Section summing up Coffee break

Topical area: 1.2.6. Fire Safety Chairman: Nikiforov V.V., Technology Affiliate of Rosenergoatom Concern JSC Co-Chairman: Aleshkov M.V., the State Firefighting Service of the EMERCOM of Russia

Building 1, 6th floor, room 615 May 23rd Wednesday 1330–1340 Session opening Nikiforov V.V., Technology Affiliate of Rosenergoatom Concern JSC Aleshkov M.V., the State Firefighting Service of the EMERCOM of Russia 1340–1400 Enhancement of Fire Protection at the Existing NPPs Kharevsky V.А., FSS, Technology Affiliate of Rosenergoatom Concern JSC 1400–1420 The Main Areas of Activities on Fire Prevention at the Objects of Rosenergoatom Urban Planning Activities Sazykin V.I., FSS, Technology Affiliate of Rosenergoatom Concern JSC 1420–1440 Issues Related to Regulatory Technical Control of Fire Safety Bolodian I.А., R&D Institute of Fire Safety of the EMERCOM of Russia 1440–1500 The Challenge of Unit Fire Safety Measures Sufficiency Justification and Its Main Solutions. Key Aspects of the Fire Impact and Consequences Analysis Methodology to Assess Fire Impact on Safe Reactor Shutdown and Cooldown during the Design, Construction and Commissioning Phases. Ugorelov V.А., R&D Institute of Fire Safety of the EMERCOM of Russia 1500–1530 Coffee break

26 1530–1550 The Training Simulator for Fire Extinguishing at Electric Facilities of up to 10kV Voltage: Innovative Solutions to Ensure Safety of NPP Operators and Firefighting Brigade Staff in Course of Electric Facility Fire Extinguishing. Varshamov A.G., “Respiratory Systems-2000” JSC 1550–1610 Integrated Solutions for NPP Fire Protection Kurushin N.N., Siemens LLC» 1610–1620 Purpose, Application and Operational Features of the DPA-300 Respirator Churkin V.E., “TD Arsenal PTV” JSC 1620–1630 Fire Extinguishing at NPPs in the Environment of Fire Hazards, Radiation Fields and Chemical Accident Induced Hazards Using a Mobile Robotic Firefighting Unit Bogdanov A.E., FSS / Technology Affiliate of Rosenergoatom Concern JSC 1630–1650 Innovative Technologies for Fire Protection of NPP Facilities Using TRV Sets Makunin I.V., “Technos-M” 1650–1710 The Fire Protection Control System of Beloyarsk NPP Unit 3. Experience of Implementation and Operation Moskalev K.V., Beloyarsk NPP 1710–1730 Discussion 1730–1800 Summing up

May 24th Thursday 0900–0910 Session resumption. Opening remarks Nikiforov V.V., FSS / Technology Affiliate of Rosenergoatom Concern JSC Aleshkov М.V., State Fire Service Academy of the EMERCOM of Russia 0910–0920 Upgrading Hydrogen Safety of VVER NPPs by Means of Hydrogen Separation through Nickel Membrane and Absorption by Zirconium Orlova E.A., NRNU MEPhI 0920–0930 Fire Safety at Special Purpose Facilities Leilkhner A.V., Pozhtekhnika JSC 0930–0940 OSART Mission Results in the Area of Fire Safety at Leningrad NPP Mikhailov Yu.V., Leningrad NPP

27 0940–0950 Conduct of First Competitions for the Title of the Best Fire-Fighting Crews of Voluntary Fire Units at Operating Nuclear Power Plants: Main Results and Preparation For Competitions in 2018 Bogdanov A.E., Fire Safety Service of Rosenergoatom Concern JSC 0950–1000 Establishment of Fire Protection Service Unit for Floating NCP Protection Fedosov D.V., Affiliated Directorate for Construction and Operation of Floating NCP of Rosenergoatom Concern JSC 1000–1030 Readiness to Physical Startup of New Power Units at Leningrad NPP and Power Startup at Novovoronezh and Rostov NPPs Mikhailov Yu.V., Leningrad NPP; Karakash S.V. Novovoronezh NPP; Pobednov A.A., Rostov NPP 1030–1110 Coffee break 1110–1115 Challenges for Fire Safety during Kursk-II NPP Construction (Related to Fire Department Organizational Structure and Staffing Level, Organization of Fire Protection of Kursk-II NPP Facilities) Usik V.V., Kursk NPP 1115–1200 Reports on organization of communications and information exchange between NPPs on the best practices in Fire Safety improvement, the measures implemented or planned as well as on emerging challenges Rapporteurs: Heads of FSS NPPs 1200–1300 Discussion Section summing up 1300–1400 Coffee break

28 Subsection 1.3. Radiation safety, NPP ecology, emergency preparedness Chairman: Khlebtsevich V.E., Rosenergoatom Concern JSC Co-Chairman: Zhurbenko A.V., NSC Kurchatov Institute

Topical area: 1.3.1. Radiation safety at NPPs Chairman: Dolzhenkov I.V., Rosenergoatom Concern JSC Co-Chairman: Kut’kov V.A., NSC Kurchatov Institute

Building 1, 2nd floor, room 214 (the Crisis Center) May 23rd Wednesday 1300–1310 Session opening Khlebtsevich V.E., Rosenergoatom Concern JSC 1310–1340 Topical Issues of Optimization of Radiation Protection and Improvement of Dosimetry Control Dolzhenkov I.V., Rosenergoatom Concern JSC 1340–1410 Minimization of Radiological Risks for Personnel in Situations of Planned and Emergency Radiation Exposure Chekin S.Yu., SC for Medical Radiology n.a. A.F.Tsyb 1410–1440 The Concept of a Computerized System for Individual Dosimetry Monitoring as a System Important for NPP Safety Kislov O.V., FSUE “PSZ” 1440–1500 Coffee break

