Metro Expresslanes

Total Page:16

File Type:pdf, Size:1020Kb

Metro Expresslanes Metro ExpressLanes http://www.metro.net/projects/expresslanes/ Overview Construction Notices Closures The Plan MetroThe Source ExpressLanes View new videos to learn more View Comments Fill out online form today! Overview Metro ExpressLanes is a pilot, one-year demonstration program overseen by Metro, Caltrans and several other mobility partners that have joined forces to develop a package of solutions to improve traffic flow and provide enhanced travel options on the I-10 and I-110 Freeways in Los Angeles County. The solution package includes the introduction of congestion pricing by converting High Occupancy Vehicle (HOV) lanes to High Occupancy Toll (HOT) lanes; the improvement of transit service and other alternatives to driving; the updating of transit facilities; and the implementation of a more effective parking management system in downtown Los Angeles. Metro ExpressLanes features include: Conversion of the I-10 El Monte Busway HOV lanes (I-605 to Alameda St.) to HOT lanes Conversion of the I-110 Harbor Transitway HOV lanes (Artesia Transit Center to Adams Blvd.) to HOT lanes 59 new alternative fuel expansion buses and operating subsidy for the demo period El Monte Station Expansion New Transit Station at Patsaouras Plaza Harbor Transitway Park & Ride Upgrades Metrolink Pomona Station Expansion Transit Signal Priority Expanded in Downtown LA 100 New Metro Vanpools New expansion bicycle lockers at the Artesia Transit Center & bicycle station at El Monte Station Express Park New Bus Maintenance Facility in Downtown LA Budget - $290 million Construction begins: 2011 Keywords: ExpressLanes projects Overview Last Revised: Tuesday April 05, 2011 Printer Friendly Version for 'Overview ' Construction Notices Versión en español Construction Notices Get construction updates on Twitter Start Date Notice Brief More Info Area: Westbound tunnel entrance to I-10 San Bernardino Freeway at El Monte Station As part of the Los Angeles County Congestion HTML 03/02/2012 Reduction Demonstration Program along the I-110 PDF and I-10 freeways, Metro’s Contractor is working to install power and utility support units needed for the operation of dynamic message signs. The construction 1 of 7 3/22/2012 3:47 PM Metro ExpressLanes http://www.metro.net/projects/expresslanes/ activities from the job site include sign foundation installation and retaining wall work at the Westbound tunnel entrance to I-10 San Bernardino Freeway at El Monte Station. Area: Eastbound I-10 San Bernardino Freeway between the eastbound Gibson Tunnel entrance and MTA Way As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is constructing HTML 01/09/2012 the new El Monte Bus Station. The construction PDF activities from the job site include concrete removal, demolition and debris removal on the Eastbound I-10 San Bernardino Freeway. Work is scheduled to begin Monday, January 9, 2012 through Sunday, January 15, 2012; 9:00 p.m. - 6:00 a.m., Monday - Sunday. Area: In the vicinity of Alameda St., between Arcadia St. & Los Angeles St. As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro's Contractor is continuing HTML 01/09/2012 with the installation of conduit as a means of PDF providing power at numerous locations. This work must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 9880 Flair Drive, El Monte As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing with the installation of conduit as a means of HTML 11/28/2011 providing power at numerous locations. This work PDF must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 10641 Asher Street, El Monte As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing with the installation of conduit as a means of HTML 11/28/2011 providing power at numerous locations. This work PDF must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 12008 Exline St., El Monte As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing with the installation of conduit as a means of HTML 11/28/2011 providing power at numerous locations. This work PDF must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 11610 Valley Blvd., El Monte As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing with the installation of conduit as a means of HTML 11/28/2011 providing power at numerous locations. This work PDF must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. 2 of 7 3/22/2012 3:47 PM Metro ExpressLanes http://www.metro.net/projects/expresslanes/ Area: Where's it happening? As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing with the installation of conduit as a means of HTML 11/23/2011 providing power at numerous locations. This work PDF must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 3462 ½ Earlwood Drive, Rosemead As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing HTML 11/23/2011 with the installation of conduit as a means of PDF providing power at numerous locations. This work must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 9341 ½ Ramona Blvd., Rosemead As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing HTML 11/23/2011 with the installation of conduit as a means of PDF providing power at numerous locations. This work must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 1864 S. Sierra Vista Avenue, Alhambra As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing