Nuclear Power Industry
Total Page:16
File Type:pdf, Size:1020Kb
JSC ATOMENERGOMASH RESULTS OF 20161 1 The brochure data are valid as of April 26, 2017. JSC ATOMENERGOMASH RESULTS OF 2016 The pilot fast neutron reactor After a long interruption, JSC Atomenergomash with primary sodium CEFR the nuclear industry equipment reinforces the key 3,668 developed under the order manufacture was resumed at business areas – nuclear from Chinese Nuclear Power “Atommash” plant. In particular, power industry, gas and Corporation. The developer the activities were commenced petrochemical industry, of the reactor plant was for the manufacture of the main shipbuilding and general 10 YEARS OF PROGRESS OJSC Afrikantov OKBM, the equipment of the reactor island industry. steam generator developer of the Power units 1 and 2 of was OJSC OKB GIDROPRESS. Belarusian NPP. THE HISTORY OF JSC ATOMENERGOMASH, THE mechanical ENGINEERING DIVISION OF ROSATOM STATE CORPORATION (THE «DIVISION») STARTED FROM TWO 2,947 OJSC Atomenergomash The complete cycle of steam COMPANIES. TODAY THE DIVISION IS ONE OF THE LEADING mechanical ENGINEERING COMPANIES IN RUSSIA. IT COMPRISES OVER 20 LEADING ENGINEERING manufactured a core catcher generators manufacture was at the Atommash plant in mastered – from semi-products JSC TsKBM completed the BUREAUS, MAJOR MACHINE BUILDERS, RESEARCH INSTITUTIONS. THE DIVISION IS INVOLVED IN THE KEY PROJECTS IMPLEMENTED BY ROSATOM, WIDENS unprecedentedly short time (PJSC Energomashspetsstal) to test of the new MCP design – and supplied it to the Baltic body manufacture (OJSC PZM), single-shaft configuration 2,414 Labor productivity per employee, thousand rubles THE COMPETENCES AND ACTIVELY MASTERS NEW MARKETS AND TECHNOLOGIES. 2,397 NPP. assembly of in-vessel components with water cooling of motor and shipment to client and bearing assemblies that (OJSC ZiO-Podolsk). Mastering the manufacture would allow increasing NPP of NPP equipment, and safety due to replacement of 2,395 developing the market oil lubricant with water. NUMBER OF AEM NPP Power unit 2 with VVER-1000 1,916 competition gave the eleven- was started at Tianwan NPP 1,866 2,122 figure effect. The price of (China). long-lead equipment set in SUPPLIED EQUIPMENT 2014 decreased by 11% in TO OVER THE Memorandums of current prices comparing to 420.2 1,566 Understanding was Complex program 2007. 1,789 signed with Alstom and 10 YEARS: was launched for Walchandnagar Industries Ltd. OJSC Atomenergomash companies efficiency increase 392.7 27 NPPs PJSC Energomashspetsstal in 2013–2018 within the was certified for the products Division. The unique equipment At the Power unit 1 of Temelin quality control for NPP for MOX fuel commercial NPP (Czech Republic) with equipment. production for fast neutron Order portfolio, billion rubles VVER-1000 the active zone on reactors was put into The agreement was signed the basis of NFA developed OJSC PZM mastered the flow operation, the major part of it for manufacture and supply by OJSC Afrikantov OKBM manufacture of NPP reactor was developed and supplied of steam generators was used. PGV-1000MK for Power plant equipment, steam by OJSC SverdNIIkhimmash Hungarian Ganz EEM LLC units 1 and 2 of Belene OJSC OKB GIDROPRESS generator bodies, main and JSC TsKBM. specialized in pumping 261 NPP (Bulgaria). completed the development circulation pump (MCP) bodies, equipment including those for Nuclear icebreaker “50 of reactor plant for typical and pipes for main circulation nuclear industry was included OJSC ZiO Podolsk declared 63.4 Let Pobedy” was put into optimized IT controlled VVER piping as per the state-of-the- into the Division. the completion of supply of operation. Developer of all power unit (VVER-TOI). art technology. reactors for icebreakers, the Power unit 1 equipment OJSC SverdNIIkhimmash for Leningrad NPP-2 (four submarines and naval ships is signed a contract to design OJSC Afrikantov OKBM. steam generators and 56.7 and supply equipment for embedded parts set). pilot demonstration facility – 227.5 test site for safe technologies 51.8 of fuel reprocessing. 50.9 CJSC Petrozavodskmash3, 46.3 Combined revenue, billion rubles having technological and Power unit 1 with VVER- production capabilities and 1000 was started at Tianwan competences for producing 48.6 (China). All VVER reactors key equipment for reactor were developed by OJSC OKB island, became the part of GIDROPRESS. Ivanovskaya combined cycle OJSC Atomenergomash. power plant was put into 27 operation, the equipment 150 OJSC ZiO-Podolsk for it was manufactured by and OJSC ZIOMAR EC OJSC ZiO-Podolsk. This was 91.6 99.1 (manufacturers of steam the first combined cycle 23 power plant in Russia erected 22 OJSC SverdNIIkhimmash, generators for NPP), and 78.9 with the domestic equipment the leading research and Arako spol. s.r.o., the Czech only. 20 development institute, company, became the part became the part of of OJSC Atomenergomash. 