1500–1530 Development of Scientific & Engineering Bases and Designing of Computerized Systems for Individual Dosimetry Monitoring and High-Tech Dosimeters Using the Optically Stimulated Luminescence Effects Syurdo A.I., IPE of Ural Branch of RAS 1530–1600 New Solutions in the On-line Monitoring of Individual Occupational Doses Grudovik V., Polymaster LLC 1600–1700 Overview of poster presentations

1700–1730 Discussion Summing up

29 May 24th Thursday 900–910 Session resumption 910–930 Topical Issues of Optimization of NPP Radiological Impact on the Environment Belikov A.D., Rosenergoatom Concern JSC 930–950 Modern Requirements Regulating Radioactive Releases & Discharges from Russian NPPs into the Environment Kuryndin A.V., FBE “SEC NRC” 950–1010 Analysis of Results of the Radiation & Engineering Examination of Radioactive Source Terms at NPPs Vasyanovich M.E., IPE of Ural Branch of RAS 1010–1030 Experience of Application of Computerized Instruments for Taking Tritium Samples to Study Specific Activity of Tritium in Surface Air Tarasenko A.A., FSUE “Mayak” 1030–1050 The Concept of a New Generation Automated Radiological Monitoring System (ASKRO) Bakin R.I., Nuclear Safety Institute of the Russian Academy of Sciences 1050–1110 Coffee break

1110–1130 The Automated Radiological Monitoring System ASKRO as a Safety Important System. Prospects of Further Development. Rtischev D.E., FSUE “PSZ” 1130–1230 Discussion of the presentations Discussion of topical areas of assessment and limitation of NPP radiological impact on the environment Section summing up Coffee break

30 Topical area 1.3.2. NPP ecology Chairman: Pechkurov А.V., Rosenergoatom Concern JSC Co-chairman: Plyamina О.V., Scientific & Research Institute of Ecology

The Module building, 1st floor May 23rd Wednesday 1400–1410 Session opening Opening remarks Dolzhenkov I.V., Rosenergoatom Concern JSC 1410–1440 Adaptation of Environmental Activities at Rosenergoatom NPPs to the Changes In Legislative and Regulatory Frameworks of the Russian Federation Peckurov A.V., Palitskaya T.A., Rosenergoatom Concern JSC 1440–1510 A Two-Component Nuclear Power System – a Promising Way of Environmentally Safe Development of Nuclear Energy Grachev V.A., State Corporation Rosatom 1510–1540 Assessment of Biological Indicators of Aquatic Ecosystems in Design and Operation of NPP Hydraulic Facilities Petrukhina, N.A., Atomenergoproekt JSC 1540–1600 Coffee break 1600–1630 Comparative Analysis of Radiological and Chemical Risks in the Region of Beloyarsk NPP Placement Arakelyan A.A., Panchenko S.V., Strizhova S.V., Nuclear Safety Institute of the Russian Academy of Sciences 1630–1700 Modern Concepts on Organization the Monitoring System of Radiation Hazardous Facilities Taking into Account the Experience Gained in the Analysis of the Situation with Ru-106 in 2017 Shershakov V.M., NPO Typhoon of Roshydromet 1700–1730 Protection of Nuclear Power Plant from Fouling with Glumatella of Plumatella Genus: Lifetime Management vs Elimination Orlova M.I., NPO Hydrotechproekt LLC; Strogova E.V., FBSSI Zoological Institute of the Russian Academy of Sciences; Lichi T., NPO Atlantium LLC 1730–1800 Discussion Summing up

31 May 24th Thursday 0900–0930 Some Aspects of Fouler (Dreissena) Effects on Hydro Chemical Regime of Kalinin NPP Cooling Ponds in the Years of Extremum Water Content Danilkin A.Yu., Gvay I.A., Kalinin NPP 0930–1000 Regarding the Issue of Compensation of a Possible Damage to Aquatic Biological Resources Caused in Course of a NPP Operation. Luneva E.V., CPI Affiliate of Rosenergoatom Concern JSC; Shibaev S.V., Kaliningrad State Technical University; Shibaev L.V., West Baltic Basin Authority for Fishery and Preservation of Aquatic Biological Resources 1000–1030 Ensuring Technogenic Safety of NPP Cooling Pond by Organization of Optimal Water Exchange by Means of Blowdown-Makeup Moroz N.A., Sednev V.A., Zamyslova T.N., VNIIAES JSC 1030–1100 Coffee break

1100–1140 Methods and Technologies of Hydro Botanic and Frequency-Wave Treatment of NPP Cooling Pond Water Areas Podosinovikov A.A., Egorov M.A., Pashkin S.V., Miroshnikov A.I., ANO “GosCSI”; Chapaev Yu.N., IUVNPI-Moscow 1140–1220 Climatic Parameter Changes in the European Part of Russia and Assessment of Their Impact on Availability of Water Supply to NPPs Obyazov V.A., Markov M.L., SPA “Gidrotechproject” LLC 1220–1300 Fouling Fighting by Means of Ultra Violet Decontamination Onischenko D.O, Dushenko A.Yu. “KST-water” LLC Lourier M.A., Atlantium Technologies Ltd. 1300–1400 Coffee break 1400–1530 Discussion Section summing up