HTML 11/21/2011 with the installation of conduit as a means of PDF providing power at numerous locations. This work must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 3334 Maxson Road, city of El Monte As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing HTML 11/21/2011 with the installation of conduit as a means of PDF providing power at numerous locations. This work must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 3410 Flair Drive, city of El Monte As part of the Los Angeles County Congestion Reduction Demonstration Program along the I-110 and I-10 freeways, Metro’s Contractor is continuing HTML 11/21/2011 with the installation of conduit as a means of PDF providing power at numerous locations. This work must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: In the vicinity of 12388 Exline St between Durfee Ave and Gillman Rd, El Monte HTML 11/21/2011 As part of the Los Angeles County Congestion PDF Reduction Demonstration Program along the I-110 3 of 7 3/22/2012 3:47 PM Metro ExpressLanes http://www.metro.net/projects/expresslanes/ and I-10 freeways, Metro’s Contractor is continuing with the installation of conduit as a means of providing power at numerous locations. This work must be performed in order to place the conduit underground. Upon completion of the installation of the conduit, each trench will be back filled, and returned to pre-existing conditions. Area: San Bernardino Freeway (I-10) between I-710 Freeway in Los Angeles to I-605 Freeway in El Monte The Metro ExpressLanes Demonstration Project along the San Bernardino Freeway (I-10) will lessen congestion, improve travel choices, and maximize efficiency on a heavily traveled west-east corridor connecting downtown Los Angeles to I-605 Freeway. HTML 09/30/2011 The project will provide a new way to move traffic in PDF LA County by converting the existing carpool lanes on I-10 to ExpressLanes.
Recommended publications
  • Metro Bus and Metro Rail System
    Approximate frequency in minutes Approximate frequency in minutes Approximate frequency in minutes Approximate frequency in minutes Metro Bus Lines East/West Local Service in other areas Weekdays Saturdays Sundays North/South Local Service in other areas Weekdays Saturdays Sundays Limited Stop Service Weekdays Saturdays Sundays Special Service Weekdays Saturdays Sundays Approximate frequency in minutes Line Route Name Peaks Day Eve Day Eve Day Eve Line Route Name Peaks Day Eve Day Eve Day Eve Line Route Name Peaks Day Eve Day Eve Day Eve Line Route Name Peaks Day Eve Day Eve Day Eve Weekdays Saturdays Sundays 102 Walnut Park-Florence-East Jefferson Bl- 200 Alvarado St 5-8 11 12-30 10 12-30 12 12-30 302 Sunset Bl Limited 6-20—————— 603 Rampart Bl-Hoover St-Allesandro St- Local Service To/From Downtown LA 29-4038-4531-4545454545 10-12123020-303020-3030 Exposition Bl-Coliseum St 201 Silverlake Bl-Atwater-Glendale 40 40 40 60 60a 60 60a 305 Crosstown Bus:UCLA/Westwood- Colorado St Line Route Name Peaks Day Eve Day Eve Day Eve 3045-60————— NEWHALL 105 202 Imperial/Wilmington Station Limited 605 SANTA CLARITA 2 Sunset Bl 3-8 9-10 15-30 12-14 15-30 15-25 20-30 Vernon Av-La Cienega Bl 15-18 18-20 20-60 15 20-60 20 40-60 Willowbrook-Compton-Wilmington 30-60 — 60* — 60* — —60* Grande Vista Av-Boyle Heights- 5 10 15-20 30a 30 30a 30 30a PRINCESSA 4 Santa Monica Bl 7-14 8-14 15-18 12-18 12-15 15-30 15 108 Marina del Rey-Slauson Av-Pico Rivera 4-8 15 18-60 14-17 18-60 15-20 25-60 204 Vermont Av 6-10 10-15 20-30 15-20 15-30 12-15 15-30 312 La Brea
    [Show full text]
  • Mobility in Southeast Florida: a New Approach Based on Pricing and Bus Rapid Transit by Robert W
    Policy Study 400 March 2012 Increasing Mobility in Southeast Florida: A New Approach Based on Pricing and Bus Rapid Transit by Robert W. Poole, Jr. with Thomas A. Rubin, CPA and Chris Swenson, PE Acknowledgement This policy study is the independent work product of Reason Foundation, a non-profit, tax-exempt research institute headquartered in Los Angeles. It was funded by the Galvin Foundation of Chicago as part of a series of urban-region mobility studies in various parts of the United States. The project team received outstanding cooperation from the various agencies in Miami-Dade, Broward and Palm Beach Counties responsible for transportation policy, planning, investment and operations. These include the Florida Department of Transportation Districts 4 and 6, the Miami-Dade Expressway Author- ity, Florida’s Turnpike Enterprise, Miami-Dade Transit, Broward County Transit, PalmTran, the Palm Beach Metropolitan Planning Organization (MPO), the Broward County MPO, the Miami-Dade County MPO and the Southeast Florida Transportation Council. We gratefully acknowledge their provision of extensive data, response to numerous questions, and review of a draft of this report. Needless to say, the findings and recommendations in this report are those of the authors and Reason Foundation, and do not necessarily reflect the views of any of the region’s transportation agencies. Reason Foundation Reason Foundation’s mission is to advance a free society by developing, applying and promoting libertarian principles, including individual liberty, free markets and the rule of law. We use journalism and public policy research to influence the frameworks and actions of policymakers, journalists and opinion leaders.
