FORM-1, 1A & CONCEPTUAL PLAN FOR ADDITION AND ALTERATION IN EXISTING COLONY 'SARGODHA VIHAR CO-OP GR HSG SOCIETY’ AT PLOT NO. 13, SECTOR-7, DWARKA,

SUBMITTED BY SARGODHA VIHAR CGHS LIMITED Plot No-13,Sector-7,Dwarka,-110075

ENVIRONMENTAL CONSULTANT

IND TECH HOUSE CONSULT (An ISO 9001:2008 Certified Organization) G-8/6, Ground Floor, Sector 11, Rohini, Delhi – 110 085 Tel: +91 11 2757 1410, 6460 7252, Fax: +91 11 2757 2241 (NABET/EIA/1821/RA 0098 VALID TILL 31.01.2021)

FORM-1, 1A & CONCEPTUAL PLAN FOR ADDITION AND ALTERATION IN EXISTING COLONY 'SARGODHA VIHAR CO-OP GR HSG SOCIETY’ AT PLOT NO. 13, SECTOR-7, DWARKA, DELHI Project Proponent: Sargodha Vihar CGHS Limited Plot No-13,Sector-7,Dwarka,New Delhi-110075

For and on behalf of: Ind Tech House Consult

Approved by: Mr. Soumya Dwivedi

Signed:

Position: EIA Coordinator

Date: August, 2019

This report has been prepared by Ind Tech House Consult with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our general terms and conditions of business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. The document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of Ind Tech House Consult being obtained. Ind Tech House Consult accepts no responsibility or liability for the consequences of this document being used for a purpose other than the purpose for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify Ind Tech House Consult for all loss or damage resulting there from. Ind Tech House Consult accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned.

DECLARATION BY EXPERTS

Declaration by Experts Contributing to the Addition and Alteration In Existing Colony 'Sargodha Vihar CO-OP Gr Hsg Society’ at Plot No. 13, Sector-7, Dwarka, Delhi

I, hereby, certify that I was a part of the EIA team in the following capacity that developed the above Report.

EIA coordinator: Mr. Soumya Dwivedi

Signature and Date:

Period of Involvement: July 2019 to till date

Contact Information: 011-27571410

Functional Area Experts:

S. Functional Involvement Name of the expert/s Signature and date NO. areas (period and tasks) July 2019 to till date Study about Air pollution source, 1 AP Mr. Suman Banerjee (FAE) impacts, mitigation measures and management July 2019 to till date Study about Water Pollution source, usage, impacts, 2 WP Mr. Suman Banerjee (FAE) mitigation measures, anagement, Water quality, water conservation July 2019 to till date Study about classification of solid 3 SHW Mr. Soumya Dwivedi (FAE) waste, treatment method, disposal technics etc. July 2019 to till date Dr. Debashish Bhttacharya Study about Socio-economic 4 SE (FAE) survey, demographic of study area etc. July 2018 to till date Study about ecologically 5 EB Dr. Bideh Shukla (FAE) sensitive area of study area,

existing flora/fauna, national park & wildlife sanctuaries etc. July 2019 to till date Study about soil charatorstic, 6 SC Dr. Bideh Shukla (FAE) conservation measures, impacts

on land and mitigation measures etc. July 2019 to till date Dr. Manoj Kr. Mishra (FAE) Study about ambient noise 7 NV Mr. Suman Banerjee (Team qiality, source, impacts, Member) mitigation measures, traffic survey etc.

S. Functional Involvement Name of the expert/s Signature and date NO. areas (period and tasks) July 2019 to till date Study about existing land use of 8 LU Mr. Manish Shukla (FAE) the study area as per Master

Plan, study of draiange pattern, topography of the area, etc.

Declaration:

I, Mr. Soumya Dwivedi, hereby confirm that the above mentioned experts prepared the report of Addition and Alteration In Existing Colony 'Sargodha Vihar CO-OP Gr Hsg Society’ at Plot No. 13, Sector-7, Dwarka, Delhi. I also confirm that the consultant organization shall be fully accountable for any mis-leading information mentioned in this statement.

Name: Mr. Soumya Dwivedi Designation: EIA Coordinator Name of the EIA consultant organization: M/s Ind Tech House Consult NABET Certificate No. & Issue Date: NABET/EIA/1821/RA 0098 valid till 31.01.2021

TABLE OF CONTENTS

S. No. Contents

I FORM 1 1-12

II FORM 1 A 13-27

III CONCEPTUAL PLAN 28-34

A DESCRIPTIVE

Project site location map Annexure-A1

500 m map on Google Earth Annexure-A2 10 km Topo map Annexure-A3

B DOCUMENTS

Electricity Bill Annexure-B1

Building Plan Approval Annexure-B2

Water Bill Receipt Annexure-B3

C CONSULTANT NABET ACCREDITATION LETTER

NABET Accreditation letter Annexure-C1

D DRAWINGS

Site Plan Annexure-D1

Parking Plan Annexure-D2 Landscape Plan Annexure-D3

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

Application for Prior Environmental Clearance (EC) FORM 1 (See Paragraph – 6 Notification dated14th September 2006) as amended to EIA Notification, 2006 issued vide S.O. 3067(E) on dt.01.12.2009.

