Draft Delineations for the Protected Major Transit Station Areas Within the Downtown Secondary Plan and Draft Citywide MTSA Policy Directions
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
General Manager Subway Construction Date
TORONTO TRANSIT COMMISSION REPORT NO. S7 Meeting Date June 4, 1968 From: General Manager Subway Construction Date: June 3, 1968 QUEEN STREET SUBWAY FOR STREETCAR OPERATION The Commission, at its meeting of February 8, 1966, approved advising the City of Toronto that it was prepared to co-operate in the study of a "transit facility in the downtown section of Queen Street" and approved advising the Metropolitan Council that the Commission proposes to undertake this study at a cost of $30,000.00, it being understood that the cost involved would form part of the capital cost of the project when approved. The General Secretary transmitted the above approval of the Commission to the City Clerk in a letter dated February 22, 1966, a copy of which is attached. In a letter dated November 2, 1966, a copy of which is attached, the Commission was advised by the Metropolitan Clerk that Metropolitan Council had adopted Clause No. 2 of Report No. 16 of the Transportation Committee, headed "Proposed Queen Street Subway", as amended. The recommendation of Clause No. 2 reads as follows, "It is recommended that the Metropolitan Council formally request the Toronto Transit Commission to complete their study of the physical aspects of the Queen Street tunnel as outlined in the Commission's letter of February 22, 1966, on the understanding that the required expenditure of $30,000.00 will form part of the capital cost of the project." The amendment to Clause No. 2 reads as follows, "The matter of the Queen Street tunnel being considered in relation to the question of the Queen-Greenwood Subway." In accordance with all the foregoing, plans were developed for a "transit facility in the downtown section on Queen Street", and in addition to this a preliminary examination was made of the downtown section in relation to it becoming part of the Queen-Greenwood Subway. -
Attachment 4 – Assessment of Ontario Line
EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively. -
Appendix C3. Public Engagement Record: December 2019
Appendix C3 Public Engagement Record: December 10, 2019 to September 16, 2020 Public Engagement Record: December 10, 2019 to September 16, 2020 • Website Screenshots Public Engagement Record: December 10, 2019 to September 16, 2020 • Ask-A-Question Submissions Ask A Question – January 23 to September 16, 2020 Comment title Comment body Response Future Is the western terminus of the line to be built so that it would be able to be We are currently advancing plans for the line between Exhibition/Ontario expansion extended north west at a later date? Thank you Place and the Ontario Science Centre. However, these plans don’t preclude future expansions that may be presented to improve access and meet demand. Thorncliffe Park Where is the station in relation to Overlea Blvd Teams are analyzing the 15 stations identified in the Initial Business Case to Station determine whether or not they should be built, looking at factors like the potential number of users, ease of construction, and cost, to name a few. Findings will be presented in the Preliminary Design Business Case, which we are aiming to complete by summer 2020.By using the GO corridor and building bridges across the Don River instead of tunneling underneath it, a route that is approximately twice the length of the Relief Line South can be built at a similar cost. Also, using the GO corridor will allow people to more easily connect between GO and TTC services that will both be accessible by street level, saving time compared to connections that would lead people into deep underground stations. -
Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C. -
TTC Typography History
With the exception of Eglinton Station, 11 of the 12 stations of The intention of using Helvetica and Univers is unknown, however The Toronto Subway Font (Designer Unknown) the original Yonge Subway line have been renovated extensively. with the usage of the latter on the design of the Spadina Subway in Based on Futura by Paul Renner (1928) Some stations retained the original typefaces but with tighter 1978, it may have been an internal decision to try and assimilate tracking and subtle differences in weight, while other stations subsequent renovations of existing stations in the aging Yonge and were renovated so poorly there no longer is a sense of simplicity University lines. The TTC avoided the usage of the Toronto Subway seen with the 1954 designs in terms of typographical harmony. font on new subway stations for over two decades. ABCabc RQKS Queen Station, for example, used Helvetica (LT Std 75 Bold) in such The Sheppard Subway in 2002 saw the return of the Toronto Subway an irresponsible manner; it is repulsively inconsistent with all the typeface as it is used for the names of the stations posted on ABCabc RQKS other stations, and due to the renovators preserving the original platfrom level. Helvetica became the primary typeface for all TTC There are subtle differences between the two typefaces, notably the glass tile trim, the font weight itself looks botched and unsuitable. wayfinding signages and informational material system-wide. R, Q, K, and S; most have different terminals, spines, and junctions. ST CLAIR SUMMERHILL BLOOR DANGER DA N GER Danger DO NOT ENTER Do Not Enter Do Not Enter DAVISVILLE ST CL AIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR The specially-designed Toronto Subway that embodied the spirit of modernism and replaced with a brutal mix of Helvetica and YONGE SUBWAY typeface graced the walls of the 12 stations, progress. -
