Relief Line South Environmental Project Report, Section 1 Introduction
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Noise and Vibration Projects
Frontop Engineering Limited 101 Amber Street, Unit 1, Markham Ontario, Canada, L3R 3B2 Telephone: (905) 947-0900; Fax: (905) 305-9370 Website: www.frontop.ca; Email: [email protected] List of Our Ongoing Noise and Vibration Monitoring Projects Project 1: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Keelesdale Station Location: Toronto, Ontario, Canada Client: Metrolinx-Eglinton Crosstown Light Rapid Transit (ECLRT) Project Main project features: Geotechnical Instrumentation and Monitoring, Noise and Vibration Monitoring Activities performed: install and monitoring following instrument Prepared and installed six (6) real-time vibration stations and five (5) real-time noise monitoring station. And weekly attendant two (2) noise and two (2) vibration stations monitoring. Project 2: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Mt Dennis Station Location: Toronto, Ontario, Canada Client: Metrolinx-Eglinton Crosstown Light Rapid Transit (ECLRT) Project Main project features: Geotechnical Instrumentation and Monitoring, Noise and Vibration Monitoring Activities performed: install and monitoring following instrument Prepared and installed four (4) real-time vibration stations and four (4) real-time noise monitoring station. And weekly attendant two (2) noise and two (2) vibration stations monitoring Project 3: Name of Project: TTC Wilson Yard Track and Structure Building Renovation (Contract AW1-3) Location: Toronto, Ontario, Canada Client: TTC Main project features: Track and Structure Building Renovation Activities performed: Prepared and installed the one (1) real-time noise monitoring station and one (1) real- time vibration monitoring station. Project 4: Name of Project: TTC Hillcrest Complex Surface Way Facility Replacement, and Harvey Shop Loading Deck (Contract M7-2 & M1-91) Client: TTC Main project features: Surface Way Facility Replacement Activities performed: Prepared and installed the two (2) real-time noise monitoring station and two (2) real- time vibration monitoring station. -
3.09 Metrolinx—Regional Transportation Planning
Chapter 3 Section 3.09 Metrolinx—Regional Transportation Planning relates only to upgrading and expanding the regional Background transportation network but does not include the esti- mated maintenance that is expected to be required to keep the additional transportation infrastructure Metrolinx, an agency of the government of Ontario, in a state of good repair over its useful life. was created by the Greater Toronto Transportation In the first 15 years, Metrolinx plans to imple- Authority Act, 2006, now the Metrolinx Act, 2006 ment the priority transit projects listed in Figure 1. (Act). According to the Act, one of Metrolinx’s Metrolinx’s estimate of the cost of these projects is key objectives is to provide leadership in the co- approximately $33 billion, of which approximately ordination, planning, financing and development of $3 billion had been spent by the province as of an integrated, multi-modal transportation network March 31, 2012. For about half of these projects, in the Greater Toronto and Hamilton Area (GTHA). the majority of the funding comes from a 2007 The GTHA consists of two single-tier municipalities Chapter 3 • VFM Section 3.09 provincial commitment of $11.5 billion, along with (Toronto and Hamilton), four regional munici- previously announced project funding. The remain- palities (Durham, Halton, Peel and York) and 24 ing priority projects that are funded—such as the local municipalities. Air Rail Link between Union Station and Pearson In November 2008, Metrolinx formally adopted International Airport and projects to revitalize a Regional Transportation Plan (RTP)—also known Union Station—are being funded from the prov- as “The Big Move”—that sets out the priorities, ince’s capital budget for GO Transit (the commuter policies and programs for implementing a trans- rail and bus system serving the GTHA, a division of portation system within the GTHA. -
Toronto Transit Commission Relief Line South Toronto Transit Commission
Toronto Transit Commission Relief Line South Toronto Transit Commission The engineering support services provided by GZ included Location: Toronto, Canada preliminary design of the temporary and permanent support measures for the SEM caverns in the swelling conditions as well Date: 2017 - 2019 design of the waterproofing system. In addition, GZ provided constructability reviews and value engineering studies for the stations, as well as for the alignment. Structure: 2 large diameter underground Station caverns Length: 4.66 mi (7.5 km) Geology: Georgian Bay Shale, glacial tills Cost: - Client: HDR Owner: Toronto Transit Commission Preliminary SEM Station Design: n 2017, the Toronto Transit Commission approved the I Preliminary Engineering Design of the Relief Line South Project, which was a planned new 7.5 km long subway line that