Basic Information

S.No. Item Details 1. Name of the project/s Addition and Alteration In Existing Colony 'Sargodha Vihar CO-OP Gr Hsg Society‟ at Plot No. 13, Sector-7, Dwarka, Delhi 2. S. No. in the schedule 8(a) 3. Proposed capacity/area/length /tonnage to be Total Plot area : 19615.137 sqm handled/ command area/lease area/ number Proposed Built up area: 9,239.737 sqm of wells to be drilled Existing built-up area: 29002.26 sqm Total built-up area: Sqm Existing No. of DU‟s: Nos 4. New/Expansion/Modernization Modernization 5. Existing capacity/area etc. Existing Built-up area: 29002.26 constructed & occupied in year 2002. 6. Category of the project i e „A‟ or „B‟ B 7. Does it attract the general condition? If yes, No please specify. 8. Does it attract the specific condition? If yes, No please specify. 9. Location Plot No. 13, Sector-7, Dwarka, Delhi Plot/Survey/Khasra No. Plot No. 13, Sector-7

Village Tehsil Dwarka District South State Delhi 10. Nearest railway station/airport along with IGI Airport:1.30 Km/SE distance in kms. New Delhi Railway Station: 17.49 Km/NE Palam Railway Station: 2.02 Km/NE 11. Nearest town, city, district Headquarters along Delhi with distance in Km 12. Village Panchayats, ZillaParishad, Municipal DDA, MCD and DJB Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant Sargodha Vihar CGHS Limited 14. Registered Address Plot No-13,Sector-7,Dwarka,New Delhi-110075 15. Address for correspondence: Plot No-13,Sector-7,Dwarka,New Delhi-110075 Name Dwarika Nath Dash Designation (Owner/Partner/CEO) Secretary RWA Address Plot No-13,Sector-7,Dwarka,New Delhi-110075

ITHC/PRJ/19-20/EIA/223/Rev.01 1 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

Pin Code 110075 E-mail [email protected] Telephone No. 9873355598 Fax No. - 16. Details of Alternative Sites examined, if any. Not applicable. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects Nil 18. Whether separate application of interlinked Not Applicable project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason. Not Applicable 21. Whether the proposal involves approval/ No, Project proposal does not involves clearance under: if yes, details of the same approval/clearance under subhead a, b & c. and their status to be given. (a) The forest (Conservation) Act, 1980? (b) The wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government order/policy No relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending against No the project and/or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project.

(I) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data

1.1 Permanent or temporary change in No The landuse of the project site is Residential as per land use, land cover or topography Delhi Master plan. including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, Yes Clearance of existing land is not involved as the vegetation and buildings? proposal is only for increase in balcony area.

ITHC/PRJ/19-20/EIA/223/Rev.01 2 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data

1.3 Creation of new land uses? No. Creation of new landuse is not involved as the proposal is only for increase in balcony area. 1.4 Pre-construction investigations e.g. No No soil excavation/ bores involved as the proposed bore houses, soil testing? construction is only of additional balcony area of the existing housing. 1.5 Construction works? Yes The major construction works is only for construction for increase in balcony area.

1.6 Demolition works? No Not involved. Only balcony area will be added to the existing housing colony. 1.7 Temporary sites used for No Local labors will be employed. construction works or housing of construction workers? 1.8 Above ground buildings, structures Yes Existing structure is G/ST+ 07 and in this proposal only or earthworks including linear balcony area will be added to the existing structure. No structures, cut and fill or excavations additional tower/ block will construct.

1.9 Underground works including mining Yes Excavation for erection of columns to support balcony. or tunneling? 1.10 Reclamation works? No Not involved. 1.11 Dredging? No Not involved. 1.12 Offshore structures? No Not involved. 1.13 Production and manufacturing No This is a building construction project. Hence, no processes? production or manufacturing activities will be involved.

1.14 Facilities for storage of goods or Yes Temporary storage facilities will be created during materials? construction phase for storage of construction materials.

1.15 Facilities for treatment or disposal of Yes Solid Waste solid or liquid effluents? Construction Stage: During construction phase, municipal waste generated will be collected and transfer to society bin from where MCD will collecting on daily basis for further disposal.

Operation Phase Building is already in operation phase, there would not be any additional generation of solid waste, Waste water due to expansion of the project. 1.16 Facilities for long term housing of No No housing will be provided for operational worker. operational workers? 1.17 New road, rail or sea traffic during No Not applicable construction or operation?

ITHC/PRJ/19-20/EIA/223/Rev.01 3 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data

1.18 New road, rail, air waterborne or No No such construction. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not applicable or pipelines? 1.21 Impoundment, damming, culverting, No Not applicable. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable

1.23 Abstraction or transfers of water No Water source is Delhi Jal Board (DJB). form ground or surface waters? 1.24 Changes in water bodies or the land Yes 04 RWH exist at site to recharge the ground water. surface affecting drainage or run-off.

1.25 Transport of personnel or materials Yes During construction phase transport of personnel as for construction, operation or well as construction materials would be required. The decommissioning. personnel would preferably be engaged from nearby areas. Precaution will be taken to reduce the impact of vehicular movement by trying to avoid the vehicular trips during peak hours.

Operation phase: Provision for additional parking made. 1.26 Long-term dismantling or No Not applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Construction phase – temporarily or permanently? Temporary influx of people about 40 from the nearby areas is expected. Operation phase – Nill

1.29 Introduction of alien species? No Not applicable 1.30 Loss of native species or genetic No Not applicable diversity? 1.31 Any other actions? No None

ITHC/PRJ/19-20/EIA/223/Rev.01 4 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S.No. Information/checklist Yes/ No Details thereof (with approximate quantities /rates, confirmation wherever possible) with source of information data 2.1 Land especially undeveloped or Yes The land for the proposed project is duly approved by agricultural land (ha) DDA for Residential Use.

2.2 Water (expected source & Yes Main source of water supply is municipal water supply competing users) unit: by Delhi Jal Board. 2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, Construction materials such as Cement, Steel, Bricks, aggregates, sand / soil (expected Yes Stone aggregates, and Sand would be required for source – MT) construction of the project. These will be preferably procured from local reputed licensed vendors. 2.5 Forests and timber (source – MT) No Not Applicable 2.6 Energy including electricity and Yes There would not be additional demand of power due to this fuels (source, competing users) expansion. Unit: fuel (MT), energy (MW)

2.7 Any other natural resources (use No _ _ appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 3.1 Use of substances or materials, No Not applicable. which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No Not applicable. or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No Not Applicable. changing living conditions? 3.4 Vulnerable groups of people who No Not applicable. could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No. Information/Checklist Yes/ No Details thereof (with approximate quantities/rates, confirmation wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not Applicable .

