Hotel Complex & Convention Centre
Total Page:16
File Type:pdf, Size:1020Kb
“Hotel Complex & Convention Centre” M/s Aerocity Hotel & Global Centre (Delhi) Pvt. Ltd. Application for Amendment in Environmental Clearance Of “Hotel Complex & Convention Centre” At Asset No. 13, Hospitality District, DIAL IGI Airport, Delhi BEING DEVELOPED BY: M/s Aerocity Hotel & Global Centre(Delhi) Private Limited Asset No. 13, Hospitality District, DIAL IGI Airport, Delhi PREPARED BY: Environmental Consultant M/s PERFACT ENVIRO SOLUTIONS PVT. LTD. (NABET Registered wide list of accredited consultants organizations/ Rev 43/ 11th July, 2016 at S.No-88) NN Mall, Sector-3, Rohini, New-Delhi-85 Phone: 011-47528467; 011-47021086 Fax: - 011-47528434 “Hotel Complex & Convention Centre” M/s Aerocity Hotel & Global Centre (Delhi) Pvt. Ltd. FORM 1 I. Basic Information S.No. Item Details 1. Name of the project/s Hotel Complex & Convention Centre 2. S. No. in the schedule 8 (b) Proposed capacity/ area/length/ Total plot area – 31163.13 Sq m tonnage to be handled/ command Builtup Area- 212732.72 3. area/ lease area/ number of wells to be drilled Amendment in Environmental Clearance The project has already been granted 4. New/ Expansion/ Modernization Environmental Clearance vide F.No. 92/DPCC/SEIAA-SEAC/10/1444-1448 dated 11-11-2010 Plot Area (as per EC granted) – 31163.13 sq m 5. Existing Capacity/ Area etc. Built-up Area (as per EC granted) –212732.72 sqm 6. Category of Project i.e. ‘A’ or ‘B’ ‘B’ Does it attract the general 7. Not Applicable condition? If yes, please specify. Does it attract the specific 8. Not Applicable condition? If yes, please specify. Asset No 13, Hospitality District, DIAL IGI Airport, Location Delhi Plot/ Survey/ Khasra No. Asset No 13 9. Village - Tehsil - District Hospitality State Delhi New Delhi Railway Station 14.08 Km NE Palam Railway Station 4.83 Km NW Nearest railway station/ airport IGI Airport Metro Station 3.46 Km NW 10. along with distance in kms. Indira Gandhi International Airport 0.32 Km SW Safdarjung Airport 9.22 Km NE Nearest Town, city, District 11. Headquarters along with distance Project Site is in Delhi. in kms. Village Panchayats, Zilla Parishad, 12. Municipal Corporation of Delhi Municipal Corporation, Local body “Hotel Complex & Convention Centre” M/s Aerocity Hotel & Global Centre (Delhi) Pvt. Ltd. (complete postal addresses with telephone nos. to be given) M/s Aerocity hotel and global Centre (Delhi) Pvt. 13. Name of the applicant Ltd. Asset No 13, Hospitality District, DIAL IGI Airport, 14. Registered Address Delhi Asset No 13, Hospitality District, DIAL IGI Airport, 15. Address for correspondence: Delhi Name Dimple Mahna Designation (Owner/Partner/CEO) AVP ( Regulatory ) A-75;Top Floor; Sector -8 A ; Dwarka ;New Delhi- Address 110075 Pin Code 110075 E-mail [email protected] Telephone No. 09873779639 Fax no. Details of Alternative Sites examined, if any. Location of these No alternative site has been examined. It is 16. sites should be shown on a amendment in Environmental clearance of project. toposheet. 17. Interlinked Projects No it is not an interlinked project Whether separate application of 18. interlinked project has been Not Applicable submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. 21. (a) The Forest (Conservation) Act, Not Applicable 1980? (b) The Wildlife (Protection) Act, Not Applicable 1972? “Hotel Complex & Convention Centre” M/s Aerocity Hotel & Global Centre (Delhi) Pvt. Ltd. (c) The C.R.Z. Notification, 1991? Not Applicable Whether there is any Government 22. Order/ Policy relevant/ relating to Not Applicable the site? 23. Forest land involved (hectares) No Whether there is any litigation pending against the project and/ or land in which the project is propose to be set up? No (a) Name of the Court Not applicable 24. (b) Case No. Not applicable (c) Orders/ directions of the Not applicable Court, if any and its relevance with the proposed project. II. Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary No The Project has already been granted change in land use, land cover environmental clearance vide F.No. or topography including 92/DPCC/SEIAA-SEAC/10/1444-1448 increase in intensity of land use dated 11-11-2010. (with respect to local land use The Excavation has been started for zone plan) one out of three zones on the vacant land and proposed proposal is for amendment in Environmental clearance. Hence no Change on land use has been done. Earlier the vacant land use was changed to Hotel building. 