    [Show full text]
  • El Monte Station Connections Foothilltransit.Org
    metro.net El Monte Station Connections foothilltransit.org BUSWAY 10 Greyhound Foothill Transit El Monte Station Upper Level FT Silver Streak Discharge Only FT486 FT488 FT492 Eastbound Metro ExpressLanes Walk-in Center Discharge 24 25 26 27 28 Only Bus stop for: 23 EMT Red, EMT Green EMS Civic Ctr Main Entrance Upper Level Bus Bays for All Service B 29 22 21 20 19 18 Greyhound FT481 FT Silver Streak Metro Silver Line Metro Bike Hub FT494 Westbound RAMONA BL RAMONA BL A Bus stop for: EMS Flair Park (am/pm) Metro Parking Structure Division 9 Building SANTA ANITA AV El Monte Station Lower Level 1 Bus Bay A Bus Stop (on street) 267 268 487 190 194 FT178 FT269 FT282 2 Metro Rapid 9 10 11 12 13 14 15 16 Bus Bay 577X Metro Silver Line 8 18 Bus Bay Lower Level Bus Bays Elevator 76 Escalator 17 Bike Rail 7 6 5 4 3 2 1 EMS Bike Parking 270 176 Discharge Only Commuter 770 70 Connection Parking Building 13-0879 ©2012 LACMTA DEC 2012 Subject to Change Destinations Lines Bus Bay or Destinations Lines Bus Bay or Destinations Lines Bus Bay or Street Stop Street Stop Street Stop 7th St/Metro Center Rail Station Metro Silver Line 18 19 Hacienda Heights FT282 16 Pershing Square Metro Rail Station Metro Silver Line , 70, 76, 770, 1 2 17 18 37th St/USC Transitway Station Metro Silver Line 18 19 FT Silver Streak 19 20 21 Harbor Fwy Metro Rail Station Metro Silver Line 18 19 Pomona TransCenter ÅÍ FT Silver Streak 28 Alhambra 76, 176 6 17 Highland Park 176 6 Altadena 267, 268 9 10 Puente Hills Mall FT178, FT282 14 16 Industry Å 194, FT282 13 16 Arcadia 268,
    [Show full text]
  • Attachment A: FY16Q1 Status Update
    ATTACHMENT A FY16Q1 STATUS UPDATE ON RIDERSHIP AND CUSTOMER SERVICE INITIATIVES MARKET RESEARCH Analysis of Service to Regional Employment Centers Employment is the primary external factor influencing ridership, particularly on our rail and BRT system. Downtown LA can be considered the region’s primary Central Business District (CBD), and as such, is already well served by transit. However, Operations has identified an additional 24 employment centers throughout the region with high densities of employment, regional destinations, and activities. Once identified, ridership in these areas was compared to journey to work data to evaluate current and potential ridership. This information will assist Operations in adjusting services to better meet these employment travel demands. Social Media Research The Communications team is embarking on several efforts to better understand existing and potential new riders through social and electronic media. To better understand existing riders, Communications is partnering with the TAP team to collect rider email addresses to be matched against social media accounts to gain a deeper understanding of rider demographics. Improvements to our Customer Relationship Manager (CRM) system should also provide an opportunity to connect rider information between their TAP usage, social media information, and customer service calls. Communications is also procuring services of a social media advertising buyer tasked with identifying existing and potential riders for targeted advertisement. Using our existing email lists, social media follower information, look-a-like modeling, and third party marketing sources that create customized client lists based on a vast array of consumer information, we will be able to gain insight into the demographic and psychographic characteristics of various rider and non-rider market segments.