ITHC/PRJ/19-20/EIA/223/Rev.01 5 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

S.No. Information/Checklist Yes/ No Details thereof (with approximate quantities/rates, confirmation wherever possible) with source of information data 4.2 Municipal wastes (domestic and or Yes Construction Phase: commercial wastes) During construction phase, municipal waste generated will be collected and transfer to society bin from where MCD will collecting on daily basis for further disposal.

Operation Phase: Building is already in operation phase, there would not be any additional generation of solid waste, Waste water due to expansion of the project. 4.3 Hazardous wastes (as per Yes Building is already in operation phase, there would not Hazardous Waste Management be any additional generation of Hazardous wastes due Rules) to expansion of the project.

4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge Not applicable from effluent treatment 4.7 Construction or demolition wastes Yes Construction waste shall be disposed-off in C & D Waste landfill site.

4.8 Redundant machinery or No Not applicable equipment 4.9 Contaminated soils or other No Not applicable materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No. Information/Checklist Yes/ No Details thereof (with approximate quantities/rates, confirmation wherever possible) with source of information data 5.1 Emissions from combustion of No Building is already in operation phase. fossil fuels from stationary or mobile sources

5.2 Emissions from production No Not applicable processes 5.3 Emissions from materials No Fugitive dust emission due to handling and handling including storage or loading - unloading activities is envisaged during transport construction. Green net will be provided.

ITHC/PRJ/19-20/EIA/223/Rev.01 6 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

S.No. Information/Checklist Yes/ No Details thereof (with approximate quantities/rates, confirmation wherever possible) with source of information data 5.4 Emissions from construction Yes During the construction phase, major emission will be in activities including plant and Marginal the form of fugitive dust, and transportation of equipment construction material. 5.5 Dust or odours from handling of Yes The project may cause rise in dust levels during materials including construction construction phase. Precautions would be taken to materials, sewage and waste reduce dust generation during construction phase:

Sewage generated from existing project is being discharged in municipal sewer. No change in sewage generation due to proposed expansion. 5.6 Emissions from incineration of No Not applicable waste 5.7 Emissions from burning of waste No Burning of any substances including biomass, slash in open air (e.g. slash materials, materials and/ or construction debris will be prohibited construction debris) 5.8 Emissions from any other No Nil sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes Noise is expected to be generated during construction engines, ventilation plant, phase mainly from operation of heavy machinery, DG crushers sets, and traffic. The indicated noise levels from certain construction plants/equipment are indicated below: . Concrete Mixer - 85 dBA . Trucks - 85 – 90 dBA

For control of noise following measures shall be adopted:

 Properly maintained equipment with mufflers will be used.

 Construction activities would be carried out only during day time.

There is no provision of DG set for proposed expansion. 6.2 From industrial or similar No Not applicable processes 6.3 From construction or demolition Yes Noise Pollution Control: Noise pollution will be due to operation of machinery as well as transportation vehicles. However following precautions shall be taken to control noise pollution:  High noise generating construction activities would be carried out only during day time.  Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. 6.4 From blasting or piling No Blasting & piling work is not involved in the project.

ITHC/PRJ/19-20/EIA/223/Rev.01 7 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 6.5 From construction or operational Yes Construction Phase: traffic Welding is light and heat generating activity during construction. Appropriate safety measures will be taken as per I.S. code and CPWD work manual. Materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours.

Operation Phase: Car parking is provided on surface and Stilt.

Vehicular movement is restricted to roads and parking areas. Provision of soft green peripheral and road side plantation will help in reduction of noise level. 6.6 From lighting or cooling systems No Nil 6.7 From any other sources No Nil

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 7.1 From handling, storage, use or No Building is already in operation phase, there would not be spillage of hazardous materials any additional generation of hazardous material.

7.2 From discharge of sewage or No Wastewater generated from existing project site is being other effluents to water or the discharge in municipal sewer. Proposed expansion will land (expected mode and place of not generate additional sewage/ effluents. discharge) 7.3 By deposition of pollutants No Dust generation during construction phase from emitted to air into the land or into earthworks and movement of vehicles is a temporary water phenomenon and will have short term impact during construction phase. Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts.

7.4 From any other sources No Nil 7.5 Is there a risk of long term build No No. up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

ITHC/PRJ/19-20/EIA/223/Rev.01 8 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 8.1 From explosions, spillages, fires No During construction phase, no such risk is anticipated. etc from storage, handling, use or However, the contractors shall comply with the safety production of hazardous procedures, norms and guidelines as per applicability and substances mentioned in the National Building Code of India and Bureau of Indian Standards.

During Operation Phase, all precautionary and safety measures will be taken to minimize any accident hazard. 8.2 From any other causes No Nil 8.3 Could the project be affected by Yes The proposed project site has no history of natural natural disasters causing disasters such as floods, landslides, cloudburst etc. environmental damage (e.g. Floods, earthquakes, landslides, The site lies in Seismic Zone IV. The construction will be cloudburst etc)? carried out as per the guidelines prescribed for Seismic Zone IV.

All the civil structures will be seismically resistant and designed in accordance with provisions recommended related IS codes: IS 4326: 1993 IS 1893 (Part I),2002

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 9.1 Lead to development of Not applicable supporting. facilities, ancillary development or development No stimulated by the project, which could have impact on the environment e.g.:  Supporting infrastructure No Not applicable (roads, power supply, waste or waste water treatment, etc.)  extractive industries No No  supply industries Yes Construction materials  other No No 9.2 Lead to after-use of the site, No No which could have an impact on the environment 9.3 Set a precedent for later No Not Applicable developments

ITHC/PRJ/19-20/EIA/223/Rev.01 9 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 9.4 Have cumulative effects due to No Not Applicable proximity to other existing or planned projects with similar effects

(II) Environmental Sensitivity (Note: Detailed environmental sensitivity is given in Conceptual Plan)

