Bid Document BID DOCUMENT Tripura State Electricity Corporation Limited Office of the Deputy General Manager Electrical Division, Udaipur, Gomati District, Tripura DNIT No. : DNIT/DGM/ED/UDP/2016-17/04 Dated, 26/10/2016) Name of work : Shifting of HT/LT line in/c Distribution Sub-Stations from Kishore Ganj to Uttar Shilghati (upto the jurisdiction of Kakraban Electrical Sub-Division, Kakraban) in connection with widening of road by NBCC PMGSY Road under Electrical Sub-Division Kakraban. Estimated Cost : Rs.5,90,616.00 Earnest Money : Rs.11,812.00 Cost of Bidding Document : Rs.500.00 Bid Document Sale Last Date : 11.05.2017 upto 3.00 pm. Bid Receipt Time and Date : 15.05.2017 upto 3.00 pm. Time for completion : 60 (sixty) days. Date of Opening a) Pre-Qualification & Techno : 15.05.2017 at 3.30 pm, if possible. Commercial Bid b) Price Bid : 16.05.2017 at 11.00 am. if possible. This Bidding Document contains 82(eighty two) pages excluding front & back cover pages. (Er. A. Sarkar) Deputy General Manager TSECL, Electrical Division, Udaipur Gomati District, Tripura This Bidding Document is issued to Shri / Smt. / M/s ……………… ……… ……………………………………………………… (Er. A. Sarkar) Deputy General Manager TSECL, Electrical Division, Udaipur Gomati District, Tripura Tripura State Electricity Corporation Limited (A Govt. of Tripura Enterprise) SECTION-I TRIPURA STATE ELECTRICITY CORPORATION LIMITED (INVITATION OF LOCALCOMPETITIVE BIDDING) NOTICE INVITING TENDER FOR Shifting of HT/LT line in/c Distribution Sub- Stations from Kishore Ganj to Uttar Shilghati (upto the jurisdiction of Kakraban Electrical Sub-Division, Kakraban in connection with widening of road by NBCC PMGSY Road under Electrical Sub-Division Kakraban. (DNIT No: DNIT /DGM/ED/UDP/2016-17/04 Dated, 26/10/2016) 1. INTRODUCTION In connection with improvement / widening of Road under PMGSY Scheme from from Kishore Ganj to Uttar Shilghati,after detailed survey of the locations, Schedule of Works including supply of all materials (except Earthing Pipe, M.S. Clamp, Nuts & Bolts, polythene pipe,Hard drawn etc.) has been prepared from this end. The configuration of the Line Sections shall be as per REC standards followed by TSECL in Tripura SCOPE OF WORK Scope of work covered under this package includes supply, transportation to site/ Sub- Divisional Store-yard, storage, insurance, handling, Laying, testing & commissioning / charging of HT / LT Lines on PCC/ST Pole as stated in above including supply of all materials (except Earthing Pipe, M.S. Clamp, Nuts & Bolts etc.). Scope of work given above is only indicative. The detailed scope has been described in the Schedule of Work attached with this bidding document. Bidding Document Sale Last date 11.05.2017 upto 3.00 pm. Bid Receipt time and date 15.05.2017 upto 3.00 pm. Bid opening time and date 15.05.2017 at 3.30 pm. if possible. (Pre-qualification & Technical) Bid opening time and date (Price Bid) 16.05.2017 at 11.00 am. if possible. Cost of bidding document Rs.500.00 Estimated Cost Rs.5,90,616.00 Earnest Money Rs.11,812.00 Completion Period 60 (sixty) Days. 2.0 QUALIFYING REQUIREMENTS FOR BIDDERS To be qualified to bid for the package, the bidder shall have to meet the following minimum criteria: 2.1 The bidder must have experience executed maintenance works of HT/LT lines (up to11KV) or similar nature of work, total work value not less than 1.00 lakh in a single award (supported with authenticated documents or certification from competent authority not below the rank of Sr. Manager) in a particular financial year during last 3 (three) financial years. Contractor 1 Dy.GM,Udaipur Tripura State Electricity Corporation Limited (A Govt. of Tripura Enterprise) or 2.2 The bidder must have executed construction works of HT/LT lines (up to 11KV) or similar nature of work, total work value not less than 1.00 lakh in a single award (supported with authenticated documents or certification from competent authority not below the rank of Sr. Manager) in a particular financial year during last 3 (three) financial years. 