was intended to run through the center of downtown Toronto. The project was to connect the Yonge-University-Spadina Subway (Line 1) to the Bloor-Danforth Subway (Line 2) in the downtown area. The goal of the Relief Line South was to help relieve Figure 1. Proposed Relief Line South arrangement with stations. crowding on Line 1 south of Bloor, at the Bloor-Yonge Station, and on the surface transit routes coming in and out of downtown. Construction planning of the Relief Line South included construction of twin running tunnels by means of tunnel boring machines, five new stations, and modifications to three existing stations, which will be converted to interchange stations. Design of the Relief Line South progressed to the preliminary engineering stage, and was consequently re-envisioned as the southern section of the Ontario Line Project. -
2012 Annual Report
2012 Annual Report Office of the Auditor General of Ontario Office of the Auditor General of Ontario To the Honourable Speaker of the Legislative Assembly In my capacity as the Auditor General, I am pleased to submit to you the 2012 Annual Report of the Office of the Auditor General of Ontario to lay before the Assembly in accordance with the provi- sions of section 12 of the Auditor General Act. Jim McCarter, FCA Auditor General Fall 2012 Copies of this report are available for $9.00 from Publications Ontario: (416) 326-5300 or toll-free long distance 1-800-668-9938. An electronic version of this report is available on the Internet at www.auditor.on.ca © 2012, Queen’s Printer for Ontario Ce document est également disponible en français. Cover photograph credits: ISSN 1719-2609 (Print) top right: Dick Hemingway Photographs ISBN 978-1-4606-0348-2 (Print, 2012 ed.) middle left: © Tetra Images/INMAGINE.com middle centre: © iStockphoto.com/ssuaphoto ISSN 1911-7078 (Online) bottom left: Office of the Auditor General of Ontario/Mariana Green ISBN 978-1-4606-0349-9 (PDF, 2012 ed.) bottom centre: © iStockphoto.com/mevens, HooRoo Graphics Table of Contents Chapter 1 Overview and Summaries of Value-for-money Audits and Reviews 5 Chapter 2 Public Accounts of the Province 27 Chapter 3 Reports on Value-for-money Audits and Reviews 45 Section 3.01 Cancer Screening Programs 46 Section 3.02 Criminal Prosecutions 65 Section 3.03 Diabetes Management Strategy 82 Section 3.04 Drive Clean Program 107 Section 3.05 Education of Aboriginal Students 129 Section -
Relief Line and Yonge Subway Extension
Relief Line and Yonge Subway Extension Leslie Woo Chief Planning Officer JUNE-26-17 RELIEF LINE AND YONGE SUBWAY EXTENSION OVERVIEWS • Both the Relief Line and the Yonge Subway Extension are priority projects included in The Big Move and will be included in the next Regional Transportation Plan • Each project makes a significant contribution to the regional transit network by: • Enhancing our ability to connect people to where they need to be • Adding capacity so that transit trips are more comfortable • Enabling more residents to choose transit for their trips • Spurring on local transit oriented development 2 A REGIONAL SYSTEM • The Relief Line and the Yonge Subway Extension are part of the regional transportation network needed to meet the GTHA’s growth to 2031 and beyond • The 7.4 km northern extension of the Yonge Subway (Line 1) from Finch Avenue into Richmond Hill will connect two provincial urban growth centres, North York Centre and Richmond Hill Centre, and significantly reduce the 2,500 daily bus trips along the busy Yonge corridor • The Relief Line is a critical infrastructure investment required to create capacity for new riders on the Yonge subway and provide a new connection into Toronto’s downtown • The Yonge Subway Extension would generate more access • The Relief Line would create more capacity • Both projects need to advance in an integrated way 3 PARTNERSHIPS Much progress is being made in bringing the parties together to work as a team to advance both projects Yonge Subway Extension • Metrolinx, City of Toronto, Toronto -
The One Toronto Transit Plan the One Toronto Transit Plan
THE ONE TORONTO TRANSIT PLAN THE ONE TORONTO TRANSIT PLAN As Mayor, John Tory will make Toronto more liveable, affordable and functional. Public transit is at the heart of what it takes to improve Toronto in each of these areas. John Tory’s One Toronto Transit Plan is a collection of initiatives and public transit investments that will get our city moving in seven years, and provide relief to the Yonge-University-Spadina subway line. THE ONE TORONTO PLAN WILL: • Start construction of the Scarborough subway extension immediately. • Engage the City with the Government of Ontario’s and Metrolinx’s plans for Regional Express Rail (RER) – all-day, two-way surface subway service on existing GO track lines with new higher-speed vehicles . • Start with the SmartTrack line as the first RER project, providing 53 km of relief. The SmartTrack line will run from the Airport Corporate Centre in the west, down to Union Station and back up to Markham in the east, with 22 new station stops and four interchanges with the TTC rapid transit network. • Finance the City’s one third of the capital cost of the SmartTrack line without raising property taxes, using tax increment financing. • Provide new express bus services for a segment of travelers that can be moved much quicker if fewer stops are made en route. Examples, which have been discussed, include, Don Mills Road, Dufferin Street and Front Street/Liberty Village. THE ONE TORONTO TRANSIT PLAN BENEFITS ASSOCIATED WITH TORY’S ONE TORONTO TRANSIT RELIEF PLAN INCLUDE: • Bringing relief sooner, to more Torontonians, rather than just the downtown- concentrated proposals of other candidates. -