32 Topical area 1.3.3. Emergency preparedness Chairman: Markov А.P., Rosenergoatom Concern JSC Co-chairman: Kosov А.D., VNIIAES JSC

Building 1, 2nd floor, room 207 (the Crisis Center) May 23rd Wednesday 1300–1310 Session opening. Challenges of Implementation of NP-001, para. 4.5.2 Requirements Markov A.P., Rosenergoatom Concern JSC 1310–1330 State of Emergency Preparedness in REA. Areas for Improvement. Progress of Work to Address the Rostechnadzor’s Comments Referring to para. 4.5.2 of NP-001 Markov A.P., Rosenergoatom Concern JSC 1330–1415 On Relationship between the Guidelines for Management of Beyond-Design Basis Accidents for Russian NPPs and the Emergency Response Procedures, and Consideration of Possibility of Multi-Unit Accidents Suslov A.I., NRC Kurchatov Institute 1415–1435 Opportunities for Application of Software and Technical Modelling Sets, Including Full-Scope Simulations, to Ensure Maintaining the Emergency Preparedness of NPP Units. Molev A.P., VNIAES JSC 1435–1500 Simulation of Severe Accidents at VVER Full-Scope Simulators Osadchaya D.Yu., ETC JET JSC 1500–1520 Software and Hardware Set “Virtual-digital VVER NPP”: State of Development and Scope of Application Druzhaev A.A., VNIAES JSC 1520 -1545 Revision of Approaches to Emergency Zoning of Territories in View of Simultaneous Occurrence of Beyond Design Basis Accidents at Several NPP Units Illaryonenkova D.V., VNIAES JSC 1545–1615 Overview of poster presentations 1615–1630 Coffee break 1630–1730 Discussion of the presentations. Discussion on the topical areas of emergency preparedness enhancement

33 May 24th Thursday 0900–0905 Session resumption Enhancement of Emergency Preparedness 0905–0930 General IAEA Safety Requirements with Respect to Emergency Preparedness and Response to Nuclear and Radiological Emergencies Kutkov V.A., IAEA 0930–0950 Further Development of Guidance Documents for the Group of Emergency Support to NPPs (the OPAS Group) in the Part of their Harmonization with Existing RF Regulation Bases and International Standards Golubkin V.A., Rosenergoatom Concern JSC 0950–1010 Development of Operational Tools to Support Decision-Making Based on Data of the Plant Radiation Monitoring System Orekhov A.A., VNIAES JSC 1010–1030 Development of Instruments for On-line Support to Decision Making Based on NPP Radiation Monitoring System Data Krasnoperov S.N., Nuclear Safety Institute of the Russian Academy of Sciences 1030–1050 The Issue of Uncertainties Assessment in the Results of Radiation Exposure Calculation for Personnel and Public in an Event of Radiation Accident at a NPP Polyantsev S.S., VNIAES JSC 1050–1110 Coffee break 1110–1140 Instrumental Methods for Assessment of Social and Economic Consequences of Radiological Accidents Aron D.V., Nuclear Safety Institute of the Russian Academy of Sciences (NSI RAS) 1130–1200 Areas for Development of National Regulatory Framework in the Field of Protection of Personnel and Public in Case of an Accident at a Nuclear Power Plant Taking into Account Modern IAEA Standards Kosov A.D., VNIAES JSC 1200–1230 Discussion of the presentations Discussion on the topical areas of assessment and limitation of NPP radiological impacts on the environment Discussion Section summing up Coffee break

34 SECTION 2. NUCLEAR POWER DEVELOPMENT Chairman: Bezzubtsev V.S., Rosenergoatom Concern JSC; Co-Chairmen: Ponomarev-Stepnoy N.N., Rosenergoatom Concern JSC; Davidenko N.N., VNIIAES JSC

Subsection 2.1. Key areas of advanced technological development of nuclear power Chairman: Bezzubtsev V.S., Rosenergoatom Concern JSC Co-Chairmen: Kornienko K.A., Bakanov M.V., Rosenergoatom Concern JSC

LSK Building, 1st floor May 23rd Wednesday 1410–1420 Session opening Bezzubtsev V.S., Rosenergoatom Concern JSC 1420–1450 Technical & Economic Aspects of Innovative Development of Russian Nuclear Power Industry in XXI Century Alexeev S.V., Rosenergoatom Concern JSC 1450–1520 Innovative Reactor Technologies of the 4th Generation and Their Current Status of Development within the International Forum GENERATION -IV Ashurko Yu.M., SNC RF IPPE» 1520–1540 Optimization of the Two-Component NPS Based on RBN and TR Reactors Muraviev E.V., ITCP PRORYV 1540–1600 Solution of the Problem of Thermal Reactor SNF within a Two- Component Nuclear Power System Chebeskov A.N., SNC RF IPPE 1600–1630 Coffee break 1630–1650 Current Status and Prospects of development of Fast Reactors with Lead Coolant Moiseev A.V., RDIPE JSC 1650–1710 Modular Lead-Bismuth Fast Reactors for Nuclear Power Plants of Small and Medium Size Klimov N.N., “EDO Gidropress” JSC 1710–1730 Modular Nuclear Plants with SVBR Reactor Unit Komlev O.G., “AKME-Engineering” JSC 1730–1800 Discussion Section summing up