3.0 The minimum average annual turnover of the bidder for the last three years should not be less than 30% of the estimated cost put to tender. 3.1.. Bids may be submitted by an individual firm or joint venture as one of the following 3.1.1 A single firm, which meets anyone or both the requirement, indicating in para 2.1 2.2 above and 3.0 mandatory. 3.1.2. A joint venture of two or more registered firms wherein each partner shall meet any one or both the requirements stipulated under clause 2.1, 2.2 & 3.0. 3.1.3. The figures of average annual turnovers for each joint Venture partners shall be added together to determine the bidder’s compliance with the minimum average annual turn over requirement for the package as given at para 3.0 above. 3.2. In case of joint venture any one of the partners shall be authorized to incur liabilities and receive instructions for and on bealf of any and all partners of the joint venture and the entire execution of the contract including receipt of payment shall be done exclusively through him. This authorization shall be evidenced by submitting a power of attorney signed by legally authorized signatories of all the parteners 3.3. All partners of Joint Venture shall be liable jointly and individually / severally for the execution of the contract in accordance with the contract terms. A copy of the agreement of joint venture partners having such provision shall be submitted with the bid. 3.4. Notwithstanding anything contained herein above, TSECL reserves the right to assess the “capacity and capability” of the bidder to execute the work. 4. The Bid Document complete with general condition of contract, technical specification, schedule of quantities etc. may be seen in the Office of the Deputy General Manager, Electrical Division, Udaipur, Gomati District, Tripura on all working days during office hours upto the date fixed for sale of bid documents. 5. The bidder shall bear all cost and expenses associated with purchase and submission of its bid including post bid discussions, technical; & other presentation etc., and TSECL will in no case be responsible or liable for those cost, regardless of the conduct or outcome of the bidding process. 6. The bidder shall furnish documentary evidence in support of the qualifying requirements stipulated above along with their bid. Bid received without such documents shall be summarily rejected. Contractor 2 Dy.GM,Udaipur Tripura State Electricity Corporation Limited (A Govt. of Tripura Enterprise) 7. The bidder shall be required to deposit earnest money amounting Rs. 11,812.00.00 @ 2.0 % of the estimated cost put to tender in the shape of demand draft or Bankers Cheque from any Schedule Bank guaranteed by Reserve Bank of India in favour of TRIPURA STATE ELECTRICITY CORPORATION LIMITED payable at SBI, Udaipur Branch, Gomati District, Tripura along with the bid. The earnest money deposited is adjustable with Contract Performance Guaranty. The successful bidder shall be required to furnish a Contract Performance Guaranty @ 10% of the total contract price in the shape of Demand Draft / Bankers Cheque in favour of TRIPURA STATE ELECTRICITY CORPORATION LIMITED from any Schedule Bank guaranteed by Reserve Bank of India payable at SBI, Udaipur Branch, Gomati District, Tripura or in the shape of Bank guarantee in favour of TRIPURA STATE ELECTRICITY CORPORATION LIMITED on any Public Sector / Scheduled Indian Bank on award of the contract. BID NOT ACCOMPANIED WITH REQUISITE BID EARNEST MONEY SHALL NOT BE ENTRTAINED. 8. The bidding documents are not transferable and cost of bidding document is not refundable under any circumstances. 