Chief Executive Officer's Report March 2017
STAFF REPORT Insert TTC logo here FOR INFORMATION Chief Executive Officer’s Report – March 2017 Update Date: March 22, 2017 To: TTC Board From: Chief Executive Officer Summary The Chief Executive Officer’s Report is submitted each month to the TTC Board, for information. Copies of the report are also forwarded to each City of Toronto Councillor, the City Deputy Manager, and the City Chief Financial Officer, for information. The report is also available on the TTC’s website. Financial Summary There are no financial impacts associated with this report. Accessibility/Equity Matters There are no accessibility or equity issues associated with this report. Decision History The Chief Executive Officer’s Report, which was created in 2012 to better reflect the Chief Executive Officer’s goal to completely modernize the TTC from top to bottom, has been transformed to be more closely aligned with the TTC’s seven strategic objectives – safety, customer, people, assets, growth, financial sustainability, and reputation. Issue Background For each strategic objective, updates of current and emerging issues and performance are now provided, along with a refreshed performance dashboard that reports on the customer experience. This information is intended to keep the reader completely up-to-date on the various initiatives underway at the TTC that, taken together, will help the TTC achieve its vision of a transit system that makes Toronto proud. Contact Vince Cosentino, Director – Statistics, [email protected], Tel. 416-393-3961 Attachments Chief Executive Officer’s Report – March 2017 Update Chief Executive Officer’s Report Toronto Transit Commission March 2017 Update Introduction Table of Contents The Chief Executive Officer’s Report, which was created in 2012 to better 1. -
Draft Delineations for the Protected Major Transit Station Areas Within the Downtown Secondary Plan and Draft Citywide MTSA Policy Directions
REPORT FOR ACTION Draft Delineations for the Protected Major Transit Station Areas within the Downtown Secondary Plan and Draft Citywide MTSA Policy Directions Date: March 30, 2021 To: Planning and Housing Committee From: Chief Planner and Executive Director, City Planning Wards: Ward 10 - Spadina-Fort York; Ward 11 - University Rosedale and Ward 13 - Toronto Centre SUMMARY In June 2020, City Planning initiated the Growth Plan Conformity and Municipal Comprehensive Review ("the MCR") which includes the delineation of 180+ Major Transit Station Areas (MTSAs) to meet Provincial intensification requirements by July 2022. The introduction of Protected Major Transit Station Areas (PMTSAs) is part of the MCR. An equity lens is being applied to this work program that prioritizes the delineation of PMTSAs to enable the implementation of inclusionary zoning as an affordable housing tool, where market conditions could support it. This report presents the policy approach for advancing the implementation of Major Transit Station Areas and Protected Major Transit Station Areas, and the proposed delineations within the Downtown Secondary Plan. This report is intended as the basis for consultation of the draft Official Plan Amendment (OPA) that includes 16 Site and Area Specific Policies (SASPs) that delineate Protected Major Transit Station Areas (PMTSAs) within the Downtown Secondary Plan area. The draft policy directions for the introduction of a new Chapter 8 of the Official Plan will be refined following consultation and brought forward as part of the final Official Plan Amendment. The 16 PMTSA delineations included in this draft OPA would implement the Minister approved Downtown Plan and address the requirements of the A Place to Grow: Growth Plan for the Greater Golden Horseshoe (2020) (the "Growth Plan") and Section 16(15) of the Planning Act. -
General Manager Subway Construction Date