35 May 24th Thursday 0900–0925 Concerning a Need to Retain and Develop the Single Circuit Design Line within the National Nuclear Power Industry Blagoveschensky A.Ya., Naval Polytechnical Institute of the Russian Navy 0925–0945 Capabilities and Problems of the Use of Supercritical Water Coolant in Reactor Installation. Sedov A.A., NRC Kurchatov Institute 0945–1015 Outlook on Technical & Economic Parameters Improvement for VVER Nuclear Fuel by Means of Partial Introduction of Thorium into the Nuclear Fuel Cycle Bobrov E.V., NRC Kurchatov Institute 1015–1050 Studies Aimed to Substantiate the High Temperature Nuclear Technology Based on Fast Sodium-Cooled Reactor for Hydrogen Generation and Other Innovative Applications. Kuzina Yu.A., SNC RF IPPE 1050–1120 Coffee break

1120–1150 A Power Engineering Complex with HTGC Reactor Unit for Hydrogen Generation Fateev S.A., OKBM Afrikantov JSC 1150–1210 Experimental Studies of Sodium Boiling in Accident Modes with a Model Fuel Assembly for Fast Reactor Sorokin A.P., SNC RF IPPE 1210–1230 Application of a Virtual Power Unit for Designing a Fast Reactor NPP Ushatikov A.S., OKBM Afrikantov JSC 1230–1300 A Standalone Passive Heat Removal System for VVER Primary Circuit: Peculiarities of Actuation and Operation Sviridenko I.I. , Sevastopol State University 1300–1430 Discussion Section summing up

36 Subsection 2.2. Construction of new nuclear power units Chairman: Barinov A.V., Capital Projects Implementation Affiliate, Rosenergoatom Concern JSC Co-Chairman: Baryshev A.V., Capital Projects Implementation Affiliate, Rosenergoatom Concern JSC

Building 1, 6th floor, room 603 May 23rd Wednesday 1410–1420 Session opening Barinov A.V., Rosenergoatom Concern JSC 1420–1500 Improvement of Construction Cost & Terms Management Efficiency: TCM NC. Cost & Terms Management Based on the Industry-wide Digital Platform Stepaev A.N., PE OCKS of the State Corporation Rosatom 1500–1520 Experimental Study of Performance of the Passive Safety Systems for Modern VVER NPP Designs Morozov A.V., SNC RF IPPE 1520–1550 Experience Gained with Project Management (Example of Leningrad-II NPP Construction ) Vagner V.A., Capital Projects Implementation Affiliate, Rosenergoatom Concern JSC 1550–1620 Coffee break 1620–1640 Methodology for Safety Class Justification for Systems Chaban O.G., EC ASE JSC 1640–1700 Informational Support to Capital Construction Processes Reberger A.M., Rosenergoatom Concern JSC 1700–1720 Methodology for Safety Class Justification for NPP Systems and Components Ershov G.A., EC ASE JSC 1720–1740 Methodology for NPP Readiness Analysis Nikolaev F.V., EC ASE JSC 1740–1810 Discussion Section summing up

May 24th Thursday 0900–0910 Session resumption Barinov A.V., Rosenergoatom Concern JSC

37 0910–0940 Advanced Technologies for Transformation of Weak Soils Chesnokov G.V., “NIIgraphite” JSC 0940–1000 Regarding Calculations of Nuclear Reactor Vessel Bottoms under Thermal & Mechanical Loads Pukhliy V.A., Sevastopol State University 1000–1020 Calculation of Aircraft Crash on External Containment of NPP Reactor Building with Foundation Yielding Taken into Account Modestov V.S., St.Petersburg SPU 1020–1040 Nuclear District Heating in Russia – The Experience Available, Capacities of the Industry, Deployment Challenges Boldyrev V.M., International Union of Veterans of Nuclear Power Industry 1100–1130 Coffee break

1130–1200 A Multi-Purpose Nuclear Power Unit of 75 MWe Capacity Khorasanov G.V., NRNU MEPhI 1200–1230 Optimization of Air Conditioning Costs by Applying the Universal Climate Control Units with Air Cooler Operating in the Indirect Evaporation Cycle Shafikov R.T., GMZ “Khimmash” JSC 1230–1430 Discussion Section summing up Coffee break

38 Subsection 2.3. Commissioning of new nuclear power plants Chairman: Katsman A.M., Rosenergoatom Concern JSC Topical area 2.3.1. Nuclear power units commissioning experience Co-Chairman: Deriy V.P., Atomtechenergo JSC

The Module building, 2nd floor, Room 211 May 23rd Wednesday 1410–1420 Session opening Katsman A.M., Rosenergoatom Concern JSC 1420–1450 The Use of Startup & Commissioning Works Experience for Enhancement of New Nuclear Unit Designs Kormilitsyn A.A., Sychugin V.I., Atomtechenergo JSC 1450–1530 Increase of Economic Efficiency of New NPPs Operation Sukhorukov Yu.G., Smolkin Yu.V., Sokolov K.V., “SPA CKTI” CJSC 1530–1600 Coffee break 1600–1625 Generalization of the Experience Gained with BN-800 Reactor Unit Startup for Justification of Thermohydraulic Parameters for Normal Operation Modes Fadeev I.D., OKBM Afrikantov JSC 1625–1650 The Strategy for Diagnostics Support to Startup & Commissioning Works at New Power Unit Sites Rachkov V.L., Atomtechenergo JSC 1650–1715 Design Features and Issues to Address during Startup & Commissioning Works at Essential and Auxiliary Equipment of Novovoronezh-II Unit 1 Turbine Hall Pozdnyakov A.V., Atomtechenergo JSC 1715–1740 Experience of Mooring Tests of Turbine Compartment Process Systems and Fuel Reloading Equipment at the Pilot Floating Nuclear Power Unit Kanakov V.Yu., Aliev R.R., Atomtechenergo JSC 1740–1800 Discussion Section summing up