S.No. Areas Name/ Aerial distance (within 15 km) of proposed project Identity location boundary 1 Areas protected under Yes Central Ridge: 8.64 km/N international conventions, Aravali Biodiversity Park: 10.99 Km/SE national or local legislation for Rajokri Protected Forest: 8.59 km/SE their ecological, landscape, Sanjay Van: 11.87 km/SE cultural or other related value 2 Areas which are important or Yes Najafgarh Drain: 3.30 Km/SW sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, Yes Central Ridge: 8.64 km/N important or sensitive species Aravali Biodiversity Park: 10.99 Km/SE of flora or fauna for breeding, Rajokri Protected Forest: 8.59 km/SE nesting, foraging, resting, over Sanjay Van: 11.87 km/SE wintering, migration 4 Inland, coastal, marine or No Not located within 15 km of the proposed project underground waters location. 5 State, National boundaries Yes Delhi Haryana Border: 7.02 km/SW 6 Routes or facilities used by the Yes NH-8: 0.56 km/SE public for accessto recreation or other tourist, pilgrim areas 7 Defense installations Yes Safdarjang Airport: 12.93 km/NE : 8.49 km/NE CRPF camp Jharoda kalan: 12.58 km/NW 8 Densely populated or built-up Yes The area in the vicinity is densely populated. area 9 Areas occupied by sensitive Yes Number of manmade community facilities such as, man-made land uses (hospitals, schools, places of worship is available in nearby areas, schools, places of worship, but not close to the site. These installations will not have community facilities) any impact due to construction of proposed project.

10 Areas containing important, high Yes The project site does not fall in the notified areas for quality or scarce control and regulation of ground water. resources(ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

ITHC/PRJ/19-20/EIA/223/Rev.01 10 IND TECH HOUSE CONSULT ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1 SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

S.No. Areas Name/ Aerial distance (within 15 km) of proposed project Identity location boundary 11 Areas already subjected to No Project is located in Delhi itself. Baseline Environmental pollution or environmental monitoring has been conducted. damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural Yes The project is located at seismic zone IV according to hazard which could cause the Indian Standard Seismic Zoning Map. Structural design project to present environmental will be done for this seismic zone as per code. problems (earthquakes, There are no possibilities of the proposed project site subsidence, landslides, erosion, getting flooded as per available records. flooding or extreme or adverse Landslides are not applicable as the project site & climatic conditions) surrounding land is flat.

ITHC/PRJ/19-20/EIA/223/Rev.01 11 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

FORM-1 A

1. LAND ENVIRONMENT

1.1. Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use, if any and the statutory approval from the competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans.

The existing landuse of the project site is Residential as per Delhi Master Plan 2021. The Group Housing building already exists at site. The project involved only for increase in balcony area.

The following maps are attached as Annexure.

(i) Site location map (ii) 500 M Radius Map for site surrounding (iii) 10 km topo map

1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc.

The brief description of the proposed project is given below in Table-1:

Table-1: Brief description of the Project BRIEF SUMMARY OF EXISTING COLONY Sl. Existing Description Unit No. Quantity 1 Plot Area 19615.137 SQMT 2 Built Up Area 29002.26 SQMT 3 Total no of Existing Dwelling Units 297 No. 4 Max Height of Building (Upto Terrace) 24.32 M 5 Max No of Floors G/St+7 No. 6 Population 1485 No. 7 Existing Ground Coverage Area 5434.14 SQMT 8 Existing FAR Area 27092.05 SQMT 9 Average Water Consumption / Day as/ DJB Bill 93 KLD 10 Total Storage Volume of RWH Trenches 138.50 cum 11 Existing no. of RWH trenches 4 No. 12 Existing Parking 365.84 ECS 13 Sanctioned Power by BSES 1586 kVA 14 DG set backup 505 KVA 2 15 No. of DG Sets installed No. (1X380+1X125)

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 13

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology).

The project is already in operation phase.

1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc. may be given).

The site is already a developed land by having Group Housing Society. Site leveling, flooring has already been done.

Structural design of building has already vetted by the Govt agency nominated by local body & structural stability certificate will be submitted to local body as per rules. Soil investigation has been done.

1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site)

No, proposal will not involve alteration of natural drainage system. Due to this construction project there will be increase in hard area & storm water runoff rates. But with the implementation of proposed RWH scheme, the runoff rate will be less than the preconstruction runoff rate.

1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.)

During construction phase, excavation is envisaged for construction of foundation. The excavated top soil will be preserved separately for reusing it for horticulture development. The remaining soil will be properly stored under cover & will be used for site leveling, back filling and road construction. There will be no requirement to bring materials for filling from outside.

1.7 Give details regarding water supply, waste handling etc. during the construction period.

Water Supply: During construction stage, Tanker water supply will be taken for construction works.

Waste Generation and Handling: Excavated soil will be stored and covered at site and it will be reused for site leveling. The fertile top soil will be reused for landscaping purpose. Construction waste generated at site will be disposed off as per C&D rules.

1.8 Will the low lying areas and wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity)

No, there is no low lying area observed.

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 14

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

1.9 Whether construction debris and waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labor and the means of disposal)

Construction waste generated will be disposed of as per C&D Rules.

The waste generated will be collected and disposed of through an authorized agency. Approx. 40 labors per day will be employed during the construction period. Required sanitary facilities will be provided to Construction laborers in Common toilets and municipal waste generated will be collected and transfer to society bin from where MCD will collecting on daily basis for further disposal.

2. WATER ENVIRONMENT

2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement.

As on date approx. 93 KLD water demand is sourced from DJB for the project.

2.2 What is the capacity (dependable flow or yield) of the proposed source of water?

The source of fresh water supply is being met from DJB.

2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality)

During operation phase, fresh water is being sourced from water supply department of DJB. The quality of water would confirm to the desirable drinking water standards as per IS: 10500. 2012.

2.4 How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage)

Building is already in operation phase.

2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption)

Fresh water confirming to the drinking water standard will be supplied by DJB. Therefore, no diversion of water from other user is expected and no impact on the existing users is anticipated.