9. The original Bidding document shall be signed by the bidder(s) on all pages and will be submitted with the COMMERCIAL / PRICE bid. All corrections to rates and items in the Bid(s) should be initialed by the Bidder(s). Every Page of the Schedule Price Bidding shall be signed in full by the Bidder(s). 10. The Bidder(s) shall have to give a DECLARATION that he/they have gone through the details of the Bidding Document(s) as per format appended with the Bidding Document. 11. Address for Communication / Purchase of Bid Document. Deputy General Manager Tripura State Electricity Corporation Limited Electrical Division, Udaipur Gomati District, Tripura PIN – 799120 Phone: 03821-222371 Contractor 3 Dy.GM,Udaipur Tripura State Electricity Corporation Limited (A Govt. of Tripura Enterprise) SECTION-II INSTRUCTION TO BIDDERS 1. GENERAL INSTRUCTIONS The bidders are to satisfy themselves by visiting to the ‘sites of work’ as regards the prevailing condition of locations proposed for Distribution sub-Stations, proposed way leave for the overhead and underground lines, their approaches, transportation facilities, availability of laborers and availability of materials etc. before submission of bid. No claim or excuse on this account will be entertained at any stage later on. The location of the work falls under the jurisdiction of Kakraban Electrical Sub-Division. 2. COST OF BIDDING The Bidder shall bear all the costs and expenses associated with preparation and submission of its Bid including post-bid discussions, technical and other presentation etc. and the TSECL shall in no case be responsible or liable for those costs, regardless of the conduct or outcome of the bidding process. 3. THE BIDDING DOCUMENT 3.1 CONTENTS OF BIDDING DOCUMENTS The goods and services required, bidding procedures and contract terms are as prescribed in the Bidding Documents. In addition to the Invitation for Bids, the Bidding Documents is a compilation of the following sections: a. Instructions to Bidders b. General Conditions of Contract c.
Recommended publications
  • Gomati-District
    INDEX Sl. No. Subject matter Page No. 1. Map of Gomati District. 3-5 2. Introduce and Multi Hazard Disaster Management plan 7 3. Disaster Management Plan 8 4. Diagram of DDMP 9 5. Disaster Negative and positive Aspects 10 6. Hazards in Gomati District and assessment of crop to be damage due to naturalcal 11-12 7. Type of Disaster 13 8. Impact of Natural Disaster, landslide, earthquake, typhoon ,tornado ,Hailstorm, Heat 14-17 wave attack. Fire Accident 9 Gomati District at a Glance 18-21 10 Rain fall received during 2013 22-23 11 District Disaster Management authority 24 12 District Disaster Management Committee, DEOC 25-28 13 Udaipur Sub-Divisional Disaster Management & NGO coordination committee 28-38 14 Amarpur Sub-Divisional Committee 39-48 15 Karbook Sub-divisional Committee 49 16 Karbook Quick Response team 50 17 RD Block Disaster Management committee:-,SLC, KBK, KIL, Name & contact No of 51-65 different GP of Amarpur, ,KBN, , etc. 18 List of equipment with TSR 5th Bn, SDM Amarpur, Karbook and Udaipur 65-67 19 List of equipment available with PWD and Private Agency 68-69 20 S.P Gomati field level officer 70-80 21 District Level committee for forest area 81-82 22 List of nodal officer of different offices 82-90 23 District Education office and nodal officer, NSS/ NCC Unit. 101-103 24 Shelter houses 104-107 25 Different Shelter Houses selected by Shelter Management Team 26 Medical and first AID team and contact detail of Major Hospital &QR Team 107-110 27 Role of ARDD in Disaster Management , Agriculture ,Fisheries, 111-112 28 Map showing flood prone area Udaipur and Dumbur lake 113 29 List of Helipad 114 30 Resource available with SP(G),Fire service, TSECL, DWS, PWD(R&B),,OTPC, CNG 114-155- 229 31 Alternate Route 230-231 32 Recourse available with Food Deptt., ARDD, Agri,Fisheries,, 231- 33 Control Room 239 34 Mock Drill 252 35 Zoning of Flood prone area 256 36 Action Plan 2016-17.