39 Topical area 2.3.2. Enhancement of APCS reliability and cyber-security Co-Chairman: Antipov S.I., RASU JSC

The Module building, 2nd floor, Room 211 May 24th Thursday 0900–0910 Session opening Katsman A.M., Rosenergoatom Concern JSC 0910–0950 Nuclear Magnetic Flowmeters-Relaxometers to Monitor the Flow and State of Liquid Cooling Systems. Davydov V.V., St. Petersburg State Polytechnic University 0950–1030 Testing of In-Core Monitoring Information Diagnostics System at Novovoronezh-II NPP Unit 1 Semenikhin A.V., Novovoronezh branch of Atomtechenergo JSC 1030–1110 Improvement of Configuration of Automated Process Control System at a Nuclear Unit Terekhov D.V., Novovoronezh NPP 1110–1140 Coffee break

1140–1220 Provision of Computer Security of Automated Systems Based on Data-Remove Method Kolodenkova A.E. , Samara State University, Korobkin V.V., Research institute MVS UFU 1220–1300 Cybersecurity of NPP APCS. Sets (Stands) and Methods for Analysis of APCS Security Babayev D.I. VNIIAES JSC 1300–1340 Improving the cybersecurity of APCS by means of operating analysis and monitoring the state of information security Domukhovsky N.A. Ural Center of Security Systems, LLC 1340–1430 Discussion Section summing up Coffee break

40 SECTION 3. NUCLEAR POWER ECONOMICS AND INFORMATION TECHNOLOGIES Subsection 3.1. Nuclear power economics Chairman: Migalin S.A., Rosenergoatom Concern JSC Co-Chairman: Demidova L.N., Rosenergoatom Concern JSC

Building 1, 2nd floor, room 204 (the Crisis Center) May 23rd Wednesday 1400–1405 Session opening Migalin S.A., Rosenergoatom Concern JSC 1405–1425 Development of Business Environment: World Trends and Changes in State Corporation Rosatom Lyakhova E.V., State Corporation Rosatom 1425–1445 Strategy of Development of State Corporation Rosatom Ermakov I.A., State Corporation Rosatom 1445–1500 System of Operational Efficiency Management in the Electric Power Division, the Main Strategic Objectives and Indicators of its Achievement Migalin S.A., Rosenergoatom Concern JSC 1500–1515 Specific Features of Rosenergoatom Operation at the Market of Power Khvalko A.A., Rosenergoatom Concern JSC 1515–1530 Planning of Costs for Maintenance and Repair of NPP Equipment and Systems Osetskaya M.M., ANO DPO Technical Academy of Rosatom 1530–1545 Economics of NPPs with Fast Reactors: Long-Term Ensuring of Competitiveness Tolstoukhov D.A., Panov S.A., Private institution ITCP PRORYV 1545–1600 Economic Effects from Introduction of Innovative Management Models Based on Stakeholder Approach and Network Forms of Business Organization. Smirnova L.S., NRC Kurchatov Institute 1600–1630 Coffee break 1630–1645 Centralization of Heat Sales Activities of Rosenergoatom: a Strategy for Improving Economic Efficiency of the Heat Sales Activities Polozov A.G., Rosenergoatom Concern JSC

41 1645–1700 Enhancing the Competitiveness of Nuclear Energy In The Long Term Perspective as a Tool for Diversifying Energy Mix and Addressing Environmental Problems Veselov F.V., Energy Research Institute of the Russian Academy of Sciences 1700–1715 Assessment of Long-Term Development Risks at the Example of Predictive Modelling of Feasibility Indicators of the NPP Operating Company Gurin A.V., NRC Kurchatov Institute 1715–1730 Feasibility Model of Efficiency Assessment of NPP Life Cycle with Different Fuel Production Scenarios Koltun O.V., VNIIAES JSC 1730–1745 Effective Strategy for Management of Liquid Radioactive Waste in Federal Property Accumulated At Kola NPP as a Method of Reduction Electricity Production Costs Serebrenikova M.S.,Kola NPP 1745–1800 Discussion Section summing up

42 Subsection 3.2. Information technologies for the nuclear power Chairman: Migalin S.A., Rosenergoatom Concern JSC Co-Chairman: Demidova L.N., Rosenergoatom Concern JSC

Building 1, 2nd floor, room 204 (The Crisis Center) May 24th Thursday 0900–0910 Session opening Migalin S.A., Rosenergoatom Concern JSC 0910–0925 State Corporation Rosatom – Supplier of Digital Products Popov S.G., State Corporation Rosatom 0925–0940 Directions of Digitalization in State Corporation Rosatom Chistyakova A.V., State Corporation Rosatom 0940–1010 Elaboration of Digital NPP Operation Template Shalnov O.E., Rosenergoatom Concern JSC Establishment of Data Processing Center for Digital Products Nemchenkov S.N., Rosenergoatom Concern JSC Use of Operating Experience Mets A.A., Rosenergoatom Concern JSC 1010–1030 Integrated Real-Time System for Monitoring and Reporting of Process Parameters and Modes of NPP Operation in Rosenergoatom in Failure Safe and Accident Resistant Design Lysachev M.N., Consyst-OS JSC 1030–1045 Automated System for Control of Technical Documentation for Documentation Support to Safe Operation and Maintenance of NPP Units Frolov F.V., Rosenergoatom Concern JSC 1045–1105 Coffee break