2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity)

Building is already in operation phase and proposed construction is only of additional balcony area of the existing housing.

2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created.

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 15

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

Four numbers of Rain Water Harvesting pits are constructed to the project to recharge the ground water.

2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way?

Landuse of the project will not be changed as the project is already exists on land,

2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any)

There will be no tapping of ground water.

2.10 What precautions/measures are taken to prevent the run-off from construction activities polluting land and aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts)

During the construction stage construction water will be channelized to sedimentation basin with silt trap. The water will be reused after testing for construction. Requirement of water for construction purposes will be 02 KLD. This will be filtered and reused for sprinkling.

2.11 How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels)

Storm water drainage network is already constructed to collect run offs channelized to rain water harvesting system.

2.12 Will the deployment of construction laborers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation)

Approx 40 Labour camp will be sourced form near by area with provision of common toilets of society. Proper maintenance of the area and facility would be done regularly to maintain hygienic condition.

2.13 What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology and facilities for recycling and disposal)

During operation phase, waste water is being discharged to municipal sewer.

2.14 Give details of dual plumbing system if treated waste water is used for flushing of toilets or any other use.

Building is already in operation phase.

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 16

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

3. VEGETATION

3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any)

Construction will be done in confined and covered area, which may not affect the existing environment.

3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project)

There is no requirement for extensive clearing or modification of vegetation.

3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale)

Project have dedicatedly 3,197.912 sqm green area. Landscape development has already been done for shade and reduction of Air and Noise pollution.

4. FAUNA

4.1 Is there likely to be any displacement of fauna-both terrestrial and aquatic or creation of barriers for their movement? Provide the details.

Not applicable for this project.

4.2 Any direct or indirect impacts on the avifauna of the area? Provide details.

No direct or indirect impact on the fauna of the area is envisaged.

4.3 Prescribe measures such as corridors, fish ladders etc. to mitigate adverse impacts on fauna.

Not applicable for this project.

5. AIR ENVIRONMENT

5.1 Will the project increase atmospheric concentration of gases and result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions)

Proposed development will increase hard areas (Terrace, Roads, Paths and parking area). The traffic volume due to proposed project will increase marginally. Heat island effect will be negligible due to shading of hard surfaces by proposed plantation along periphery of the plot, roads and paths.

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 17

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters.

During construction phase, Dust, Particulate Matter is the main pollutant, which may be generated during construction activities. Other emissions sources are intermittent and include emissions of SO2, NOx and CO from materials transport of heavy vehicles on site etc.

Sources of Air pollution during operational phase  The gaseous emission from vehicles.  Emissions from DG set while in operation only during power failure.

Mitigation measures:  The traffic congestion will be avoided by proper parking arrangement and maintaining smooth traffic flow.  Regular PUC check up for vehicles.  Regular maintenance of DG sets shall be done & low sulphur diesel shall be used.

5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site.

No, well organized parking arrangement has been designed for the project. Proposed parking is more than required parking as building byelaws. Separate Entry & exit is planned to avoid cognation congestion at these point.

5.4 Provide details of the movement patterns with internal roads, bicycle tracks, Pedestrian pathways, footpaths etc with area under each category.

The site is approached through NH-8. There is a provision of road network for internal traffic movement on the project site. The detail of the road system had been clearly demarcated in the layout plan.

5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above.

The source of noise is mainly vehicular noise. Well organized parking arrangement is designed to maintain smooth traffic flow which would help in reducing traffic congestion and noise levels.

5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details.

D.G. Sets will be operated only in case of power failures during construction and operational phase. The Pollutants like SPM, SO2 that may arise from emissions from D.G. sets will be discharged through vent of proper height. D.G. sets will be installed with in built acoustic enclosure to reduce the noise of D.G. sets while in construction or operation. Plantation of trees would act as noise barrier and will reduce noise level.

DG sets with a capacity of 505 kVA have been proposed during operation phase as power backup during power failure.

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 18

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

6. AESTHETICS

6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents?

No, the use of proposed site is in conformity with the planned land use. There is no scenic amenity or landscape in its surrounding.

6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account?

Design development of the project was done on the basis of development control norms and as per approved master plan of the local body the construction of the proposed project will not have any adverse impact on the structures to be developed in future.

6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out.

There are no mandatory guidelines issued by local body for development of urban form; however architect and landscape have designed the project keeping in mind principles of urban design & urban form and setting in overall contexts.

6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered.

Site is surrounded by many archeological sites. List if given below: All kind of necessary and adequate pollution control measures will be adopted during construction.

Table: LIST OF ARCHEOLOGICAL SITES Sl Name Location District Distance Direction Ramp and gateways of 13.60 km South East 1 Adchini South Rai Pithora's Fort, Adchini

2 Begumpuri Masjid Begumpur South 13.79 km South East

3 Lal Gumbad, Chirag Delhi Chirag Delhi South 14.47 km South East

Hauz Khas:- Group of 12.17 km South East Building at consisting of the following

i. The tomb of Ferozshah 4 Hauz Khas South ii. Domed Building to the west of No.1 iii. Dalan between 1&2 iv. Domed Building & its court to the south of No. 3, v. Dalans

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 19

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

and all ruined Buildings to the north of no. 1 and existing upto No.10 vi. Five Chhatris to the East of No. 1& No.5 vii. Old Gate to the north of No.6 viii. Three Chhatris to the north-west of No.7

ix. Ruined courtyard and its Dalans with the Domed building to the north-west to the No.8

x. Old wall running east from No.4 xi. 2.23 Acres of land surrounding the above monuments and bouded on the North by house of Chhange and Mehra Chand sons of Hansram and house of Udairam, son of Kushla South Ghairmumkan Rasta East By village site belonging to village community. Others West By field no. 185 & 186.