    [Show full text]
  • In Gomati District , Pre-Disaster,During Disaster, Post Disaster
    1 INDEX Sl. No. Subject matter Page No. 1. Preface of The D. M & The SDMs of Gomati District. 3-6 2. Introduce and Multi Hazard Disaster Management plan 7-8 3. Disaster Management Plan 2016-17 9 4. Diagram of DDMP 10 5. Disaster Negative and positive Aspects 11 6. Hazards in Gomati District , pre-disaster,during disaster, post disaster. 12-13 7. Type of Disaster 14 8. Impact of Natural Disaster, Consequences of Flood, Effect of cyclone,landslide, 15-17 earthquake, typhoon ,tornado ,Hailstorm, Heat wave attack. 9. Fire Accident 18 10. HRVC 19 11. District Disaster Management Authority,Gomati District,Tripura 20 12. District Disaster Management Committiee 21 13. Udaipur Sub-Division Committee, Amarpur & Karbook Committee 22-24 14. Gomati District at a glance 24-26 15. Rainfall of 2015 27-28 16. District Emergency Opertion Centre(DEOC) 29-30 17. District Level Core team 31-32 18. District Level Quick Response Team 33-38 19. Quick Response team under Karbook Sub-Division 39 20. NGO Coordination committee 39-40 21. Prominent NGO of Udaipur Sub-Division. 40 22. Killa Block Committee, 41 23. Kakraban Block Committee & Quick Response team 42-44 24. Amarpur Sub-Division Preliminary Block Profile 44-48 25. Karbook Sub-Division at a Glance 48-55 26. List of equipments with TSR 5th Bn, SDM Amarpur, SDM Karbook, SDM 56-58 Udaipur 27. List of equipments available with PWD 3rd Circle,Udaipur 58 28. List of equipments available with agencies(private) Amarpur,Karbook & Udaipur 59 29. Division wise quick response team of PWD for restoration of roads,Bridges etc.
    [Show full text]
  • “Improvement of Salgarah to Shilghati Embankment Road Via Amtali (L-7.70 Km)/SH: Re- Sectioning, Soling, Metalling & Carpe
    FORMAT – A (For publication in the Local Newspapers and Websites) GOVERNMENT OF TRIPURA PUBLIC WORKS DEPARTMENT PRESS NOTICE INVITING TENDER NO: 06/EE/UDP-DIVN/UDP/2015-16 Dated,29.06.2015 The Executive Engineer, Udaipur Division, PWD(R&B), Udaipur, Gomati District, Tripura invites on behalf of the ‘Governor of Tripura’ sealed percentage rate tender(s) from the Central & State public sector undertaking / enterprise and eligible Contractors /Firms/Agencies of appropriate class registered with PWD/TTAADC/MES/CPWD/Railway/Other State PWD up to 3.00 P.M. on 28.07.2015 for the following work:- T F Y E E S D E F T L O S N N M N O F T N R A A O F R R O O R R E A G C N S I I O O D R E E O O T T E D O O N E E T F R O F D U I M E F F D T A S E P N M L D E N S I O N S T R N A E NAME OF THE WORK T E E P C D S U E N S E L I E T I E A A D A E L N E S P M M C L M C D F I I T R C E T P E E N M T T O O C T N O S I P O A R O R T E M F L D F C A A I T S A P L T O E E , r a e r 5 ) u e 1 5 B n p 0 s i i 1 & r 2 0 g h .
    [Show full text]
  • TRI Book Kalika Press