Bus Bridging Decision-Support Toolkit: Optimization Framework and Policy Analysis
Bus Bridging Decision-Support Toolkit: Optimization Framework and Policy Analysis by Alaa Itani A thesis submitted in conformity with the requirements for the degree of Master of Applied Science Department of Civil and Mineral Engineering University of Toronto © Copyright by Alaa Itani 2019 Bus Bridging Decision-Support Toolkit: Optimization Framework and Policy Analysis Alaa Itani Master of Applied Science Department of Civil and Mineral Engineering University of Toronto 2019 Abstract Bus Bridging is the strategy most commonly applied in responding to rail service interruptions in North America and Europe. In determining the required number of buses and source routes, most transit agencies rely on ad-hoc approaches based on operational experience and constraints, which can lead to extensive delays and queue build-ups at affected stations. This thesis developed an optimization model, to determine the optimal number of shuttle buses and route allocation which minimize the overall subway and bus riders delay. The generated optimal solutions are sensitive to bus bay capacity constraints along the shuttle service corridor. The optimization model is integrated with a previously developed simulation tool that tracks the evolution of system queues and delays throughout the bus bridging process. A set of bus bridging policy guidelines were developed based on further analysis of the optimization model outputs using a Classification and Regression Tree (CART) model. ii Acknowledgments First, I would like to thank my parents and for their continuous support and trust in my abilities. Although they were thousands of miles away, they were always supportive, I couldn’t have made it here without their presence. -
Mobility Hubs December 2008
Mobility Hubs December 2008 1. Introduction This is one in a series of backgrounders that have been produced by Metrolinx to provide further explanation and clarification on the policies and directions of the Regional Transportation Plan (RTP). The RTP is available for downloading at www.metrolinx.com. This backgrounder should be read as an accompaniment to Strategy 7 of the RTP. It is intended to provide additional detail on the mobility hub policies of the RTP and clarification of the terms and definitions used in the RTP with respect to mobility hubs. Metrolinx wishes to acknowledge the invaluable contribution of Urban Strategies Inc. and IBI Group to the preparation of this backgrounder. 2. What is a Mobility Hub? The mobility hub policies of the RTP build on the overall policy framework established in the Growth Plan for the Greater Golden Horseshoe, particularly those related to major transit station areas. The Growth Plan defines major transit station areas as the area within a 500m radius (10 minute walk) of any existing or planned higher order transit station within a settlement area or around a major bus depot in an urban core. Major transit station areas that are particularly significant for the regional rapid transit system are recognized as mobility hubs in the RTP. Mobility hubs are major transit station areas with significant levels of transit service planned for them in the RTP, high development potential, and a critical function in the regional transportation system as major trip generators. They are places of connectivity where different modes of transportation — from walking to high- speed rail — come together seamlessly and where there is an intensive concentration of employment, living, shopping and/or recreation. -
204 Spadina Avenue Newly Renovated Building - 5,521 SF (Divisible) for Lease: Office
204 Spadina Avenue Newly Renovated Building - 5,521 SF (divisible) For Lease: Office Here is where your business will grow. lennard.com 204 Spadina Avenue 5,521 SF Office Available for Lease near Dundas Street West and Spadina Avenue in Downtown West Property Highlights • Building signage available • Spadina Avenue streetcar at front door • Located in Downtown West • Substantially renovated • Excellent amenities nearby • Close proximity to many restaurants Available Space Availability Retail - Leased! Immediately 1st Floor - 2,744 SF Listing Agents 2nd Floor - 2,777 SF Paul Cheevers** Contiguous Office - 5,521 SF Vice President 416.649.5949 Net Rent [email protected] $25.00 PSF (Year 1 + escalations) **Broker Additional Rent $13.58 PSF (2021 Estimate) (plus hydro - separately metered) Flexible Office Use Central location to Downtown Core Open Space Concept Interior 204 Spadina Avenue Leased! Retail 1st Floor - 2,744 SF 204 Spadina Avenue 2nd Floor - 2,777 SF 204 Spadina Avenue 204 Spadina Avenue at Queen West 505 Dundas What’s Near By 204 Spadina Avenue is located near Dundas Street West and Spadina Avenue at the heart of Toronto’s downtown core. This exceptional office building has direct access to streetcar stops. Excellent Amenities Bathurst Street nearby. Substantially renovated and located near many restaurants and amenities! 501 Queen 504 King 5 204 Spadina Avenue 510 Spadina St Patrick Station Dundas Street W Osgoode Station Queen Street W 501 Queen Adelaide Street W St. Andrew Station King Street W 504 King Union Station Spadina Avenue Front Street W Amazing Transit Opportunities Walk Times from 204 Spadina Avenue 505 Dundas Streetcar: 4 min St. -