Humayunpur 12.57 km South East Bagh-i-Alam Gumbad with 5 Village (Hauz South a Mosque Khas)

6 Kali Gumti Hauz Khas South 12.50 km South East

Humayunpur 14.02 km South East Village (Hauz 7 Tohfewala Gumbad South Khas), Shahpur Jat

8 Bijay Mandal, Malviya Nagar South 13.78 km South East neighbouring domes,

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 20

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

buildings and dalan to north of Begumpur

Bandi or Poti ka Gumbad 13.12 km South East 9 Hauz Khas South III-280

10 Biran-Ka-Gumbad-282 Hauz Khas South 12.99 km South East

Biwi or Dadi-ka-Gumbad- 14.39 km North East 11 Hauz Khas South 281

12 No. 289 Vol III Hauz Khas South 13.47 km South East

13 Choti Gumti Hauz Khas South 12.93 km South East

Hauz Khas 13.43 km South East 14 Idgah of Kharehra South Enclave

Hauz Khas 13.44 km South East 15 Nili Mosque South Enclave

Hauz Khas 12.96 km South East 16 Sakri Gumti-284 Enclave near South Green Park

17 in Mehrauli Village South 12.72 km South East

Mosque known by the 12.60 km South East name of Shamsi Tallab 18 Mehrauli Village South together with both platform entrance gates.

The Qutab Archaeological 12.70 km South East area as now fenced in, including the Mosque, Iron Pillar, Minar of Qutbud-din, unfinished

19 Minar, all colonnades, Mehrauli Village South screen arches, tomb of Altamash, college, buildings of Alaud-Din, Tomb of Imam Zamin and all carved stones in the above area with gardens,

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 21

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

paths and water channels, and all gateways including the Alai-Darwaza , also all graves in the above area

Tomb of Adham Khan 12.46 km South East 20 Mehrauli South (Rest House)

Tomb and Mosque of 13.11 km South East 21 Mehrauli South Maulana Jamali Kamali

Behind South 14.37 km South East 22 Moth-ki-Masjid South Extension-II

Tombs of Bade-Khan, and Kotla Mubrakpur 14.40 km South East 23 South Mubarakpur Kotla, Kotla Village

Tombs of Chote Khan, Kotla Mubrakpur 14.42 km South East 24 South Mubarakpur, Kotla Village

Tin Burji Wala Gumbad, Mohammad Pur 14.02 km South East 25 South Mommad Pur Village Village

26 Munda Gumbad, Munirka Munirka South 11.89 km South Eaast

Gateways of Rai Pithoria's Lado Sarai 12.79 km South East 27 south Fort Village

Malikpur Kothi 8.21 km South East 28 Tomb of opposite Vasant South Kunj

Mehrauli (Qutb 12.63 km South East 29 Iron Pillar, Hindu remains South Complex)

7. SOCIO-ECONOMIC ASPECTS

7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details.

The project already exists at site.

7.2 Give details of the existing social infrastructure around the proposed project.

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 22

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

The project site is located at Plot No. 13, Sector-7, Dwarka, Delhi.Site is easily accessible through public transport such as buses, Auto, Taxis etc, Apart from this number of Hospitals/Clinics, and facilities like post office, schools, shopping are also located at convenient distance from the site.

7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed?

No, the proposed project will not cause any adverse effects on local communities, disturbance to sacred sites or other cultural values.

8. BUILDING MATERIALS

8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency)

ISI marked building materials of reputed brands to be procured from 400 km range as far as possible. Preference will be given to locally available building materials which conserve low energy in entire processes of manufacture. Use of alternative technologies for each component of the buildings of envelope, superstructure, finishes and the road and surrounding areas will be as per guidelines provided in NBC 2016.

8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts?

Detail construction management plan shall be prepared by the construction management Team showing location of storage of different building materials in the go down Covered places and in open yards.

8.3 Are recycled materials used in roads and structures? State the extent of savings achieved?

Locally available recycled materials would be given preference.

However, bricks made from the fly-ash will be used for construction of pavements, side walls, boundaries for parks etc. Readymade concrete (RMC) will be used in construction. This will result in significant saving.

8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project.

Building is already in operation phase, there would not be any additional generation of solid waste, Waste water due to expansion of the project.

9. ENERGY CONSERVATION

9.1 Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption?

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 23

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

 Power Supply.: Power load of 1586 Kva will be required for proposed development. The power shall be supplied by BSES, Rajhdhani.

DG sets of Capacity: 2 No. DG set of 505 KVA is proposed to meet requirement of power back up during power failure.

9.2. What type of, and capacity of, power back-up do you plan to provide?

I) Type: Diesel Generator Set II) Capacity: 505 KVA

9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation?

Not applicable

9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. Passive solar technique:-

Not applicable.

9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details.

Yes, the layout of building has been designed to maximize the potential for solar energy devices.

9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected?

Not applicable

9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications.

Not applicable as the proposal is only for increase in balcony area.

9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects?

Not applicable as the proposal is only for increase in balcony area

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 24

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components.

Not applicable as the proposal is only for increase in balcony area

9.10 What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans.

Not applicable as the proposal is only for increase in balcony area.

9.11 If you are using glass as wall material provides details and specifications including emissive and thermal characteristics.

Not applicable as the proposal is only for increase in balcony area

9.12 What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration.

Not applicable as the proposal is only for increase in balcony area

9.13 To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used.

Not applicable as the proposal is only for increase in balcony area

10. Environment Management Plan

The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance ofvarious environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.