18 OJSC Atomenergomash. 38.9 20.1 19.2 26.6 15 16.7 16 Share in the Russian power % engineering industry, 11 10.3 14 The long-term strategy till 13 PJSC Energomashspetsstal, 2030 was approved; the aim having the unique of this strategy is to transform Steam generators manufacture The stage of power start-up 8 10.5 competences for producing OJSC ATOMENERGOMASH was restored at the premises and low power testing was 10 large special steel blanks into global diversified high- of JSC AEM-Technologies of commenced at Beloyarsk NPP for NPP equipment, tech holding company. Atommash, for which purpose Power unit 4 with BN-800 reactor 0.3 became the part of new production sectors were developed and supplied by the OJSC Atomenergomash. organized and new equipment main designer or fast neutron was purchased. reactor plants – JSC Afrikantov OKBM. 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 On March 29, OJSC Atomenergomash Creation of target structure of The company continues its The establishment of process OJSC Atomenergomash extends The formation of production Restoring facilities of ATOMMASH, OJSC ATOMENERGOMASH companies For the first time in its history, After 30 years, the first reactor was established in the system of OJSC Atomenergomash. Formation activities in the field of complex for manufacturing the the international cooperation chain for long-lead equipment the Soviet biggest manufacturer successfully mastered the JSC ATOMENERGOMASH became the body manufactured at ATOMMASH the Federal Atomic Energy of industrial and engineering MECHANICAL ENGINEERING complete range of equipment for and forms the vertical integral manufacture was continued in of NPP equipment, was started complete cycle of manufacture supplier of complete nuclear (branch of JSC AEM-Technologies) Agency (Rosatom). The purpose competences, and corporate ASSETS consolidation both the reactor plant (NSSS2) has structure for manufacturing OJSC ATOMENERGOMASH companies. as well as mastering the of NPP long-lead equipment. steam supply systems and premises was supplied to of OJSC Atomenergomash was perimeter. in Russia and abroad. The been commenced. key equipment for NPP. manufacture of nuclear island turbine hall equipment. Belarusian NPP. Besides, that ensuring the sustainable Division structure includes equipment including reactor, was the first VVER reactor body development of nuclear 16 companies in total. steam generator, etc. manufactured by the Rosatom industry domestically and State Corporation company4. internationally as well as widening the process potential of power industry complex of 3 Petrozavodskmash is the branch 4 Earlier Rosatom State Corporation Russia. 2 Nuclear Steam Supply System. of JSC AEM-Technologies. used to purchase those products from an external source. 2 3 JSC ATOMENERGOMASH RESULTS OF 2016 10 Years of Progress ................................................................................................................................................................ 2 JSC Atomenergomash, is one of the biggest mechanical The Company In Brief .................................................................................................................................................................. 4 engineering holding companies in 2016 Performance Highlights ............................................................................................................................................. 6 Russia that provides the complete range of equipment design, Key Events in 2016 ........................................................................................................................................................................ 7 manufacture and supply solutions for nuclear and thermal power Message from Company Management ........................................................................................................................ 8 industry, gas and petrochemical Key Performance Indicators of JSC ATOMENERGOMASH for 2016 ......................................................... 12 industries, shipbuilding, and special steels market. Target Markets and Position of the Company.................................................................................................... 13 The Division comprises the The Company’s Development Strategy ..................................................................................................................... 14 major power industry businesses including manufacture, research, Sustainable Development of the Company ........................................................................................................... 15 and engineering companies