    [Show full text]
  • Transit Service Plan
    Attachment A 1 Core Network Key spines in the network Highest investment in customer and operations infrastructure 53% of today’s bus riders use one of these top 25 corridors 2 81% of Metro’s bus riders use a Tier 1 or 2 Convenience corridor Network Completes the spontaneous-use network Focuses on network continuity High investment in customer and operations infrastructure 28% of today’s bus riders use one of the 19 Tier 2 corridors 3 Connectivity Network Completes the frequent network Moderate investment in customer and operations infrastructure 4 Community Network Focuses on community travel in areas with lower demand; also includes Expresses Minimal investment in customer and operations infrastructure 5 Full Network The full network complements Muni lines, Metro Rail, & Metrolink services 6 Attachment A NextGen Transit First Service Change Proposals by Line Existing Weekday Frequency Proposed Weekday Frequency Existing Saturday Frequency Proposed Saturday Frequency Existing Sunday Frequency Proposed Sunday Frequency Service Change ProposalLine AM PM Late AM PM Late AM PM Late AM PM Late AM PM Late AM PM Late Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl R2New Line 2: Merge Lines 2 and 302 on Sunset Bl with Line 200 (Alvarado/Hoover): 15 15 15 20 30 60 7.5 12 7.5 15 30 60 12 15 15 20 30 60 12 12 12 15 30 60 20 20 20 30 30 60 12 12 12 15 30 60 •E Ğǁ >ŝŶĞϮǁ ŽƵůĚĨŽůůŽǁ ĞdžŝƐƟŶŐ>ŝŶĞƐϮΘϯϬϮƌŽƵƚĞƐŽŶ^ƵŶƐĞƚůďĞƚǁ
    [Show full text]
  • Tour 1: Wilshire BRT / Metro Orange Line Technical Tour – Limit 100
    Tour 1: Wilshire BRT / Metro Orange Line Technical Tour – Limit 100 Wilshire Boulevard is the most heavily used bus corridor in the County of Los Angeles. In addition to being the most heavily used transit corridor in the County, Wilshire Boulevard has the distinction of having some of the highest average daily traffic (ADT) volumes in the City of Los Angeles. The Wilshire BRT Project, completed in November 2015, added 7.7 miles of dedicated peak period curbside bus lanes, as well as other street, signal improvements and further enhancements to the existing transit signal priority system. The tour will include a short trip along this busy corridor with a brief stop at the Wilshire/Vermont Metro Red/Purple Line station. There you will be able to observe and hear about one of Metro’s successful joint development projects sitting on 5.64 acres or one entire City block. The project, completed in August 2007, consists of 3.24 acres of Metro-owned property ground leased to the developer, 449 apartments (20% affordable), 35,000 square feet of ground floor retail, new subway portal and elevator access. Another 2.4 acres was sold to the Los Angeles Unified School District to construct an 800-student middle school completed in October 2008 and opened in Fall 2009. Also, a new bus layover facility sitting on an adjacent 1.02 acre parcel was also constructed. From there, the tour will continue on to the North Hollywood Metro Orange/Red Line Station where the group will take a short trip on the Metro Orange Line.