    MAPPING THE IAMATIAS OF TRIPURA Ed: Dr. Milan Rani Jarnatia ||I‘lI||- \ .,f_,.-;_- n~ #- '*'€"2""‘1it -1%» . J \_ I 1;,.-__jfi~.__\ Tribal Hésnimh -'a In-stitu ta, Q?’ gmrt. Inf Tripuri, Agautpla i L MAPPING THE JAMATIAS OF TRIPURA EDITED BY Dr. Milan Rani Jamatia TRIBAL RESEARCH AND CULTURAL INSTITUTE GOVERNMENT OF TRIPURA, AGARTALA Phone : 0381 2324389 e-mail : [email protected], web : www.trci.tripura.gov.in MAPPING THE JAMATIAS OF TRIPURA c Tribal Research and Cultural Institute Government of Tripura, Agartala First Published : 15th September, 2020 ISBN : 978-93-86707-55-0 Cover Design : Pushpal Deb Type & Setting : Dhruba Debnath Price : Rs. 160/- Printed by : Kalika Press Pvt. Ltd. Kolkata Contents Message 7 Foreword 9 Acknowledgement 11 Preface 13 1. INTRODUCTION 15-48 1.1 Brief profile of the Jamatia Community 15 1.2 Language 18 1.3 Education 19 1.3.1 Education among the Jamatia Tribes 19 1.4 Status of Women in Jamatia Community 22 1.5 Land Alienation and Displacement 24 1.6 Moyal Wise Table 27 1.7 Objectives and Methodology 47 1.7.1 Objective of the study 47 1.7.2 Methodology 48 1.7.2.1 Sources of Information 48 1.7.2.2 Methods & Tools 48 1.7.2.3 Duration of the Study 48 1.7.2.4 Analysis of Data 48 1.8 Limitation 48 2. SOCIAL STRUCTURE 49-59 2.1 Family 50 2.1.1 Birth 51 2.1.2 Risa Soromani (Stage of wearing Risa) 51 2.1.3 Marriage 52 2.1.4 Function of Pandani Sal (Wedding Day) 53 2.1.5 Ri-Sumani Sal 53 2.2 Kinship 54 2.3 Adoption 54 2.4 Divorce 55 2.5 Death 55 2.6 Cultural Spectrum 57 2.6.1 Food Habits 57 2.6.2 Dress and Ornament 57 2.6.3 Music and Dance 58 2.6.4 Art and Craft 58 3.
    [Show full text]
  • ALPHABETICAL LIST of VILLAGES, TOWN and VILLAGE DIRECTORY and PRIMARY CENSUS ABSTRACT DISTRICT CENSUS HANDBOOI( SOUTH Trrdlpura DBST~~CT
    CENSUS 1971 S:rnRI:rnS 20 PART X-A & B TRIPURA ALPHABETICAL LIST OF VILLAGES, TOWN AND VILLAGE DIRECTORY AND PRIMARY CENSUS ABSTRACT DISTRICT CENSUS HANDBOOI( SOUTH TrRDlPURA DBST~~CT A. K. BHATTACHARVVA OF THE TRIPURA CIVIL SERVICE D/rector of Census Operations Tripura SOUTH rrRIPURA DISTRICT LIST OF 1911 CENSUS PUBLICATIONS. TlUPURA ( All the Census publications of the State will bear series-10 ) Part I-A General Report Part I-B General Report Part I-C • Subsidiary Tables Part II-A General Population Table, Distribution of Popula­ &. tion, Mothertongue, Scheduled Castes and Part II-C(i) ~ Scheduled Tribes. Part II-BCi) } Part II-B(ii) Economic Tables Part I1-B(iii) Part II-C(ii) } Social and Cultural Tables, Migration and Fertility Part II-D Tables. Part III Establishments Reports and Tables Part IV Housing Report and Tables Part V Special Tables and Ethnographic notes on Scheduled Castes and Scheduled Tribes. Part VI-B Special Survey Reports on Selected Towns. Part VI-C Survey Reports on Selected Villages Part VII-A Administrative Report - Enumeration &. } For official use only Part VII-B Administrative Report -- Tabulation Part IX­ State Census Atlas (District Census Handbook) Miscellaneous Special Study on Tea-Industry of Tripura (Tentative) (sTATE GOV?RNMENT PUBLICATION) Part X~A &. B Village &. Town Directory and Village &. Urban block.wise Primary Census Abstract. Part X.C Analytical Report, Administrative Statistics and District Census Tables. CONTENTS Pagol PREFACE lX-XI FIGURES AT A GLANCE xn ~ ALPHABETICAL LIST OF VILLAGES XIII-XXVII PART X-A VILLAGE AND TOWN DIRECTORY Explanatory Note to District Census Handbook 1-13 Village Directory and its Appendices 15 Udaipur Sub-division 16-25 Amarpur Sub-division 26-47 Belonia Sub-division 48-81 Sabroom Sub.division 82-87 Appendix I 89 Land use data for non-municipal town Appendix II 90-91 Sub-division wise Abstract of Educational, Medical and other amenities TOWN DIRECTORY Statement I Status, growth history and Functional Category of Towns 94-95 Statement II Physical Aspects & Location of Towns.