Table4: Environment Management Plan

Parameters for SN Potential Impact Action Timing Monitoring I. Construction Phase All equipments will be Random checks of operated within Construction activities equipment logs/ specified design manuals 1. Air Emission parameters. Vehicle trips to be Vehicle logs Site clearance and minimized to the extent construction activities possible

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 25

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

Any dry, dusty materials stored in Absence of stockpiles Construction activities sealed containers or or open containers of

prevented from dusty materials. blowing. Compaction of soil Construction logs Construction activities during various

construction activities Ambient air quality within the premises of PM10, PM2.5, SO2, As per DPCC requirement. the proposed unit to be NO2 and CO monitored. List of all onsite noise generating machinery Equipment logs, noise During construction with age to be reading phase. prepared. Equipment to

be maintained in good working order. Generation of vehicular Maintenance records of During construction phase. noise vehicles Implement good working practices (equipment selection and sitting) to minimize noise and also reduce Site working practices During construction its impacts on human records, noise reading Phase. health (ear muffs, safe distances, and enclosures). No machinery running when not required. 2. Noise Acoustic Mufflers/enclosures in mufflers/enclosures to Prior to use of equipment. place. be provided in large

engines Noise to be monitored in ambient air within the As per SPCB requirement plant premises. Noise reading or quarterly whichever is The Noise level will not lesser. exceed the permissible

limit both during day and night. All equipment operated Random checks of During construction within specified design Equipment logs/ phase. parameters. manuals Vehicle trips to be During construction Vehicle logs minimized to the extent Phase.

possible Take care in disposal of Discharge norms for

wastewater generated effluents as given by

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 26

ENVIRONMENTAL CLEARANCE FOR ADDITION AND FORM 1A SARGODHA VIHAR CGHS ALTERATION IN EXISTING COLONY 'SARGODHA LIMITED VIHAR CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

such that soil and PCB. groundwater resources are protected. II. Operational Phase

The project is in operation stage and involves only increase in balcony area with no increase in population neither any other environmental attributes. Hence, the ongoing environmental measures will continue to be implemented at site.

Table 5: Environment Monitoring Plan(Construction Phase)

S. Particulars Parameters Frequency No. 1. Ambient Air Monitoring PM10, PM2.5, SO2, NOx, CO Half Yearly

2. Water Quality Monitoring Drinking Water Standard Half yearly

3. Noise Level Monitoring 24 Hrs. Noise Level Once in a month

ITHC/PRJ/19-20/EIA/223/Rev.01 IND TECH HOUSE CONSULT 27

ENVIRONMENTAL CLEARANCE FOR ADDITION AND CONCEPTUAL PLAN SARGODHA VIHAR ALTERATION IN EXISTING COLONY 'SARGODHA VIHAR CGHS LIMITED CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

1. BACKGROUND INFORMATION

The proposed project is “Addition and alteration in Existing Colony 'Sargodha Vihar CO-OP Gr HSG Society is at Plot No. 13, sector-7, Dwarka, Delhi. The existing group housing project was become operation in june 2002. Detail existing project are furnished below in Table 1. The proposed addition & alteration in the existing project involve addition/ extension of existing Balconies. The details of proposed expansion are given in Table2. Due to construction of proposed project there will not be change in water requirement, power requirement, solid waste generation, as there is no increase in no. of DU’s and Population.

Fig. 1. Delhi Master Plan 2021

PROJECT DETAILS

The salient features of the project are given in table: 1 below

Table 1. Salient features of Existing project

BRIEF SUMMARY OF EXISTING COLONY Sl. Existing Description Unit No. Quantity 1 Plot Area 19615.137 SQMT 2 Built Up Area 29002.26 SQMT

ITHC/PRJ/19-20/EIA/223/Rev.01 28 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION AND CONCEPTUAL PLAN SARGODHA VIHAR ALTERATION IN EXISTING COLONY 'SARGODHA VIHAR CGHS LIMITED CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

3 Total no of Existing Dwelling Units 297 No. 4 Max Height of Building (Upto Terrace) 24.32 M 5 Max No of Floors G/St+7 No. 6 Population 1485 No. 7 Existing Ground Coverage Area 5434.14 SQMT 8 Existing FAR Area 27092.05 SQMT 9 Average Water Consumption / Day as/ DJB Bill 93 KLD 10 Total Storage Volume of RWH Trenches 138.50 cum 11 Existing no. of RWH trenches 4 No. 12 Existing Parking 365.84 ECS 13 Sanctioned Power by BSES 1586 kVA 14 DG set backup 505 KVA 2 15 No. of DG Sets installed No. (1X380+1X125)

Table -2 Proposed Additional Expansion

PROJECT SUMMARY ( Proposed Addition) Addition & Extension of Balconies in Existing Dwelling Units Sl. Description Prop Addition Unit No. GENERAL 19615.137 1 Plot Area SQMT ( No Change) 2 Built Up Area 9239.737 SQMT 297 3 Total no of Existing Dwelling Units No. (No change) 24.32 4 Max Height of Building (Upto Terrace) M (No Change) G/St+7 5 Max No of Floors No. (No change) 1485 6 Population No. ( No Change) 7 Cost of Project ( Prop Addition) 7 CR AREAS 8 Proposed Addition in Ground Coverage Area 252.312 SQMT 9 Proposed Addition in FAR Area 2001.70 SQMT Proposed Total Built Up Area (FAR + Non FAR 10 9239.74 SQMT Areas) WATER 93 11 Average Water Consumption / Day as/ DJB Bill KLD (No change) RAIN WATER HARVESTING 4 12 No of RWH of Pits Proposed No. (No change) PARKING 13 Parking Required as / Building Bye Laws 40.03 ECS 14 Proposed Total Parking 40.03 ECS GREEN AREA

ITHC/PRJ/19-20/EIA/223/Rev.01 29 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION AND CONCEPTUAL PLAN SARGODHA VIHAR ALTERATION IN EXISTING COLONY 'SARGODHA VIHAR CGHS LIMITED CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

15 Total Green Area (Hard & Soft Green) 3197.91 SQMT ENERGY 1586 16 Existing Sactioned Power By BSES kVA (No change) 505 17 Existing DG set backup kVA ( No change) 2 18 Existing No. of DG Sets (1X380+1X125) No. (No change)

2.0 CONNECTIVITY

The Project site is well connected to the Major National highway NH-8 in the direction of 0.56 km south east. Almost all the surrounding and nearby areas are connected with network of roads. New Delhi Station and Palam railway station is around 17.49 km in North East and 2.02 km in North East direction and IGI Airport is approx. 2.95 km in SE direction. Google image showing location and connectivity of project site is as given below (Ref, fig.2, 3 & 4).