    [Show full text]
  • The Transit Advocate
    How to join SO.CA.TA: Yearly dues are $30.00 cates. In all other cases, permission must be ($12.00 low income). Dues are prorated on a secured from the copyright holder. quarterly basis. Disclaimer: The Southern California Transit THE TRANSIT ADVOCATE Submission of materials: ALL materials for the Advocates is not affiliated with any governmental TRANSIT ADVOCATE newsletter go to Andrew agency or transportation provider. Names and Newsletter of the Southern California Transit Advocates Novak at P.O. Box 2383, Downey California 90242 logos of agencies appear for information and or to [email protected]. Please enclose a self reference purposes only. November 2011 Vol. 19, No. 11 ISSN 1525-2892 addressed stamped envelope for returns. SO.CA.TA officers, 2011 Newsletter deadlines are the Fridays a week President: Nate Zablen before SO.CA.TA meetings, at 6:00 p.m. Pacific Vice President: Kent Landfield time, unless otherwise announced. Recording Secretary: Edmund Buckley Executive Secretary: Dana Gabbard Opinions: Unless clearly marked as "Editorial" or Treasurer: Dave Snowden "Position Paper", all written material within, Directors at Large: Ken Ruben including all inserted flyers and postcards, are the J.K. Drummond expressed opinions of the authors and not Joe Dunn necessarily that of the Southern California Transit ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Advocates. Newsletter Editor: Andrew Novak Newsletter Prod. Mgr: Dana Gabbard Copyright: © 2011 Southern California Transit Webmaster: Charles Hobbs Advocates. Permission is freely granted to repro-
    [Show full text]
  • CPY Document
    FORM GEN,, ',GOAIR".'/82) CITY OF LOS ANGELES IN, ~R-DEPARTMENTAL CORRESPONDl:..tE Date: December 4, 2007 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention:~l.7~ Wendy Greuel, Chair, Transportation Committee From: rRita L. Robinson, General Manager Department of Transportation Subject: USDOT CONGESTION REDUCTION DEMONSTRATION INITIATIVE- CONGESTION PRICING (CF 07-3754) As directed by the motion (CF 07-3754) presented by Councilmember Wendy Greuel (CD 2), the Los Angeles Department of Transportation (LADOT) has prepared this report regarding the recent announcement by the United States Department of Transportation (US DOT) on the availability of federal funds for Congestion-Reduction Demonstration Initiatives. The motion directed LADOT to identify projects that would be eligible for grant funding under this federal program and to work with the Los Angeles County Metropolitan Transportation Authority (Metro) to prepare a grant application to be submitted to USDOT by the deadline of December 31, 2007. RECOMMENDATION AUTHORIZE LADOT to partner with Metro and Caltrans in the preparation of a joint Congestion-Reduction Demonstration Initiatives application package to the USDOT with consideration of the following overall project elements including complementary City components which total approximately $35 million: 1. Conversion of the existing Interstate 110 (Harbor Transitway) High Occupancy Vehicle (HOV) lanes to High Occupancy Toll (HOT) lanes (Caltrans to determine scope and cost) 2. Grade separation of the northern terminus of proposed HOT lanes on the Harbor Transitway over Adams Boulevard onto Figueroa Street (Caltrans to determine feasibility, scope and cost) 3. Enhancement of Transit Service along Harbor Transitway from Artesia Transit Center to Downtown Civic Center (Metro to determine feasibility, scope and cost) 4.
    [Show full text]
  • IV. Environmental Impact Analysis G. Land Use
    IV. Environmental Impact Analysis G. Land Use 1. Introduction This section of the Draft EIR analyzes the proposed Project’s potential impacts with regard to land use. Specifically, this section analyzes the proposed Project’s consistency with relevant land use plans, policies, and regulations and evaluates the relationship of the proposed Project with surrounding land uses. 2. Environmental Setting a. Existing Conditions (1) Project Site The Project site is comprised of approximately 207 net acres located approximately 1.5 miles southwest of downtown Los Angeles within the South Los Angeles and Southeast Los Angeles Community Plan areas of the City of Los Angeles (City). The Project site is generally bounded by 30th Street and the alley south of 30th Street to the north, Jefferson Boulevard to the northeast, Exposition Boulevard to the south, Hoover Street and Flower Street to the east, and Vermont Avenue to the west. In addition, the Project site also includes a small area to the south of Exposition Boulevard and a second area to the east of the Harbor Freeway (I-110), adjacent to Jefferson Boulevard between Hope and Hill Streets. Of this area, approximately 202.5 net acres are currently owned by the University and approximately 4.5 net acres are owned by others (discussed in detail below).1 In general, these University-owned areas include academic space and University-affiliated uses, student and faculty housing uses, and retail/commercial uses. An overview of existing conditions within each of the Subareas of the Project site is provided below: 1 Non-owned University properties include a gas station (0.5 acres) and the United University Church (0.6 acres) in Subarea 1 and the Jessie L.
    [Show full text]
  • Metro Public Hearing Pamphlet
    Proposed Service Changes Metro will hold a series of six virtual on proposed major service changes to public hearings beginning Wednesday, Metro’s bus service. Approved changes August 19 through Thursday, August 27, will become effective December 2020 2020 to receive community input or later. How to Participate By Phone: Other Ways to Comment: Members of the public can call Comments sent via U.S Mail should be addressed to: 877.422.8614 Metro Service Planning & Development and enter the corresponding extension to listen Attn: NextGen Bus Plan Proposed to the proceedings or to submit comments by phone in their preferred language (from the time Service Changes each hearing starts until it concludes). Audio and 1 Gateway Plaza, 99-7-1 comment lines with live translations in Mandarin, Los Angeles, CA 90012-2932 Spanish, and Russian will be available as listed. Callers to the comment line will be able to listen Comments must be postmarked by midnight, to the proceedings while they wait for their turn Thursday, August 27, 2020. Only comments to submit comments via phone. Audio lines received via the comment links in the agendas are available to listen to the hearings without will be read during each hearing. being called on to provide live public comment Comments via e-mail should be addressed to: via phone. [email protected] Online: Attn: “NextGen Bus Plan Submit your comments online via the Public Proposed Service Changes” Hearing Agendas. Agendas will be posted at metro.net/about/board/agenda Facsimiles should be addressed as above and sent to: at least 72 hours in advance of each hearing.