    [Show full text]
  • +15% Gas Based Combined Cycle Power Plant
    Environmental Impact Assessment of (2 x 363.3 MW) +15% Gas Based Combined Cycle Power Plant (Expansion): Palatana, Gomti District, Tripura 21*&7ULSXUD3RZHU &RPSDQ\/WG 273& )LQDO(,$5HSRUW±9ROXPH 0DLQ5HSRUW February 2019 (,$&RQVXOWDQW(50,QGLD3ULYDWH/LPLWHG*XUJDRQ±1$%(7$FFUHGLWHGDVSHU &HUWLILFDWH1R1$%(7(,$5$GDWHG-XQ ZZZHUPFRP The business of sustainability FINAL REPORT ONGC Tripura Power Company Ltd (OTPC) Environmental Impact Assessment of (2 x 363.3 MW) +15% Gas BasedCombined Cycle Power Plant (Expansion): Palatana, Gomti District, Tripura Environmental Consultant: ERM India Private Limites, Gurgaon; NABET Accredited as per certificate No.: NABET/EIA/1619/ RA 0055; Valid till 31 October 2019 February 2019 Reference # 0397129 Version/ Description Coordinated Reviewed by Approved Revision by by 01 Final EIA Salil Das Debanjan Neena Report Bandyapadhyay; Singh : Partner Managing Director This report has been prepared by ERM India Private Limited a member of Environmental Resources Management Group of companies, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at their own risk. COMPLIANCE OF APPROVED TERMS OF REFERENCE (TOR) FOR THE EIA STUDY The terms of reference (ToR) for conduct of EIA study as approved by EAC of MoEFCC has been provided at Annex A.
    [Show full text]
  • Tripura State Electricity Corporation Limited Office of the Dy
    Tripura State Electricity Corporation Limited Office of the Dy. General Manager, Electrical Division, Udaipur, Gomati District, Tripura NOTICE INVITING TENDER NIT No. DGM/ED/UDP/2017-18/ 01 Date. 19.04.2017. The Dy. General Manager, Electrical Division, Udaipur, Gomati District, Tripura on behalf of Tripura State Electricity Corporation Ltd. invites separate sealed tender in 2 (two) parts from the bonfires agencies having experience of maintenance works of HT/LT lines (up to11KV) or similar nature of work, total work value not less than 1.00 lakh in a single award in a particular financial year during last 3 (three) financial years or construction works of HT/LT lines (up to 11KV) or similar nature of work, total work value not less than 1.00 lakh in a single award in a particular financial year during last 3 (three) financial years & also the minimum average annual turnover of the bidder for the last three years should not be less than 30% of the estimated cost for the work as mentioned below: Estimated Cost Last date of selling Cost of Time for Sl. No Name of work Earnest Money Last date of receiving Tender Form completion 1 Shifting of HT/LT line in/c Distribution Sub-Stations from Kishore Ganj to Uttar Shilghati (upto the jurisdiction of Kakraban Electrical Sub-Division, Rs.5,90,616.00 11-05-2017 up to 3.00 pm Rs.500.00 60 (sixty) days Kakraban) in connection with widening of Rs. 11,812.00 15-05-2017 up to 3.00 pm road by NBCC PMGSY Road under Electrical Sub-Division Kakraban.
    [Show full text]
  • Resettlement and Indigenous Peoples Plan
    Resettlement and Indigenous Peoples Plan February 2013 IND: North Eastern State Roads Investment Program Udaipur–Melaghar Subproject (TR02) Prepared by Ministry of Development of North Eastern Region for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 21 February 2013) Currency unit – Indian rupee (Rs) Rs1.00 = $0.0184145106 $1.00 = Rs 54.305000 ABBREVIATIONS ADB – Asian Development Bank BPL – Below poverty line DC – District Collector DP – Displaced person DPMC – Design and Project Management Consultants DPR – Detailed Projecr Report EA – Executing Agency GOI – Government of India GOT – Government of Tripura GRC – Grievance Redressal Committee HH – Household IA – Implementing Agency IPP – Indigenous Peoples Plan IR – involuntary resettlement LA – land acquisition LAA – Land Acquisition Act, 1894 LAP – Land acquisition plan LVC – Land Valuation Committee MDONER – Ministry of Development of North Eastern Region MDR – Major district road NE – north east NESRIP – North Eastern State Roads Investment Program NGO – nongovernment organization NH – national highway NRRP – National Rehabilitation and Resettlement Policy, 2007 PD – Project Director PIU – Project implementation unit PWD – Public Works Department R&R – resettlement and rehabilitation RO – resettlement officer ROW – right-of-way RP – resettlement plan RU – resettlement unit SC – scheduled caste SDP – state domestic product SH – state highway SOR – Schedule of Rates SPS – Safeguard Policy Statement ST – scheduled tribe TOR – terms of reference WHH – women-headed household NOTE In this report, "$" refers to US dollars. This resettlement and indigenous peoples plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website.