Fig 2: Project site Location on Google Image

ITHC/PRJ/19-20/EIA/223/Rev.01 30 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION AND CONCEPTUAL PLAN SARGODHA VIHAR ALTERATION IN EXISTING COLONY 'SARGODHA VIHAR CGHS LIMITED CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

Fig 3: 500 m map on Google Image

Fig 4: 10 km topomap

ITHC/PRJ/19-20/EIA/223/Rev.01 31 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION AND CONCEPTUAL PLAN SARGODHA VIHAR ALTERATION IN EXISTING COLONY 'SARGODHA VIHAR CGHS LIMITED CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

3.0 PROJECT SURROUNDINGS

The proposed project site 'Sargodha Vihar CO-OP Gr Hsg Society Plot No. 13, Sector-7, Dwarka, Delhi. The location coordinate of project site are 280 34’ 53.00”N and 770 04’ 20.71” E. The Project site is well connected to the Major National highway NH-8. Almost all the surrounding and nearby areas are connected with network of roads. New Delhi Station and Palam railway station is around 17.49 km in North East and 2.02 km in North East direction and IGI Airport is approx. 2.95 km in SE direction. The details of site surroundings are given below in Table- 5.

Table-5: Site and Surrounding of the project Site

S. No. Particulars Details 1. Nearest National Highway NH-8: 0.56 km/SE 2. Nearest Railway Station New Delhi Railway Station: 17.49 Km/NE Palam Railway Station: 2.02 Km/NE 3. Nearest Airport IGI Airport:2.95 Km/SE 4. Nearest Town/ City Delhi 5. River Body Najafgarh Drain: 3.30 Km/SW 6. Hills/ Valleys Plain 7. Site Topography Nil 8. State Boundary Delhi Haryana Border: 7.02 km/SW 9. Seismicity The study area falls under Seismic Zone-IV

Table6 : Archeological/ Historical Places

Sl Name Location District Distance Direction

Humayunpur 12.57 km South East Bagh-i-Alam Gumbad with 1 Village (Hauz South a Mosque Khas)

2 Kali Gumti Hauz Khas South 12.50 km South East

Humayunpur 14.02 km South East Village (Hauz 3 Tohfewala Gumbad South Khas), Shahpur Jat

4 Biran-Ka-Gumbad-282 Hauz Khas South 12.99 km South East

Hauz Khas 12.96 km South East 5 Sakri Gumti-284 Enclave near South Green Park

6 Jahaz Mahal in Mehrauli Mehrauli Village South 12.72 km South East

7 Mosque known by the Mehrauli Village South 12.60 km South East name of Shamsi Tallab

ITHC/PRJ/19-20/EIA/223/Rev.01 32 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION AND CONCEPTUAL PLAN SARGODHA VIHAR ALTERATION IN EXISTING COLONY 'SARGODHA VIHAR CGHS LIMITED CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

together with both platform entrance gates.

Tomb of Adham Khan 12.46 km South East 8 Mehrauli South (Rest House)

9 Munda Gumbad, Munirka Munirka South 11.89 km South Eaast

Malikpur Kothi 8.21 km South East 10 Tomb of Sultan Ghari opposite Vasant South Kunj

Mehrauli (Qutb 12.63 km South East 11 Iron Pillar, Hindu remains South Complex)

Lodi Era Baoli (Dwarka

Baoli)

4.0 OCCUPANCY DETAILS

Particulars Quantity Unit Existing Population 1485 Nos Proposed Population due to Expansion No Change Nos.

5.0 WATER DEMAND

Water Quantity Unit Existing water requirement 93 KLD Additional water requirement due to No Change Nos. proposed Expansion

6.0 WASTE GENERATION, COLLECTION, TRANSPORT AND DISPOSAL

. Due to expansion there will be no change in waste generation.

7.0 POWER REQUIREMENT DETAILS

The power supply is being supplied by BSES Rajdhani Power Ltd. the estimated electrical demand load & proposed power back to be used during power failure shall be as per details given in Table:11 below.

Table:11 Power & DG detail Total Unit Total Power Requirement 1586 KVA DG set backup 505 KVA No of DG Sets 2 No.

ITHC/PRJ/19-20/EIA/223/Rev.01 33 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION AND CONCEPTUAL PLAN SARGODHA VIHAR ALTERATION IN EXISTING COLONY 'SARGODHA VIHAR CGHS LIMITED CO-OP GR HSG SOCIETY’ PLOT NO. 13, SECTOR-7, DWARKA, DELHI

7.1 BACKUP POWER DETAILS

There is provision of 2 no. of DG set of (380+125) kva shall be provided for power back-up. The DG sets will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion.

7.2 STORM WATER DRAINAGE & RAIN WATER HARVESTING SYSTEM

A network of covered/underground storm water drain is already present at site. Four rainwater harvesting tranches have been constructed to collect store and recharge rain water from roof tops.

8.0 LANDSCAPE & SHELTERBELT DEVELOPMENT

Total green area measures 3197.92 m2 of the total plot area. Approx. 50% of area would be used for peripherial tree plantation, road side plantation & remaining area would be used for plantation of shrubs, lawn, and ground cover.

9.0 PARKING FACILITIES

For smooth circulation & reduction of pollution separate entry & exits with gates of adequate sizes are planned for the vehicles & also for the movement of fire engine. Provision for car/vehicle parking is planned in the basements. Apart from peripheral roads for vehicular movement internal roads/pavements are planned for traffic free movement of pedestrians. Details of parking provision are given in table:8

Table-8: Parking Details

Parking Quantity Unit Existing Parking 365 ECS Proposed Parking 40 ECS

10.0 PROJECT COST The construction cost for expansion of the project is approximately Rs. 07 Crore.

ITHC/PRJ/19-20/EIA/223/Rev.01 34 IND TECH HOUSE CONSULT