125 Years of Toronto Streetcars
125 YEARS OF TORONTO STREETCARS UPPER CANADA RAILWAY SOCIETY BOX 122 STATION "A" TORONTO, ONTARIO One of the Belgian streetcars which recently began running on a new line at the Grand Cypress Resort near Orlando, Florida. See article 'The End of an Era' in this issue. , --John Fleck Gulf Pulp & Paper Co. 0-6-0 38, on display at Mount Forest, Ont., after being bought by Christian Bell Porcelain. Further details in Feb. 1986 NEWSLETTER. Photo taken April 26, 1986. McCarten lP NFTA LRV 125 has been turned into the world's newest and fanciest 'streetcar diner' outside Hoak's Armor Inn, Hamburg, N.Y. The car was dropped and damaged irreparably while being deliverd to the NFTA shops in Buffalo; a replacement 125 was subsequently built and delivered and the '1st 125', which never turned a wheel in revenue service, was sold to this restaurant, probably for use as a cocktail lounge. July 28, 1986. McCarten SEPTEMBER 1986 3 Years of Urban Rail Transit in Tnronto On Sept. 11, 1986 we think back to the equivalent date in 1861, when Canada's first urban rail passenger service commenced operation: a horsecar service provided by the Toronto Street Railway Company. Mr. Alexander Easton of Philadelphia, a public transit entrepreneur of the day, obtained a 30-year franchise to operate animal powered streetcar service from the City of Toronto on March 26, 1861. The TSR was organized in May of that year with A. Easton as President and Alexander Bleekly and Daniel Smith as Directors. The franchise provided for service on at least a 30-minute headway, with the daily operating period to be 16 hours a day in summer and 14 hours a day in winter (the spring and fall seasons do not appear to have been recognized). -
59 Hayden Flyer Nov 3.Indd
FULL-FLOOR OFFICE FOR SALE | TORONTO, ON 59 HAYDEN STREET Boutique 8-Storey Office Condo in the Heart of Yonge & Bloor Yonge & Bloor Commercial Corridor Fifty Nine Hayden is strategically located steps from one of the most connected intersections in the world. Steps to two subway lines and great amenities such as world-class hotels, restaurants, banks, shops and services. With over 17,000 new residential units, 2.3 million square feet of retail and 8.5 million square feet of office planned, the area is attracting fine businesses such as Eataly, Nordstrom, and Apple. The next wave of development is expected to deliver over 300,000 square feet of office and 1 million square feet of retail, promising immense growth to an already vibrant community. ENTERTAINMENT / NIGHTLIFE SHOPPING 1. Royal Ontario Museum 39. Holt Renfrew Toronto 2. Cineplex Odeon Varsity 40. Sephora and VIP Cinemas 41. Gucci AMENITIES 42. Tiffany & Co. FOOD / DINING 43. Chanel 3. Whole Foods Market 44. Indigo Bay & Bloor 4. The One Eighty 45. Cartier 46. TNT Man DAVENPORT RD. 5. One Restaurant 6. La Société Toronto 47. TNT 7. Hemingway’s Restaurant 48. Teatro Verde HAZELTON AVE. AVENUE RD. AVENUE 49. Hugo Boss 8. Sassafraz YONGE ST. YONGE 9. Trattoria Nervosa 50. David’s Shoes 51. Dolce & Gabbana 10. Starbucks 52. Prada 11. Crown Princess 53. Hermès Fine Dining 54. Harry Rosen 12. Wish Café 15 55. Louis Vuitton 13. Focaccia Restaurant 56. Mulberry 14. Buca Osteria & Bar 67 57. Intermix 47 46 15. NAO Steak House 3 34 58. Husk SHERBOURNE ST. SHERBOURNE 16. -
Second Exit Program Automatic Entrance at Five Stations
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 28, 2009 SUBJECT: FIRE VENTILATION UPGRADE SECOND EXIT PROGRAM AUTOMATIC ENTRANCE AT FIVE STATIONS ACTION ITEM RECOMMENDATION It is recommended that the Commission authorize staff to convert the conceptual layouts of second exits from a daily exit configuration to an automatic entrance configuration at five stations: College, Museum, Dundas, Dundas West and Wellesley, as outlined in this report. FUNDING Funds for the Second Exit Program are included in Program 3.9 – Buildings and Structures – Fire Ventilation Upgrade Project, as set out in pages 781-792, State of Good Repair/Safety Category of the TTC’s 2009-2013 Capital Program, which was approved by City Council on December 10, 2008. Reconfiguration of the second exits to automatic entrances will require additional funds based on specific site conditions. The increase in cost will be reflected in the 2010-2014 Capital Program Budget. BACKGROUND A Fire and Life Safety Assessment Study completed in 2002 identified fourteen high priority stations requiring an alternate means of egress from the station platform. Subsequently, the Second Exit Program was incorporated into the Fire Ventilation Upgrade Project to provide a second means of egress from station platforms at the following fourteen high priority stations: Broadview; Castle Frank; Pape; Dufferin; College; Museum; Wellesley; Dundas; Dundas West; Woodbine; Chester; Donlands; Greenwood; and Summerhill. FIRE VENTILATION UPGRADE SECOND EXIT PROGRAM AUTOMATIC -
Changes to Transit Service in the MBTA District 1964-Present
Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.