    [Show full text]
  • Transfer of GT, AT, UGT & Kbts Dated 18.12.2020
    REGISTERED POST No. F. 1 (1 9-1)-DEE lBsttl2020(L-1 4) Gover"nment of TriPura feoea :, Directorate of Elementary Education ii: t Establishment Section I Dated, Agarrala, JKI -12*lzozo . MEMO. Teacher/ Subject: - Transfer of Graduate Teacher /[Jnder Graduate Teacher /Assistant Kokborok T,eacher. In public interest, 36 (Thirty Six) Graduate Teacher funder Graduate Tt acher /Assistant Teacher/ Kokborok Teacher as per list contained in Annexure-A are hereby transferred their from their existing places of posting to the schools as noted against each in Column No.2 with existing pay and scale of pay plus other admissible allowances per month until firther order. They should report for their duty at the places of transfer and submit joining report to the Head of Offices as indicated against each in ColumnNo.3' They shall be treated as released from their existing places of posting w.e.f. the afternoon or ?,,4 l \!Lzozo. Their pay and allowances etc. will be drawn against the Head of Account against which their pay and allowances etc. are usually drawn. Concerned Head of Offrces /Inspector of the Heads Schools shall send the LpC/Service Book/Personal file etc. of the employees concemed to of Offices as noted against each in Column No.3 in due course under intirnation to this Directorate. (Saju A,IAS) Director of Elementary Education. Tripura. Copv to:- 1. The District Education Officer, District for information' Z. The Principal Officer (Education), TTAADC, Khumulwng, Jirania, West Tripura District for information and taking necessary action 3. The Head of Office & DDO, for information and taking necessary action.
    [Show full text]
  • TSR Female Candidates.Pdf
    ROAD MAP OF TRIPURA Q 16 Km Airport to TSR 2nd Bn 15 Km Railway station to t TSR 2nd Bn 7 Km Bus Station to TSR v 2nd Bn Schedule for PST & PET (Outdoor Test) of female candidates for the post of Riflemen (GD) and Riflemen (Tradesmen) towards raising of 02 (two) new India Reserve (IR) Battalions for the State of Tripura S/No Registration Name of C/O Female Categor DOB Education Village PO PS Dist State Pin No Post Inside / Others Date of No applicant y applied for Outside outdoor test 1 5 Jayashree Das Sadip Das Female SC 25/02/1998 12th Bhattapuku A.D.Nagar A.D.Nagar West Tripura 799003 Riflemen(G Inside 26-07-2021 Passed r Kalitilla D) 2 7 Rajib Rani Kushilian Female ST 10/09/1999 12th Monithang Thelakung Jampuijala Sepahijala Tripura 799102 Riflemen(S Inside 26-07-2021 Kaipeng Kaipeng Passed weeper) 3 11 Susmita Saha Debasish Saha Female UR 31/12/1997 Graduate Town Agartala East West Tripura 799001 Riflemen(G Inside 26-07-2021 Pratapgarh Agartala D) 4 12 Rupali Khatun Jahagir Miah Female UR 13/10/1998 12th Rajnagar Agartala West West Tripura 799001 Riflemen(G Inside 26-07-2021 Passed Agartala D) 5 13 Jhuma Sarkar Harimal Sarkar Female SC 13/07/1999 12th Sanmura Lankamura West West Tripura 799009 Riflemen(G Inside 26-07-2021 Passed Agartala D) 6 17 Ranjana Singha Madan Mohan Female OBC 04/02/1997 12th Betcherra Kumarghat Kumarghat Unakoti Tripura 799266 Riflemen(G Inside 26-07-2021 Singha Passed D) 7 24 Punam Sarkar Ratan Sarkar Female SC 25/12/1995 12th Sidhai Sidhai Sidhai West Tripura 799212 Riflemen(G Inside 26-07-2021 Passed Mohanpur D) 8 27 Sunita Debbarma Uttam Debbarma Female ST 10/09/1998 9th Passed Chikanchar Laticherra Bishramganj Sepahijala Tripura 799103 Riflemen(G Inside 26-07-2021 a D) 9 40 Achri Debbarma Lt.