1105–1120 Digital energy for Rosenergoatom Concern JSC Andreeva L.V., Rosenergoatom Concern JSC 1120–1135 Application of Modern Data Flow Processing Technologies in APCS Belousov P.A., National Research Nuclear University MEPhI 1135–1150 Use of Digital Image Processing Methods to Determine the Range of Object Fluctuations Drumov I.V., OKBM Afrikantov JSC 1150–1205 A System of In-Core Monitoring Operating Data Storage and Processing. Outlook and Potential Khalizov M.V., NRC Kurchatov Institute

43 1205–1220 Implementation of Computerized Training and Management of Qualification of Operating Personnel in the Field of Nuclear and Radiation Safety Shubovsky D.A., WANO-MC 1220–1230 Coffee break

1230–1245 Global Trends in Development and Research on Modern Information Technologies to Improve Production Efficiency and Safety Doschenko S.A., Gartner Executive Programs - Russia 1245–1300 Global ICT market trends Macedonskiy S.N., Forrester Research CIS&Baltics 1300–1315 Application of New IT Technologies in Production (Practical Examples) Khlopov N.M., The Hinge Ideas, Moscow 1315–1330 Section summing up Coffee break

44 SECTION 4. INTERNATIONAL COOPERATION FOR NUCLEAR SAFETY Chairman: Konstantinov N.I, Rosenergoatom Concern JSC Co-Chairperson: Ivanova N.Yu., Rosenergoatom Concern JSC Facilitator: Sokolov Yu.A., SC Rosatom

Building 2, Conference hall May 23rd Wednesday 1400–1410 Session opening Konstantinov N.I, Rosenergoatom Concern JSC Topic 1: Provision support to new operating organizations

1410–1435 The Milestones Approach in Nuclear Power Infrastructure Development. IAEA support to newcomer countries Kovachev M., NE / IAEA 1435–1500 WANO New Unit Assistance Programme Polyakov А., WANO-London 1500–1525 Capacity Building in the Countries Embarking on a Nuclear Power Programme Chernyakhovskaya Y., Rusatom Service JSC 1525–1550 EDF Support to Newcomers Camarcat N., EDF Engineering and New Nuclear Projects, France 1550–1610 Discussion (Topic 1) 1610–1640 Coffee break

Topic 2: International and regional initiatives for safety

1640–1710 What We Have Learnt about Operational Safety from Recent OSART Missions Jiang F., NS / IAEA 1710–1740 EDF International cooperation for safety Maillart H., EDF, France 1740–1800 Discussion Summing up

45 May 24th Thursday Special Safety Reassessments (Stress-Tests) of Belorussian NPP 0900–0925 Valeev R.Sh., SE Belorussian NPP, Ostrovets WANO Peer Review Programme 0925–0950 Schelik, Yury, WANO Moscow Center 0950–1015 Organization of Support to Operating Power Units and New Builts Associated in WANO MC Bojkovský R., WANO Moscow Centre / Mochovce NPP 1015–1040 Discussion (Topic 2)

1040–1110 Coffee break Overview of poster presentations Topic 3: Support to decommissioning activities through international cooperation 1110–1140 Decommissioning of Nuclear Facilities: Outlook and challenges Glorennec C., NE / IAEA International Cooperation of Leningrad NPP in the 1140–1210 Decommissioning Area Rakhuba A.Yu., Leningrad NPP 1210–1230 Discussion (Topic 3)

1230–1300 Overview of poster presentations

1300–1330 Voting for the best section report 1330–1400 Discussion Section summing up 1400–1430 Coffee break. Drafting the section overview presentation for the plenary session

Poster presentations: Design Informed WANO Peer Reviews Bazarev D.N., WANO-MC Participation of Paks NPP in WANO activities in 2017 Hadnagy L., MVM Paks NPP

46 SECTION 5. HUMAN RESOURCE FOR THE NUCLEAR POWER Subsection 5.1. Human resource for the nuclear power Chairman: Gudin S.A., Rosenergoatom Concern JSC Co-Chairman: Aksinenko S.P., VNIIAES JSC

The Module building, 3rd floor, rooms 317/1, 2, meeting room May 23rd Wednesday 1400–1405 Session opening Interaction with higher education institutions and students training 1405–1420 Forecast and Provisions to Meet the Demand in Specialist Operators of BN-type NPPs (BN-600,BN-800, BN-1200) Tashlykov O.L., Ural Federal University 1420–1440 AGILE: Engineering of the Future Kuritsyn D.B., EC ASE JSC 1440–1455 Youth Policy of the Engineering Division Fokin K.B., EC ASE JSC 1455–1505 Personnel Recruitment Activities in CEZ Bila N., WANO MC / Temelin NPP Personnel motivation. Personnel motivation tools as impetus towards safe performance 1510–1525 Intangible Motivation. Development of a Commitment to Safety amongst the Division Employees Kosareva I.V., Novovoronezh NPP 1525–1545 Material Motivation of Employees Aimed at Ensuring NPP Safety Kovalev A.V., Rosenergoatom Concern JSC 1545–1600 Tools for Motivation of Personnel Sent to Foreign NPPs by ROSATOM. Kvasha A.V., Rosenergoatom Concern JSC 1600–1620 Coffee break Interaction with higher education institutions and students training 1620–1640 Establishment of a Rosenergoatom Strategic Reserve Pool to Include Higher Education Institution Graduates Shapovalova I.A., Rosenergoatom Concern JSC 1640–1655 Organization of University Training for NPPs Using a Full-Scope Simulator Volman M.A., FSBEI HE Ivanovo State Energy University n.a. V.I. Lenin