TORONTO TRANSIT COMMISSION REPORT NO. S7 Meeting Date June 4, 1968 From: General Manager Subway Construction Date: June 3, 1968 QUEEN STREET SUBWAY FOR STREETCAR OPERATION The Commission, at its meeting of February 8, 1966, approved advising the City of Toronto that it was prepared to co-operate in the study of a "transit facility in the downtown section of Queen Street" and approved advising the Metropolitan Council that the Commission proposes to undertake this study at a cost of $30,000.00, it being understood that the cost involved would form part of the capital cost of the project when approved. The General Secretary transmitted the above approval of the Commission to the City Clerk in a letter dated February 22, 1966, a copy of which is attached. In a letter dated November 2, 1966, a copy of which is attached, the Commission was advised by the Metropolitan Clerk that Metropolitan Council had adopted Clause No. 2 of Report No. 16 of the Transportation Committee, headed "Proposed Queen Street Subway", as amended. The recommendation of Clause No. 2 reads as follows, "It is recommended that the Metropolitan Council formally request the Toronto Transit Commission to complete their study of the physical aspects of the Queen Street tunnel as outlined in the Commission's letter of February 22, 1966, on the understanding that the required expenditure of $30,000.00 will form part of the capital cost of the project." The amendment to Clause No. 2 reads as follows, "The matter of the Queen Street tunnel being considered in relation to the question of the Queen-Greenwood Subway." In accordance with all the foregoing, plans were developed for a "transit facility in the downtown section on Queen Street", and in addition to this a preliminary examination was made of the downtown section in relation to it becoming part of the Queen-Greenwood Subway. -
Toronto Subway System, ON
Canadian Geotechnical Society Canadian Geotechnical Achievements 2017 Toronto Subway System Geotechnical Investigation and Design of Tunnels Geographical location Key References Wong, JW. 1981. Geotechnical/ Toronto, Ontario geological aspects of the Toronto subway system. Toronto Transit Commission. When it began or was completed Walters, DL, Main, A, Palmer, S, Construction began in 1949 and continues today. Westland, J, and Bihendi, H. 2011. Managing subsurface risk for Toronto- York Spadina Subway extension project. Why a Canadian geotechnical achievement? 2011 Pan-Am and CGS Geotechnical Conference. Construction of the Toronto Transit Commission (TTC) subway system, the first in Canada, began in 1949 and currently consists Photograph and Map of four subway lines. In total there are currently approximately 68 km of subway tracks and 69 stations. Over one million trips are taken daily on the TTC during weekdays. The subway system has been expanded in several stages, from 1954, when the first line (the Yonge Line) was opened, to 2002, when the most recently completed line (the Sheppard Line) was opened. Currently the Toronto-York Spadina Subway Extension is under construction. The subway tunnels have been constructed using a number of different technologies over the years including: open cut excavation, open/closed shield tunneling under ambient air pressure and compressed air, hand mining and earth pressurized tunnel boring machines. The subway tunnels range in design from reinforced concrete box structures to approximately 6 m diameter precast concrete segmental liners or cast iron segmental liners. Looking east inside newly constructed TTC subway The tunnels have been advanced through various geological tunnel, 1968. (City of Toronto Archives) formations: from hard glacial tills to saturated alluvial sands and silts, and from glaciolacustrine clays to shale bedrock. -
Attachment 4 – Assessment of Ontario Line
EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively. -
Appendix C3. Public Engagement Record: December 2019
Appendix C3 Public Engagement Record: December 10, 2019 to September 16, 2020 Public Engagement Record: December 10, 2019 to September 16, 2020 • Website Screenshots Public Engagement Record: December 10, 2019 to September 16, 2020 • Ask-A-Question Submissions Ask A Question – January 23 to September 16, 2020 Comment title Comment body Response Future Is the western terminus of the line to be built so that it would be able to be We are currently advancing plans for the line between Exhibition/Ontario expansion extended north west at a later date? Thank you Place and the Ontario Science Centre. However, these plans don’t preclude future expansions that may be presented to improve access and meet demand. Thorncliffe Park Where is the station in relation to Overlea Blvd Teams are analyzing the 15 stations identified in the Initial Business Case to Station determine whether or not they should be built, looking at factors like the potential number of users, ease of construction, and cost, to name a few. Findings will be presented in the Preliminary Design Business Case, which we are aiming to complete by summer 2020.By using the GO corridor and building bridges across the Don River instead of tunneling underneath it, a route that is approximately twice the length of the Relief Line South can be built at a similar cost. Also, using the GO corridor will allow people to more easily connect between GO and TTC services that will both be accessible by street level, saving time compared to connections that would lead people into deep underground stations.