    [Show full text]
  • Gomati District
    1 INDEX Sl. No. Subject matter Page No. 1. Map of Gomati District. 3 2. Introduce and Multi Hazard Disaster Management plan 4-5 3. Disaster Management Plan 6 4. Diagram of DDMP 7 5. Disaster Negative and positive Aspects 8 6. Hazards in Gomati District and assessment of crop to be damage due to 9-10 naturalcal 7. Type of Disaster 11 8. Impact of Natural Disaster, landslide, earthquake, typhoon ,tornado ,Hailstorm, 12-13 Heat wave attack. 9. Fire Accident 14 10. Gomati District at a glance 15-18 11. Rain fall received during 2013 18 12. District Disaster Management authority 19 13. District Disaster Management Committee. 20 14. Udaipur Sub-Divisional Disaster Management & NGO coordination committee 21-23 15. Amarpur Sub-Divisional Committee 24 16. Karbook Sub-divisional Committee 25 17. Karbook Quick Response team 26 18. RD Block Disaster Management committee:-KBK,SLC, KIL, Name & contact No 27-35 of different GP of Amarpur, OMP,KBN, MTB, etc. Tepania 19. List of equipment with TSR 5th Bn, SDM Amarpur, Karbook and Udaipur 36-38 20. Nominal roll of trains personnel in TSR 5th Bn, Duluma 38-40 21. List of equipment available with PWD and Private Agency 41-42 22. S.P Gomati field level officer 42-43 23. District Level committee for forest area 43 24. List of nodal officer of different offices 44-46 25. District Level Core team 46-48 26. District Level Quick Response team 48-54 27. Description of vulnerable area of Gomati District and response mechanism 55-73 28. District Education office and nodal officer, NSS/ NCC Unit.
    [Show full text]
  • Amendment to the Constitution of India in 2005 the Disaster Management Act Was Enacted Under the Concurrence List of the Constitution of India
    1 2 3 INTRODUCTIN With the 73rd and 74th amendment to the constitution of India in 2005 the Disaster Management Act was enacted under the concurrence list of the constitution of India . This act comprises 79 sections and 11 chapters.This act provides for the prerequisite institutional mechanism for monitoring and implementation of plans. It ensures measures by various wings of the Government for the prevention and mitigation of disasters. With the enactment of disaster management act 2005 ,National policy on Disaster Management was framed in 2005. All State Governments have been directed to implement the National policy on Disaster Management to safeguard the safety of people, property and ensure developmental planning giving importance to the pre disaster preparedness. Preparedness rather than post – crisis management, co-ordinated participatory approach, technology upgradation and deployment, information as a tool for disaster management, recognition of linkages between disasters and development, connecting specific programmes for management of natural disasters, forecasting and warning using latest technology, are some of the important features of disaster management. Natural disasters are flood, cyclone, landslide, hailstorm, earthquake and Tsunami.In Tripura it is observed from the records of last 50 years, mostly widespread flood affected the people of Tripura in different years. In the years 1983, 1993, 1994, 2003, 2004, the people of Tripura experienced the divastating flood. In some years, cyclone hailstorm, landslide, and earthquake also, damaged lives and property. Recently cyclone and thunderstorm are playing a disastrous role for the loss of life and property in Tripura. Three persons died of thunderstorm in the months of may and June 2012 under Gomati District.
    [Show full text]