47 1655–1710 Implementation of Practice-Oriented Training of Specialists for Rosatom Foreign Projects in the Resource Center of NRNU MEPhI Bublikova I.A., Volgodonsk Engineering Institute – branch of NRNU MEPhI 1710–1725 Training of Foreign Students in Obninsk Institute of Atomic Energy of the NRNU MEPhI: Experience and Problems Leskin S.T., Slobodchuk V.I., Chistozvonova E.A. Obninsk Institute of Atomic Energy (OIAE NRNU MEPhI) 1725–1740 International Inter-University Cooperation in Support to Implementation of Rosatom Foreign Projects (NPPs, ICAE) and Promotion of Innovative Nuclear Technologies Filipyev I.S., Karmanov F.I., Artisiuk V.V., ANO DPO Rosatom Technical Academy; Karezin V.V., State Corporation Rosatom 1740–1800 Discussion Summing up May 24th Thursday Professional training of domestic and foreign NPP personnel 0900–0920 Session resumption 0930–0950 Particularities of Ruppur NPP Personnel Training at a Russian Reference NPP in Operation Kritsky R.O., Rosenergoatom Concern JSC 0950–1015 Russian Experience with Newcomer Countries Training in Nuclear Infrastructure Issues Performed Jointly with the IAEA in the Facilities of Rosatom Technical Academy Ulanov D.V., State Corporation Rosatom, Yunikova A.V., Andryushin I.I., ANO DPO Rosatom Technical Academy 1015–1045 Training of the Foreign Customer Personnel: Basic Courses for the Plant Owner Personnel Podolyakin D.P., Ponomarenko A.A., Shulepova N.A., ANO DPO Rosatom Technical Academy 1110–1130 Training of International Leaders for the Nuclear Industry: Experience of Joint Russia-IAEA Schools in Nuclear Management Filipyev I.S., Karmanov F.I., Artisiuk V.V., ANO DPO Rosatom Technical Academy 1100–1130 Coffee break

48 1130–1145 Development of Internet-based Glossary of Nuclear Terms for Training of Foreign Specialists Varseev V.V., ANO DPO Technical Academy of Rosatom 1145–1200 Use of Scientific Internship Format as a Tool for Promotion of HTGCR Technological Platform to External Markets Dyachenko A.I., Artisyuk V.V., ANO DPO Rosatom Technical Academy; Ponomarev-Stepnoy N.N., Alexeev S.V., Rosenergoatom Concern JSC 1200–1230 Overview of poster presentations 1230–1300 Discussion Section summing up

49 Subsection 5.2. Use of veterans’ experience and expertise. Tutorship Chairman: Markelov N.I., Interregional Nonprofit Organization for Rosenergoatom Veterans (MOOVK) Co-Chairman: Simagin A.B., Interregional Nonprofit Organization for Rosenergoatom Veterans (MOOVK)

Building 2, 3rd floor, right wing May 23rd Wednesday 1400–1415 Session opening. Welcoming address Cherkasov V.G., MOOVK - Rosenergoatom 1415–1445 Tutorship as the Fundamental Principle to Ensure Succession in NPP Safe Operation Field Dumshev V.G., Kalinin NPP regional division of MOOVK 1445–1515 Use of Operating Experience in Training of NPP Personnel Mikheev M.I., Smolensk NPP regional division of MOOVK 1515–1545 Human factor in construction of nuclear facilities Rukhman G.S., Smolensk NPP regional division of MOOVK 1545–1615 Coffee break 1615–1645 Some Aspects of Chernobyl Accident Patrakov A.I., Smolensk NPP regional division of MOOVK 1645–1715 Assessment of effectiveness of NPP upgrading activities Fiantsev V.S., MOOVK-Rosenergoatom 1715–1800 Discussion Summing up May 24th Thursday 0900–0930 Leningrad NPP Today and Tomorrow Karrask M.P., Leningrad NPP regional division of MOOVK 0930–1000 Experience of Rational Water Usage at Leningrad NPP Oleynik V.K., Leningrad NPP regional division of MOOVK 1100–1130 Veterans the Environment Defenders Advocating for Nuclear Power Terekhov Yu.L., Balakovo NPP regional division of MOOVK 1130–1200 Experience of Implementation of the Project «Kola Power Bridge», Export of Excess Power from Kola NPP into the Nordic Power System “Nordel” Vishnyakov V.Z., Kola NPP regional division of MOOVK

50 1200–1230 Full-scale automated coolant leak detection system (FSACLDS) Yurkov M.V., Smolensk NPP regional division of MOOVK 1230–1300 Experiences and Lessons Learned from Operation of BN-600 Nuclear Power Unit Kiselev S.V., Beloyarsk NPP regional division of MOOVK 1300–1430 Coffee break 1430–1530 Discussion Section summing up

Subsection 5.3. Transfer of international experience and traditions to the youth Chairman: Saraev Yu.P., International Union of Veterans of Nuclear Power Industry (IUV NPI) Co-Chairman: Kuleshov I.I., International Union of Veterans of Nuclear Power Industry (IUV NPI)

Building 2, 3rd floor, right wing May 23rd Wednesday 1410–1420 Session opening Saraev Yu.P., IUV NPI / Rosenergoatom Concern JSC 1420–1500 Information on IUV NPI Activities over the Period from 2010 (the year of establishment) to 2018 1520–1600 Reports 1600–1630 Coffee break 1630–1700 Opening of the demonstration stand (within the Exhibition) 1700–1800 Reports 1800–1830 Discussion Summing up May 24th Thursday 0900–1000 Information on IUV NPI Activities over the Period from 2010 (the year of establishment) to 2018 1005–1120 Reports 1120–1150 Coffee break 1300–1430 Discussion Section summing up