    [Show full text]
  • Evolution of the Silver Streak “BRT- Like” Service
    Evolution of the Silver Streak “BRT- Like” Service BRT Conference June 18, 2018 FOOTHILL TRANSIT FACTS • 327 Square Miles • 359 Buses In Fleet • San Gabriel Valley • 329 CNG Buses • Pomona Valley • 30 All Electric Proterra Buses • 37 Lines SLOW POPULATION GROWTH FOOTHILL TRANSIT FACTS • Began Service in December of 1988 • Formed to provide improved service • Increase local control of regional transit • UniqueSLOW Public/Private POPULATION Partnership GROWTH • Public: Joint Powers Authority • 22 member-cities • Los Angeles County • Administration Foothill Transit Employees • Private: Contracted Operations • Pomona Operation Facility – Keolis • Irwindale/ Arcadia Operations Facility – TransDev • Call Center/ Transit Stores/ Bus Stop Technicians- TransDev JOINT POWERS AUTHORITY 22 Cities and the County of Los Angeles Cluster 1 Cluster 2 Cluster 3 • Claremont • Azusa • Arcadia • La VerneSLOW POPULATION• Baldwin GROWTH Park • Bradbury • Pomona • Covina • Duarte • San Dimas • Glendora • Monrovia • Walnut • Irwindale • Pasadena Cluster 4 • West Covina • Temple City • Diamond Bar Cluster 5 • El Monte • First District, County of L.A. • Industry • Fourth District, County of L.A. • La Puente • Fifth District, County of L.A. • South El Monte What is the Silver Streak • A high-speed bus system which operates like a rail line on rubber tires • Incorporates high-tech vehicles, uniform fare structure, stations not stops, and frequent service Vehicles • 60-foot articulated buses • 58-passenger seating capacity • SmartBUS equipped • Boarding through three doors Service • Replace current Line 480 • Easy connections to Metro, Metrolink, Omni, and Foothill Transit local routes Service Map • Reduce travel time by 30-40 minutes • Simple, easy to understand route SILVER STREAK BRT FEATURES (2007) • Unique Branding • Dedicated Fleet • WiSLOW-Fi POPULATION GROWTH • All Door Boarding • Exclusive Right of Way • El Monte Busway (El Monte – Union Station) TAP CARD (2009) SLOW POPULATION GROWTH .
    [Show full text]
  • Part 3 Outreach
    Part 3 Outreach Input from key stakeholders was an essential component of the research and analysis presented in Part 4 (Opportunities and Constraints), and ultimately Part 5 (Vision). Stakeholder Interviews Metro and Foothill Transit Magellan Group CBRE and Cranbrook Realty Corporation Brokers Executive Summary Station Area Profile Outreach Opportunities/Constraints Vision Implementation Plan Metro and Foothill Transit - 4/17/2018 STAKEHOLDER INTERVIEWS The Consultant Team facilitated a conference call meeting with representatives from the City’s - Overall ridership increase predicted Transit providers: Metro and Foothill Transit. A short presentation of the conceptual framework - Ridership will increase if UPass program is expanded for students plan was followed by a discussion of opportunities and considerations for the vision plan. Notes from that discussion follow: Ramona Corridor - Ramona corridor as possible BRT from El Monte to Baldwin Park Introductory Comments - Alternatives Analysis will be released as RFP soon - This project will set up a vision and policy document, not a regulatory framework - El Monte received grant for BRT - Reduced car use, net-zero development, new technologies, urban and walkable - LA County of Public Works neighborhoods - Lead agency (BRT) Metrolink Station TIF Grant from Metro - Metro and City jointly own Metrolink site - EIFD Financing in downtown area - Metro completed Metrolink relocation study in 2017 - Kick-off meeting anticipated in September 2019 - Includes key background data that could be
    [Show full text]