1.2 Clearance of existing land, No The project is for amendment in vegetation and buildings? environmental clearance for which construction has already started so no need “Hotel Complex & Convention Centre” M/s Aerocity Hotel & Global Centre (Delhi) Pvt. Ltd. of clearance of existing land vegetation and buildings 1.3 Creation of new land uses? No No creation of new land uses. It is amendment in Environmental Clearance of the same project. 1.4 Pre-construction investigations Yes Pre-construction Geo-technical investigation e.g. bore houses, soil testing? has been carried out. 1.5 Construction works? Yes As per Building Sanction Plan. 1.6 Demolition works? No No demolition is required. 1.7 Temporary sites used for No Workers during construction phase were construction works or housing of hired from nearby areas and same shall be construction workers? done during construction after getting amendment in Environmental Clearance and hence there no housing provisions made. Only temporary shelters will be provided. 1.8 Above ground buildings, Yes Above ground, the building shall be elevated structures or earthworks up to maximum height of 15 m and including linear structures, cut excavation is being required for construction and fill or excavations of foundation and basement of 6 level whose quantity of soil excavated will be approx. 567000 cubic metre. 1.9 Underground works including No Not Applicable. mining or tunnelling? 1.10 Reclamation works? No No reclamation work required. 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No It is a construction project therefore no processes? production or manufacturing processes shall be carried out. 1.14 Facilities for storage of goods or Yes During Construction Phase: materials? Separate raw material yard will be made within the project site. Cement is being separately stored under cover in bales. Sand is being stacked nearby under tarpaulin cover. “Hotel Complex & Convention Centre” M/s Aerocity Hotel & Global Centre (Delhi) Pvt. Ltd. Bricks and steel were laid in open, same shall be done during proposed construction. During Operation Phase: As the project is a Hotel complex and Convention Centre, the raw material storage will be done within the project site. 1.15 Facilities for treatment or Yes During Construction phase: disposal of solid waste or liquid For further construction, Total 150 labourers effluents? shall be working during the construction phase and hence the solid waste generation will be 23 kg/day which disposed off at municipal solid waste site. Excavated soil will be used for levelling and back filling. Top soil will be preserved and shall be reused for landscaping to the extent possible. Total 7 KLD of waste water shall be generated which will discharge to septic tank via soak pit. During Operation Phase: Approx. 3105 Kg/day of solid waste shall be generated from the complex. The total waste water generated from Hotel complex and convention centre shall be 258 KLD which will be treated in STP of 310 KLD. Details of Water Management & Solid Waste Management are given in Environmental Report. “Hotel Complex & Convention Centre” M/s Aerocity Hotel & Global Centre (Delhi) Pvt. Ltd. 1.16 Facilities for long term housing No During Construction phase: of operational workers? The workers during construction phase were hired from nearby areas and hence no provision of long term housing had been made. Only temporary shelters were provided. For further construction same shall be followed. During Operation Phase: As this is a Hotel complex and Convention Centre, staff will be needed in the hotel shops, offices and restaurant. Other staff like maintenance staff will be from the nearby areas. Separate housing may not be provided. 1.17 New road, rail or sea traffic No No new road, rail or sea traffic is proposed. during construction or Existing transportation facilities will be used operation? during construction or operation phase. 1.18 New road, rail, air, waterborne No No new road, rail, or sea traffic is proposed. or other transport infrastructure The transportation measures already including new or altered routes existing near site are as follows: and stations, ports, airports Nearest Airport: etc.? Indira Gandhi International Airport 0.32 Km SW Safdarjung Airport 9.22 Km NE Nearest Railway Station: New Delhi Railway Station 14.08 Km NE Palam Railway Station 4.83 Km NW IGI Airport Metro Station 3.46 Km NW Palam Railway Station 4.83 Km NW Shahbad Mohammadpur Rly. Station 4.99 Km NW Nearest National Highway: NH-8 0.44 Km SE NH-2 13.25 Km NE NH-24 14.40 Km NE NH-236 6.92 Km SE NH-10 13.92 Km N “Hotel Complex & Convention Centre” M/s Aerocity Hotel & Global Centre (Delhi) Pvt. Ltd. 1.19 Closure or diversion of existing No No closure or diversion of existing transport transport routes or infrastructure routes or infrastructure leading to changes in leading to changes in traffic traffic movements will be made.