51 Subsection 5.4. Young nuclear engineers and safe operation of NPPs Chairman: Kushnarev S.V., Nuclear Society of Russia Co-Chairman: Kirichenko A.M., WANO Moscow Center

Building 1, 15th floor, room 1509/1511 May 23rd Wednesday 1410–1420 Session opening Kushnarev S.V., Nuclear Society of Russia 1420–1500 Meeting of young nuclear engineers with Rosenergoatom top management and NPP Directors 1500–1650 Plenary on “Exchange by Best International Practices in NPP Safe Operation and Involvement of Young People” 1650–1720 Coffee break 1800–1830 Discussion Summing up May 24th Thursday 0900–1000 Plenary on “Exchange by Best International Practices in NPP Safe Operation and Involvement of Young People” (cont’d) 1005–1120 Meeting of young nuclear engineers with nuclear power industry veterans: evolution of safety on the individual examples 1120–1150 Coffee break 1300–1430 Discussion Section summing up

52 PLENARY SESSION / CONFERENCE CLOSING

Building 2, Conference hall May 24th Thursday

0900–1400 Section sessions cont’d

1030–1100 Coffee break 1400–1430 Coffee break 1430–1530 Overview of the sections work Rapporteurs: the section chairmen Dementiev A.A. Bezzubtsev V.S. Migalin S.A. Konstantinov N.I. Gudin S.A. Summing up the results of the competition for the best section report The overall results of MNTK-2018, closing of the conference

53 REFERENCE INFORMATION

Organizational committee

Dementiev A.A. Deputy Director General - Director for Production and NPP Operation, chairman of the Organizational committee Konstantinov N.I. Deputy Director General - Director for Business Development, vice-chairman of the Organizational committee Teterin Yu.P. Deputy Director for Production and NPP Operation – Director of Engineering Support Department, vice-chairman of the Organizational committee Tukhvetov F.T. Director General of VNIIAES JSC, vice-chairman of the Organizational committee Gudin A.A. Head of Administrative Support Office Gudin S.A. Director of Department for Staff Management, Labour Management and Personal Motivation Ivanova N.Yu. Head of Division for International Scientific & Technical Cooperation Lebedev N.Yu. Chief expert, Department for IT Projects Management and Integration Lymar V.V. Deputy Chief Accountant – Head of Office for Bookkeeping and Tax Accounting Migalin S.A. Deputy Director General – Director for Economy and Finances Moskalev S.V. Division head, Technology Affiliate, MNTK-2018 Administrator, coordinator of Organizational and Programme committees Timonov A.V. Director of Department for Communications and Public Relations Churkin I.V. Chief specialist, Department for IT Projects Management and Integration Shalnov O. E. Director of Department for IT Projects Management and Integration

Programme committee

Shutikov A.V. 1st Deputy Director General for NPP Operation, chairman of the Programme committee Bezzubtsev V.S. Director for Technological Development, vice-chairman of the Programme committee Ipatov P.L. Deputy Director General – Director for Special Projects and Initiatives, vice-chairman of the Programme committee

54 Bystrikov A.A. Head of Office for Channel & Fast Reactors Operation Davidenko N.N. Deputy Director General for Technological Development, VNIIAES JSC Demidova L.N. Director of Department for Economy and Controlling Katsman A.M Deputy Director for Production & NPP Operation – Director of Department for Operational Readiness of New Build Krupsky A.G. Deputy Director for Production & NPP Operation – Director of Department for Plant Maintenance, Repair and Installation Maximov Yu.M. Deputy Director for Production & NPP Operation – Director of Department for Production Planning, Modernization and Lifetime Extension Nikiforov Victor V. Deputy Director – Head of Fire Safety Service, Technology Affiliate Ponomarev-Stepnoy N.N. Scientific Advisor to Director General Sultanov R.M. Deputy Director of Department for Engineering Support Kharlampiev S.A. Project manager, Division for International Scientific & Technical Cooperation Khlebtsevich V.E. Deputy Director for Production & NPP Operation – Director of Department for Emergency Preparedness and Radiation Protection Chernikov O.G. First Deputy Director for Production & NPP Operation – Director of Department for NPP Operation and Nuclear Fuel Management Exhibition organizer Belyakov O.A. Head, NPP Operation Office, EREC JSC

55 Contact Information:

O&P Committee address: Room 3326в, Rosenergoatom, Kholodilny per. 3a, 115191, Moscow

MNTK-2018 information website: www.mntk.rosenergoatom.ru

Coordinator, Organizational & Programme committees: Mr. Moskalev Sergey Vasilievich Tel.: +7 495 921 19 52 e-mail: [email protected]

Coordinator, International participants: Mr. Kharlampiev Sergey Andreevich Tel.: +7 495 647 43 79 E-mail: [email protected]

Coordinator, Exhibition matters: Mr. Belyakov Oleg Anatolyevich Tel.: +7 495 969 29 33 e-mail: [email protected]

Simultaneous interpretation is provided at: - plenary sessions - (sub)section sessions 1.1.1, 1.2.4, 4

Subsecutive interpretation is provided at (sub)section sessions: 1.1.3, 1.2.1, 1.2.2, 1.2.3, 2.1, 2.2, 5.4

Address of the Conference venue: Moscow, Ferganskaya str. 25

Directions: “Vykhino” metro station, then by bus № 209, 4th stop (“Art School n.a. Balakirev”) or by route taxi № 209, 610

56